nh department of transportation * division of … · print date: 03/31/20 2020 page 3 of 11 fiscal...
TRANSCRIPT
![Page 1: NH DEPARTMENT OF TRANSPORTATION * DIVISION OF … · Print Date: 03/31/20 2020 Page 3 of 11 Fiscal Year 2020 NH Route 107 Replacement of a 5' x 7' metal arch culvert under NH 107,](https://reader034.vdocuments.us/reader034/viewer/2022042217/5ec1f49393e4a025a2723a48/html5/thumbnails/1.jpg)
_________________________________________________________________________
NH DEPARTMENT OF TRANSPORTATION * DIVISION OF PROJECT DEVELOPMENT
ADVERTISING SCHEDULE
FEDERAL FISCAL YEARS
2020-2021
April 2020
_________________________________________________________________________
![Page 2: NH DEPARTMENT OF TRANSPORTATION * DIVISION OF … · Print Date: 03/31/20 2020 Page 3 of 11 Fiscal Year 2020 NH Route 107 Replacement of a 5' x 7' metal arch culvert under NH 107,](https://reader034.vdocuments.us/reader034/viewer/2022042217/5ec1f49393e4a025a2723a48/html5/thumbnails/2.jpg)
Project Previous Ad Date Revised Ad Date Explanation
Shelburne 42426 March 24, 2020 March 31, 2020 More time for Project Development (Highway Design)
to realign Betterment Funding to Federal Funds.
Manchester 42635A April 21, 2020 April 7, 2020Advanced by Project Development (Highway Design)
to realign better for construction program.
Guardrail Repair West 42994 April 7, 2020
New project added by Operations (Highway
Maintenance) for guardrail repairs through Betterment
and Maintenance funding.
Guardrail Repair North 43005 April 7, 2020
New project added by Operations (Highway
Maintenance) for guardrail repairs through Betterment
and Maintenance funding.
Conway 25103 March 4, 2020 April 7, 2020More time for Project Development (Bridge Design) to
obtain environmental permits.
Hillsboro-Henniker-Hopkinton
42864March 31, 2020 April 28, 2020 More time for Project Development (Highway Design)
to realign Betterment Funding to Federal Funds
North Hampton Bridge Painting
42917May 26, 2020
New project added by Project Development (Bridge
Design) for Turnpike R&R bridge painting.
Manchester-Hooksett 41475 November 10, 2020 September 1, 2020Advanced by Project Development (Bridge Design)
into FY 2020 construction program.
Statewide 40842 May 5, 2020 September 1, 2020More time for Project Development (Highway Design)
for public outreach.
Allenstown-Pembroke 40362 June 2, 2020 November 17, 2020
More time for Project Development (Bridge Design) for
obtaining input from fed/state agencies and public
outreach.
Danbury 16303 June 30, 2020 January 26, 2021More time for Project Development (Bridge Design) to
complete alternative studies and public outreach.
Advertisement Schedule Changes for NHDOT Managed Projects
from March 2020 to February 2021
![Page 3: NH DEPARTMENT OF TRANSPORTATION * DIVISION OF … · Print Date: 03/31/20 2020 Page 3 of 11 Fiscal Year 2020 NH Route 107 Replacement of a 5' x 7' metal arch culvert under NH 107,](https://reader034.vdocuments.us/reader034/viewer/2022042217/5ec1f49393e4a025a2723a48/html5/thumbnails/3.jpg)
03/31/20Print Date: 2020 Page 1 of 11
Fiscal Year
2020
I-93 Exit 1 to Exit 5 - Construct 4th lane northbound and southbound[NON-PAR (other), Other Fed Aid, TIFIA]
US3 & NH26 Resurfacing of various Tier 2 roadways in the Northern region for Maintenance & Preservation
[Pave-T2-Resurf]
US 202 & NH101 & NH12 Resurfacing of various Tier 2 roadways in the Southwest region for Maintenance & Preservation.
[Pave-T2-Resurf]
NH 16 Reconstruct railway-highway crossing, roadway approaches & protective devices (Wakefield054-237Y)[RR-RCS *]
Various Replace cable guardrail in Districts 1 &3 (East).[HSIP *]
NH28 Bridge Preservation efforts for NH28 over NHRR in Ossipee (Br. No. 194/146).[BET-BMT-BD]
Various Replace cable guardrail and F terminal units on Tier 2 and 3 roads in Districts 4 & 5.[HSIP *]
Various Tier 2 South Resurfacing of various Tier 2 roadways in the Southwest region for Maintenance & Preservation
[NON-PAR (other), Pave-T2-Resurf]
Project DescriptionTarget Ad Date
Approx. Contract Amt.
Federal Dollars
SALEM TO MANCHESTER 14633J A004(438)
STATEWIDE TIER 2 (N) RESURFACING 42291 X-A004(806)
STATEWIDE TIER 2 (SW) RESURFACING 42289 X-A004(804)
WAKEFIELD 42240 X-A004(793)
STATEWIDE 41909 X-A004(776)
OSSIPEE 41916
STATEWIDE 41899 X-A004(769)
STATEWIDE TIER 2 (S) RESURFACING 42293 X-A004(808)
Project Name / Number
October Monthly Total
$6,839,200
$1,807,700
$2,831,800
$939,800
$1,040,900
$539,800
$839,200
$5,362,500
$4,103,500
$1,807,700
$2,831,800
$939,800
$1,040,900
$0
$839,200
$5,362,500
01-Oct-19
01-Oct-19
01-Oct-19
08-Oct-19
22-Oct-19
29-Oct-19
29-Oct-19
05-Nov-19
$14,838,400 $11,562,900
NH DEPARTMENT OF TRANSPORTATION * DIVISION OF PROJECT DEVELOPMENT
ADVERTISING SCHEDULE
low-bid
low-bid
low-bid
low-bid
low-bid
low-bid
low-bid
low-bid
October 2019
November 2019
Contact Person: Wendy Johnson
Contact Person: Ronald Grandmaison
Contact Person: Ronald Grandmaison
Contact Person: Melodie Esterberg
Contact Person: Kirk Mudgett
Contact Person: David Scott
Contact Person: Kirk Mudgett
Contact Person: Ronald Grandmaison
![Page 4: NH DEPARTMENT OF TRANSPORTATION * DIVISION OF … · Print Date: 03/31/20 2020 Page 3 of 11 Fiscal Year 2020 NH Route 107 Replacement of a 5' x 7' metal arch culvert under NH 107,](https://reader034.vdocuments.us/reader034/viewer/2022042217/5ec1f49393e4a025a2723a48/html5/thumbnails/4.jpg)
03/31/20Print Date: 2020 Page 2 of 11
Fiscal Year
2020
Various Tier 2 Southeast Resurfacing of various Tier 2 roadways in the Southeast region for Maintenance & Preservation.[NON-PAR (other), Pave-T2-Resurf]
US302,NH 10 Preservation efforts on 5-span bridge carrying US302,NH 10 over I-93 (Littleton 187/065). [Bridg-T1-2-Main-Pres]
US4/NH10/NH12A Resurfacing various Tier 2 roadways in District 2.
[NON-PAR (other), Pave-T2-Resurf]
US Route 4 and Tremont Street Bridge Pres for US4 over River Rd,NHRR(ABD)(139/040) & for Tremont St over Contoocook Riv (131/035)[BET-BMT-BD]
I-93, I-89, and I-393 Resurfacing I-93 MM 38.5 to 44.0; I-89 MM 8.2 to MM 13.6, and crack sealing along I393 & I93
[Pave-T1-Resurf, Pave-T2-Resurf]
US 3 & I-93 Preservation work on Plymouth 142/145, & Campton 105/058 and 104/059.[Bridg-T1-2-Main-Pres]
I-93 Repair of a 48" CMP culvert at MM 35.2 under I-93/I-89 CD road[TRR *]
NH Route 101 Pavement preservation from MM 115.2 to MM 124.6 including ramps from Exit 6 through Exit 9 [GRR *, Pave-T1-Resurf]
Project DescriptionTarget Ad Date
Approx. Contract Amt.
