LKAB PRESENTATION
Magnus Johansson Jänkänpää
2
A world without steel is unthinkable. Steel is made from Iron ore and is recyclable.
ResponsibilityPut safety first.
Keep your promises.Care about the environment
and the places where we operate.
InnovationWelcome new ideas.
Be open to differences.Find new solutions.
CommitmentTake the initiative.Do that little extra.
Increase our efficiency.
LKAB’s values
LKAB MOVIE
OPERATIONS
Employees: c.4,200 Owner: 100% Swedish state
Operations
KirunaUnder ground
mining and processing
KirunaUnder ground
mining and processing
MalmbergetUnder ground
mining and processing
MalmbergetUnder ground
mining and processing
LuleåHarbour and Head Office
LuleåHarbour and Head Office
SvappavaaraOpen pit mining and processing
SvappavaaraOpen pit mining and processing
NarvikHarbourNarvikHarbour
MalmbananRailway Narvik -
Luleå
MalmbananRailway Narvik -
Luleå
IRON ORE OPERATIONS
Harbours
Mines and processing plants
Sales and/or purchasing offices
LKAB Minerals and LKAB Wassara
LKAB WORLDWIDE
8
PRODUCTION
LKAB accounts for 90 % of the iron ore produced in the E.U.
Sweden has 60 % of Europe’s iron ore assets.
KÄLLA: USGS; RGM
Production EU27
90 %LKAB90 %LKAB10 %
Others10 %Others
GROWTH OF THE IRON ORE MARKET (SEABORNE) 2000 – 2021F
Source: CRU Iron Ore Market Outlook Dec 2011 & Jan 2013
2000 VS 2010 VS 2020
PRODUCTION AND SALES
Blast furnace pellets (BF) for manufacturing with coal Direct reduction pellets (DR) for manufacturing with natural gas
Pellets BF 63%
Pellets DR 21%
Fines 12%
Special 4%
Products
Europe 67%
MENA & Asien 32%
Others 1%
Market (Revenues)
THE IRON ORE MARKET AND LKAB
LKABCompetitors
GLOBAL EXPORTS OF IRON ORE (VOLUME)
Australia39%
Brazil 31%
Lat. Am. 2.7 %
India 4.5 %
Others 4.5%Sweden
1.8%Africa 1%
South Africa 4.6%
Canada 3%
CIS 6.7%
CIS: Commonwealth of Independent States (members of the former Soviet Republics)
Source UNCTAD Iron Ore Statistics 2012.
Magnetite oxidises during the manufacturing of pellets and thereby provides 60 procentof the energy required.
LKAB has the world’s most energy-efficient manufacturing process. • Less fossil fuels• Lower Co2 emissions
*Source: Swerea/MEFOS 2010 ”Benchmarking of carbon dioxide emissions from iron ore pelletizing” av Lawrence Hooey
LKAB green pellets
GROWTH 2010–2015
+35%
LK37
The quantity of iron LKAB takes up from its underground mines per day is equivalent to 6 Eiffel Towers
From 2015 the open pit mines in Svappavaara is planned to give iron equivalent to 2 Eiffel Towers .
KirunaKiruna
MalmbergetMalmberget
Svappavaara
E10 highway towards Kiruna
MertainenStart planned in 2015
Malmbananrailroad
GruvbergetIn operation May 2010 -June 2012. Plans to restart operations before 2015
LeveäniemiStart planned in 2015
Power network
THE SVAPPAVAARA FIELD- EUROPE’S BIGGEST IRON ORE PROJECT
New railway
KUJ 1365
New sluices Luossajärvi
Mining machinery
New dam Luossajärvi
150 new residential properties Luossavaara
Reconstruction of barracks 24 new apartments Jägarskolan
Upgrading of control system and process plants
4 new locomotives and 5 new carraige sets
Mining town park, stage 1
50 new apartments Jägarskolan
Infrastructure below ground
Storeage facilities for coal
New laboratory
Capaciity-raising measures KK4
Upgrading of locomotive terminal
More efficient train operations
Construction of dams
Railway connection of terminal tracks
New approaches and roads
ONGOING AND PLANNED INVESTMENTS IN KIRUNA
Underground workshops and areas for workers
M1250
Mining machineryDam raising
Infrastructure below ground
Agglomeration laboratory
New entrance and office
Upgrading of the infrastructure
Upgrading of purification plant
More secure electricity supplies
4 new locomotives and 5 new carraige sets
More efficient train operations
More efficient warehousing
Replacement accomodationfor student housing area
Acquisition and new construction Granbacka
ONGOING AND PLANNED INVESTMENTS IN MALMBERGET
New evacuation road
Improved ventilation
New flue-gas cleaning
New freight outbound
New freight inbound for additives
Gruvberget
Collages
Drainage Leveäniemi
Mertainen
ONGOING AND PLANNED INVESTMENTSIN SVAPPAVAARA
Dam measures
Reconstruction of terminal
4 new locomotives and 5 new carraige sets
More efficient train operations
Environmental and risk-reducing measures
New additives-handling facility
Land acquisition Upgrading Lundberg storage buildning
4 new locomotives and 5 new carraige sets
More efficient train operations
ONGOING AND PLANNED INVESTMENTS IN NARVIK
• The capacity of Malmbanan• Uncertainty about the time required for
granting of permits • Competence requirements• Attractive urban development• Housing• Energy• Costs
GROWTH CHALLENGES
Deformation zoneFracture
zoneCaving zone
EFFECTS FROM MINING IN KIRUNA
EXPANSIVE MALMFÄLTEN
LKAB has a workforce of about 4,200 and employs some 11,500 contractors and consultants in the region.
Open unemployment in Kiruna, in October 2012 was 328 people. (504 job vacancies).
LKAB has decided to build 500 homes in Kiruna and Gällivareby 2015.
1000 NEW EMPLOYEES BY 2015
Great need to recruitThe largest occupational groups needed are miners, mechanics/repair men and engineers. There are needs in just over 180 occupations.
FurthermoreSuppliers are much needed, not least within construction and in the major ongoing projects in the Swedish ore fields.
LKAB Trading Shanghai
Support & Purchasing Development
C Purch.
Material supply chain
Investments & Urban transformation
Strategic Purchasing
Operating Purchases
Energy, Raw Materials& Additives
LKAB Purchase Organisation
TRANSFORMATION
• Price negotiations• Monitoring deliveries • Administration• Waiting for assignments• Working independently• Involved late in the process
2727
Now
• Long-term solutions, focusing on the total cost• Developing ourselves and suppliers• Global market knowledge• Interaction between internal customers and
purchasers• Early involvement in processes• Sustainability is a natural part of the business
Before
INCREASE COOPERATION WITH THE SUPPLIER BASE
28
LKABSupplier
Increased cooperation
LKAB’s customers
• Lower total cost
• Higher productivity
• Improved quality
• Shorter lead times
• Increased value
• Higher customer satisfaction
• Increased competitiveness
” Business development is one of the most important activities to strengthen our competitiveness”
• Safety
• Sustainability
• Innovation
• Attractive LKAB
Purchasing
HOW DOES A COMPANY BECOME AN LKABSUPPLIER?
29
28/10/2014
30
Go to www.lkab.com
Click on “supplier”
28/10/2014
31
On this page you will find
information for LKAB suppliers. It also contains information for
prospective LKAB suppliers.
28/10/2014
32
Then click on “supplier portal”. Here
you can create an account,
which you will need to do
before you can become an
LKAB supplier.
28/10/2014
33
Log in here or create an account for LKAB’s
supplier portal.
28/10/2014
34
You have now created an account for your company on
LKAB’s supplier portal. In doing so, you have also declared your
acceptance of LKAB’s Basic Requirements for Suppliers.
28/10/2014
35
Only one acceptance per company is required. It is OK, however, for the Basic Requirements to be accepted by several different users at the same company.
You will need to accept the Basic Requirements for the whole of your company. You will also need to accept the Basic Requirements for any specific tenders that
you submit via the supplier portal.
If you would like your company to be an LKAB supplier, you must first accept the Basic Requirements for the whole of your company. In doing so, you confirm that your company complies with these Basic Requirements. LKAB’s Purchasing department
will then follow a process to potentially add you as an LKAB supplier.
All existing LKAB suppliers must accept the Basic Requirements for their company. All companies wishing to be an LKAB supplier must accept LKAB’s Basic
Requirements for their company.
INFORMATION 28/10/2014
36
Any questions?
For technical support concerning the portal:
Click on “contact us” at the bottom of the
supplier portal.
For questions about tenders and requirements
specifications:
Contact responsible purchaser.
28/10/2014
THANK YOU FOR YOUR ATTENTION!