nist priority action plan 9 demand response and distributed energy resource signal semantics meeting...
TRANSCRIPT
![Page 1: NIST Priority Action Plan 9 Demand Response and Distributed Energy Resource Signal Semantics Meeting 20090929-30 Presentation to Energy Interoperation](https://reader034.vdocuments.us/reader034/viewer/2022051621/56649eb75503460f94bc122f/html5/thumbnails/1.jpg)
NIST Priority Action Plan 9
Demand Response and Distributed Energy Resource Signal Semantics
Meeting 20090929-30
Presentation to Energy Interoperation TC 20091007
![Page 2: NIST Priority Action Plan 9 Demand Response and Distributed Energy Resource Signal Semantics Meeting 20090929-30 Presentation to Energy Interoperation](https://reader034.vdocuments.us/reader034/viewer/2022051621/56649eb75503460f94bc122f/html5/thumbnails/2.jpg)
Overview
• PAP09 Workshop August 3-4– Unanimous agreement on plan– Execution under way
• Update and review September 29-30 PAPs 3, 4, 9, 10– Broad discussion– Issues arising from work in progress
• Summary output– No present work is invalidated– Coordination goals and approach to IEC TC57 Common
Information Model– Deeper understanding
2EITC 20091007
![Page 3: NIST Priority Action Plan 9 Demand Response and Distributed Energy Resource Signal Semantics Meeting 20090929-30 Presentation to Energy Interoperation](https://reader034.vdocuments.us/reader034/viewer/2022051621/56649eb75503460f94bc122f/html5/thumbnails/3.jpg)
Slides from Meeting
• Following are slides from the meeting.• Full notes are at
– http://collaborate.nist.gov/twiki-sggrid/bin/view/SmartGrid/PAP34910MeetingPage
• Socialized approach among stakeholders• Broader context for work
– EnergyInterop, ZigBee work in parallel– Feedback to IEC CIM
• Requirements input from utility industry and ISOs through NAESB– Review of high level NAESB document in progress
3EITC 20091007
![Page 4: NIST Priority Action Plan 9 Demand Response and Distributed Energy Resource Signal Semantics Meeting 20090929-30 Presentation to Energy Interoperation](https://reader034.vdocuments.us/reader034/viewer/2022051621/56649eb75503460f94bc122f/html5/thumbnails/4.jpg)
Requirements Capture Process
OpenH
AN
SR
S
Ope
nAD
R
AS
HR
AE
S.E. M.R.D.
S.E. T.R.D
Use
Cas
es
S.E. 1.0
NAESB / UCAIug Requirements
From NIST Workshop 20090929-304EITC 20091007
![Page 5: NIST Priority Action Plan 9 Demand Response and Distributed Energy Resource Signal Semantics Meeting 20090929-30 Presentation to Energy Interoperation](https://reader034.vdocuments.us/reader034/viewer/2022051621/56649eb75503460f94bc122f/html5/thumbnails/5.jpg)
Multipath Approach61968 Based Root
(61850 Harmonized Externally)
Zigbee SE OASIS
61968 Based Solution
PAP 09 Process
“Fast Track”Supporting Initial
Utility Deployments
From NIST Workshop 20090929-305EITC 20091007
![Page 6: NIST Priority Action Plan 9 Demand Response and Distributed Energy Resource Signal Semantics Meeting 20090929-30 Presentation to Energy Interoperation](https://reader034.vdocuments.us/reader034/viewer/2022051621/56649eb75503460f94bc122f/html5/thumbnails/6.jpg)
PAP 9 Responsibility Breakdown
EITC 20091007 6From NIST Workshop 20090929-30
![Page 7: NIST Priority Action Plan 9 Demand Response and Distributed Energy Resource Signal Semantics Meeting 20090929-30 Presentation to Energy Interoperation](https://reader034.vdocuments.us/reader034/viewer/2022051621/56649eb75503460f94bc122f/html5/thumbnails/7.jpg)
EITC 20091007 7
Consensus• IEC 61968 CIM alignment
• Reuse where appropriate from published DR components with IEC 61968 CIM family for PAP9 work
• If someone is developing extensions, submit them to IEC (TC57) for approval (loopback)
• Incorporate where appropriate from OpenADR-OASIS• Common semantic model for inter-domain interfaces
• Scope boundaries fuzzy (need to solve)• How deep do the definitions (semantics vs. syntax) go? (need to
solve)• Utility commitment to IEC 61968 CIM family becomes a boundary
requirement• Tactical: Need a mechanism for a joint TF to allow parties from each
organization to participate in effort and share work products
From NIST Workshop 20090929-30
![Page 8: NIST Priority Action Plan 9 Demand Response and Distributed Energy Resource Signal Semantics Meeting 20090929-30 Presentation to Energy Interoperation](https://reader034.vdocuments.us/reader034/viewer/2022051621/56649eb75503460f94bc122f/html5/thumbnails/8.jpg)
EITC 20091007 8
PAP 9 Tasks Identified [AGREED]Task Responsible Date Notes
Define proper DER Interaction, Scope Lunch table discussion; later readout to Action Team List
Input before 2009-10
x2G DEWGs, IEC TC57. Storage Models IEEE1547.3, NAESBPAP07 Outcome, PAP11 Elec Trans
Collect, Analyze, and Consolidate Use Cases and deliver UML (inc DER)
UCAIug, NAESB 2009-10 Incorporating OpenADR (Starting point for OASIS EITC). No Magic.
