NASA Technical Memorandum 104771 /lv// .i( Hypervelocity Impact Testing of the Space Station Utility Distribution System Carrier Scott Lazaroff (NASA-TM-I04771) HYPERVELOCITY IMPACT TESTING OF THE SPACE STATION UTILITY DISTRIBUTION SYSTEM CARRIER (NASA) 01 p N93-30507 Unclas G3/20 017_968 July 1993 Nf A

Upload: others

Post on 29-Jul-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Nf A - ntrs.nasa.gov

NASA Technical Memorandum 104771

/lv//

.i(

Hypervelocity Impact Testing of theSpace Station Utility DistributionSystem Carrier

Scott Lazaroff

(NASA-TM-I04771) HYPERVELOCITY

IMPACT TESTING OF THE SPACE STATION

UTILITY DISTRIBUTION SYSTEM CARRIER

(NASA) 01 p

N93-30507

Unclas

G3/20 017_968

July 1993

Nf A

Page 2: Nf A - ntrs.nasa.gov
Page 3: Nf A - ntrs.nasa.gov

REVISED ERRATA

NASA Technical Memorandum 104771

Hypervelocity Impact Testing of the Space Station

Utility Distribution System Carrier

by

Scott Lazaroff

Please disregard earlier errata. Replace pages 13, 15, 17, and 27 with the attachedcorrected pages.

Page 4: Nf A - ntrs.nasa.gov
Page 5: Nf A - ntrs.nasa.gov

NASA Technical Memorandum 104771

Hypervelocity Impact Testing of theSpace Station Utility DistributionSystem Carrier

Scott Lazaroff

Lyndon B. Johnson Space Center

Houston, Texas

National Aeronautics and Space AdministrationLyndon BoJohnson Space CenterHouston, Texas

July 1993

Page 6: Nf A - ntrs.nasa.gov
Page 7: Nf A - ntrs.nasa.gov

Contents

Section Page

Introduction ................................................................................................................... 1

Test Article Description ................................................................................................. 1Avionic Lines .......................................................................................................... 2Fluid Lines ............................................................................................................. 2

Test Procedure and System Setup .................................................................................. 3Avionic Lines .......................................................................................................... 3Fluid Lines ............................................................................................................. 3

Test Results ................................................................................................................... 3Avionic Lines .......................................................................................................... 4

Secondary Power Lines .............................................................. :. .................. 4

Primary Power Lines ...................................................................................... 5Coaxial Lines .................................................................................................. 51553 Data Bus Lines ...................................................................................... 5

Fiber Optic Lines ............................................................................................ 5Fluid Lines ............................................................................................................. 6

Active Thermal Control System (ATCS) Lines ............................................... 6Environmental Control and Life Support System (ECLSS) Lines .................. 7Supplemental Reboost System (SRS) Lines ................................................... 7

Conclusions and Recommendations .............................................................................. 8Avionic Lines .......................................................................................................... 8Fluid Lines ............................................................................................................. 9

Acknowledgments .......................................................................................................... 10Appendix A: Data for the UDS Avionic Lines Used for HVI Testing .......................... 44Appendix B: Pre-HVI and Post-HVI Avionic Line Functional

Checkout Description .............................................................................. 45Appendix C: List of NASA Photographs from Test Program. ...................................... 50Appendix D: BUMPER-E Vulnerability Analysis of the LIDS Trays ........................... 51

" rt

ooo

ILl

Page 8: Nf A - ntrs.nasa.gov

Figures

Figure Page

1 Typical Section of the Baseline Utility Carrier on the PIT ................................ 112 Typical Cross Sections of the UDS Test Articles ............................................. 123 Typical HVI Setup of Avionic Bundle Test Article and Simulated Carder ........ 12

4 Secondary Power Line Test Setup for a 0 ° Particle Impact (HIRL Shot No.A1493) in the JSC 4.3 mm Light Gas Gun .................................................. 13

5 Active Thermal Control System Fluid Line Test Setup for a 45 ° ParticleImpact (HIRL Shot No. A1614) in the JSC 4.3 mm Light Gas Gun ........... 14

6 Schematic of JSC HIRL Pressure System ........................................................ 157 Bumper and Witness Plate Mounted in 1.7 mm Light Gas Gun Test Cell

from HIRL Shot No. 1941 ...................................................... :. .................. 168 Physical Damage to Secondary Power Lines from HIR Shot No. 1941 ........ 179 Physical Damage to Secondary Power Lines from HIRL Shot No. A1492 ...... 18

10 Physical Damage to Secondary Power Lines from H[RL Shot No. A1494 ...... 1911 Physical Damage to Secondary Power Line Bundle A2A from HIRL Shot

No. A1494 at Magnifications of 10x, 10x, 10x, and 16x ............................. 2012 Physical Damage to Secondary Power Line Bundle A2C from HIRL Shot

No. A1494 at Magnifications of 16x, 16x, 10x, and 10x ............................. 2113 Physical Damage to Primary Power Lines from HIRL Shot No. A1500 .......... 2214 Physical Damage to Primary Power Lines from HIRL Shot No. A1500 at

Magnifications of6x, 10x, and 16x for Line A5B and 10x for ASA ........... 2315 Physical Damage to Coaxial Line Bundle A17B from HIRL Shot No.

A1509 at Magnifications of 6x, 6x, 10x, and 10x ........................................ 2416 Physical Damage to 1553 Data Bus Lines from HIRL Shot No. A1532 .......... 2517 Physical Damage to 1553 Data Bus Lines from HIRL Shot No. A1532 at

Magnifications of 6x and 6x for Line A15A and 6x and 6x forLine A15B ................................................................................................... 26

18 Physical Damage to Fiber Optic Lines from HIRL Shot No. A1539 ............... 2719 Physical Damage to Fiber Optic Line Bundles from HIRL Shot No. A1539

at Magnifications of 6x, 6x, 10x, and 10x ................................................... 2820 Physical Damage to Fiber Optic Line Bundles from HIRL Shot No. A1578

at Magnifications of 6x, 10x, 6x, and 6x ..................................................... 29

21 Bumper, Fiber Optic Bundle and Witness Plate Mounted in 1.7 mm LightGas Gun Test Cell from HIRL Shot No. 2020 ............................................ 30

22 Physical Damage to Fiber Optic Lines from FIIRL Shot No. 2020 .................. 30

23 Physical Damage to Active Thermal Control System Fluid Line from HIRLShot No. A1622 at a Magnification of 10x .................................................. 31

24 Physical Damage to the Internal Wall of the Active Thermal Control SystemFluid Line from HIRL Shot No. A1690 ...................................................... 32

25 Scanning Electron Microscope Photo of the HIRL Shot No. A1688 Tube

Wall, an Impact Crater, and Inner Wall Spalling at a Magnificationof 50x .......................................................................................................... 33

26 Metallurgical Cross Section of Fluid Line from HIRL Shot No. A1688 .......... 3327 Metallurgical Cross Section of Fluid Line from HIRL Shot No. A1690 .......... 34

28 Physical Damage to Environmental Control and Life Support System Linefrom HIRL Shot No. A1631 ........................................................................ 34

29 Physical Damage to Supplemental Reboost System Fluid Line from HIRLShot No. A1751 ........................................................................................... 35

iv

Page 9: Nf A - ntrs.nasa.gov

Figure

30

Page

Close-upof Dimple on the Internal Wall of Fluid Line from HIRL Shot No.A1751 .......................................................................................................... 35

Appendix

B 1 Setup for Resistance Check of Secondary Power, Coaxial, and1553 Data Bus Lines ................................................................................... 47

B2 Setup for Resistance Check of Primary Power Lines ....................................... 48B3 Setup for Establishment of Fiber Optic Baseline Conditions ............................ 49B4 Setup for Determining Losses in Fiber Optic Cable ......................................... 49

Tables

Table Page

la Projectile, Target, Bumper, and Wimess Plate Descriptions from JSC HV'ITests of UDS Avionic Lines (Shots 1940, 1941, A1492-A1494, A1498,A1500, A1505, A1507, and A1509) ............................................................. 36

lb Shot Description, Notes/Comments/Damage Descriptions, Avionic Tests, andResults of Avionic Tests from JSC HVI Tests of UDS Avionic Lines

(Shots 1940, 1941, A1492-A1494, A1498, A1500, A1505, A1507,and A1509) .................................................................................................. 37

2a Projectile, Target, Bumper, and Witness Plate Descriptions from JSC HVITests of UDS Avionic Lines (Shots A1517, A1526, A1532, 2020, A1539,A1543, A1576, and A1578) ....................................................................... 38

2b Shot Description, Notes/Comments/Damage Description, Avionic Tests, andResults of Avionic Tests from JSC HVI Tests of UDS Avionic Lines

(Shots A1517, A1526, A1532, 2020, A1539, A1543, A1576,and A1578) .................................................................................................. 39

3a Projectile, Target, Shot, and Bumper Descriptions from JSC FrvI Tests ofUDS Fluid Lines (Shots A1613, A1614, A1622, A1626, A1631, A1640,A1651, A1688, and A1690) ......................................................................... 40

3b Witness Plate Description, Bumper Damage, Damage Description of WitnessPlate, and Notes/Comments/Damage Description from JSC HVI Tests ofUDS Fluid Lines (Shots A1613, A1614, A1622, A1626, A1631, A1640,A1651, A1688, and A1690) ......................................................................... 41

4a Projectile, Target, Shot, and Bumper Descriptions from JSC HVI Tests ofUDS Fluid Lines (Shots A1693, A1695, A1749-A1751, and A1800) ......... 42

4b Wimess Plate Description, Bumper Damage, Damage Description of WitnessPlate, and Notes/Comments/Damage Description from JSC HVI Tests ofLIDS Fluid Lines (Shots A1693, A1695, A1749-A1751, and A1800) ......... 43

Appendix

D1 LIDS Tray Dimensions ..................................................................................... 52D2 Results of Analysis ........................................................................................... 53

V

Page 10: Nf A - ntrs.nasa.gov

Acronyms and Abbreviations

AIATCSAWG

cin

dB

ECLSS

FEP

GN2

HALHIRLHVI

in.