Federal Dollars
STATEWIDE TIER 2 (SE) RESURFACING 42292 X-A004(807)
LITTLETON 42376 X-A004(831)
STATEWIDE TIER 2 (W) RESURFACING 42272 X-A004(829)
BOSCAWEN 42440
CONCORD / HOPKINTON 41906 X-A004(775)
PLYMOUTH-CAMPTON 42364 X-A004(824)
BOW 42300
EPPING-EXETER 41790 X-A004(851)
Project Name / Number
First Quarter Total
November Monthly Total
December Monthly Total
$3,785,700
$1,267,700
$2,123,500
$1,647,600
$7,791,200
$1,729,100
$289,700
$6,981,500
$3,785,700
$1,267,700
$2,123,500
$0
$7,791,200
$1,729,100
$0
$6,981,500
12-Nov-19
19-Nov-19
19-Nov-19
26-Nov-19
26-Nov-19
26-Nov-19
07-Jan-20
07-Jan-20
$23,707,300
$0
$22,059,700
$0
$38,545,700 $33,622,600
low-bid
low-bid
low-bid
low-bid
low-bid
low-bid
low-bid
low-bid
November 2019
December 2019
January 2020
Contact Person: Ronald Grandmaison
Contact Person: Joseph Adams
Contact Person: Ronald Grandmaison
Contact Person: David Scott
Contact Person: Ronald Grandmaison
Contact Person: Joseph Adams
Contact Person: Kirk Mudgett
Contact Person: Ronald Grandmaison
![Page 5: NH DEPARTMENT OF TRANSPORTATION * DIVISION OF … · Print Date: 03/31/20 2020 Page 3 of 11 Fiscal Year 2020 NH Route 107 Replacement of a 5' x 7' metal arch culvert under NH 107,](https://reader034.vdocuments.us/reader034/viewer/2022042217/5ec1f49393e4a025a2723a48/html5/thumbnails/5.jpg)
03/31/20Print Date: 2020 Page 3 of 11
Fiscal Year
2020
NH Route 107 Replacement of a 5' x 7' metal arch culvert under NH 107, 1/2 mi north of US 4.[BET-DRG-HQ, NON-PAR (dot)]
I-89 NB & SB Superstructure Replace & Widening, I-89 NB & SB over Connecticut River (Br No 044/103 & 044/104)[Bridg-HIB-Rehab-Rcn, NON-PAR (Vermont), None-Bridge]
Statewide Statewide Striping (Turnpikes)[TRR *]
Various Replace cable guardrail and F terminal units on Tier 2 and 3 roads[HSIP *]
FEET FEET[TRR *]
Various Resurfacing various tier 2, 3, and 4 roadways in District 1.
[BET-RL-1, BET-RL-HQ, NON-PAR (Vermont), Pave-T2-Resurf, Pave-T3-4-Rehab, Pave-T3-4-Resurf]
Various Resurfacing various Tier 2, 3, and 4 roadways in District 1.
[BET-RL-1, BET-RL-HQ, NON-PAR (Vermont), Pave-T2-Resurf, Pave-T3-4-Resurf]
Various Resurfacing various tier 2, 3, and 4 roadways in District 2.
[NON-PAR (Vermont), Pave-T2-Resurf, Pave-T3-4-Resurf]
Various Resurfacing various Tier 2, 3, and 4 roadways in District 2.
[Pave-T2-Resurf, Pave-T3-4-Resurf]
Project DescriptionTarget Ad Date
Approx. Contract Amt.
Federal Dollars
NORTHWOOD 42363
LEBANON, NH - HARTFORD, VT 16148 A001(154)
STATEWIDE STRIPING (TURNPIKES) 41823
STATEWIDE 41897 X-A004(767)
CENTRAL TURNPIKE PAVING 41821
DISTRICT 1 16161I
DISTRICT 1 2020 42318
DISTRICT 2 16162I
DISTRICT 2 2020 42319
Project Name / Number
January Monthly Total
$441,000
$43,166,900
$908,900
$1,298,200
$4,103,200
$2,931,400
$2,202,800
$2,082,200
$2,914,100
$0
$26,637,000
$0
$1,298,200
$0
$0
$0
$0
$0
14-Jan-20
21-Jan-20
21-Jan-20
28-Jan-20
04-Feb-20
04-Feb-20
04-Feb-20
04-Feb-20
04-Feb-20
$53,086,200 $34,916,700
low-bid
low-bid
low-bid
low-bid
low-bid
low-bid
January 2020
February 2020
Contact Person: Kirk Mudgett
Contact Person: Joseph Adams
Contact Person: Nancy Spaulding
Contact Person: Kirk Mudgett
Contact Person: Nancy Spaulding
Contact Person: Ronald Grandmaison
Contact Person: Ronald Grandmaison
Contact Person: Ronald Grandmaison
Contact Person: Ronald Grandmaison
![Page 6: NH DEPARTMENT OF TRANSPORTATION * DIVISION OF … · Print Date: 03/31/20 2020 Page 3 of 11 Fiscal Year 2020 NH Route 107 Replacement of a 5' x 7' metal arch culvert under NH 107,](https://reader034.vdocuments.us/reader034/viewer/2022042217/5ec1f49393e4a025a2723a48/html5/thumbnails/6.jpg)
03/31/20Print Date: 2020 Page 4 of 11
Fiscal Year
2020
Various Resurfacing various tier 2, 3, and 4 roadways in District 3.
[BET-RL-3, BET-RL-HQ, Pave-T2-Resurf, Pave-T3-4-Resurf]
Various Resurfacing various tier 2, 3, and 4 roadways in District 4.
[BET-RL-4, BET-RL-HQ, NON-PAR (dot), Pave-T3-4-Resurf]
Various Resurfacing various tier 2, 3, and 4 roadways in District 5.
[Pave-T2-Resurf, Pave-T3-4-Resurf]
Various Resurfacing various tier 2, 3, and 4 roadways in District 6.
[BET-RL-6, BET-RL-HQ, Pave-T2-Resurf, Pave-T3-4-Resurf]
I-95 & NH 16 I-95 & NH 16[TRR *]
Statewide Statewide Bridge Washing Contract - Tier 1 Roads[NON-PAR (dot)]
NH Route 112 Replacement of corten guardrail on NH Route 112 in Woodstock.[GRR *]
Statewide - North Northern State Bridge Washing Contract - Tier 1 roads[NON-PAR (dot)]
NH 16 Repair failed roadway slope along NH 16 abutting the Magalloway River[BET-DRG-HQ, FLAP, NON-PAR (dot)]
NH 102 Redrill Child salted well[WELLS]
Project DescriptionTarget Ad Date
Approx. Contract Amt.
