NFPA-110 Chapter 8: Routine and Operational Testing ChecklistPage 1
Project Equipment Description
Company / Owner
Address:
Contact:
Phone:
Chapter 8.1.1 General
The routine maintenance and operation testing program shall be based on all of the following:
Manufacturer's recommendations, Instruction Manuals, Minimum Requirements of NFPA-110 Chapter 8, and AHJ
8.2.1. Are there two sets of instruction manuals NO
for all the major components of the EPSS YES
8.2.2. Are there two sets of manuals on all Level 1 NO
equipment? One at equipment and one stored elsewhere? YES
8.2.3. Are special tools required for routine maintenance NO
available onsite and available for use when needed? YES
8.2.4. Are manufacturer's recommended spare NO
parts inventoried in a secure location on site? YES
8.3.1.-2. Has the EPSS been maintained to ensure to a NO
reasonable degree that the system is reliable? YES
8.3.3. Has a written schedule for routine maintenance NO
and operational testing of the EPSS been established? YES
8.3.4. Is a permanent record of the EPSS inspections, NO
tests, exercising, operation, and repairs available? YES
8.3.5. Has a written schedule for routine maintenance NO
and operational testing of the transfer switch evident? YES
8.3.6. Has a written schedule for routine maintenance NO
and operational testing of the paralleling gear evident? YES (Only if applicable)
8.3.7.* Is a permanent record of weekly inspections and NO
maintenance of the storage batteries available? YES
8.3.8. Is a permanent record of annual inspections NO
of the fuel quality by ASTM standards available? YES
-
Prime Power Services
8225 Troon Circle
Austell, Georgia 30168
855-436-7774 Emergency
770-381-2424 Office
770-381-2438 Fax
NFPA-110 Chapter 8: Routine and Operational Testing ChecklistPage 2
8.4.1. Is a permanent record available that the NO
EPSS has been inspected weekly? YES
8.4.2. Is a permanent record available that the NO
EPSS has been exercised under 30% load monthly? YES
8.4.2.3 Systems that do not meet 30% monthly must be NO
annually load banked 50% for 30min & 75% for 60Min YES
8.4.4 Does permanent record also include NO
"cold start" testing? YES
8.4.6. Is a permanent record available that the NO
transfer switch(s) are operated monthly? YES
8.4.7. Is a permanent record available that the NO
low voltage circuit breakers are exercised annually? YES
(circuit breakers above 600V are exercised every 2 years)?
8.4.9. Is a permanent record available that the EPSS NO
every three years has run with 30% connected load for 4 hours? YES
Additional Notes or Comments
Name of person completing report? Print:
Signature
Firm:
email: