news upo jun 28 2013 didier contardo , jeff spalding

6
1 News UPO Jun 28 2013 Didier Contardo, Jeff Spalding

Upload: wauna

Post on 09-Feb-2016

22 views

Category:

Documents


0 download

DESCRIPTION

News UPO Jun 28 2013 Didier Contardo , Jeff Spalding. CMS week Jul 8-12. CMS Plenary (Monday 8) Status of LS1 (TBD) 40’ Presentation of phase 2 scenarios (Francesca ) 40’ Other Sessions In parallel with TC Plenary - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: News UPO Jun 28 2013 Didier  Contardo , Jeff Spalding

1

NewsUPO Jun 28 2013Didier Contardo, Jeff Spalding

Page 2: News UPO Jun 28 2013 Didier  Contardo , Jeff Spalding

2CMS week Jul 8-12

o CMS Plenary (Monday 8)- Status of LS1 (TBD) 40’- Presentation of phase 2 scenarios (Francesca) 40’

o Other SessionsIn parallel with TC Plenary- Upgrade simulation studies (David, Frank, Marcus Paolo) Wednesday 9:00-12:30Physics Plenary Session Thursday 14:00-18:00- Snowmass Whitepaper approvalsParallel Sessions- TPSWG (Oliver, Wesley) Thursday 8:30-10:30- FDWG (Marcello, Roger) Thursday 10:30-13:30- FCAL TF (Brad, Randy) Thursday 17:00-19:00

o Upgrade Plenary Wednesday 13:30-16:00 https://indico.cern.ch/conferenceDisplay.py?confId=260461

- Introduction 25+5’- Status of HCAL longevity studies 25+5’- Report from TPSWG 25+5’- Report from FDWG 25+5’- Summary of Upgrade simulation studies 25+5’

Page 3: News UPO Jun 28 2013 Didier  Contardo , Jeff Spalding

3ECFA HL-LHC Experiments Workshop Oct. 1-3

o Registration is openhttps://indico.cern.ch/conferenceDisplay.py?confId=252045

o Abstracts for submission to the Program Committee by end of Jun. - will be uploaded in CINCO

Page 4: News UPO Jun 28 2013 Didier  Contardo , Jeff Spalding

4Next for 2013 RRB Document

o The Document– Considerations• We are specifically asked for cost estimate and profile for Phase 2• Document will outline the scope and process to define it (longevity, studies,

cost and TC considerations), and provide cost scale • Not intended to be equivalent to Atlas LOI or pre-empt our TP in 2014• Document must encompass what will be in the TP

– Content• Introduce the document and the process (towards TP and TDRs)

consideration for scope…• Overview of physics program and motivations for upgrades• Longevity issues (how much detail?)• Scenarios and options under consideration• Describe subsystems conceptual designs and R&D status and needs• Discuss TC and common system considerations• Present cost and schedule

Page 5: News UPO Jun 28 2013 Didier  Contardo , Jeff Spalding

5Next for 2013 RRB Document

o Timeline – Present the document outline at MB/FB on July 4/5 (next week)– Initial cost information by July 2 (status report at MB/FB) – see later this

meeting– Meeting with each area to scrub cost estimates in middle two weeks of July.

This will be a fairly intense period.– V1 DRAFT document and cost exercise presented to MB July 29– Update with simulation studies - see later this meeting– Release to collaboration in mid August approval at Taipei Sept 9 – Final update with studies for ECFA workshop Oct 1-3

Page 6: News UPO Jun 28 2013 Didier  Contardo , Jeff Spalding

6Towards the Technical Proposal

Goal: submit document at LHCC meeting Sep 2014 , and RRB Oct Must be in CWR in July

Use Upgrade Weeks: Oct 21, 2013 - Apr 7, 2014 - Sep 1, 2014 Next Upgrade Week in Oct is 1/3 of the way there from now!– We need to scope the document appropriately

Propose to:o Organize October Upgrade Week sessions/plenaries to sections of the TP– Must also give more time to Phase 1

o Aim for not much more than 200 pages [?]. Proposed layout might be– main body: the message - overview and studies, cost & schedule… – technical appendices on simulations, Tracker, Endcap….etc

o Make DocDB repository for relevant documents– Post-DESY summaries: so far - ECAL, FDWG, FCTF…– RRB(2013) document and backup info– Working notes towards TP