newcastle local plan moni report 01 · no new waste management facilities were built in 2014/15....
TRANSCRIPT
Newcastle Local Plan
Annual Monitoring Report 2014-2015
January 2016
Newcastle Local Plan - Annual Monitoring Report 3
Table of Contents Contents Table of Contents ................................................................................................................ 3
Executive S u m m a r y ............................................................................................................. 5
Progress in preparing Newcastle upon Tyne’s Local Plan ............................................... 5
Effectiveness of Planning Policies .................................................................................... 7
Economy .......................................................................................................................... 7
Population and Housing ................................................................................................... 7
People and Place ............................................................................................................. 7
Transport and Accessibility ............................................................................................... 8
Minerals and Waste .......................................................................................................... 8
1. Introduction ................................................................................................................... 9
Newcastle Monitoring Framework .................................................................................... 9
The Structure of Newcastle AMR ..................................................................................... 9
Future AMR’s ................................................................................................................... 9
2. Progress in preparing the planning policy framework .................................................. 10
National and Regional Policy Context ............................................................................ 10
Progress of preparing the Newcastle Local Plan against Local Development Scheme . 10
Core Strategy and Urban Core Plan ............................................................................... 12
Development and Allocations LDD ................................................................................. 12
Benwell Scotswood Area Action Plan ............................................................................. 12
Walker Riverside Area Action Plan ................................................................................. 12
Supplementary Planning Documents (SPDs) ................................................................ 13
Saving of UDP policies ................................................................................................... 13
Statement of Community Involvement ........................................................................... 13
Duty to Co-operate ......................................................................................................... 14
Community Infrastructure Levy ...................................................................................... 14
Neighbourhood Plans ..................................................................................................... 14
Evidence Base ............................................................................................................... 14
Local Development Scheme .......................................................................................... 15
3 . Effectiveness of Planning Policies ........................................................................... 17
4. Economy ..................................................................................................................... 18
Employment development during 2014-15 ..................................................................... 18
Emerging Land Availability ............................................................................................. 19
Prospects for the Future ................................................................................................. 19
Leisure, Culture and Tourism ......................................................................................... 19
Retail .............................................................................................................................. 20
Newcastle Local Plan - Annual Monitoring Report 4
5 Housing and Population .............................................................................................. 23
Population ...................................................................................................................... 23
New housing development ............................................................................................. 23
Affordable Housing ......................................................................................................... 24
Student Housing ............................................................................................................. 25
Five Year Land Supply ................................................................................................... 26
6 . People and Place ..................................................................................................... 27
Health and Wellbeing ..................................................................................................... 27
Air Quality ....................................................................................................................... 27
Promoting Place making ................................................................................................ 28
Heritage .......................................................................................................................... 28
Heritage at Risk .............................................................................................................. 30
Climate Change .............................................................................................................. 30
Green Infrastructure and the natural environment .............................................................. 31
Green Belt and countryside ............................................................................................ 31
Green Infrastructure and the natural environment .......................................................... 31
7 . Transport and Accessibility ....................................................................................... 34
Upgrading the Transport Network .................................................................................. 34
8 . Minerals and Waste ................................................................................................. 37
Minerals .......................................................................................................................... 37
Waste ............................................................................................................................. 37
9 . Conclusion ............................................................................................................... 38
Appendices Appendix 1: Housing Completions Appendix 2: Five Year Land Supply
Newcastle Local Plan - Annual Monitoring Report 5
Executive S um m a r y The Core Strategy and Urban Core Plan (CSUCP) was examined in public by an independent Planning Inspector in hearings sessions held during June, July and October 2014 to assess whether:
1. the Plan has been prepared in accordance with the duty to cooperate, legal and procedural requirements as set out in 2012 by the Town and Country Planning (Local Planning) (England) Regulations 2012 and
2. it is sound namely that it is positively prepared, justified, effective and consistent with national policy.