JSC

kmkm/skPa

LEO

MDA-t'IB

M/OD

_nmAi3m-n

MPa

NASA

OD

PFAHTPTFE

SEMSRSSSF

t

UDS

WSTF

aluminum

Active Thermal Control SystemAmerican wire gage

centimeter

decibel

Environmental Control and Life Support System

fluorinated ethylene propylene

gaseous nitrogen

Hypervelocity Analysis LaboratoryHypervelocity Impact Research Laboratoryhypervelocity impact

inches

Johnson Space Center

kilometer

kilometer per secondkilopascal

low Earth orbit

McDonnell Douglas Aerospace-Huntington Beachmeteoroid and orbital debrismicrometer

milliampmillimeter

megapascal

National Aeronautics and Space Administration

outer diameter

pcrfluoralkoxypre-integrated tresspolytetrafluorethylene

Scanning Electron MicroscopeSupplemental Reboost SystemSpace Station Freedom

thickness

Utility Distribution System

White Sands Test Facility

vi

Page 11: Nf A - ntrs.nasa.gov

Abstract

The Utility Distribution System (UDS) of the Space Station Freedom (SSF) is, inpart, responsible for routing avionic and fluid utilities along the pre-integrated trusssegments. These lines arc housed in a rectangular aluminum carrier that providesprotection from the impacts of meteoroid and orbital debris (M/OD) particles. An initialanalysis completed by McDonnell Douglas Aerospace-Huntington Beach estimated thatthe avionic lines in the UDS carrier could experience approximately 200 failures per year.This number is based on a very conservative failure criteria that any penetration into theavionic portion of the UDS carrier would cause an avionic line to fail. This conservativecriteria had to be used because little is known about the effects of M/OD on avionic and

fluid lines, especially behind a protective carrier cover. As a result, a two-phase jointNASA Johnson Space Center and McDonnell Douglas Aerospace-Huntington Beachhypervelocity impact (I-IV'I) test program was initiated to develop an improvedunderstanding of how M/OD impacts affect the SSF avionic and fluid lines routed in theUDS carrier.

This report documents the first phase of the test program which covers nonpoweredavionic line segment and pressurized fluid line segment HVI testing. From these tests, abetter estimation of avionic line failures is approximately 15 failures per year and couldvery well drop to around I or 2 avionic line failures per year (depending upon the resultsof the second phase testing of the powered avionic line testing at White Sands). For thefluid lines, the initial McDonnell Douglas analysis calculated 1 to 2 line failures over a 30year period. The data obtained from these tests indicate the number of predicted fluidline failures increased slightly to as many as 3 in the first 10 years and up to 15 for theentire 30 year life of SSF.

vii

Page 12: Nf A - ntrs.nasa.gov
Page 13: Nf A - ntrs.nasa.gov

Introduction

Since the Space Station Freedom (SSF) will be exposed to a low Earth orbit (LEO)

environment (up to a 500-km altitude), it must be designed to withstand both meteoroid andorbital debris (M/OD) collisions. Specifically, the Utility Distribution System (UDS) is

required to provide M/OD protection for its fluid and avionic lines to a level that, whenconsidering redundancy and repair capability, provides an acceptable system. Yet, littleinformation exists on how M/OD impacts affect pressurized fluid and avionic lines behind aprotective bumper.

For the UDS, the protective bumper is the utility carrier--a rectangular box that runs the

length of the Space Station and made of 0.64 mm (0.025 in.) thick 7075-T73 aluminum(A1). There are two primary carriers where utility lines are routed, one on face 2 and one onface 6 of the hexagonal pre-integrated truss (P1T) segments.

One way of estimating the level of M/OD impacts or failures for a particular design isto use penetration equations that have been derived from empirical data of previoushypervelocity impact (HVI) tests. These equations, such as the Cour-Palais orFish/Summers penetration equations, provide an analytical method to make theseestimations. A study performed by McDonnell Douglas Aerospace-Huntington Beach(MDA-HB) in July of 1991 calculated the number of failures that can be expected of theUDS fluid and avionic lines inside the carders (reference MDA-HB report no. MDC91-H0643, section 4.5.3). The results showed 5650 avionic line failures and 1 to 2 fluid line

failures over a 30 year period (or approximately 200 failures/year). It is important to notethat a very conservative failure criteria assumption was used for the avionic lines becauseof the lack of available data regarding M/OD impacts on utility lines. The assumptionused was that any penetration through the carrier would cause an avionic line failure.

To better understand M/OD impacts and the affect they have on the avionic and fluidlines in the LIDS carder, an HVI test program was initiated. This coordinated test programbeing performed by the Johnson Space Center (JSC) and MDA-HB is separated into twophases. The fast phase of tests, under the direction of the Power Branch of the Propulsionand Power Division, is with segments of inactive avionic lines and pressurized fluid utilitylines behind a simulated UDS carder cover. The second phase uses active avionic lines andpressurized fluid lines (with longer lengths of lines and representative fluid systemvolumes). These tests in the second phase will be conducted with the articles behind both asimulated LIDS carder and housed in a flight-like UDS carrier.

The testing described in this report covers the HVIs completed on the inactive UDSavionics lines and pressurized fluid lines (phase 1), at the JSC Hypervelocity ImpactResearch Laboratory (HIRL), from January through May of 1992 and September throughOctober of 1992, respectively. Its primary objective was to perform an engineeringcharacterization of the damage tolerance of the UDS lines inside the carders. Thisinformation will feed directly into building the test matrix for the next phase of the avionicand fluid line tests that is to be conducted at White Sands Test Facility (WSTF). A

secondary objective was to investigate the effects of the HVIs on functional characteristicsof the avionic lines. Also, a more realistic number of failures of UDS lines inside the carrier

will be estimated using the test data and a probability analysis computed by the BUMPER-E M/OD modeling code.

Test Article Description

The test articles used are representative of the LIDS avionics and fluid lines which areenclosed inside the carrier in individual sections separated by a thin metal barrier. Figure 1shows a typical portion of the current baseline configuration of the utility carders on thePIT.

Page 14: Nf A - ntrs.nasa.gov

Avionic Lines

The types of avionic lines tested were secondary power, primary power, coaxial, 1553data bus, and fiber optic lines. Except for the primary power line tests, the test articles for

each HVI were usually two bundles, each consisting of 7 lines that were approximately 30.5- 35.6 cm (12 - 14 in.) long with minimal spacing between the bundles. The goal here wasto provide adequate target area for an accurate shot and enough length of line to capture asmuch debris as possible. Because interest was being focused on the lines of the bundle thatwere struck first by the particle/debris, a lot of excess lines in the bundle were notnecessary.

The primary power lines had a large enough diameter that bundling was not required,so, two or three individual lines provided a sufficient target area. Figure 2 shows the typicalcross sections of the UDS test articles that were used for the HVIs. Some specificationsfor the avionic lines are given in appendix A.

The test articles were placed approximately 8.5 cm (3.35 in.) behind a 15.2 x 15.2 cm(6 x 6 in.) piece of 0.64 mm (0.025 in.) thick 7075-T73 A1 bumper that represented theUDS carrier cover. In an M/OD protection system, the bumper is a single sheet of materialthat is used to break up the incoming particle. This dissipates the particle's energy andmakes the resulting debris cloud less potent. A constant distance of 8.5 cm was usedbecause it represented the worst case (shortest) spacing between the avionic lines and thebumper. According to MDA-HB drawing no. 1F02896 (August 1991), the distancebetween the UDS carder cover and the largest bundle had been approximated at 8.5 cm.Furthermore, the size of the bundles could vary and this dimension had not been determinedfor the actual bundles in the Space Station carder.

In addition, a witness plate of 0.64 mm thick 7075-T'/3 A1 was placed typically 20.3 cm(8.0 in.) behind the bumper (approximately 11.4 cm or 4.5 in. behind the test articles). Thisdistance corresponds to the depth of the actual Space Station carrier. Information on thedimensions of materials and spacing used for all the avionic tests are also given in tables laand 2a.

An example of the typical layout of the avionic test articles and the simulated UDS

carrier in the test cell, for a shot with an impact angle of 0 ° (relative to the projectile's path),is illustrated in figure 3. A photograph of an actual secondary power line test setup, in theJSC HIRL 4.3 mm light gas gun, is shown in figure 4.

Fluid Lines

The tubing used for the fluid line test articles represented the SSF Active ThermalControl System (ATCS), Environmental Control and Life Support System ('ECLSS), andthe Supplemental Reboost System (SRS). All the tubing was 304L stainless steel and hadthe following outer diameters (OD) and wall thicknesses:

ATCS:ECLSS:SRS:

4.45 cm OD x 0.089 cm wall (1.75 in. OD x 0.035 in. wall); welded1.27 cm OD x 0.051 cm wall (0.50 in. OD x 0.020 in. wall); seamless0.95 cm OD x 0.089 cm wall (0.375 in. OD x 0.035 in. wall); seamless

The tubes were cut to about 36 cm (14 in.) lengths and the ends were flared to

accommodate 37 ° military standard fittings. These end fittings were used to adapt the testarticles to the 1/4 in. tubing required by the JSC HIRL pressure system. For the largediameter ATCS lines, special reducers had to be constructed by welding a 1/4 in. union to a1.75 in. plug and drilling a hole through the assembly. These special plugs and the rest ofthe fluid test article preparations were fabricated at the JSC Thermochernical Test Area.

The spacing between the fluid test articles and the bumper varied depending upon thesize of the fluid line being shot. These distances were based on the spacing of the carrier

2

Page 15: Nf A - ntrs.nasa.gov

barfrom thecarrier cover shown in MDA-HB drawing no. 1F02896 and are given in tables3a, 3b, 4a, and 4b. The bumper and wimess plate material (0.64 mm thick 7075-T73 A1)and dimensional specifications used are the same as in the avionic line tests. The witness

plate was placed 20.3 cm behind the bumper.A photograph of one of the ATCS fluid line HVI test setups, at an impact angle of 45 °

(relative to the path of the projectile), is shown in figure 5.

Test Procedure and System Setup

Avionic Lines

Each avionic HVI test consisted of four parts: a pre-HVI functional check, the HVI

shot, a post-HVI functional check, and the visual inspection/physical damagedocumentation. The functional checks were performed to determine the current carryingcapability of the lines before and after the H'VI tests. This consisted of light signaldegradation measurements for the fiber optic lines, or resistance and dielectric breakdown(current leakage) measurements for the other types of avionic lines. A more detaileddescription of these functional checks is given in appendix B. Two of the three HIRL lightgas guns, the 1.7 mm and the 4.3 mm guns, were used for this portion of the testing. Foreach shot, the test article was installed at the required impact angle and the target chamberevacuated. The vacuum level in the chamber depended upon which light gas gun was used.The smaller, 1.7 mm (0.07 caliber) gun uses aerodynamic sabot separation, and it was

evacuated to approximately 9.5 - 10 torr (about 0.2 psia). The 4.3 mm (0.17 caliber) gunhas a rifled barrel and was pumped down to a vacuum level, approximately 0.5 - 2.0 tort

(0.01 - 0.04 psia), for the shot. After the shot, the test articles were photographed,examined, and sent through the post-test functional checks. All HVI shots, test parameters,and results of the inspections are discussed in the Test Results section.

Fluid Lines

The testing for each type of tubing was composed of two parts: 1) fluid lines atambient pressure and 2) fluid lines at maximum on-orbit system pressure. The test articlewas installed in the target chamber of the 4.3 mm light gas gun at the specified impact angle

(figure 5), and the target chamber was evacuated to approximately 0.5 - 2.0 torr (0.01 - 0.04psia). All of the fluid line tests were performed with the 4.3 mm gun. The test article wasthen pressurized and the light gas gun was fired. A schematic of the JSC HIRL pressuresystem is shown in figure 6. After the shot, a visual inspection was made to document thedamage on the lines. This included examinations with a borescope, a Scanning ElectronMicroscope (SEM), and a metallograph. These findings are described in the Test Resultssection.

Test Results

The main objective of this test program was to gather data on the physical damage tothe UDS carrier utility lines sustained from simulated M/OD HVIs. Also, the effects theseparticles have on the functional characteristics of the avionic lines were examined. Theinformation obtained during the HVI tests and post-shot functional examinations is used toestablish a ballistic limit of the utility lines that are protected by the UDS carrier. This leadsto a better estimation of the number of avionic and fluid line failures to be expected and a

better estimation of whether the current UDS M/OD protection design is adequate.

Page 16: Nf A - ntrs.nasa.gov

Theterm ballistic limit is used to describe the conditions that cause a failure in a

particular shield system. For this test program, the shield system consisted of the protectivebumper (carrier cover) and the rearwall (fluid or avionic line test articles). A ballistic limit isdefined by the parameters of the particle impact such as particle velocity, particle size andmaterial, impact angle, and the type of fluid or avionic line test article. For example, theinitial shot at a shield system uses a certain size particle at a set velocity. The particle size isincreased (or decreased) until the smallest particle which causes the shield system to fail isfound. At that point, a ballistic limit for that system, particle, and velocity has beendetermined, but for these parameters only. If any one of these variables is changed, thentesting must be performed to determine a new ballistic limit.

For this HVI testing, the basic emphasis was to determine what size particle, traveling atapproximately 6.5 km/s and hitting the bumper at 0 ° or 45 °, would cause a failure of the

avionic and fluid lines in the UDS carrier. In other words, the goal was to establish theballistic limit of the UDS lines in the carrier for particles striking the cover at 6.5 km/s at an

impact angle of 0 ° or 45 °. This data was then directly used by the BUMPER-E impactanalysis tool to get a better determination of the effectiveness of the UDS carrier to protectthe lines from M/OD (see Conclusions and Recommendations).

A detailed description of the test articles, the shots, and the physical and functionalcheckout results can be referenced in tables la, lb, 2a, and 2b for the avionic lines and tables

3a, 3b, 4a, and 4b for the fluid lines. A listing of all photographs taken during this testprogram is given in appendix C.

An important note for this testing is that there are a number of shots where a piece ofdebris (either from the pump tube piston or a piece of sabot that was shed from around the

particle) trailed the particle through the light gas gun and impacted the bumper plate. Basedon the visual evidence left by the debris and the expertise of the members of the HIRL, thisdebris did not affect the damage on the test articles that were sustained from the actual HVIparticle. Where there was a question regarding the significance of the debris on the testarticle damage, a repeat shot was performed.

Avionic Lines

A set of criteria was established for these HVI tests to determine the extent of

functional damage the lines would have to receive to classify them as failed. This failurecriteria was put together with the help of SSF engineers responsible for the particular typeof avionic lines used in these tests. For the power, data bus, and coaxial lines, the failurecriteria was > 5 mA of current leakage and/or a 10 - 15% increase in resistance. For thefiber optic lines, a signal loss of 8 - 10 dB constituted a failed line.

Secondary Power Lines

The first set of HVI shots conducted for this test program used secondary power linesas the test articles. Because little was known of the effects of M/OD on avionic lines, theinitial shots were conservative using very small particle sizes. Figure 7 shows the bumperand witness plate mounted in the test setup from HIRL shot no. 1941 (post-HYI and withtest articles removed). Figure 8 is a close-up picture of these test articles from HIRL shot

no. 1941. This shot used a 0.8 mm (1/32 in.) diameter A1 sphere traveling 6.66 km/s. Theparticle penetrated the simulated carrier cover, but did very little physical damage and did notdegrade the insulation or increase the resistance of the lines. This is very important becausethe MDA-HB estimation described earlier used a failure assumption that any penetrationthrough the carrier would cause an avionic line failure. These tests prove that even thoughthe particle penetrates the bumper (simulated carrier cover) a failure does not necessarilyresult. HIRL shot no. A1492 is another example of the particle perforating the bumper, yetcausing no functional deterioration in the lines (figure 9 and tables la and lb).

Page 17: Nf A - ntrs.nasa.gov

A preciseballisticlimit wasnotdeterminedfor secondarypowerlines. A 2.4mm (3/32in.) diameterA1spherestrikingthesimulatedcarriercoverat45° (HIRL shot no. A1494)was the biggest particle fired at the secondary power lines. It caused a large amount ofphysical damage (figures 10, 11, and 12), and a few of the test article lines indicated someslight increases in resistance during the post-HV checkout. There was no dielectricbreakdown of the insulation on any of the secondary power lines. For this part of the HVItest program, the parameters of A1494 are on the borderline of the ballistic limit curve, andthe WSTF active line testing will better establish this limit.

