ngn 2004 project status on july 25
DESCRIPTION
NGN 2004 Project status on July 25. Jean-Yves Cochennec WP 1/13 Chairman. The NGN 2004 ITU-T Project. The Project has been launched at the SG13 Nov. 2002 meeting, a document describing the Project had then been prepared (TD19 Plen) - PowerPoint PPT PresentationTRANSCRIPT
International Telecommunication Union
SG13 meeting, "futures" session, July 25, 2003
NGN 2004 ProjectNGN 2004 Projectstatus on July 25status on July 25
Jean-Yves CochennecWP 1/13 Chairman
225 July 2003 SG13 meeting, "futures" session, July 25, 2003
ITU-TThe NGN 2004 ITU-T Project
o The Project has been launched at the SG13 Nov. 2002 meeting, a document describing the Project had then been prepared (TD19 Plen)
o It contains a list of basic characteristics in order to give a common understanding to NGN
o Standardization activities on the NGN in ITU-T have been listed in seven study areas : 1. General framework models for the
NGN 2. Functional architecture models for
the NGN 3. End-to-end Quality of Service 4. Service platforms (APIs) 5. Network management 6. Security 7. Generalized mobility
325 July 2003 SG13 meeting, "futures" session, July 25, 2003
ITU-T
NGN 2004 Project : activities at this SG13 meeting
o A management meeting of the NGN 2004 Project held on July 11 has confirmed a growing interest for the Project, proposals to expand its scope through new study areas were then formulated
o Results of WP1/13 meeting : Four new study areas are introduced in the Project, a living list is created (two items)
o New study areas are :• Network control architecture and protocols• Service capabilities and service architecture• Interoperability of services and network in the NGN• Numbering, naming and addressing (title only)
o We noted that the coverage of service aspects in the Project still needs clarification, a specific liaison will be transmitted to SG16.