During the hearings, a number of modifications to the Plan were proposed to ensure the Plan is sound. The proposed modifications were subject to consultation for 7 weeks from 17 November until 4 January 2015 and representations were considered by the Planning Inspector. The Inspector’s Final report was received by the Council on 24 February 2015. The Inspector’s Report concluded the Plan satisfies the criteria of soundness in the National Planning Policy Framework subject to a number of main modifications. The CSUCP was adopted by Newcastle Council in March 2015. This Annual Monitoring Report covers the period from April 2014 to March 2015. Progress in preparing Newcastle upon Tyne’s Local Plan Newcastle Development Plan Newcastle statutory development plan or Local Plan currently comprises of the following document;
Planning for the Future Core Strategy and Urban Core Plan (2015) (CSUCP) Unitary Development Plan (1998) (UDP) – Saved policies Walker Riverside Area Action Plan (2007) (WRAAP) – Saved policies Benwell Scotswood Area Action Plan (2009) (BSAAP) – Saved policies Newcastle policies map which includes all designations/allocations
All local authorities are required to produce a Local Plan. The Local Plan sets out how we will plan the future development of Newcastle. The City Council is progressing with the preparation of a two Part Local Plan covering the whole of the City Council's area. The Newcastle Local Plan comprises the following Local Development Documents (LDDs) See also Figure 1: Part 1 - The Core Strategy and Urban Core Plan (CSUCP) - adopted by Newcastle Council on 26 March 2015. Part 2 - Part two will be the Development and Allocations Local Development Document (DALDD). This document will include detailed development management policies and allocate and designate land. Upon adoption the DALDD this will replace the Unitary Development Plan (1998), Walker Riverside Area Action Plan (2007) and Benwell Scotsood Area Action Plan (2009). As illustrated in Figure 1.
Newcastle Local Plan - Annual Monitoring Report 6
Figure 1 Newcastle's Local Plan
The Local Development Scheme (LDS) was updated in November 2015 to reflect progress on the CSUCP and provide a timescale for the DALDD:
Document Updated LDS, November 2015
Core Strategy and Urban Core Plan
Submitted: February 2014 Examination: Summer 2014 Adopted: March 2015
Development and Allocations LDD
Call out for Sites Commenced Call out for sites
Consultation Draft
Submission Document
Submission for Examination
Examination
Adoption
January 2016
January 2017
September 2017
November 2017
March 2018
September 2018
Figure 2 LDS (2015) timescales for preparing Newcastle’s Local Plan
Core Strategy and Urban Core Plan
LDD
Unitary Development
Plan
Walker Riverside AAP
Benwell Scotswood AAP
SPD’s SCI
Newcastle’s Development Plan 2015
Core Strategy and Urban Core Plan
LDD
Development and Allocations LDD
SPD’s SCI
Newcastle’s Development Plan 2018
CIL Neighbourhood Plans
Newcastle Local Plan - Annual Monitoring Report 7
Effectiveness of Planning Policies Each year the AMR reports on a range of indicators and whether specified targets have been met. Both Gateshead and Newcastle Councils have recently adopted the CSUCPin March 2015 which is at the end of the monitoring period. Therefore, the AMR will report on the implementation of existing saved policies from the UDP from April 2014-March 2015. Subsequent AMRs will be aligned to Newcastle’s Local Plan, which will include the CSUCP. For the purposes of this report the topic headings are linked to the Local Plan topic heading, including economy, housing and population, people and place, transport and accessibility and minerals and waste. The AMR has reviewed progress from 2014 to 2015 which indicates that: Economy 12,152 sq m of floorspace (sq m) for employment has been developed.
Walker Riverside has seen two significant take-ups linked to the Low Carbon
Enterprise Zone.
98.87 ha of employment land is available in the emerging employment land portfolio.
Leisure, culture and tourism remain key growth sectors. Budget gyms have been a particular growth area. Three new hotels have also opened in the City.
Newcastle City Centre remains a strong retailing destination. The redevelopment of
Eldon Square has continued and 21 new catering units - though this has temporarily increased the number of vacant units in the Core Shopping Area.
Vacancy levels in the great majority District Centre has improved since the last
monitoring period. Population and Housing Excluding student housing, the build rate in 2014/15 was 810 gross completions. This
equates to a net gain of 747 dwellings when allowance is made for the loss of 63 dwellings through conversions and demolitions.
In 2014/15 a total of 289 affordable homes were completed in the City.
During 2014/15 654 student units have been completed equating to 1118 bedspaces.
People and Place In 2014 mean nitrogen dioxide levels within the City Centre AQMA achieved 40µg/m3.
This is the fifth year in a row that nitrogen dioxide levels have shown a decrease in the City Centre AQMA.
Newcastle Local Plan - Annual Monitoring Report 8
The mean nitrogen dioxide level for the Gosforth AQMA fell in 2014 to 31µg/m3
continuing the downward trend for the seventh year in a row. Killingworth Road and Station Road levels fell slightly but continue to be of concern giving mean nitrogen dioxide levels of 39µg/m3 and 33µg/m3 respectively.
There has been no loss of designated heritage assets and no deliberate damage has been recorded.
1 entry was removed from 2014 English Heritage at Risk List, (Sallyport Tower, Tower
Street) but 6 were added.
Newcastle now has 26 Local Wildlife Sites, though these are due to be reviewed in 2016. There are also 35 Sites of Local Conservation Interest based on new designation criteria and a review undertaken in 2014.
The revised Green Belt Boundary has been established in the Core Strategy and Urban Core Plan. The remaining Green Belt will be protected in accordance with the National Planning Policy Framework.
There are currently 3 parks that have achieved Green Flag status:
• Heaton Park, Jesmond Vale Lane (NE6 5JS) • Jesmond Dene, Red Walk (NE7 7BQ) • King's Campus (Newcastle University)
Transport and Accessibility
The Transport Plan for the North East Combined Authority will be completed by autumn
2016. The Local Growth Deal has secured funding for improvements at junctions on Cow Hill, Kenton Road-Grandstand Road, at Blue House, Osborne Road, and the Haddricks Mill roundabouts at South Gosforth. Full business cases are being developed for the above schemes.
Minerals and Waste
No new waste management facilities were built in 2014/15.
138,490 tonnes of municipal waste in 2014/15 were recorded.
Newcastle Local Plan - Annual Monitoring Report 9
1. Introduction 1.1 Section 113 of the Localism Act 2011 establishes the requirement for each local
planning authority to prepare a monitoring report each year, while Regulation 34 of the Town and Country Planning (Local Planning) (England) Regulations 2012 identifies the information they should contain. The main purpose of Newcastle’s Annual Monitoring Report (AMR) is to set out information on the implementation of the Council’s Local Development Scheme (LDS) and to review the progress and effectiveness of existing policies. Newcastle Monitoring Framework
1.2 Comprehensive monitoring is essential in order to establish whether the Council is
succeeding in promoting and managing the future development of Newcastle. This is the tenth Annual Monitoring report to be adopted by Newcastle City Council under the Planning and Compulsory Purchase Act (2004), and covers the period April 2014 to March 2015. The Structure of Newcastle AMR
1.3 The content and structure of the report is in accordance with relevant regulations. 1.4 The first part of this report considers the council’s current progress on and future
programme for producing policy documents. The next section represents the main body of the report and sets out the findings of the monitoring work and provides an analysis of the results against a series of indicators. The information is provided by topic area, which corresponds with the chapters in the CSUCP under the following headings: Economy - Chapter 4 Housing and Population – Chapter 5 People and Place – Chapter 6 Transport and Accessibility – Chapter 7 Minerals and Waste – Chapter 8
Future AMR’s
1.5 The monitoring of plans and policies is an iterative process. The monitoring
framework will continue to develop as work progresses on the preparation of the Newcastle Local Plan. Subsequent AMRs will contain objectives, indicators and targets derived from the CSUCP and Development and Allocations LDD and from the Sustainability Appraisals of these documents.
Newcastle Local Plan - Annual Monitoring Report 10
2. Progress in preparing the planning policy framework
National and Regional Policy Context
2.1 The Planning and Compulsory Purchase Act (2004), the Planning Act (2008), the
Localism Act (2011) and the National Planning Policy Framework (NPPF), supported by the Local Planning Regulations 2012 set out the current requirements for plan making by local authorities.
Progress of preparing the Newcastle Local Plan against Local Development Scheme
2.2 This section of the AMR assesses progress in preparing the Council’s Local Plan.
Newcastle’s Local Development Scheme (LDS) Newcastle adopted a revised LDS in November 2015: http://www.newcastle.gov.uk/planning-and-buildings/planning-policy/local-development-scheme
2.3 The NPPF requires Local Planning Authorities to produce a Local Plan for their area which can be reviewed in whole or in part to respond flexibly to changing circumstances. Any additional development plan documents should only be used where clearly justified. Supplementary Planning Documents should only be used where they can help applicants make successful applications or aid infrastructure delivery, and should not be used to add unnecessarily to the financial burdens on development.
2.4 Newcastle statutory development plan or Local Plan currently comprises of the following document;
Planning for the Future Core Strategy and Urban Core Plan (2015) (CSUCP) Unitary Development Plan (1998) (UDP) – Saved policies Walker Riverside Area Action Plan (2007) (WRAAP) – Saved policies Benwell Scotswood Area Action Plan (2009) (BSAAP) – Saved policies Newcastle policies map which includes all designations/allocations
2.5 The council is progressing with the preparation of a two Part Local Plan covering the
whole of the City Council's area. Part one of the Local Plan is the Core Strategy and Urban Core Plan which was adopted March 2015.
2.6 Part two will be the Development and Allocations Local Development Plan (DALDD).
This document will include detailed development management policies and allocate and designate land. Upon adoption the DALDD this will replace the Unitary Development Plan (1998), Walker Riverside Area Action Plan (2007) and Benwell Scotswood Area Action Plan (2009). As illustrated in Figure 3.
Newcastle Local Plan - Annual Monitoring Report 11
Figure 3 Newcastle's Local Plan
Core Strategy and Urban Core Plan
LDD
Unitary Development Plan
Walker Riverside AAP
Benwell Scotswood AAP
SPD’s SCI
Newcastle’s Development Plan 2015
Core Strategy and Urban Core Plan
LDD
Development and Allocations LDD
SPD’s SCI
Newcastle’s Development Plan 2018
CIL Neighbourhood Plans
Newcastle Local Plan - Annual Monitoring Report 12
Core Strategy and Urban Core Plan 2.7 The Core Strategy and Urban Core Plan (CSUCP) was examined in public by an
independent Planning Inspector in hearings sessions held in June, July and October 2014 to assess whether the Plan has been prepared in accordance with the duty to cooperate, legal and procedural requirements as set out in 2012 by the Town and Country Planning (Local Planning) (England) Regulations 2012 and whether it is sound namely that it is positively prepared, justified, effective and consistent with national policy. During the hearings, a number of modifications to the Plan were proposed to ensure the Plan is sound. The proposed modifications were subject to consultation for 7 weeks from 17 November until 4 January 2015 and representations were considered by the Planning Inspector. The Inspector’s Report concludes the Plan satisfies the criteria of soundness in the National Planning Policy Framework subject to a number of main modifications.
2.8 The CSUCP was adopted in March 2015.
Development and Allocations LDD
2.9 The Development and Allocations LDD will allocate land for new development,
designate land for protection and contain development management policies that will be used to determine whether planning applications submitted to the Council should be granted. An Allocations Map showing the allocations on an ordnance survey base will also be part of this document.
Benwell Scotswood Area Action Plan
2.10 The Area Action Plan was adopted in 2009. Work to deliver the Scotswood
Development Area (SDA) is progressing with development of residential units by Barratt Homes and Keepmoat for sale, as well as a number of affordable units which are being provided by Thirteen Group. Development of the first phase is well underway with 56 units complete, approximately 150 sales and over 100 residents who had moved into the development by the end of October 2015. It is expected that the entire first phase of 377 homes will be completed by July 2017. Detailed design of Phase 2 and the new Neighbourhood Centre will commence early next year.
Walker Riverside Area Action Plan
2.11 The Area Action Plan was adopted in 2007. Places for People completed work on
Riversgate (Phase 2) in March 2014 providing 39 units for affordable rent, and are now working towards the next site which has drawn down under their Strategic Partnership Agreement with the Council, Chalfont Road. They are currently in discussion with the Council regarding this site and moving towards a planning application. Their aim is to start on site with development of approximately 40 units in summer 2016.
2.12 Gleeson were selected as the preferred developer of 40 units at Phase 3 of Hibernia
Village. They started development on site in summer 2014 and development is progressing well. At the end of Quarter 2 in 2015/16 there were 25 units completed.
Newcastle Local Plan - Annual Monitoring Report 13
2.13 The Council has assembled land at Chalfont Road in Walker. A large, underused
allotment site has been cleared to provide a future residential development opportunity.
2.14 The residential development for YHN for older people at Walker Central is on site.
The first phase – a 75 unit Assisted Living Scheme is now on site and progressing on programme for completion in October 2016. Contractors Wates Living are also building out Phase 2 , a mixed scheme of 36 apartments and 8 bungalows also for residents aged 55+, which is programmed to complete in July 2016. Supplementary Planning Documents (SPDs)
2.15 The Council currently has 18 adopted SPDs. SPDs can be used as a vehicle to aid in the successful delivery of development or infrastructure, they do not need to be listed in a local authority's Local Development Scheme, so can be brought forward as circumstances change. In addition to those existing SPD, it is also intended that a series of new SPD will be prepared. These will include:
Hot food Takeaway SPD – adoption spring 2016 Developer Contributions SPD - adoption expect early 2016 The Council is also updating its Maintaining Sustainable Communities SPD.
It is intended that this document will be adopted in 2016
2.16 Existing adopted SPDs will also need to be reviewed in light of policy changes in the emerging Local Plan and through the review of the CIL Charging Schedule. The Council intends to review the Maintaining Sustainable Communities SPD to ensure its compliancy with the Local Plan.
Saving of UDP policies
2.17 The provisions of the Planning and Compulsory Purchase Act 2004 allows for
existing statutory plans and accompanying Supplementary Planning Guidance documents ‘to be saved’ until replaced by new documents. Following the adoption of the CSUCP, the UDP, BSAAP and WRAAP were reviewed and a number of policies were deleted. The Council has published the Newcastle Development Document which sets out all of the saved policies in Newcastle Development Plan.1
Statement of Community Involvement
2.18 The Planning and Compulsory Purchase Act 2004 requires the Council to produce a
Statement of Community Involvement (SCI). This document was originally adopted in 2006 and was refreshed in April 2013. The SCI sets out how the Council intends to continuously engage and consult with local and statutory stakeholders in the preparation of Local Plan Documents and the processes involved. The SCI will be reviewed and updated as required. The latest SCI can be found in the 'Statement of Community Involvement' webpage.