Federal Dollars
DISTRICT 3 16163I
DISTRICT 4 16164I
DISTRICT 5 16165I
DISTRICT 6 16166I
EASTERN TURNPIKE PAVING 41822
BRIDGE WASHING 42939
WOODSTOCK 42576 X-A004(917)
BRIDGE WASHING 42997
ERROL 41069 X-A004(565)
CHESTER 42597B
Project Name / Number
February Monthly Total
$2,278,900
$3,964,700
$2,582,300
$5,117,100
$2,964,100
$465,000
$1,015,700
$744,000
$883,500
$25,400
$0
$0
$0
$0
$0
$0
$1,015,700
$0
$0
$0
04-Feb-20
04-Feb-20
04-Feb-20
04-Feb-20
04-Feb-20
18-Feb-20
18-Feb-20
25-Feb-20
25-Feb-20
03-Mar-20
$34,249,000 $1,015,700
low-bid
low-bid
February 2020
March 2020
Contact Person: Ronald Grandmaison
Contact Person: Ronald Grandmaison
Contact Person: Ronald Grandmaison
Contact Person: Ronald Grandmaison
Contact Person: Nancy Spaulding
Contact Person: Steve Johnson (Br Maint)
Contact Person: Kirk Mudgett
Contact Person: Steve Johnson (Br Maint)
Contact Person: Tobey Reynolds
Contact Person: Victoria Chase
![Page 7: NH DEPARTMENT OF TRANSPORTATION * DIVISION OF … · Print Date: 03/31/20 2020 Page 3 of 11 Fiscal Year 2020 NH Route 107 Replacement of a 5' x 7' metal arch culvert under NH 107,](https://reader034.vdocuments.us/reader034/viewer/2022042217/5ec1f49393e4a025a2723a48/html5/thumbnails/7.jpg)
03/31/20Print Date: 2020 Page 5 of 11
Fiscal Year
2020
NH 127 Replace Frye salted well[WELLS]
NH 77 Replace salted Lacroix well.[WELLS]
Rehab Queen City Bridge over I-293, BMRR & Merrimack River BRIDGE REHABILITATION-QUEEN CITY BR. OVER I-293, BMRR & MERRIMACK RIVER-BR. #151/065 (MOBRR)[SAB *]
Various Roadway preservation (Chip Seal) on Various roadways.[Pave-T3-4-Resurf]
NH 175, NH 49, & Tripoli Rd PMRAP and resurfacing on NH 175 and resurfacing of NH 49 and Tripoli Rd.[BET-RL-3, BET-RL-HQ, Pave-T3-4-Rehab, Pave-T3-4-Resurf]
NH 11 NH 11 corridor safety improvements andresurfacing[HSIP *, Pave-T2-Resurf]
Dover Community Trail Const multi-use path to connect 2 portions of the Dover Community Trail, which are gaps (14-27TAP)[NON-PAR (other), TA *]
I-95, I-93, I-293, FEET and NH 16 Replacement and repair of guardrail systems along the Turnpike facilities[TRR *]
Pavement Markings Pavement Marking Maintenance via Contractor. Limited to Stenciled and Transverse Markings[BET-STAL-HQ]
Charlotte Avenue Elementary School Constructnew sidewalk, reconstruct crosswalk to meet ADA standards.[NON-PAR (other), SRTS]
Project DescriptionTarget Ad Date
Approx. Contract Amt.
Federal Dollars
HOPKINTON 42597D
WEARE 42597C
MANCHESTER 28336 X-A003(718)(LPA)
DISTRICT 5 CHIP SEAL 2020 42438
HOLDERNESS-WATERVILLE VALLEY PMRAP 42786
ROCHESTER-FARMINGTON 42243 X-A004(795)
DOVER 40437 X-A004(407)(LPA)
STATEWIDE GUARDRAIL 41939
STATEWIDE PAVEMENT MARKINGS 42963
NASHUA 28739 X-A003(786)(LPA)
Project Name / Number
$19,800
$20,700
$7,760,200
$1,141,700
$2,569,600
$1,304,200
$410,800
$622,000
$212,600
$93,000
$0
$0
$0
$0
$0
$1,304,200
$286,300
$0
$0
$93,000
03-Mar-20
03-Mar-20
06-Mar-20
10-Mar-20
10-Mar-20
10-Mar-20
17-Mar-20
17-Mar-20
17-Mar-20
24-Mar-20
March 2020 Contact Person: Victoria Chase
Contact Person: Victoria Chase
Contact Person: Ron Kleiner
Contact Person: Ronald Grandmaison
Contact Person: Ronald Grandmaison
Contact Person: Mike Dugas
Contact Person: Tom Jameson
Contact Person: Nancy Spaulding
Contact Person: Lee Baronas
Contact Person: C.R. Willeke
![Page 8: NH DEPARTMENT OF TRANSPORTATION * DIVISION OF … · Print Date: 03/31/20 2020 Page 3 of 11 Fiscal Year 2020 NH Route 107 Replacement of a 5' x 7' metal arch culvert under NH 107,](https://reader034.vdocuments.us/reader034/viewer/2022042217/5ec1f49393e4a025a2723a48/html5/thumbnails/8.jpg)
03/31/20Print Date: 2020 Page 6 of 11
Fiscal Year
2020
Blue Star, FEET & Spaulding Turnpike, I-93, Rt 101 Central, Eastern Turnpikes, I-93 and Rt. 101 guardail repair on as needed basis.[BET-STAL-HQ, NON-PAR (dot), NON-PAR (other)]
NH Rte 106 NH Rte 106 Roadway Widening (3.6 mi, Phase II) from Soucook Road, Loudon to Ames Road, Canterbury [None-Highway]
US Route 2 Rehab or replacement of a 50 ft long, 72" cmp/60" cmp/5'x8' box culvert carrying Kidder Brook.[CRDR *]
East Side Road Saco River Covered Bridge Scour Protection effort [BRPPI *, Bridg-T3-4-Main-Pres, NHCBP*]
I-93 (Exit 14 to VT Border) Guardail Repair North - I-93 Exit 20 to VT border[BET-STAL-HQ, NON-PAR (dot)]
I-93, I-89 & I-393 Guardrail Repair on the Turnpike System, I-93 (Exit 14 to 20) & I-89[BET-STAL-HQ, NON-PAR (dot)]
I-293/NH101 & NH 111 HBP inlays along I-293/NH101 and BWC along NH 111[Pave-T1-Resurf, Pave-T2-Resurf]
BRADFORD CENTER ROAD Bridge Rehab-Bradford Center Rd over West Branch of Warner River-Br. #140/144-Bement Covered Br[NHCBP*, SAB *]
NH 16 Reconstruct NH 16 from Olympic Lane east to NH 153 (Four Corners)[NON-PAR (other), Other Fed Aid, PRRCS *]
Project DescriptionTarget Ad Date
Approx. Contract Amt.
Federal Dollars
GUARDRAIL REPAIR SOUTH 42444
LOUDON - CANTERBURY 29613A X-A004(458)
SHELBURNE 42426 X-A004(842)
CONWAY 25103 X-A003(039)
GUARDRAIL REPAIR NORTH 43005
GUARDRAIL REPAIR WEST 42994
MANCHESTER 42635A X-A005(001)
BRADFORD 23819 X-A002(772)(LPA)
CONWAY 40018 X-A004(327)(LPA)
Project Name / Number
Second Quarter Total
March Monthly Total
$762,100
$7,830,000
$669,700
$744,000
$231,600
$399,500
$1,337,600
$1,015,600
$3,460,800
$0
$7,830,000
$669,700
$744,000
$0
$0
$1,337,600
$494,300
$2,549,400
31-Mar-20
31-Mar-20
31-Mar-20
07-Apr-20
07-Apr-20
07-Apr-20
07-Apr-20
15-Apr-20
15-Apr-20
$23,441,800 $10,183,200
$110,777,000 $46,115,600
March 2020
April 2020
Contact Person: John Corcoran
Contact Person: Matthew Lampron
Contact Person: Kirk Mudgett
Contact Person: Joseph Adams
Contact Person: Sam Newsom
Contact Person: Sam Newsom
Contact Person: Ronald Grandmaison
Contact Person: Kevin Russell
Contact Person: Kevin Russell
![Page 9: NH DEPARTMENT OF TRANSPORTATION * DIVISION OF … · Print Date: 03/31/20 2020 Page 3 of 11 Fiscal Year 2020 NH Route 107 Replacement of a 5' x 7' metal arch culvert under NH 107,](https://reader034.vdocuments.us/reader034/viewer/2022042217/5ec1f49393e4a025a2723a48/html5/thumbnails/9.jpg)
03/31/20Print Date: 2020 Page 7 of 11
Fiscal Year
2020
I-93 I-93 EXIT 4A - Prelim., Final Design, ROW &Construction of NEW INTERCHANGE and connecting roadway[NON-PAR (other), Other Fed Aid]
US 202 Resurfacing US 202 in Hillsborough and Henniker including the ramps at NH 114.[Pave-T2-Resurf]
NH 28 Phase 1 roadway and building demo for Salem #12334 Depot Project at intersection of NH28 & NH97 [Other Fed Aid]
NH 28 RECONSTRUCT DEPOT INTERSECTION NH28 (BROADWAY) AND NH 97 (MAIN STREET) ADD TURN LANES ON NH28 MUPCA[Ear-NH072, MUPCA*, Other Fed Aid]
Main Street Construct sidewalks, crosswalks, lighting and landscaping along Main Street in Durham on UNH Campu[TA *]
I 95 Turnpikes R&R Program Bridge Painting[TRR *]
Various To install Road and Weather systems around the State. [None-Highway, TPK *]
NUDD ROAD Bridge Rehabilitation-Nudd Rd over Bearcamp River-Bridge #108/333-Phase II-Whittier Covered Bridge[NHCBP*, SAB *]
NH 27, NH 111A, Winter St, Spring St Constructsidewalks on Epping Road, Brentwood Road, Winter Street, and Spring Street[TA *]
Project DescriptionTarget Ad Date
Approx. Contract Amt.
