Prime Power Services 8225 Troon Circle Austell, Georgia 30168 855-436-7774 Emergency 770-381-2424 Office 770-381-2438 Fax NFPA-110 Chapter 8: Routine and Operational Testing Checklist Page 1 Project Equipment Description Company / Owner Address: Contact: Phone: Chapter 8.1.1 General The routine maintenance and operation testing program shall be based on all of the following: Manufacturer's recommendations, Instruction Manuals, Minimum Requirements of NFPA-110 Chapter 8, and AHJ 8.2.1. Are there two sets of instruction manuals NO for all the major components of the EPSS YES 8.2.2. Are there two sets of manuals on all Level 1 NO equipment? One at equipment and one stored elsewhere? YES 8.2.3. Are special tools required for routine maintenance NO available onsite and available for use when needed? YES 8.2.4. Are manufacturer's recommended spare NO parts inventoried in a secure location on site? YES 8.3.1.-2. Has the EPSS been maintained to ensure to a NO reasonable degree that the system is reliable? YES 8.3.3. Has a written schedule for routine maintenance NO and operational testing of the EPSS been established? YES 8.3.4. Is a permanent record of the EPSS inspections, NO tests, exercising, operation, and repairs available? YES 8.3.5. Has a written schedule for routine maintenance NO and operational testing of the transfer switch evident? YES 8.3.6. Has a written schedule for routine maintenance NO and operational testing of the paralleling gear evident? YES (Only if applicable) 8.3.7.* Is a permanent record of weekly inspections and NO maintenance of the storage batteries available? YES 8.3.8. Is a permanent record of annual inspections NO of the fuel quality by ASTM standards available? YES

Upload: mohammad-shahidul-islam

Post on 31-Aug-2015

18 views

Category:

Documents


1 download

DESCRIPTION

NFP

TRANSCRIPT

  • Prime Power Services

    8225 Troon Circle

    Austell, Georgia 30168

    855-436-7774 Emergency

    770-381-2424 Office

    770-381-2438 Fax

    NFPA-110 Chapter 8: Routine and Operational Testing ChecklistPage 1

    Project Equipment Description

    Company / Owner

    Address:

    Contact:

    Phone:

    Chapter 8.1.1 General

    The routine maintenance and operation testing program shall be based on all of the following:

    Manufacturer's recommendations, Instruction Manuals, Minimum Requirements of NFPA-110 Chapter 8, and AHJ

    8.2.1. Are there two sets of instruction manuals NO

    for all the major components of the EPSS YES

    8.2.2. Are there two sets of manuals on all Level 1 NO

    equipment? One at equipment and one stored elsewhere? YES

    8.2.3. Are special tools required for routine maintenance NO

    available onsite and available for use when needed? YES

    8.2.4. Are manufacturer's recommended spare NO

    parts inventoried in a secure location on site? YES

    8.3.1.-2. Has the EPSS been maintained to ensure to a NO

    reasonable degree that the system is reliable? YES

    8.3.3. Has a written schedule for routine maintenance NO

    and operational testing of the EPSS been established? YES

    8.3.4. Is a permanent record of the EPSS inspections, NO

    tests, exercising, operation, and repairs available? YES

    8.3.5. Has a written schedule for routine maintenance NO

    and operational testing of the transfer switch evident? YES

    8.3.6. Has a written schedule for routine maintenance NO

    and operational testing of the paralleling gear evident? YES (Only if applicable)

    8.3.7.* Is a permanent record of weekly inspections and NO

    maintenance of the storage batteries available? YES

    8.3.8. Is a permanent record of annual inspections NO

    of the fuel quality by ASTM standards available? YES

  • Prime Power Services

    8225 Troon Circle

    Austell, Georgia 30168

    855-436-7774 Emergency

    770-381-2424 Office

    770-381-2438 Fax

    NFPA-110 Chapter 8: Routine and Operational Testing ChecklistPage 2

    8.4.1. Is a permanent record available that the NO

    EPSS has been inspected weekly? YES

    8.4.2. Is a permanent record available that the NO

    EPSS has been exercised under 30% load monthly? YES

    8.4.2.3 Systems that do not meet 30% monthly must be NO

    annually load banked 50% for 30min & 75% for 60Min YES

    8.4.4 Does permanent record also include NO

    "cold start" testing? YES

    8.4.6. Is a permanent record available that the NO

    transfer switch(s) are operated monthly? YES

    8.4.7. Is a permanent record available that the NO

    low voltage circuit breakers are exercised annually? YES

    (circuit breakers above 600V are exercised every 2 years)?

    8.4.9. Is a permanent record available that the EPSS NO

    every three years has run with 30% connected load for 4 hours? YES

    Additional Notes or Comments

    Name of person completing report? Print:

    Signature

    Firm:

    email: