newhaven college stage 2 - gymnasium 1995.02 site ...€¦ · newhaven college stage 2 - gymnasium...
TRANSCRIPT
67° 44' 50"506.75 m
N
W
23° 0
9' 2
0"
54.6
8 m
N
W
51° 2
0' 40
"
688.32
m
S
W
38° 39' 20"
590.81 m
S
E
51° 1
9' 25
"
403.89
m
S
W
EXISTING SUBSTATION
+ MAIN SWITCH BOARD
SEWER PUMP
EXISTING SERVICES ROAD TO BE
RELOCATED AS PER MASTERPLAN
SHARED PATHWAY
EXISTING VEGETATION
EXISTING VEGETATION
COURTYARD
EXISTING TREES
EXISTING TREES
EXISTING VEGETATION
P H
I L L I P I S
L A N
D R
O A
D
COURTYARD
EXISTING
BICYCLE
STORAGE:
16 SPACES
EXISTING
BICYCLE
STORAGE:
16 SPACES
EXISTING
BICYCLE
STORAGE:
16 SPACES
PROPOSED
BICYCLE
STORAGE:
16 SPACES
PROPOSED SPECIALIST
FACILTY - CURRENTLY
UNDER CONSTRUCTION
PROPOSED SENIOR
LEARNING CENTRE - -
CURRENTLY UNDER
CONSTRUCTION
PRO
PO
SED
LAN
DSC
APE
D P
ATH
PR
OP
OSE
D R
OA
D
INDICATIVE LOCATION OF NEW
DETENTION BASIN
HUB
35.00
40.00
45.00
47.0046.00
45.00
35.00
36.00
37.00
36.00 40.00
42.00
41.00
42.00
43.00
44.00
35.00
35.00
37.00
36.00
35.0034.00
34.00
35.00
34.00
34.00
EXISTING BUILDINGS
PROPOSED BUILDINGS
KEY OPEN SPACE
EXISTING VEGETATION(REFER TO LANDSCAPE PLANFOR PROPOSED LANDSCAPING)
KEY
SPORTS (FIELDS)
SPORTS (SURFACE)
PEDESTRIAN PATHWAY
WASTE COLLECTION
TITLE BOUNDARY
CARPARKING(SCHOOL HOURS)
SENIOR SCHOOL CENTRE
STAGE ONE
BOARDING HOUSE
STAFF / STUDENT NUMBERS(ALL STAGES COMBINED)
1
2
SPECIALIST BUILDING
SYNTHETIC HOCKEY PITCH /TENNIS COURTS
ALL ROAD INFRASTRUCTURE / PARKING
AQUATIC CENTRE
EARLY LEARNING CENTRE
STATUTORY REQUIREMENT: 107
STAFF : 118
ADMINISTRATION BUILDING EXPANSION
JUNIOR SCHOOL SPORT'S OVAL
STAGE TWO
EARLY LEARNING CENTRE CARPARK
STUDENTS : 969
ACTUAL PROVISION BREAK DOWN:
STAFF / VISITOR: 70
PICK UP / DROP OFF: 124
CARPARKING(AFTER HOURS / OVERFLOW)
GYMNASIUM & PERFORMING ARTS CENTREOVERFLOW: 250
AFTER HOURS (AS SCHOOL HOURS): 247
TOTAL CAMPUS PARKING: 497JUNIORSCHOOLBUILDING
MIDDLESCHOOLBUILDING
SPORTSPAVILION &CANTEEN
TRADESKILLS
CENTRE
ADMININISTRATION +LIBRARY
YEAR 9BUILDING
SPORTS OVAL
MAINTENANCESHED
JUNIOR SCHOOLSPORTS OVAL
SPECIALISTBUILDING1800m2
EXPANSION
GRASSSOCCER
PITCH
FUTURE STAFF /VISITOR PARKING
BOARDING600m2
ELC400m2
EXISTINGPLAYGROUND
AQUATICCENTRE1400m2
GYMNASIUM2764m2
ELC
FFL 41.50
FFL 43.00
FFL 41.50
FFL 38.00
FFL 37.40
FFL 46.50
RECONFIGURE SERVICE ROADWITHIN SITE
GREENHOUSE
VEGETABLEPATCH
SHELTER
VEGETABLEPATCH
EXISTINGSPORT
EXISTINGSPORT
SENIORSCHOOLCENTRE1800m2
PERFORMINGARTS AND
MUSIC2500m2
NEW PICK UP & DROPOFF PARKING
HARDCOURTS
NEW BUS PARKING BAYS
WATER TANKS
EXISTINGLONG JUMP
BOOMGATE
ADMIN
SPORTSPAVILIONCARPARK
KOALASANCTUARY
NEW BUS DROPOFF / PICK UP
FOODTECH
ARTCOURT
BOARDINGSTAFF
CARPARK
SYNTHETICHOCKEY PITCH /TENNIS COURTS
FENCE
BOOSTER
BOOSTER
AMPHITHEATRE
SHAREDPATHWAY
SHAREDPATHWAY
SECONDARYACCESS
PRIMARYACCESS
WASTE COLLECTION ANDSTORAGE TO COUNCILREQUIREMENTS
1
16
3
4
6
2
5
6
6
6
2
EXISTINGHARDCOURT
EXISTINGHARDCOURT
BU
ILD
ING
SE
TB
AC
K L
INE
PE
R
PR
EV
IOU
S T
OW
NP
LA
NN
ING
PE
RM
IT
EXISTING TREES
EXISTING TREES
EXISTIN
G TREES
OUTDOORPLAY
EX
ISTIN
G T
RE
ES
EXIS
TING
TREES
EXISTING TREES
EXISTING TREES
EXISTING TREES
BIKE PATH
EXISTING TREES TO BEREMOVED AND REINSTATEDWITH NEW LANDSCAPEDMAIN ENTRY CONCEPT
GYMNASIUMOVERFLOW CARPARK
SHOWN DASHED
PEDESTRIAN PATH
DRAINAGE SWALE
5
BUILDING SPECIFIC PARKING: 53
TOTAL: 247
PARKING SURPLUS: 140
GYM
YEAR 9
EXISTINGENTRY ANDGRAVEL ROAD
GRASSSOCCER
PITCH
4
EXPANSION1
GYMNASIUM / ASSOCIATED CARPARK
NEW ENTRANCE LANDSCAPE
REMOVAL OF EXISTING DAM / PROPOSEDRETARDING DAM / WSUD
3
STAGE THREE
SOCCER FIELDS4
STAGE FOUR
PERFORMING ARTS CENTRE5
STAGE FIVE
HARDCOURTS
6
STAGE SIX
SHED EXPANSION
3no.CAR PARKINGBAYS
9no.CAR PARKING
BAYS
2
2
2
2
16no.CAR PARKING
BAYS
38no.
CAR PARKINGBAYS
6
11no.CAR PARKING
BAYS
2
2
6no.CAR PARKING
BAYS
SE
TB
AC
K
75990
SE
TB
AC
K
107120 -
102720
SETBACK29138
0
SETBACK16496
0
SETB
AC
K110080
175740
124no.CAR PARKING
BAYS
70no.CAR PARKING
BAYS
EXIS
TING
TREES
TOWN PLANNINGBuilders/Contractors shall verify job dimensions before any job commences. Figured dimensions shall take precedence over scaled work. Work shall also conform to the specification, otherdrawings and job dimensions. All shop drawings shall be submitted to the Architect/Consultant and manufacture shall not commence prior to the return of inspected shop drawings signed by theArchitect/Consultant. © Copyright 2008 All rights reserved
Hayball Pty Ltd4/135 Sturt Street SouthbankVictoria Australia 3006T 03 9699 3644 F 03 9699 3708www.hayball.com.au
NSW Nominated Architects:Tom Jordan 7521,Richard Leonard 7522,Robert Stent 7523,Geoffrey Hammer 5147ABN 84 006 394 261
DRAWING TITLEPROJECT NAME
CHECKED
SCALE
DRAWN BY
DATE PRINTEDPROJECT ADDRESS
PROJECT NO DWG NO
STATUS
1 : 1000@ A0MP.01.021995.02NEWHAVEN COLLEGE STAGE 2 - GYMNASIUM
1770 PHILLIP ISLAND RD RHYLL
KI
OW / EW
03/30/17
SITE MASTERPLAN
0m 25m 50m 75m 100m
REV DATE DESCRIPTION
4 13.04.2017 CLIENT REVIEW
3 19.04.2016 BUILDING SETBACK REVISION
2 02.02.2016 WASTE COLLECTION AREAREVISION
1 23.12.2015 TOWN PLANNING APPROVAL
5 24.05.2017 TOWN PLANNING APPROVAL