Federal Dollars
DERRY - LONDONDERRY 13065 IM-0931(201)Design-Build
HILLSBOROUGH-HENNIKER-HOPKINTON 42864
SALEM 12334A X-A005(004)(LPA)
SALEM 12334 X-STP-X-5399(011)(LPA)
DURHAM (UNH) 41369 X-A004(608)(LPA)
NORTH HAMPTON BRIDGE PAINTING 42917
STATEWIDE-RWIS 25198 A003(059)
OSSIPEE 23818 X-A002(771)(LPA)
EXETER 41372 X-A004(611)(LPA)
Project Name / Number
April Monthly Total
May Monthly Total
$57,878,100
$2,510,200
$539,400
$4,212,900
$392,800
$2,069,100
$729,100
$1,001,900
$486,500
$57,205,000
$0
$431,500
$3,370,300
$314,200
$0
$364,600
$640,800
$389,200
23-Apr-20
28-Apr-20
28-Apr-20
06-May-20
26-May-20
26-May-20
26-May-20
15-Jun-20
16-Jun-20
$68,116,800
$7,403,900
$62,761,800
$4,049,100
April 2020
May 2020
June 2020
Contact Person: Keith Cota
Contact Person: Ronald Grandmaison
Contact Person: C.R. Willeke
Contact Person: C.R. Willeke
Contact Person: Tom Jameson
Contact Person: Nancy Spaulding
Contact Person: Charles Blackman
Contact Person: Kevin Russell
Contact Person: Bob Hudson
![Page 10: NH DEPARTMENT OF TRANSPORTATION * DIVISION OF … · Print Date: 03/31/20 2020 Page 3 of 11 Fiscal Year 2020 NH Route 107 Replacement of a 5' x 7' metal arch culvert under NH 107,](https://reader034.vdocuments.us/reader034/viewer/2022042217/5ec1f49393e4a025a2723a48/html5/thumbnails/10.jpg)
03/31/20Print Date: 2020 Page 8 of 11
Fiscal Year
2020
NH 38, NH 9 Intersection safety improvements -install Intersection Conflict Warning Systems in two locations[HSIP *]
NH 101 NH 123 intersection safety improvements[HSIP *]
Various Replacement and upgrade of signs and supports due to condition and improved compliance[USSS *]
South Main St. , Mason Road Const. Sidewalks on Rte 130, Const 60 foot Ped bridge over Nissitissit River and sidewalk to beach [TA *]
Main Street, NH Routes 3 / 25 Reconstruct sidewalks to ADA compliance and construct new sidewalks on Main Street US Rte 3/25[NON-PAR (dot), NON-PAR (other), TA *]
US 3 & NH 26 Bridge Preservation on Columbia 108/167 and Colebrook 051/098.[Bridg-T1-2-Main-Pres]
US302, NH 10 & US302 Bridge Preservation on Carroll 173/141 and Bethlehem 125/177.[Bridg-T1-2-Main-Pres]
Ami Brown Road Construct 11,695' of shared lane and bike lane markings. (14-42TAP) Ped crossing Improve at Rte 9[NON-PAR (other), TA *]
WINCHESTER STREET Reconst. of Winchester (NH 101 to Pearl & Island including Key Rd intersection) and Br. No. 125/069[Ear-NH049, MOBRR *, MUPCA*, Other Fed Aid]
Project DescriptionTarget Ad Date
Approx. Contract Amt.
Federal Dollars
PELHAM-CHESTERFIELD 29338 X-A004(016)One Contract With 15698
PETERBOROUGH 15698 X-A000(890)One Contract With 29338
STATEWIDE SIGNS 42921 X-A004(994)
BROOKLINE 41364 X-A004(607)(LPA)
ASHLAND 41370 X-A004(610)(LPA)
COLUMBIA-COLEBROOK 42313 X-A004(814)
BETHLEHEM-CARROLL 42501 X-A004(878)
KEENE 40439 X-A004(408)(LPA)
KEENE 10309B X-STP-0111(007)(LPA)
Project Name / Number
Third Quarter Total
June Monthly Total
July Monthly Total
$139,500
$111,600
$228,500
$590,600
$522,900
$720,800
$2,650,500
$332,300
$6,294,500
$139,500
$111,600
$228,500
$472,400
$302,200
$720,800
$2,650,500
$265,800
$5,035,600
16-Jun-20
16-Jun-20
23-Jun-20
30-Jun-20
09-Jul-20
14-Jul-20
21-Jul-20
26-Jul-20
27-Jul-20
$2,558,600
$10,521,000
$1,982,000
$8,974,900
$78,079,300 $68,792,900
June 2020
July 2020
Contact Person: Mike Dugas
Contact Person: Mike Dugas
Contact Person: Lee Baronas
Contact Person: Tom Jameson
Contact Person: Bob Hudson
Contact Person: David Scott
Contact Person: Joseph Adams
Contact Person: Tom Jameson
Contact Person: Jennifer Reczek
![Page 11: NH DEPARTMENT OF TRANSPORTATION * DIVISION OF … · Print Date: 03/31/20 2020 Page 3 of 11 Fiscal Year 2020 NH Route 107 Replacement of a 5' x 7' metal arch culvert under NH 107,](https://reader034.vdocuments.us/reader034/viewer/2022042217/5ec1f49393e4a025a2723a48/html5/thumbnails/11.jpg)
03/31/20Print Date: 2020 Page 9 of 11
Fiscal Year
2020
Cornish Toll Bridge Road Cornish Windsor Covered Bridge Scour Mitigation[BRPPI *, Bridg-T3-4-Main-Pres, NHCBP*, NON-PAR (Vermont)]
NH 119 Reconstruction of the new bridge over the Connecticut River[Bridg-HIB-Rehab-Rcn, NON-PAR (Vermont), None-Bridge]
Various Curve warning sign improvements on State highways[HSIP *]
Church Street Bridge Preservation efforts on the Church St over Conn River between Walpole, NH to Rockingham, Vt[Bridg-HIB-Main-Pres, NON-PAR (Vermont)]
US 4 / NH 108 Signalize intersection of US 4 westbound off ramp with NH 108[Other Fed Aid]
I-93 Full Width 1-1/2" inlay from MP 105.9 to 111.5 including exits 34B and 34C.[Pave-T1-Preserve, Pave-T1-Resurf, Pave-T3-4-Resurf]
I-93 SB Address Preservation needs on 5 bridges in Hooksett & Manchester on and over I-93 SB.[Bridg-HIB-Main-Pres, Bridg-T1-2-Main-Pres]
Various Installation of rumble strips along Stateroadways.