Primary Power Lines

For the primary power lines, an exact ballistic limit was not identified. The HVI of a3.2 mm (1/8 in.) diameter A1 sphere striking the bumper at 45 ° (HIRL shot no. A1500)

caused significant insulation damage and severed a small number of conductor strands(figures 13 and 14). However, there was no increase in resistance. Dielectric breakdown(current leakage) of the lines was not tested.

Coaxial Lines

The ballistic limit for the coaxial lines is estimated to be near the parameters of HJRLshot no. A1509. For this shot, a 2.4 mm diameter A1 sphere striking the bumper at 45 ° was

used, and it damaged one line enough to expose the inner conductor (figure 15). This linedid not increase in its resistance reading, but it did have > 5mA of current leakage from theinner conductor to the outer shield. This is enough loss in insulation protection to cause afunctional failure of that line (appendix B).

1553 Data Bus Lines

HIRL shot no. A1532 used a 2.4 mm diameter A1 sphere striking at 45 ° and caused

significant dielectric breakdown (> 5mA of current leakage = failure assumption) in severallines of both test article bundles. The physical damage to the data bus lines from this shotis depicted in figures 16 and 17. The results of this test indicate that the parameters are wellwithin the ballistic limit since many lines failed. A smaller particle was not shot at theselines, but it will be included as part of the recommendations for the active avionic HVI testsat WSTF.

Fiber Optic Lines

The ballistic limit for the fiber optic lines is found from the HIRL shot no. A1539, inwhich a 1.6 mm diameter A1 sphere impacted the bumper at 45 °. The signal losses in thetwo severely damaged fiber optic lines of shot A1539 were 35.4 and 36.3 dB. Based on thefailure criteria, this is significant enough for a functional failure of the line. The physicalline degradation associated with shot A1539 can be seen in figures 18 and 19.

The ballistic limit conclusion is reached because a repeat of the A1539 parameters wasmade (HIRL shot no. A1578), and the post-HVI check showed no loss of light signal

through the line. As seen in figure 20, the physical damage is very similar to the damage tothe fines from HIRL shot A1539. Thus in a worst case, the parameters of A1539 andA1578 can cause a failure in the fiber optic lines and therefore they lie on the border of theballistic limit curve.

In addition, figures 21 and 22 indicate similar findings described in the secondarypower lines summary of results. It can be seen that small particles (< 1.6 mm in diameter)penetrate the bumper, yet cause little physical damage and no functional damage.

5

Page 18: Nf A - ntrs.nasa.gov

Fluid Lines

The failure criteria for this testing must be mentioned before interpreting the results indetail. This criteria is that only a perforation of the test article tube wall is specifically

called a failure and not a specified degree of spall or depth of an impact crater. These lattertwo phenomena may have some affect on the strength of the line so that the burst pressurerating of the line is reduced, but for this testing these damage phenomena will not classifythe test article as a failed line.

Active Thermal Control System (ATCS) Lines

Several shots were performed with the test articles filled with water and pressurized to101 kPa (14.7 psia) to simulate liquid anamonia filled lines. The most significant resultswere obtained from HIRL shot nos. A1622 and A1688. Under the failure criteria stated

previously, the ballistic limit parameters found for this testing come from HIRL shot no.

A1622. It had a 2.4 mm diameter A1 sphere striking the bumper at 45 ° and approximately6.5 km/s. The failure criteria for the fluid line tests is a perforation of the tube wall, and thisparticle caused two perforations, 0.85 x 1.8 mm and 1.52 x 1.52 mm (figure 23). The testarticle from HIRL shot no. A1688 used a 2.0 mm diameter particle, striking the bumper at45 ° and about 6.8 km/s. It sustained some serious crater damage which caused dimpling ofthe internal wall, but no perforation resulted.

HIRL shot no. A1690 was performed with nearly the same parameters as A1688,except that the water in the line was pressurized to the maximum ATCS pressure of- 2.0MPa (286 psia). This fluid line had serious crater damage which also caused some internaldimpling, but again, no perforation of the wall occtmed.

Further structural analyses were performed on the fluid line test articles from shots

A1688 and A1690 at the JSC Structures and Mechanics Division Laboratory. Initially, aborescope was used to get a better picture of the internal dimples. Upon identifying somepotential detached spaU, a series of x-rays was taken to document the tube damage and todetermine if any changes in material density had occurred. These radiography pictures wereinconclusive.

Next, the lines were cut longitudinally and the internal damage photographed. Figure24 shows a "rift" in a dimple from the inside wall of the HIRL shot no. A1690 test article.

The most heavily damaged area of the lines was subsequently cut from the tubes and theexternal craters and internal dimples documented using a JEOL JSM-820 SEM. The pieceswere then sectioned through the crater location and further documented with the SEM. TheSEM examination identified the spalling of the internal tube wall surface, showed the

interface between the particle debris and the fluid line, and noted the compression of thegrain structure at the point of impact. Figure 25 is an example of a typical SEM photoshowing a cross-sectional view of the tube wall from HIRL shot no. A1688, a crater, and theresultant spalling of the inner wall.

In addition, a cross section of the impact area was looked at using a Zeiss AX10MATmetallograph. These metallurgical cross sections further clarified the degree of spaUing ofthe internal fluid line wall. As can be seen in figures 26 and 27, there is significant damageto the test article from HIRL shot nos. A1688 and A1690, respectively.

HIRL shot nos. A1688 and A1690 had some debris from the pump tube piston impactthe bumper. This debris may have done some damage to the test articles. The parametersof HIRL shot A1690 were repeated in HIRL shot no. A1800 to make certain the unwanted

piston did not cause the damage discussed above. Since A1688 and A1690 used verysimilar shot parameters, both were not repeated. A1800 was a clean shot and initialinspection showed several dimples on the internal wall of the test article. The fluid line was

cut open and these dimples closely compared to the ones found in A1688 and A1690.Therefore, k is concluded (without the need for further destructive analyses) that the damage

6

Page 19: Nf A - ntrs.nasa.gov

to thetestarticlesfrom shotsA1688andA1690wasindeedcaused by the particle and not

some foreign debris.Based on the criteria that a perforation of the tube wall constitutes a failure, the

parameters of HIRL shot no. A1622 are obviously beyond the ballistic limit of these fluidlines. However, the analyses of the test article from shots A1688 and A1690 clearly show

major structural damage to the tube wall at that impact point. This results in a weak spot inthe line, and may be a concern if a pressure surge were to occur. Nonetheless, it can beconcluded that the parameters of HIRL shot nos. A1688 and A1690 are barely below, if not

right at, the ballistic limit for these ATCS lines.Also, HIRL shot nos. A1688 and A1690 were conducted with almost identical

parameters except for water pressure. It was determined that the higher internal storedenergy of the test article from A1690 did not significantly affect the damage caused duringthe HVI. The maximum internal system pressure of approximately 2.0 MPa (286 psia)stresses this line less than 20% of its yield strength. The slightly deeper craters and visibleinternal wall damage on A1690 are more likely due to the lower impact velocity rather than

the higher internal pressure.

Environmental Control and Life Support System (ECLSS) Lines

These lines simulated a 1.4 MPa (200 psia) gaseous nitrogen (GN2) ECLSS line thatwill be used to pressurize the SSF external ATCS tanks and pump module hardware. Thefirst three shots were performed with the test articles at this SSF system pressure (1.4MPa), and the results indicate that the ballistic limit is near the parameters of HIRL shot no.A1631. In this shot, a 2.0 mm diameter particle impacted the bumper at 45 °, and thesubsequent cloud of debris created a 0.8 x 0.8 mm and a 1.0 x 1.1 mm perforation in the

tube wall (figure 28). HIRL shot no. A1640 used a slightly smaller particle size of 1.8 mmat the exact same parameters and only caused some mamng and craters on the externalsurface of the tube.

Next, the 1.8 and 2.0 mm particles were shot at lines also pressurized with GN2, butonly to 101 kPa. The test articles of HIRL shot nos. A1693 (using a 2.0 mm particle) andA1695 (using a 1.8 mm particle) both sustained perforations of the tube wall. Shot A1693resulted in a hole in the tube approximately 0.6 x 0.7 ram. The penetration in the line fromA1695 is 1.1 x 1.6 mm and though it is believed to have been caused by the actual testparticle striking the bumper, it could have originated from the piece of debris that followedthe particle. This debris impacted the bumper very close to where the test particle did, so itis difficdt to determine which may have caused the tube wall perforation. As a result, theparameters of shot A1695 were repeated in HIRL shot no. A1749 and no perforation of thetest article resulted. However, two visible dimples on the internal surface were found and onfurther examination, one of the dimples had detached spall. Therefore, it is determined thatthe parameters of HIRL shot no. A1693 are just past the ballistic limit for these ECLSSlines, while A1749 (and A1695) is right on the limit.

Supplemental Reboost System (SRS) Lines

Two shots were conducted with lines that represented the SSF SRS lines. The SSFSRS will collect, store, and propulsively dispose of waste gases. For these tests, the lines

were pressurized with GN2 to the maximum SRS pressure of 6.9 MPa (1000 psia). Noperforations of the tube wall were produced in these two tests, but the test article from HIRLshot no. A1751 did sustain some significant damage (figure 29). There are two particularlylarge and deep craters that penetrate approximately 0.30 - 0.35 mm into the wall and causethe internal surface of the tube to dimple. These dimples were observed with the borescope,and it appeared that one could have some possible detached spall.

A structural analysis on the line from shot A1751, similar to the one completed on theATCS lines, was completed and documented. Figure 30 definitely indicates some detached

7

Page 20: Nf A - ntrs.nasa.gov

spallon thefightinternaldimple and thestartingof some detached spallon theother(small

crack/flakingofmaterial).Furtherobservationunder thestereoscopicmicroscopesubstantiated the spaUing that occun'ed on the internal surface of the tube. As a result, it isconcluded that the parameters from HIRL shot A1751 lie on the borderline of the ballisticlimit for these lines.

A slower moving piece of debris (relative to the particle) penetrated the bumperapproximately 1.5 cm down and 1.1 cm to the right of the particle impact point. It is similarto the type of debris seen in the ATCS tests. Because of its speed and location and for thereasons discussed earlier for the ATCS lines, it is concluded that the particle and not thedebris produced the serious damage to the SRS line described here in the results.

Conclusions and Recommendations

The overall goal of this phase of the HVI test program was to develop an improvedunderstanding of how M/OD impacts affect the SSF avionic and fluid lines routed in theUDS carrier. The need for the program arose from the results of some initial and veryconservative analyses which predicted up to 200 failures per year could occur in these UDSlines. This report documents that the program goal was achieved with great success.Specifically, the three objectives of 1) perfomaing an engineering characterization of the

damage tolerance of the UDS avionic and fluid lines inside the carrier, 2) investigating theeffects of the simulated M/OD impacts on the functional characteristics of the avionic lines,and 3) estimating a more realistic number of failures of UDS lines inside the utility carriers,were sufficiently met. This phase of testing filled a void where little data had previouslyexisted. The information will help demonstrate how good the baseline UDS carrier designis from an M/OD protection standpoint and will feed directly into determining how muchextravehicular activity maintenance time is required to replace functionally damaged/failedUDS lines on SSF. A synopsis of the conclusions reached during the testing is givenbelow.

Avionic Lines

First, the JSC HVI tests prove that the conservative assumption used in the initialMDA-HB analysis is not true. This assumption stated that any penetration through thecarrier would cause an avionic line failure. Several tests on the secondary power and fiberoptic lines show that particles less than 1.6 mm in diameter (which constitute a majority ofthe particle sizes in the LEO environment) do penetrate the simulated UDS utility carriercover, but only do minimal physical damage and do not degrade the insulation or increasethe resistance of the lines.

In addition, some of the physical damage on the avionic lines seemed severe from a

visual standpoint. Insulation was destroyed and often conductors exposed. However, theselines passed the avionic line functional checks, indicating the cabling would work properly.Therefore, they were not considered failures.

These conclusions are made with the understanding that the HVI testing of poweredavionic lines at WSTF will add some crucial data that could alter the answers found here.

At the completion of these JSC HVI tests, a vulnerability analysis was performed bythe JSC Hypervelocity Analysis Laboratory (HAL) using the BUMPER-E computer model.It predicted the expected number of impacts on the avionics and fluid sections of the LIDS

carrier for several test particle diameters. A more detailed description of the BUMPERanalysis is shown in appendix D. Based on the data obtained from the HVI tests and this

BUMPER nan (which used an updated environment model and penetration equationcompared to the original MDA-HB analysis), a better estimation of the number of failuresto the avionic lines was determined. Instead of anticipating up to 200 avionic line failures

Page 21: Nf A - ntrs.nasa.gov

peryear,approximately 15 failures per year was found to be more realistic. This numberis still conservative and could potentially drop to around I or 2 avionic line failures per

year. However, the final determination of the number of avionic line failures will depend

upon the outcome of the powered avionic line HVI testing at WSTF.An additional conclusion reached from the BUMPER-E computer run was that the

upper LIDS carrier will be hit by more M/OD than the lower carder. This is due to the typeof attitude that the SSF will by flying in LEO. The ratio of impacts on the upper carrier to

the impacts on the lower carrier are as great as 10 to 1 when the Space Shuttle Orbiter isdocked to SSF. When the Orbiter is not docked, the ratio decreases to about 1.7 to 1.

The data gathered in this testing at JSC also provided a lot of background informationfor this next phase of tests at WSTF. The following are some recommendations on particlesizes that could be used during those active line tests.

Secondary_ Power Lines: The initial shot should be with a 2.4 mm or even a 1.6 mmdiameter A1 sphere striking at 45 °. These lines will operate at 120 volts, and under full loadconditions they will carry 58 A. Because of the potential of a high current fault, the smallerparticle is suggested.

primary Power Lines: A shot with a 2.4 mm diameter A1 sphere striking at 45 °should be used as a starting point for a similar reason as described above for the powered

secondary power lines.i_,9.11V_..ldll_: A shot with a 1.6 mm diameter A1 sphere striking at 45 ° is suggested

to be used as a starting point during the active avionic HVI tests at WSTF.1553 Data Bus Lines: It is recommended that the initial shot should be with a 1.6 mm

diameter A1 sphere striking at 45 °. This is because several lines were found to befunctionally damaged with a 2.4 mm diameter particle striking the bumper (HIRL shot no.A1532). A smaller particle might have enough kinetic energy to cause functional damage toa single 1553 data bus line. Thus, the parameters of A1532 could be past the ballistic limit.

Fiber Optic Lines: It is recommended that a shot with either a 1.6 mm or slightlysmaller particle (such as a 1 ram) diameter A1 sphere striking at 45 ° should be used as astarting point.

Fluid Lines

An issue with the fluid line tests was whether the internal pressure of the SSF systemswould add to the hazard of an M/OD impact. This extra potential energy in the test articles

was investigated and found not to be significant for the lines on the Space Station. First, thehoop stress calculated for the fluid lines used in the I-IVI testing was only 15% to 20%(maximum) of the yield stress of 304L stainless steel. Second, tests conducted on theATCS and ECL_S lines at system and ambient pressures showed little variance in the

degree of damage experienced. For example, the test articles from I-IIRL shot nos. A1688and A1690 had very similar amounts of damage on the external and internal wall surface.

Another conclusion was that the initial estimate of I to 2 fluid line failures over the 30

year life of the Space Station is slightly low. Based on the distribution of particlescalculated by the BUMPER-E run discussed above and the data from the HVI tests, asmany as 3 fluid line failures could be experienced in the first 10 years and overall up to 15for the entire 30 year life of SSF. At the conclusion of the WSTF testing and a moredetailed BUMPER-E UDS carder analysis, a better calculation will be provided.

For the WSTF fluid lines, some slight variations on wall thickness will be used basedon additional design information during the planning for phase 2. The data obtained from

phase 1 at JSC will help. pick the appropriate shot parameters for phase 2, but norecommendations are gaven at this time.

9

Page 22: Nf A - ntrs.nasa.gov

Acknowledgments

Thanks are extended to all the personnel at the JSC HIRL and HAL who conducted the

HVI shots, helped set up the test system, assisted in post-test visual inspection/dataanalyses, and completed the BUMPER-E computer modeling of the lADS carriers. Theyinclude Jeanne Crews, Manager of the HIRL, and Eric Christiansen, Manager of the HAL(both of the Space Science Branch at JSC). Also included are Pat White, Joe Falcon, JayLaughman, Earl Brownfield, and Lu Borrego (Lockheed support contractors at the HIRL),and Javier Ortega, Jim Hyde, and Gillian Shephard (Lockheed support contractors at theHAL).

Bill Holton, Lockheed support at the Electrical Power Systems (EPS) Laboratory,assembled all the avionic test article cable bundles and performed the pre-HVI and post-HVI checkouts on the power, coaxial, and 1553 data bus lines.

Rick Dean of the JSC Thermochemical Test Area fabricated all the fluid line testarticles.

Glenn Morgan, Lockheed support of the 3SC Structures and Mechanigs Division,performed the SEM and metallograph analyses of the specific fluid lines discussed in theresults.