For Residential ApplicationsMessage Semantics Work DR, DER, Calendar, Price
IEC/ZigBee Underway
For C+I ApplicationsMessage Semantics Work DR, DER, Calendar, Price
IEC/OASIS Underway Starting from OpenADR. Review by UNCIug, , 1377, NAESB, BAE, SEP, TC57, MultiSpeak, others
Coordinate and merge residential and C+I development tracks
NAESB Loop back to IEC process
Send residential and C+I task outputs to IEC TC57 OASIS/ZigBee
Downstream user requirements/engagement LonMark, BACnet, ZigBee SEP2
2009-10 BACnet, LonMark, HES, x2G, UPnP, OpenHAN, ZigBee, SEP, oBIX, AHAM, UCAIug, NEMA
Additional message requirements for Distribution MultiSpeak 2009-10
Resale and process for safety and interconnection and resale
NAESB 2009-10 UL
Vocabulary NAESB, UCAIug, BACnet, LonMark
TWIKI ASAP2009-09 to [UML]
Normalize OpenADR, NAESB, UCAIG, Place on TWIKIDeliver to OASIS EITC
From NIST Workshop 20090929-30
![Page 9: NIST Priority Action Plan 9 Demand Response and Distributed Energy Resource Signal Semantics Meeting 20090929-30 Presentation to Energy Interoperation](https://reader034.vdocuments.us/reader034/viewer/2022051621/56649eb75503460f94bc122f/html5/thumbnails/9.jpg)
EITC 20091007 9
PAP 4/3 Tasks Identified [AGREED]Task Responsible Date Notes
Develop high level scoping operations document
NAESB Bill Cox and others can contribute. DEWGs, No Magic, Ron Melton
--Develop high level use cases BAE (volunteer) 11/09 BAE, et al have already completed. Submit to NAESB and review operational definitions.
--Develop price requirements NAESB FIX, JPM, FISD, NARUC/NAESB, ISO/RTO CTO?, EEI, AHAM, ZigBee, OpenHAN, OASIS
--Data model OASIS, ZigBee Ongoing EMIX; FIX; IEC/CIM coord (Saxton)
--Draft pricing specification (to multiple locations)
OASIS, ZigBee 4/10 OASIS, ZigBee to submit to IEC (TC57, SG3 and others) after NAESB review. data model, XML expression?, No Magic. Review by FIX, CalConnect, FIATECH, NIBS, DEWGs, others
Import material from PAP4 where appropriate
IETF 12/09 draft
DEWGs, FIATECH, others
Meet and present deliverables at GRID-INTEROP
NAESB 11/09
From NIST Workshop 20090929-30
![Page 10: NIST Priority Action Plan 9 Demand Response and Distributed Energy Resource Signal Semantics Meeting 20090929-30 Presentation to Energy Interoperation](https://reader034.vdocuments.us/reader034/viewer/2022051621/56649eb75503460f94bc122f/html5/thumbnails/10.jpg)
Members of Energy InteroperationTC Attending
• These members of the EITC attended the NIST meeting:– Ed Cazalet– Toby Considine– William Cox– Girish Ghatikar– David Holmberg– Jeremy Roberts
• OASIS Staff– James Bryce Clark
10EITC 20091007
![Page 11: NIST Priority Action Plan 9 Demand Response and Distributed Energy Resource Signal Semantics Meeting 20090929-30 Presentation to Energy Interoperation](https://reader034.vdocuments.us/reader034/viewer/2022051621/56649eb75503460f94bc122f/html5/thumbnails/11.jpg)
Affect on Energy InteroperationTC Planning
• Requirements– Better and broader input (ISO, UCA, utilities)– Better focus– Not universal
• Need facility input (have from membership)• Need industrial, home, other input (limited)
– Need appropriate level• Review current draft (elsewhere in the agenda)
11EITC 20091007
![Page 12: NIST Priority Action Plan 9 Demand Response and Distributed Energy Resource Signal Semantics Meeting 20090929-30 Presentation to Energy Interoperation](https://reader034.vdocuments.us/reader034/viewer/2022051621/56649eb75503460f94bc122f/html5/thumbnails/12.jpg)
Action Plan Explanation• The phrases “residential” and “C&I” are shorthand for what
Toby and others call “Managed” and “Collaborative” energy
• “Managed Energy” refers to a direct load control-type approach, as exemplified in OpenHAN and ZigBee Smart Energy Profile– Though there are information aspects as well
• The EITC is doing Collaborative Energy• The responsibilities listed are EITC; target for work and
review is the IEC CIM team. • The EITC is doing more than just the work in PAP09
– That work is also in liaison process with IEC TC57 and other TCs
12EITC 20091007
![Page 13: NIST Priority Action Plan 9 Demand Response and Distributed Energy Resource Signal Semantics Meeting 20090929-30 Presentation to Energy Interoperation](https://reader034.vdocuments.us/reader034/viewer/2022051621/56649eb75503460f94bc122f/html5/thumbnails/13.jpg)
Other Action Items
• Vocabulary– Under way, need to work with NAESB and other
vocabulary efforts• “Downstream user requirements” are not
well-represented in NAESB Requirements Process– Action on EITC members to engage– Action for I2G DEWG and others to engage– Separate slides on NAESB draft input
13EITC 20091007