[HSIP *]
NH 175 & I-93 SB and NB & I-93 Ramp Scour repairs at Woodstock 195/093 (NH175 over Pemi) and scour protection at 3 I-93 brs. in Lincoln[Bridg-T1-2-Main-Pres, Bridg-T3-4-Main-Pres]
Various Preservation response to stabilize various bridges from scour.[Bridg-T1-2-Main-Pres, Bridg-T3-4-Main-Pres]
Project DescriptionTarget Ad Date
Approx. Contract Amt.
Federal Dollars
CORNISH, NH - WINDSOR, VT 25067 A003(035)
HINSDALE, NH - BRATTLEBORO, VT 12210C A004(152)
STATEWIDE 42953 X-A005(002)
WALPOLE, NH - ROCKINGHAM, VT 42277 X-A004(799)
DURHAM 16254 X-A001(211)
LINCOLN-FRANCONIA 41052 X-A004(544)
MANCHESTER - HOOKSETT 41475 X-A004(648)
STATEWIDE 40842 X-A004(501)
WOODSTOCK-LINCOLN 42534 X-A004(896)
STATEWIDE 41915 X-A004(779)
Project Name / Number
August Monthly Total
$2,325,000
$37,355,300
$465,000
$1,720,500
$568,100
$3,052,300
$6,975,000
$446,400
$720,800
$1,157,900
$2,048,800
$0
$465,000
$1,273,200
$568,100
$2,994,400
$6,975,000
$446,400
$720,800
$1,157,900
18-Aug-20
18-Aug-20
18-Aug-20
18-Aug-20
25-Aug-20
01-Sep-20
01-Sep-20
01-Sep-20
08-Sep-20
22-Sep-20
$42,433,900 $4,355,100
August 2020
September 2020
Contact Person: Joseph Adams
Contact Person: Don Lyford
Contact Person: Mike Dugas
Contact Person: David Scott
Contact Person: Loretta Doughty
Contact Person: Ronald Grandmaison
Contact Person: David Scott
Contact Person: Mike Dugas
Contact Person: David Scott
Contact Person: David Scott
![Page 12: NH DEPARTMENT OF TRANSPORTATION * DIVISION OF … · Print Date: 03/31/20 2020 Page 3 of 11 Fiscal Year 2020 NH Route 107 Replacement of a 5' x 7' metal arch culvert under NH 107,](https://reader034.vdocuments.us/reader034/viewer/2022042217/5ec1f49393e4a025a2723a48/html5/thumbnails/12.jpg)
03/31/20Print Date: 2020 Page 10 of 11
Fiscal Year
2020
Fiscal Year 2020 Total
NH Route 9 Rehab./Replacement of twin 72" x 44" corrugated metal arch pipes under Route 9.[BET-DRG-HQ, NON-PAR (dot)]
Project DescriptionTarget Ad Date
Approx. Contract Amt.
Federal Dollars
STODDARD 42708
Project Name / Number
Fourth Quarter Total
September Monthly Total
$441,800 $029-Sep-20
$12,794,200 $12,294,500
$65,749,100
$293,151,100
$25,624,500
$174,155,600
September 2020 Contact Person: Kirk Mudgett
![Page 13: NH DEPARTMENT OF TRANSPORTATION * DIVISION OF … · Print Date: 03/31/20 2020 Page 3 of 11 Fiscal Year 2020 NH Route 107 Replacement of a 5' x 7' metal arch culvert under NH 107,](https://reader034.vdocuments.us/reader034/viewer/2022042217/5ec1f49393e4a025a2723a48/html5/thumbnails/13.jpg)
03/31/20Print Date: 2020 Page 11 of 11
GUARDRAIL REPAIR NORTH 43005
MANCHESTER 41361 X-A004(604)(LPA)
HINSDALE 41365 X-A004(615)(LPA)
CONCORD-HOPKINTON 41703 X-A004(716)
BEDFORD 42268 X-A004(797)
CONCORD-ASHLAND-CAMPTON 41706 X-A004(719)
LYME-ORFORD-PIERMONT-HAVERHILL 41913 X-A004(777)
MANCHESTER 42635 X-A004(997)
STATEWIDE SW TIER 2 42716 X-A004(996)
STRATFORD-COLUMBIA (BWC) 42703 X-A004(995)
NEWPORT - CROYDON - GRANTHAM 41914 X-A004(778)
Project Name / Number
I-93 (Exit 14 to VT Border) Guardail Repair North - I-93 Exit 20 to VT border[BET-STAL-HQ, NON-PAR (dot)]
Rail Trail Const. Rail Trail along abandoned railroad bed from Mammoth Road to Lake ShoreAvenue[TA *]
Brattleboro Road Construct Sidewalks along Brattleboro Road.[NON-PAR (dot), TA *]
I-89 Painting I-89 bridges between Concord and Hopkinton[Bridg-T1-2-Main-Pres, Bridg-T3-4-Main-Pres]
NH 101/Boynton St Rehabilitate 90" structural plate pipe under NH 101 & Boynton St in Bedford.[CRDR *]
I-93 Painting I-93 bridges in Concord, Ashland, and Campton[Bridg-T1-2-Main-Pres, Bridg-T3-4-Main-Pres]
Various Upgrade cable guardrail and "F" terminals on Tier 2 & 3 highways.[HSIP *]
I-293/NH101 & NH28 Bypass Resurfacing of I293/NH101 in Manchester & 28 Bypass from Derry to Manchester[Pave-T1-Resurf, Pave-T2-Resurf]
NH 12A/NH 101/NH 10 Resurfacing of NH 12A, NH 101, and NH 10[Pave-T2-Resurf]
US Route 3 Resurfacing of US 3.[Pave-T2-Resurf]
Route 10 Cable guardrail and "F" unit replacement[HSIP *]
Project Description
07-Apr-20
09-Jun-20
15-Jun-20
11-Aug-20
18-Aug-20
01-Sep-20
22-Sep-20
22-Sep-20
22-Sep-20
22-Sep-20
29-Sep-20
Target Ad Date
$231,600
$818,600
$443,000
$2,371,500
$1,204,400
$2,334,300
$1,116,000
$5,409,200
$2,568,300
$8,413,800
$1,116,000
Approx. Contract Amt.
$0
$654,900
$354,400
$2,371,500
$1,204,400
$2,334,300
$1,116,000
$5,409,200
$2,568,300
$8,413,800
$1,116,000
Federal Dollars
ON-SHELF PROJECTS
Fiscal Year 2020
On-Shelf Projects 2020 Total $26,026,700 $25,542,800
Contact Person: Sam Newsom
Contact Person: Tom Jameson
Contact Person: Bob Hudson
Contact Person: David Scott
Contact Person: Kirk Mudgett
Contact Person: David Scott
Contact Person: Kirk Mudgett
Contact Person: Ronald Grandmaison
Contact Person: Ronald Grandmaison
Contact Person: Ronald Grandmaison
Contact Person: Kirk Mudgett
On Shelf Projects Advertising are subject to availability of funding.In addition these projects are subject to STIP Amendments to bring them into the current fiscal year.