10

Page 23: Nf A - ntrs.nasa.gov

Carrier Covers (bumper)

Fluid Line Section Avionic Line Section

Hgurc 1. Typical Section of the Baseline Utility Carrier on the PIT

11

Page 24: Nf A - ntrs.nasa.gov

Secondary Power, Coaxial,and 1553 Data Bus Bundles

BundleDiameter

Individual

Lines __

Fiber Optic Bundles

Primary Power Lines

Figure 2. Typical Cross Sections of the UDS Test Articles (not to scale)

Sabot Catcher

UDS lines mounted

to cut-out plate Witness Plate

Particle Path

iParticle

Figure 3. Typical HVI Setup of Avionic Bundle Test Article and Simulated Carrier

12

Page 25: Nf A - ntrs.nasa.gov

Figure 4. Secondary Power Line Test Setup for a 0 ° Particle Impact (HIRL Shot No.A1493) in the JSC 4.3 mm Light Gas Gun.

o_G_, L pp,G_I_ D '¢,1__'x_ p_o._O_P_

13

Page 26: Nf A - ntrs.nasa.gov

Figure5. ActiveThermalControlSystemFluid LineTestSetupfor a45° ParticleImpact(HIRL ShotNo. A1614)in theJSC4.3mm Light GasGun

o_GIt,tAt_p_GE

14

Page 27: Nf A - ntrs.nasa.gov

O4_ _

+,

LgL9 _ o_O "_Z z ,,-,

t_13::1 ojo ,.-.. T Z _ 0_Z o /',/_--..._ L_ o I ,-*

Ldl--- _ _ _ oJ. _ . _7 _u

_-_ _°_o _ryZ I- _r-q<:

°' ' I12--'°_-_J _ - zo = ol_d 1..d o _n _Z_'-" y_' ,

cu _ _(") I z I_-_1 zz.-. _ _,_ Lo

_L _ I ::3 _:_LI_, _ _.,_J E_r'X, ,'-_ z z (j

o_ _ _o_ L_ [ IS31 |(/9(/) z o _._o n_L(/)(/) L_ o _: --L-dLd _ °_ _ ------

rvn," 0_ , __ IQ.. EL o 00I-_ND-8_N

E

;)..,

:=

_J!,-i

.1

(i)

oU

o,,._

E,.=

,,6

P_

]5

Page 28: Nf A - ntrs.nasa.gov

Figure 7. Bumper and Witness Plate Mounted in 1.7 mm Light Gas Gun Test Cell fromHIRL Shot No. 1941

16

,_, _,_

Page 29: Nf A - ntrs.nasa.gov

Figure 8. Physical Damage to Secondary Power Lines from HIRL Shot No. 1941

17

_ _0_ _

Page 30: Nf A - ntrs.nasa.gov

Figure 9. Physical Damage to Secondary Power Lines from HIRL Shot No, A1492

ORIGIN/_ PAGE

BLACK AND WHITE PHOTOGRAPH

18

Page 31: Nf A - ntrs.nasa.gov

Figure 10. Physical Damage to Secondary Power Lines from HIRL Shot No. A1494

19

BU_,CKAND WHITv.. rn_

Page 32: Nf A - ntrs.nasa.gov

ORIGINAg PAGE

BLACK AND Y_LI-ttTEP_HO'[OGRAPH

2O

Or_

O

e.,

.,¢

.<

2_'-"

° _.,.q

cq ¢_

_ °,.-i

_x

3"0

8

¢)

°_,._

;>,.

°

°_,._

LT.

Page 33: Nf A - ntrs.nasa.gov

0

0

c_

°1.-q

e"

C_

<

°i.-_

0

o_

0

0

?,IBLACK AND WHITE PHOTOGRAPH

Page 34: Nf A - ntrs.nasa.gov

Figure 13. Physical Damage to Primary Power Lines from HIRL Shot No. A1500

ORIGINAC PAGE

BLACK At_D _N.Hi.TE pHO_OGRAPH 22

Page 35: Nf A - ntrs.nasa.gov

L.

x

f-

0

0

0

°,-q

<_

ZL-QJ

=:

_<_<

o,-, _,00

EC_

;>.,e.,

oz)

U.

AND WHtTE pHOTOGRAPH

23

Page 36: Nf A - ntrs.nasa.gov

0

x"

x"

0

0o,JQ

c_

c_

<9

d'_:Z.._o8

•_ "d

_'_

_._

_ m

o ,_,,i

.1

° w,,,_

0

c_

E

24

ORIGINAl" PAGE

BLACK A.ND _/J_E P_HO_OGRAP.H

Page 37: Nf A - ntrs.nasa.gov

Figure 16. Physical Damage to 1553 Data Bus Lines from HIRL Shot No. A1532

25

Page 38: Nf A - ntrs.nasa.gov

ORIGINAI_ PA-GE

BLACK AI_D WHITE PHOTOGRAPH

26

p.

x

x

O

¢'_ °,-q

*,,_ °,jq

C'4 C_

,-_ ¢)

<-_• ¢)

j:: ,.-

E"O

¢)

c_

Lz.,

Page 39: Nf A - ntrs.nasa.gov

Figure 18. Physical Damage to Fiber Optic Lines from HIRL Shot No. A 1539

27 s_c_ k_°

Page 40: Nf A - ntrs.nasa.gov

0 IciINAr.|UI_0K AND _HITE p_OT.OGRAPH

28

c'¢1

O

x"

Or._

e..,O

f_

o',

°1'--4

c_F_,-..w

.l" °_

Iw

.w.;

IT.,

.o

C_

oC

°,_I.I.,

Page 41: Nf A - ntrs.nasa.gov

29

e"

0

e"0

e"

o i,,.q

6_

_8

0

E_

_'_,_,,_

M'-"

"._

0

.8

i:m

0_,,q

BLACK AND WHITE PHOTOQRAI!H

Page 42: Nf A - ntrs.nasa.gov

r_

a,. aOZ

5Kt.)5IxI

Figure 21. Bumper, Fiber Optic Bundle and Wimess Plate Mounted in 1.7 mm Light GasGun Test Cell from HIRL Shot No. 2020

Figure 22. Physical Damage to Fiber Optic Lines from HIRL Shot No. 2020

30

Page 43: Nf A - ntrs.nasa.gov

ORIGINAI_ PAGE

BLACK _LD WH[T_E p_.HOIOGRAPH

31

0

O°m..q

P4

<:

2:

r/}

°_._

¢)

¢);>

,<

¢)

c,,I

°,,._

Page 44: Nf A - ntrs.nasa.gov

32

Page 45: Nf A - ntrs.nasa.gov

Figure 25. Scanning Electron Microscope Photo of the HIRL Shot No. A1688 TubeWall,an Impact Crater, and Inner Wall Spalling at a Magnification of 50x

Figure 26. Metallurgical Cross Section of Fluid Line from HIRL Shot No. A1688

33

Page 46: Nf A - ntrs.nasa.gov

Figure27. MetallurgicalCrossSectionof Fluid Linefrom HIRL ShotNo.A1690

Figure28. PhysicalDamageto EnvironmentalControlandLife SupportSystemLinefrom HIRL ShotNo. A1631

34

Page 47: Nf A - ntrs.nasa.gov

Two large cratersthat caused internal

wall dimples shownin figu_ 30

Figure 29. Physical Damage to Supplemental Reboost System Fluid Line from HIRLShot No. A1751

Figure 30. Close-upofDimple on thelntemalWallofFluid Line _omHIRLShotNo.A1751

35 ORIGINAl: P-A-G_

ilI,,ACK AND WHITE PHOTOGRAPH

Page 48: Nf A - ntrs.nasa.gov

n

.-" E

Ji

i-." E

E

.

E A E E

o

E

A

36

Page 49: Nf A - ntrs.nasa.gov

.._-Z

o ._

._ _'.

Z --.E

=_

.--__

_'_.

=_

=_ _

.-.9.

A

E

-

-_._

o

.E

Z

N

._.|

o

<

§

Z

o

"_ "G

_-|

g"

.!

o

It

,_ ._ §

I_-_

E

oZ

a

g

-|_-_.g E-= .=

__'-_

__-_[

.s'_ _"

_-::._| _

o

.e

.S0

Z

.E

Z

,6

- _'_'_

,< _ < < < <

3'7

Page 50: Nf A - ntrs.nasa.gov

< <: < .< < <

38

Page 51: Nf A - ntrs.nasa.gov

39

Page 52: Nf A - ntrs.nasa.gov

r._

S_

II

ili

_P

z

t_

g

,6

g

II

Az

..=4

!n

!_. ¢'_ II K .

d_ d d_

$

A

0

N

0

n

,6

f.,

f-,

II I!

o

_z _z

n

o.

II

0

_z

4O

Page 53: Nf A - ntrs.nasa.gov

[..

_4

r_

0

• °0 w

ii

"_|

|.U

.=

|q_

_t

0

I'"

0 w

!|i!

