No. 283/56/2018-Grid Solar Government of India Ministry of New & Renewable Energy Block NO. 14, CGO Complex, Lodi Road, New Delhi-110 003, Dated: 30 111 August, 2018 CORRIGENDUM Subject: Amendment in the Guidelines for implementation of a scheme for setting- up of over 5,000 MW Grid-Connected Solar PV Power Projects with Viabili ty Gap Funding (VGF) under Batch-IV of Phase II of the NSM - reg. This has ref erence to the Guidelines for Implementation of a scheme for sett ing up of over 5000 MW Grid-connected SPY power pro jects under Batch-IV of NSM Phase-II, issued vide this Ministry's O.M. ofNo. 32/3/2014-15/GSP dated 14-03-2016. The Guidelines is amended as follows: Para/ Claus eNo. Existing Provision Amended Provision 3.15 Commissioning Clause 3.15.2 (c): In case the commissioning of the pro ject is delayed over three (3) months, the tariff fixed for pro ject or the tariff discovered aft er e-Reverse Auction shall be reduced at the rate of 0.50 paise/kWh per day of delay for the delay in such remaining capacity which is not commissioned. The maximum time period allowed for commissioning of the full Pro ject Capacity with encashment of Performance Bank Guarantee and reduction in the fixed tariff shall be limited to 24 months from the date of signing of PP A. In case, the Commissioning of the Pro ject is delayed beyond 24 months from the date of signing of PP A, the PPA capacity shall stand reduced / amended to the Pro ject Capacity Commissioned and the PP A for the balance Capacity will stand terminated and shall be reduced from the selected Pro ject Capacity. The funds generated from the encashment of the Bank Guarantees shall be deposited in a separate fund under payment secur ity mechanism to be maintained by SECI under the guidance of MN RE. Commissioning Clause 3.15.2 (c): In case the commissioning of the pro ject is delayed over thr ee (3) months, the tariff fixed for pro ject or the tariff discovered aft er e-Reverse Auction shall be reduced at the rate of 0.50 paise/kWh per day of delay for the delay in such remaining capacity which is not commissioned. The maximum time period allowed for commissioning of the full Pro ject Capacity with encashment of Performance Bank Guarantee and reduction in the fixed tar iff shall be limited to 24 months from the date of signing of PPA. In case, the Commissioning of the Pro ject is delayed beyond 24 months from the date of signing of PP A, the PP A capacity shall stand reduced / amended to the Pro ject Capacity Commissioned and the PP A for the balance Capacity will stand terminated and shall be reduced from the selected Pro ject Capacity. The funds generated from the encashment of the Bank Guarantees shall be deposited in a separate fund under payment secur ity mechanism to be maintained by SECI under the guidance of MNRE. Provided that the solar pro jects where plants have been set up within the deadline of 24 months, but the formalities for completion could not be completed due to either delay in getting land use change/land ceiling/land lease pe rmissions from the State Government/ Authorities or delay in sett ing

Upload: others

Post on 10-Jul-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

No. 283/56/2018-Grid Solar Government of India

Ministry of New & Renewable Energy Block NO. 14, CGO Complex,

Lodi Road, New Delhi-110 003, Dated: 30111 August, 2018

CORRIGENDUM

Subject: Amendment in the Guidelines for implementation of a scheme for setting- up of over 5,000 MW Grid-Connected Solar PV Power Projects with Viability Gap Funding (VGF) under Batch-IV of Phase II of the NSM - reg.

This has reference to the Guidelines for Implementation of a scheme for setting up of over 5000 MW Grid-connected SPY power projects under Batch-IV of NSM Phase-II, issued vide this Ministry's O.M. ofNo. 32/3/2014-15/GSP dated 14-03-2016. The Guidelines is amended as follows:

Para/ Claus eNo.

Existing Provision Amended Provision

3.15 Commissioning Clause 3.15.2 (c): In case the commissioning of the project is delayed over three (3) months, the tariff fixed for project or the tariff discovered after e-Reverse Auction shall be reduced at the rate of 0.50 paise/kWh per day of delay for the delay in such remaining capacity which is not commissioned. The maximum time period allowed for commissioning of the full Project Capacity with encashment of Performance Bank Guarantee and reduction in the fixed tariff shall be limited to 24 months from the date of signing of PP A. In case, the Commissioning of the Project is delayed beyond 24 months from the date of signing of PP A, the PP A capacity shall stand reduced / amended to the Project Capacity Commissioned and the PP A for the balance Capacity will stand terminated and shall be reduced from the selected Project Capacity. The funds generated from the encashment of the Bank Guarantees shall be deposited in a separate fund under payment security mechanism to be maintained by SECI under the guidance of MNRE.

Commissioning Clause 3.15.2 (c): In case the commissioning of the project is delayed over three (3) months, the tariff fixed for project or the tariff discovered after e-Reverse Auction shall be reduced at the rate of 0.50 paise/kWh per day of delay for the delay in such remaining capacity which is not commissioned. The maximum time period allowed for commissioning of the full Project Capacity with encashment of Performance Bank Guarantee and reduction in the fixed tariff shall be limited to 24 months from the date of signing of PP A. In case, the Commissioning of the Project is delayed beyond 24 months from the date of signing of PP A, the PP A capacity shall stand reduced / amended to the Project Capacity Commissioned and the PP A for the balance Capacity will stand terminated and shall be reduced from the selected Project Capacity. The funds generated from the encashment of the Bank Guarantees shall be deposited in a separate fund under payment security mechanism to be maintained by SECI under the guidance of MNRE.

Provided that the solar projects where plants have been set up within the deadline of 24 months, but the formalities for completion could not be completed due to either delay in getting land use change/land ceiling/land lease permissions from the State Government/ Authorities or delay in setting

r---.-------------------~------------------ up of external evacuation system (either by the Solar Parks or State Authorities) which is not the responsibility of Developer, SFCI may grant extension beyond 24 months limit for a maximum period of six months in order to ensure such projects do not become unviable. However, such extension for solar plant shall be permitted on following conditions:

1. The solar power plant should have been set up in the 24 months period and should have been commissioned or should be ready for commissioning & supply of power.

11. Either the power is being fed into the grid or, if power is not being fed into the grid, due to absence of COD, SECI should have physically verified that the plant has been set up and is ready for commissioning & supply of power.

111. If only part of the plant has been set up, then extension will be given only for the part which has been set up.

Any extension beyond six months will be given by MNRE based on due recommendation of SECI. The PP As may be considered to be in force from the actual date of CoD. The extension shall not be allowed beyond 24 months for any reasons, other than mentioned above.

2. This issues with the approval of Hon'ble Minister (Power & New and Renewable Energy).

?><~g 'tlo /:) 7 (B.L. Ram)

Advisor (Solar Power) Copy to: 1) PS to Hon'ble Minister (Power & New and Renewable Energy) 2) PPS to Secretary, MNRE 3) PPS to Additional Secretary, MNRE 4) PS to AS & FA, MNRE 5) The Managing Director, Solar Energy Corporation of India (SECI) 6) The Director, NIC Cell, MNRE (With a request to up-load the corrigendum on the web-site of