![Page 14: NH DEPARTMENT OF TRANSPORTATION * DIVISION OF … · Print Date: 03/31/20 2020 Page 3 of 11 Fiscal Year 2020 NH Route 107 Replacement of a 5' x 7' metal arch culvert under NH 107,](https://reader034.vdocuments.us/reader034/viewer/2022042217/5ec1f49393e4a025a2723a48/html5/thumbnails/14.jpg)
03/31/20Print Date: 2021 Page 1 of 8
Fiscal Year
2021
NA Construct 2.8mile pathway parallel to the North-South Road[CMAQ *]
NH 101/Boynton St Rehabilitate 90" structural plate pipe under NH 101 & Boynton St in Bedford.[CRDR *]
Various Upgrade cable guardrail and "F" terminals on Tier 2 & 3 highways.[HSIP *]
I-293/NH101 & NH28 Bypass Resurfacing of I293/NH101 in Manchester & 28 Bypass from Derry to Manchester[Pave-T1-Resurf, Pave-T2-Resurf]
Route 10 Cable guardrail and "F" unit replacement[HSIP *]
US Route 3 Resurfacing of US 3.[Pave-T2-Resurf]
NH 12 NH 12 Bridge Preservation efforts for NH12 over NECRR in Charlestown (Br. No. 181/058).[BET-BMT-BD]
NH 12A/NH 101/NH 10 Resurfacing of NH 12A, NH 101, and NH 10[Pave-T2-Resurf]
Hogback Road Slope failure repair and possibleroadway changes.[BET-STAL-HQ, NON-PAR (dot)]
Project DescriptionTarget Ad Date
Approx. Contract Amt.
Federal Dollars
CONWAY 41755 X-A004(743)(LPA)
BEDFORD 42268 X-A004(797)
LYME-ORFORD-PIERMONT-HAVERHILL 41913 X-A004(777)
MANCHESTER 42635 X-A004(997)
NEWPORT - CROYDON - GRANTHAM 41914 X-A004(778)
STRATFORD-COLUMBIA (BWC) 42703 X-A004(995)
CHARLESTOWN 42484
STATEWIDE SW TIER 2 42716 X-A004(996)
STRATFORD 42555
Project Name / Number
October Monthly Total
$1,860,000
$1,204,400
$1,116,000
$5,409,200
$1,116,000
$8,413,800
$744,000
$2,568,300
$446,400
$1,488,000
$1,204,400
$1,116,000
$5,409,200
$1,116,000
$8,413,800
$0
$2,568,300
$0
06-Oct-20
13-Oct-20
13-Oct-20
20-Oct-20
20-Oct-20
20-Oct-20
27-Oct-20
27-Oct-20
27-Oct-20
$22,878,100 $21,315,700
NH DEPARTMENT OF TRANSPORTATION * DIVISION OF PROJECT DEVELOPMENT
ADVERTISING SCHEDULE
October 2020 Contact Person: Tom Jameson
Contact Person: Kirk Mudgett
Contact Person: Kirk Mudgett
Contact Person: Ronald Grandmaison
Contact Person: Kirk Mudgett
Contact Person: Ronald Grandmaison
Contact Person: David Scott
Contact Person: Ronald Grandmaison
Contact Person: Tobey Reynolds
![Page 15: NH DEPARTMENT OF TRANSPORTATION * DIVISION OF … · Print Date: 03/31/20 2020 Page 3 of 11 Fiscal Year 2020 NH Route 107 Replacement of a 5' x 7' metal arch culvert under NH 107,](https://reader034.vdocuments.us/reader034/viewer/2022042217/5ec1f49393e4a025a2723a48/html5/thumbnails/15.jpg)
03/31/20Print Date: 2021 Page 2 of 8
Fiscal Year
2021
Rail Trail Const. Rail Trail along abandoned railroad bed from Mammoth Road to Lake ShoreAvenue[TA *]
US 302 & NH 16 Bridge Preservation efforts forNH16 over Ellis Rvr in Jackson & US302 over Stony Brk in Bartlett.[BET-BMT-BD]
South Manchester Rail Trail Construct Multi-usepath along the abandoned rail corridor from Gold St. to Perimeter Road[CMAQ *, Ear-NH022]
Brattleboro Road Construct Sidewalks along Brattleboro Road.[NON-PAR (dot), TA *]
NH Route 28 Address Red List Bridge carrying NH 28 over Suncook River (Br No 107/098)[Bridg-T1-2-Rehab-Rcn]
NH 128 & Sherburne Rd Intersection improvements at the intersection of NH128 & Sherburne Rd and Mammoth & NH111A[CMAQ *]
I-95 ITS Improvements to I-95 from Portsmouth, NH to York, ME[TRR *]
Herritage Rail Trail East Construct the Heritage Rail Trail East[CMAQ *]
NH 202A (WALNUT STREET) INTERSECTION IMPROVEMENTS TO IMPROVE SAFETY THROUGH STRAFFORD SQ, NORTH MAIN, & WASHINGTON ST[MUPCA*, NON-PAR (other)]
RTE 108 Traffic signal improvements and installation of a camera system to monitor traffic flow.[CMAQ *]
Project DescriptionTarget Ad Date
Approx. Contract Amt.
Federal Dollars
MANCHESTER 41361 X-A004(604)(LPA)
BARTLETT-JACKSON 41989
MANCHESTER 29811 X-A004(311)(LPA)
HINSDALE 41365 X-A004(615)(LPA)
ALLENSTOWN-PEMBROKE 40362 X-A004(369)
PELHAM 41751 X-A004(739)(LPA)
PORTSMOUTH, NH - YORK, ME 16189B
NASHUA 41742 X-A004(730)(LPA)
ROCHESTER 14350 X-A000(320)(LPA)
DOVER 41746 X-A004(734)(LPA)
Project Name / Number
November Monthly Total
$818,600
$395,300
$1,427,400
$443,000
$2,483,100
$1,441,500
$4,863,900
$901,400
$4,174,000
$120,900
$654,900
$0
$1,141,900
$354,400
$0
$864,900
$0
$721,200
$1,264,800
$96,700
01-Nov-20
03-Nov-20
03-Nov-20
15-Nov-20
17-Nov-20
24-Nov-20
08-Dec-20
15-Dec-20
15-Dec-20
31-Dec-20
$7,008,900 $3,016,100
November 2020
December 2020
Contact Person: Tom Jameson
Contact Person: Joseph Adams
Contact Person: Tom Jameson
Contact Person: Bob Hudson
Contact Person: David Scott
Contact Person: Bob Hudson
Contact Person: Charles Blackman
Contact Person: Tom Jameson
Contact Person: Bob Hudson
Contact Person: Tom Jameson
![Page 16: NH DEPARTMENT OF TRANSPORTATION * DIVISION OF … · Print Date: 03/31/20 2020 Page 3 of 11 Fiscal Year 2020 NH Route 107 Replacement of a 5' x 7' metal arch culvert under NH 107,](https://reader034.vdocuments.us/reader034/viewer/2022042217/5ec1f49393e4a025a2723a48/html5/thumbnails/16.jpg)
03/31/20Print Date: 2021 Page 3 of 8
Fiscal Year
2021
US Route 3 Br Preservation on US 3 (Meredith 184/138), NH 11 (Gilford 102/099), & NH 11A (Gilford 138/137)
[Bridg-T1-2-Main-Pres, Bridg-T3-4-Main-Pres]
NH 1B Bridge replace, Single Leaf Bascule Bridge, NH 1B over Little Harbor (Red List) Br No 066/071[Bridg-HIB-Rehab-Rcn, CBI *, None-Bridge]
US 202 / NH 101 Bridge Replacement and Widening for TCP, US 202 & NH 101 over Contoocook River (Red List)[Bridg-T1-2-Rehab-Rcn, NON-PAR (dot), NON-PAR (other), None-Bridge]
Waukewan Road Rehabilitation of Red List Bridge carrying Waukewan Road over Snake River (Br No 080/040)[Bridg-T3-4-Rehab-Rcn, None-Bridge]
NH 3A Constructing a third southbound right turn lane on Lowell Rd/NH 3A [CMAQ *]
East Thetford Road Bridge Rehab, for Red List Bridge carrying East Thetford Road over the Conn. River (Br No 053/112)[Bridg-T3-4-Rehab-Rcn, NON-PAR (Vermont), None-Bridge]
NH 16 Pavement Rehab and drainage upgradesincluding improvements at Mt. Shaw Rd.[Pave-T2-Rehab]
Lang Road/Longmeadow Road/US Route 1 Realign Lang Road to connect to Longmeadow Road[HSIP *, NON-PAR (other)]
US 4 REHABILITATE OR REPLACE RED LIST BRIDGE CARRYING US 4 OVER NHRR - 156/104[Bridg-T1-2-Rehab-Rcn, None-Bridge]
Project DescriptionTarget Ad Date
Approx. Contract Amt.