I!

.<

I!

.<

.|_:_.|

o

z

II

.<

|

II

1_l

8

II

.<

..i,

n ii

i

I!

.<

o

0

II

.<

41

Page 54: Nf A - ntrs.nasa.gov

G_

o

U<

t._

,..Tr,_

0

.--,

B B

=

P

H B0

II n II ii n II

iiI

,<

O

O

II

('t

eql

o

N

.<

A=

O __ Z

II

iO

O

<

_ 2

_D

B_

O v

<

42

Page 55: Nf A - ntrs.nasa.gov

i

J

m°w

,!

IH

II

.<

"Sg

0

111,w

.<

,.S

i

_:m"- _'"i "

d _= i "

_'_ _i- _iii i!B

I

BM

A

i

0

H

<

!i"

H

O

a6

_ V_

gl_..i _ .i

_g

i

i

]v_

r',-

0

II

,<

43

Page 56: Nf A - ntrs.nasa.gov

APPENDIX A: DATA FOR THE UDS AVIONIC LINES USED FOR HVI TESTING

1553 Data Bus Cable (MIL-C-17F. M17/176-00002_

Twisted, shielded pair

Inner conductors:

Outer conductor:

Jacket:

Two 24 American wire gage (AWG) consisting of 19strands of 36 AWG silver-coated, high strength copper alloySingle braid of 38 AWG silver-coated, high strengthcopper alloy wirePFA; Diameter 0.129 + 0.005 in.

Primary_ Power

1/0 AWG line conductor

Cable diameter:Conductor:Insulation:

0.545 + 0.010 in.

Class N, nickel-coated, stranded copper rope laySilicone

Secondary Power

Twisted pair, unshielded and unjacketed

Cable diameter: 0.150 in.

Conductors: 18-gage stranded conductorsInsulation: Teflon

Coaxial Cable (RG-142Bfl, I)

Inner conductor:Dielectric core:

Outer conductor:Jacket:

Solid silver-coated, copper-covered steel wireSolid extruded PTFE (inner conductor insulation)Double braid of 36 AWG silver-coated copper wireTeflon FEP; Diameter 0.195 + 0.005 in.

Fiber Ootic Cable

100/140 gtm type (core =

Cable diameter:

Optical fiber:Protective coating:Tube:

Strength member:Jacket:

100 gtm, cladding = 140 grn)

0.083 + 0.002 in.

Doped silica (glass)High temperature polymide compoundTeflon FEP

Braided teflon coated fiberglassTeflon FEP

44

Page 57: Nf A - ntrs.nasa.gov

APPENDIX B: PRE-HVIAND POST-HVIAVIONIC LINE FUNCTIONALCHECKOUTDESCRIPTION

ThesecheckoutswereconductedbeforeeachHVI testandthenhandcarriedto theHIRL. After theHVI testwascompleted,thetestarticleswerereturnedto theEPSlab andthesecheckoutswererepeated.Thisallowedthecurrentcarrying"health"of thelinesto bedetemained.

Thefunctionalchecksfor thepower,1553databus,andcoaxiallineswereperformedattheEPSLaboratoryin building16atJSC. Thetestequipmentusedfor thispartof theprogramareasfollows:

1)

2)

3)

4)

5)

Slaughter Series 103/105 Dielectric Breakdown and Leakage Tester

Hewlett-Packard Model 3456A Digital Multimeter

Valhalla Scientific 2555A AC-DC Current Calibrator

Valhalla Scientific 4300B Digital Micro-ohmmeter

Fluke 343A DC Voltage Calibrator

The functional checks for the fiber optic lines were performed at the Fiber Optic TestBench in building 15 at JSC. The test equipment used for this part of the program are asfollows:

1) Noyes Optical Light Source OLS 1-2

2) Noyes Optical Power Meter OPM1-2

PRIMARY POWER LINE CHECKOUT

Resistance Test: Each test article was connected as shown in figure B 1. The insulation on atest article was fitted against the test blocks and the four bolts were torqued down to 134inch pounds (this provided a good tight contact without crushing the wires). The Fluke343A DC Voltage Calibration Source was set to 1 volt and the Valhalla 4300B micro-ohmmeter was set to test at 2 volts at 10 A. The resistance was then recorded from theValhalla 4300B.

SECONDARY POWER LINE CHECKOUT

Resistance Test: Each conductor of the test article was connected as shown in figure B2.The Valhalla 4300B micro-ohmmeter was set to 200 millivolts and 10 A (with notemperature compensation being used). The test was initiated and after one minute, thereading was recorded. This time allowed the test article to settle after experiencing anyinitial minor transient or heating effects.

Dielectric Breakdown Test: The Slaughter 103/105 Dielectric Breakdown and LeakageTester was set to the DC position, the voltage regulator to the X1 position and a 1200 voltsvoltage limit, and the current meter to the X1 position and a 100 gA limit. The timer was set

45

Page 58: Nf A - ntrs.nasa.gov

for 30seconds.Theconductorundertestwasthenconnectedto thepositivesideof thetesterwhileall remainingconductorsin thetestarticlebundlewereconnectedto thereturnside. ThepowerwasturnedonandtheSlaughter103/105wassetto automode.Thetestwasinitiatedandanycurrentleakagemeasuredon thecurrentmeterwasrecorded.If thearc indicatorlight namedon,thissignifiedthatthetesterdetectedacurrentleakageof greaterthan5 mA. Forthepurposesof thisphaseof thetestprogram,thiscurrentleakageconstitutedafailureof theline. This testwasperformedfor eachconductorof thetestarticle.

1553 DATA BUS LINE CHECKOUT

Resistance Test of Inner Conductors: This test is identical to the resistance test for the

secondary power lines except that the Valhalla 4300B micro-ohmmeter was set to 1 A.

Resistance Test of Shield: This test is identical to the resistance test for the secondarypower lines except that the Valhalla 4300B micro-ohmmeter was set to 20 millivolts and 1A.

Dielectric Breakdown Test: This test is identical to the dielectric breakdown test for the

secondary power lines except the voltage regulator was set to a 1000 volts voltage limit.

COAXIAL LINE CHECKOUT

Resistance Test of Inner Conductors: This test is identical to the resistance test for the

secondary power lines except that the Valhalla 4300B micro-ohmmeter was set to 20millivolts and 1 A.

Resistance Test of Shield: This test is identical to the resistance test for the secondarypower lines.

Dielectric Breakdown Test: This test is identical to the dielectric breakdown test for the

secondary power lines except the voltage regulator was set to a 1400 volts voltage limit.

FIBER OPTIC LINE CHECKOUT

Light Transmission Degradation Test: Before each fiber optic line was checked, a specificprocedure was performed as shown in figure B3. The Noyes Optical Power Source andOptical Light Meter were set for a wavelength of 1.3ktm. A launch cable was attached and a

reading taken, reading X. The launch cable is a special fiber optic line with a calibratedattenuation and is used to establish a baseline loss measurement for the checkouts that will

be performed. Because the light source and meter could not be physically connected toobtain this measurement, the launch cable was required.

Next, a reading was taken for each fiber optic line test article, reading Y, using theconfiguration shown in figure B4. The launch cable is required here to insure that thebaseline loss measurement, established above, is maintained. Finally, reading Y issubtracted from reading X to obtain the losses for the fiber optic line test article.

46

Page 59: Nf A - ntrs.nasa.gov

!

°..,e

c_C_c_

v_

c-

O

L.

Q

0

Q

u

m

o_

47

Page 60: Nf A - ntrs.nasa.gov

0L _0 wt

1

48

L

,J

0

c_

E

0

L.

CS_

Page 61: Nf A - ntrs.nasa.gov

Launch Cable

XdB [

Optical LightSourceOLS1-2

Optical PowerMeter

OPM1-2

Figure B3. Setup for Establishment of Fiber Optic Cable Baseline Conditions

Launch CableMating Adaptor

UDS F/O Cable

Optical LightSourceOLS1-2

Optical PowerMeter

OPM1-2

Figure B4. Setup for Determining Losses in Fiber Optic Cable

49

Page 62: Nf A - ntrs.nasa.gov

APPENDIX C: LIST OF NASA PHOTOGRAPHS FROM TEST PROGRAM

HIRL Shot No, Photo NO,

1940 S92-27131 - $92-271361941 S92-27392 - $92-27396A 1492 $92-27125 - $92-27130A1493 S92-27178 - S92-27184A1494 $92-27397 - S92-27399A1498 $92-28248 - $92-28251A1500 $92-27914- S92-27917A1505 $92-28274- $92-28277A 1507 $92-28311 - $92-28313A1509 $92-29010- $92-29013A1517 S92-29006- $92-29009A1526 S92-29724 - $92-29728A1532 $92-31113 - $92-311172020 S92-32079 - $92-32082A1539 $92-32519 - $92-32521A1543 $92-32758 - $92-32759A1576 $92-36091 - $92-36094A1578 $92-36095 - $92-36098

A1613A1614A1622A1626A1631A1640A1651A1688A1690A1693A1695A1749A1750A1751

Photo No,

S92-39034- $92-39036S92-39037- $92-39040

N/A$92-41718-$92-41721$92-41715- $92-41717,$92-41722

N/AS92-43375- $92-43380S92-47372S92-47371S92-47368S92-47370$92-49389$92-49381$92-49385

&$92-47375& $92-47374

& $92-47369& $92-47373-$92-49392-$92-49384-$92-49388

50

Page 63: Nf A - ntrs.nasa.gov

APPENDIX D: BUMPER-E VULNERABILITY ANALYSIS OF THE UDS TRAYS

//

.EnBineer.;n_ & Sciences Company

ENGINEERING AND SCIENCE PROGRAM2400 Nt-,SARoad 1, P.O. t,ox 58561, HOuston,Texas 77258-8561713-333-5"11

March 30, 1992M.DS-505

TO" ScottLazaroff/NA SA- J SCjEP53

Via: Eric Christian serd'NAS A- J SC/S N 3Robert Franson,n_.ES C/B22 _ 9"Demos Ts_s/LESC_JB22 ,..07-

FTOm: James L. Hyde/LES CUB22Gfilian L. Shephazd/tESC/B30

Subject: PREDICTED NL.,nVIBER OF METEOROID AND DEBRIS IMPACTS ONTHE UTILITY DISTRIBUTION SYSTEM (UDS) TRAY

Please find attached the preliminary results of oar BUMPER-E vulnerability analysis of the UDSways. The predictions are based on a finite element model (I=EM) of the full ITDS way in the PMCconfimn'_don (]..VL/-I attitude). The FEM was developed from a desi=masketch tided "PIT UTILITYCARRIERS -- FLAT PATTERN." Table 1 lists the tray dimensions that were shown in the sketch.Table 2 _ves probability of no impact (PARDand expired number of impacts on the avionics andfluids secdons for seven test panicle diameters. The "energy, scmJed_ameters" shown in the secondand third columns of _zble 2 were ca]cuJam,d using the equations 1 and 2.

Meteoroids: d.,=d=, _-_j x (Eq. 1)

Where p = 05 glee for 3/8", ]/4" & 1/8" particles and 1.0 glee for others...

x( 7 y'Debris: d,_ = d,,.,, [, 10 ,) ('Sq. 2)

The results of thSsanalysisshould be classified as preliminary,. Additional runsshould be made attypical SSF atdmdes and a 6.rne-average prediction made for the expected number of impacts. TheBUMPER Phq code does not predict number of failures. It should be noted that one impact eventcould cause muldple failures in the utility _ray. A more refined analysis will be performed in thefuture.

°

Ja_es L. HydeStructures and Mechanics Deparmaent

Gill.JanL. ShephardStructures and Mechanics Deparmaent

51

Page 64: Nf A - ntrs.nasa.gov

Table D 1. UDS Tray Dimensions

tray

segment$3

$2

$1

M1

P1

regionB1

B2

B1

B2

B3

B4

B1B2

B3B4

B5

B6B1

B2

!length (in) avionics97.110 12.0

104.470 21.0

91.950 21.0

80.430 21.0

53.310 21--_33

54.310 33.0

101.200 33.0

100.420 33.0

101.380 33.0

68.235 33.0

68.235 33.0

100.530 33.0

98.530 33.0

96.530 33.0

compartment width (in)

face 2 (upper)

compartment width (in)

face6 (lower)fluids total avionics fluids total

0.0 12.0 12.0 0.0 12.0

3.7 24.7 20.0 3.7 23.7

9.0 30.0 20.0 9--> 11.5

9.0 30.0 17.5 11.5 29.0

9.0 17.5--_33i 11.5 -

9.0 42.0 33.0 11.5 44.5

9.0 42.0 33.0 11.5 44.5

9.0 42.0 33.0 11.5 44.5

9.0 42.0 33.0 11.5 44.59.0 42.0 33.0 11.5---> 14 -

9--->11.5 - 33.0 14.0 47.0

11.5 44.5 33.0 14.0 47.0

11.5 44.5 33.0 14.0 47.011.5 44.5 33.0 14.0 47.0

P2

P3

B4 96.530 33.0

B5 98.530 33.0

B1 100.530 33.0

B2 68.235 33.0

B3 68.235 33.0

B4 101.380 33.0

B5 100.420 33.0

B6 101.200 33.0

B1 54.310 33.0

B2 53.310 33--->15

B3 80.430 15.0

B4 91.950 15.0

B 1 104.470 15.0

B2 97.110 12.0

11.5 44.5 33.0 14.0 47.0

11.5-->9 - 33.0 14.0 47.0

9.0 42.0 33.0 14.0 47.0

9.0 42.0 33.0 14.0 47.0

9.0 42.0 33.0 14-->9

9.0 42.0 33.0 9.0 42.0

9.0 42.0 33.0 9.0 42.0

9.0 42.0 33.0 9.0 42.0

9.0 42.0 33.0 9.0 42.0

9.0 33--->15 9.0

9.0 24.0 15.0 9.0 24.0

9.0 24.0 15.0 9.0 24.0

3.7 18.7 15.0 3.7 18.7

0.0 12.0 12.0 0.0 12.0

52

Page 65: Nf A - ntrs.nasa.gov

.,<0

c_

..0

ILl 14,1

0_1 COl _'-I 0

. :"o _' _' r..,:"r,.: "o c_ ml °'1 c_l _""" _ "s " _ ,'-_ _ "_ '__1_1'_1_ -_ ° oo

c; _d co m o_I-- x

o

= 1 _ o'_'o'_'_ _ i_ °°_o" o" c:;" c; orr ,,:[

53

Page 66: Nf A - ntrs.nasa.gov

REPORT DOCU M ENTATION PAGE Form ApprovedOMaNo.ozo_o,sa

Public reporting burden for this collection of information is estimated to average 1 hour per ree_onse, including the time for reviewing instructions, searching existing data sources, gathering andmaintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,including suggestions for reducing this burden, to Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503.

1. AGENCY USE ONLY (Leave blank) 2. REPORT DATE 3. REPORT TYPE AND DATES COVERED

July 1993 Technical Memorandum

4. TITLE AND SUBTITLE 5. FUNDING NUMBERS

Hypervelocity Impact Testing of the Space Station Utility

Distribution System Carrier

6. AUTHOR(S)

Scott Lazaroff, Johnson Space Center

7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES)

Propulsion and Power Division

Lyndon B. Johnson Space Center

Houston, Texas 77058

9. SPONSORING / MONITORING AGENCY NAME(S) AND ADDRESS(ES)

National Aeronautics and Space Administration

Washington, D.C. 20546

8. PERFORMING ORGANIZATIONREPORT NUMBER

S-723

10 SPONSORING/MONITORINGAGENCY REPORT NUMBER

NASA-TM-104771

11. SUPPLEMENTARY NOTES

12a. DISTRIBUTION/AVAILABILITYSTATEMENT

National Technical Information Service

5285 Port Royal Road

Springfield, VA 22161

(703) 487-4600Unclassified/Unlimited Subject Category 20

13. ABSTRACT (Maximum 200 words)

12b. DISTRIBUTION CODE

A two-phase joint NASA Johnson Space Center and McDonnell Douglas Aerospace-HuntingtonBeach hypervelocity impact (HVI) test program was initiated to develop an improved

understanding of how meteoroid and orbital debris (M/OD) impacts affect the Space

Station Freedom (SSF) avionic and fluid lines routed in the Utility Distribution System

(UDS) carrier. This report documents the first phase of the test program which covers

nonpowered avionic line segment and pressurized fluid line segment HVI testing. Fromthese tests, a better estimation of avionic line failures is approximately 15 failures

per year and could very well drop to around 1 or 2 avionic line failures per year

(depending upon the results of the second phase testing of the powered avionic line at

White Sands). For the fluid lines, the initial McDonnell Douglas analysis calculated 1

to 2 line failures over a 30 year period. The data obtained from these tests indicate

the number of predicted fluid line failures increased slightly to as many as 3 in the

first 10 years and up to 15 for the entire 30 year life of SSF.

14. SUBJECT TERMS

Hypervelocity Impact, Meteoritic Damage, Space Debris (Damage),

Impact Damage, Impact Tests,

17. SECURITY CLASSIFICATIONOF REPORT

Unclassified

18. SECURITY CLASSIFICATIONOF THIS PAGE

Unclassified

19. SECURITYCLASSIFICATIONOF ABSTRACT

Unclassi fied

15. NUMBEROF PAGES60

16. PRICE CODE

20 LIMITATIONOFABSTRJkCTUnl imited

Standard Form 298 (Rev. 2-89)