Federal Dollars
MEREDITH-GILFORD 41483 X-A004(652)
NEW CASTLE - RYE 16127 X-A001(146)
PETERBOROUGH 15879 X-A001(007)
CENTER HARBOR - NEW HAMPTON 24579 X-A002(923)
HUDSON 41754 X-A004(742)(LPA)
LYME, NH - THETFORD, VT 14460 A000(394)
OSSIPEE 41251 X-A004(573)
PORTSMOUTH 42350 X-A004(818)(LPA)
DANBURY 16303 X-A001(230)
Project Name / Number
First Quarter Total
December Monthly Total
$1,069,500
$7,532,500
$7,950,900
$737,600
$1,162,500
$8,191,400
$2,325,000
$898,800
$2,046,000
$1,069,500
$7,532,500
$7,760,600
$737,600
$930,000
$0
$2,325,000
$809,000
$2,046,000
05-Jan-21
05-Jan-21
05-Jan-21
12-Jan-21
12-Jan-21
12-Jan-21
12-Jan-21
19-Jan-21
26-Jan-21
$10,060,200 $2,082,700
$39,947,200 $26,414,500
December 2020
January 2021 Contact Person: Joseph Adams
Contact Person: Loretta Doughty
Contact Person: Joseph Adams
Contact Person: David Scott
Contact Person: Tom Jameson
Contact Person: Joseph Adams
Contact Person: Tobey Reynolds
Contact Person: Bob Hudson
Contact Person: David Scott
![Page 17: NH DEPARTMENT OF TRANSPORTATION * DIVISION OF … · Print Date: 03/31/20 2020 Page 3 of 11 Fiscal Year 2020 NH Route 107 Replacement of a 5' x 7' metal arch culvert under NH 107,](https://reader034.vdocuments.us/reader034/viewer/2022042217/5ec1f49393e4a025a2723a48/html5/thumbnails/17.jpg)
03/31/20Print Date: 2021 Page 4 of 8
Fiscal Year
2021
Various Resurfacing various tier 2, 3, and 4 roadways in District 1.
[Pave-T2-Resurf, Pave-T3-4-Resurf]
Various Resurfacing various tier 2, 3, and 4 roadways in District 1.[Pave-T3-4-Resurf]
Various Resurfacing various tier 2, 3, and 4 roadways in District 2.[Pave-T3-4-Resurf]
Various Resurfacing various tier 2, 3, and 4 roadways in District 2.
[Pave-T2-Resurf, Pave-T3-4-Resurf]
Various Resurfacing various tier 2, 3, and 4 roadways in District 3.
[Pave-T2-Resurf, Pave-T3-4-Resurf]
Varies Resurfacing various tier 2, 3, and 4 roadways in southern District 3.[Pave-T2-Resurf, Pave-T3-4-Resurf]
Various Resurfacing various tier 2, 3, and 4 roadways in District 4.
[Pave-T2-Resurf, Pave-T3-4-Resurf]
Various Resurfacing various tier 2, 3, and 4 roadways in District 5.
[Pave-T2-Resurf, Pave-T3-4-Resurf]
Various Resurfacing various tier 2, 3, and 4 roadways in District 6.
[Pave-T2-Resurf, Pave-T3-4-Resurf]
Manchester & Lawrence Rail Line 0.3 miles of Bike-Ped trail along abandoned M&L rail line from Cluff Crossing to Rockingham Pk Blvd[CMAQ *]
Project DescriptionTarget Ad Date
Approx. Contract Amt.
Federal Dollars
DISTRICT 1 N 16161J
DISTRICT 1 S 42460
DISTRICT 2 E 42461
DISTRICT 2 W 16162J
DISTRICT 3 N 16163J
DISTRICT 3 S 43026
DISTRICT 4 16164J
DISTRICT 5 16165J
DISTRICT 6 16166J
SALEM 41750 X-A004(738)(LPA)
Project Name / Number
January Monthly Total
$2,054,200
$2,197,400
$240,700
$2,613,600
$2,739,400
$4,225,700
$2,741,000
$1,311,400
$2,816,900
$609,200
$0
$0
$0
$0
$0
$0
$0
$0
$0
$487,300
02-Feb-21
02-Feb-21
02-Feb-21
02-Feb-21
02-Feb-21
02-Feb-21
02-Feb-21
02-Feb-21
02-Feb-21
15-Feb-21
$31,914,200 $23,210,200
January 2021
February 2021 Contact Person: Ronald Grandmaison
Contact Person: Ronald Grandmaison
Contact Person: Ronald Grandmaison
Contact Person: Ronald Grandmaison
Contact Person: Ronald Grandmaison
Contact Person: Ronald Grandmaison
Contact Person: Ronald Grandmaison
Contact Person: Ronald Grandmaison
Contact Person: Ronald Grandmaison
Contact Person: Tom Jameson
![Page 18: NH DEPARTMENT OF TRANSPORTATION * DIVISION OF … · Print Date: 03/31/20 2020 Page 3 of 11 Fiscal Year 2020 NH Route 107 Replacement of a 5' x 7' metal arch culvert under NH 107,](https://reader034.vdocuments.us/reader034/viewer/2022042217/5ec1f49393e4a025a2723a48/html5/thumbnails/18.jpg)
03/31/20Print Date: 2021 Page 5 of 8
Fiscal Year
2021
Spaulding Turnpike Construct All Electronic Tolling at Dover and Rochester Toll Plazas.[TPK *]
Various Roadway preservation (Chip Seal) on Various roadways.[Pave-T3-4-Resurf]
Peverly Hill Rd. Const. new sidewalk and striped bicycle shoulders and associated drainage along Peverly Hill Road.[CMAQ *, NON-PAR (other)]
FE Everett Turnpike FE Everett Turnpike widening of a 2-lane section from north of Exit 13 to north of I-293 diverge.[TPK *]
NH 101 Bridge Rehab or Replacement of br no 090/065 carrying NH 101 over Pulpit Brook[Bridg-T1-2-Rehab-Rcn, Other Fed Aid]
Various Installation of rumble strips along Stateroadways.
[HSIP *]
Portions on High Street, Memorial Drive, Cemetery Rd. Const sidewalks on High St, Memorial Dr, Cemetery Rd, upgrade crosswalk across High St, const Path[TA *]
Hampton Branch Rail Corridor Acquire 9.7 milesRR Corridor Hampton-Portsmouth & improve existing corridor surface for bike/ped[CMAQ *]
Project DescriptionTarget Ad Date
Approx. Contract Amt.
Federal Dollars
DOVER - ROCHESTER 29440
CHIP SEAL 2021 42443
PORTSMOUTH 20258 X-A002(061)(LPA)
NASHUA-MERRIMACK-BEDFORD 13761D
BEDFORD 13692C X-A004(254)
STATEWIDE 40843 X-A004(502)
SOMERSWORTH 41363 X-A004(606)(LPA)
HAMPTON - PORTSMOUTH 26485 X-A003(355)
Project Name / Number
Second Quarter Total
February Monthly Total
March Monthly Total
April Monthly Total
$16,275,000
$1,795,000
$1,063,700
$16,388,300
$3,977,100
$446,400
$810,500
$1,906,500
$0
$0
$340,400
$0
$3,977,100
$446,400
$648,400
$1,906,500
23-Feb-21
02-Mar-21
09-Mar-21
23-Mar-21
13-Apr-21
04-May-21
12-May-21
25-May-21
$37,824,500
$19,247,000
$3,977,100
$487,300
$340,400
$3,977,100
$88,985,700 $24,037,900
February 2021
March 2021
April 2021
May 2021
Contact Person: Nancy Spaulding
Contact Person: Ronald Grandmaison
Contact Person: Tom Jameson
Contact Person: Wendy Johnson
Contact Person: Jennifer Reczek
Contact Person: Mike Dugas
Contact Person: Tom Jameson
Contact Person: Mike Dugas
![Page 19: NH DEPARTMENT OF TRANSPORTATION * DIVISION OF … · Print Date: 03/31/20 2020 Page 3 of 11 Fiscal Year 2020 NH Route 107 Replacement of a 5' x 7' metal arch culvert under NH 107,](https://reader034.vdocuments.us/reader034/viewer/2022042217/5ec1f49393e4a025a2723a48/html5/thumbnails/19.jpg)
03/31/20Print Date: 2021 Page 6 of 8
Fiscal Year
2021
Elwyn Road Add a multi-use path for bike/pedalong Elwyn Rd extending from Rt1 to Harding Rd.[CMAQ *]
US 4 Bridge Pres on 3 brs in Canaan carrying US 4 over Indian Riv, Mascoma Riv, & Crystal Lake Brook.[Bridg-T1-2-Main-Pres]
NH Route 25A Bridge Replacement is anticpated for the bridge carrying NH Route 25A over Brackett Brook (217/112)[Bridg-T3-4-Rehab-Rcn]
SPAULDING TURNPIKE / LITTLE BAY BRIDGES Remove the superstructure General Sullivan Br& provide the most cost effective bike/ped connection[TPK *]
NH 101A Safety impr. at NH 101A / Cont. Blvd & at Craftsman Lane / Boston Post Rd[Other Fed Aid]
I-89 Rehabilitate from MM 24.2 to MM 28.7 including the ramps for exit 10[GARVEE-21, Pave-T1-Rehab]
I-89 Pavement Rehab from MM 20.5 to MM 24.2[GARVEE-21, Pave-T1-Rehab]
NH Route 104 Rehabilitation of a 90" dia. multi-plate pipe under Route 104 at intersection of Corliss Hill Rd.[CRDR *]
Project DescriptionTarget Ad Date
Approx. Contract Amt.
Federal Dollars
PORTSMOUTH 41752 X-A004(740)(LPA)
CANAAN 42938 X-A004(998)
ORFORD 40366 X-A004(371)
NEWINGTON - DOVER 11238S
MERRIMACK 10136D X-A001(265)
SUTTON 42419 X-A004(839)One Contract With 15747
WARNER - SUTTON 15747 X-A000(942)One Contract With 42419
MEREDITH 42912 X-A004(991)
Project Name / Number
Third Quarter Total
May Monthly Total
June Monthly Total
July Monthly Total
$790,500
$1,325,300
$1,860,000
$28,132,500
$4,019,700
$12,834,000
$12,399,700
$320,900
$632,400
$1,325,300
$1,860,000
$0
$4,019,700
$372,000
$372,000
$320,900
01-Jun-21
15-Jun-21
29-Jun-21
20-Jul-21
27-Jul-21
10-Aug-21
10-Aug-21
17-Aug-21
$3,163,400
$3,975,800
$32,152,200
$3,001,300
$3,817,700
$4,019,700
$11,116,300 $10,796,100
May 2021
June 2021
July 2021
August 2021
Contact Person: Bob Hudson
Contact Person: David Scott
Contact Person: Joseph Adams
Contact Person: Keith Cota
Contact Person: Jennifer Reczek
Contact Person: Tobey Reynolds
Contact Person: Tobey Reynolds
Contact Person: Kirk Mudgett
![Page 20: NH DEPARTMENT OF TRANSPORTATION * DIVISION OF … · Print Date: 03/31/20 2020 Page 3 of 11 Fiscal Year 2020 NH Route 107 Replacement of a 5' x 7' metal arch culvert under NH 107,](https://reader034.vdocuments.us/reader034/viewer/2022042217/5ec1f49393e4a025a2723a48/html5/thumbnails/20.jpg)
03/31/20Print Date: 2021 Page 7 of 8
Fiscal Year
2021
Fiscal Year 2021 Total
US 4 Replacement of bridge carrying US 4 overBlackwater River (143/077)[Bridg-T1-2-Rehab-Rcn]
S BENNINGTON ROAD South Bennington Road over Russell Brook Bridge Rehab or Replacement[Bridg-T3-4-Rehab-Rcn]
Huse Road Address Red List bridge carrying Huse Road over I-293 and NH Route 101 (176/106)[Bridg-T3-4-Rehab-Rcn]
NH Route 122 Address Red List bridge carrying NH 122 (Main St) over NH 101 in the Town of Amherst (135/109)[Bridg-T3-4-Rehab-Rcn]
US Route 1 Superstructure replacement of bridge carrying US 1 over Boston & Maine RR (Red List Br No 148/132)[Bridg-T1-2-Rehab-Rcn, None-Bridge]
Project DescriptionTarget Ad Date
Approx. Contract Amt.
Federal Dollars
ANDOVER 40392 X-A004(384)
BENNINGTON 29486 X-A004(156)
MANCHESTER 41414 X-A004(624)
AMHERST 41413 X-A004(623)
NORTH HAMPTON 24457 A002(909)
Project Name / Number
Fourth Quarter Total
August Monthly Total
September Monthly Total
$3,255,000
$558,000
$2,325,000
$1,860,000
$4,185,000
$3,255,000
$558,000
$2,325,000
$1,860,000
$4,185,000
31-Aug-21
07-Sep-21
07-Sep-21
14-Sep-21
14-Sep-21
$28,809,600
$8,928,000
$4,319,900
$8,928,000
$69,889,800
$209,939,000
$17,267,600
$78,516,100
August 2021
September 2021
Contact Person: Joseph Adams
Contact Person: David Scott
Contact Person: Joseph Adams
Contact Person: Joseph Adams
Contact Person: Matthew Lampron
![Page 21: NH DEPARTMENT OF TRANSPORTATION * DIVISION OF … · Print Date: 03/31/20 2020 Page 3 of 11 Fiscal Year 2020 NH Route 107 Replacement of a 5' x 7' metal arch culvert under NH 107,](https://reader034.vdocuments.us/reader034/viewer/2022042217/5ec1f49393e4a025a2723a48/html5/thumbnails/21.jpg)
03/31/20Print Date: 2021 Page 8 of 8
HANOVER, NH - NORWICH, VT 42278 X-A004(800)
BOW 42704 X-A004(950)
SWANZEY 27692 X-A003(591)
Project Name / Number
NH 10A Bridge Preservation effort on the bridge carrying NH 10A over Conn River (Ledyard Bridge)[Bridg-HIB-Main-Pres, NON-PAR (Vermont)]
I-89 Rehabilitation of a 48" cmp & 18" cmp under I-89 near intersection of I-93, Bow.[CRDR *]
NH Route 32 Address Red List Bridge (149/072) carrying NH Route 32 over Martin Brook in the Town of Swanzey[Bridg-T3-4-Rehab-Rcn]
Project Description
24-Aug-21
14-Sep-21
14-Sep-21
Target Ad Date
$1,767,000
$488,300
$1,209,000
Approx. Contract Amt.
$1,219,200
$488,300
$0
Federal Dollars
ON-SHELF PROJECTS
Fiscal Year 2021
On-Shelf Projects 2021 Total $3,464,300 $1,707,500
Contact Person: David Scott
Contact Person: Kirk Mudgett
Contact Person: Joseph Adams
On Shelf Projects Advertising are subject to availability of funding.In addition these projects are subject to STIP Amendments to bring them into the current fiscal year.