1 http://www.newcastle.gov.uk/sites/drupalncc.newcastle.gov.uk/files/wwwfileroot/planning-and-buildings/planning-policy/newcastle_upon_tyne_development_plan_policies_0.pdf
Newcastle Local Plan - Annual Monitoring Report 14
Duty to Co-operate 2.19 The Localism Act 2012 brought in the requirement for Local Authorities and other
public bodies to work together to address cross-boundary issues, particularly those relating to strategic priorities. These strategic priorities relate to planning for new homes and jobs; the provision of retail, leisure and other commercial development; the provision of infrastructure such as transport and utilities; the provision of health, security, community and cultural infrastructure; and climate change mitigation and adaptation, conservation and enhancement of the natural and historic environment, including landscape. The council continues to work with its neighbours to address strategic planning issues.
Community Infrastructure Levy
2.20 The Community Infrastructure Levy was introduced by the Planning Act 2008 and
came into force on 6 April 2010 through the CIL regulations 2010, as amended. CIL allows local authorities to introduce a new charge on development and the money raised from this will be used to help fund a wide range of infrastructure to support development. The Council consulted on their Preliminary Draft Charging Schedule in summer 2012 and spring 2015 which sets out the proposed charging rates for certain types of development in Newcastle. The Council has prepared and consulted on their Draft Charging Schedule from 26 October to 6 December 2015 before submitting for an examination in public. The Council expects to adopt CIL in 2016.
Neighbourhood Plans
2.21 The Localism Act 2011 introduced the potential for neighbourhood planning through
the preparation of Neighbourhood Development Plans and Neighbourhood Development Orders by a formally recognised local group. Any Neighbourhood Development Plan will need to be in general conformity with the National Planning Policy Framework and strategic planning policy of the local authority. It will also be subject to an independent examination and a referendum before it is formally adopted as a statutory planning policy document by the City Council.
2.22 The first step in preparing a neighbourhood plan is to designate the 'Neighbourhood
Area' for the plan and (in non-parished areas) set up a 'Neighbourhood Forum' to prepare the plan. Three Neighbourhood Areas and one Forum have been designated in the City, these being: 1. Dinnington Parish Neighbourhood Area (approved December 2013) 2. Woolsington Parish Neighbourhood Area (approved July 2014). 3. Kingston Park Neighbourhood Area and Neighbourhood Forum (approved
October 2015).
Evidence Base 2.23 The Council is continuing to develop evidence to support the production of the next
phase of the Local Plan – the Development and Allocations Local Development Document (DALDD). The Following Studies will be prepared:
Newcastle Local Plan - Annual Monitoring Report 15
Newcastle Health Check Report Update. District Centres Retail Frontage Designations. Retail Centre Boundaries Review. Retail Impact Assessment Requirement.
NewcastleGateshead Strategic Housing Market Assessment (SHMA).
Newcastle Traveller Accommodation Needs Assessment
Draft Joint Local Aggregate Assessment for County Durham, Northumberland
and Tyne and Wear.
Infrastructure Delivery Plan (IDP)
Newcastle Strategic Land Release – Strategic Highways Study
Convenience Goods Market Position Paper
Open Space Assessment
Local Development Scheme
2.24 Figure 4 below summarises the progress of the Local Development Documents
(LDDs) in Newcastle’s Local Plan, and the extent to which they have progressed in relation to the targets set out in the revised Local Development Scheme, which was published in November 2015. The preparation of the Development and Allocations LDD will be reviewed as part of future updates of the LDS as the DALDD progresses.
Newcastle Local Plan - Annual Monitoring Report 16
Document Updated LDS, November 2015
Core Strategy and Urban Core Plan
Submitted: February 2014 Examination: Summer 2014 Adopted: March 2015
Development and Allocations LDD
Call out for Sites Commenced Call out for site preparation
Call out for sites
Preparation of Draft Plan
Public Consultation (Regulation 18)
Analysis of Representations
Preparation of Pre-Submission Draft
Public Consultation (Regulation 19)
Consider modifications
Prepare Submission Document
Full Council Approval
Submission for Examination
Pre-Hearing
Independent Examination
Inspector Report
Consideration by Full Council
Adoption
Autumn 2015 January 2016
Feb – Nov 2016
January 2017
February 2017
Feb – Jun 2017
July/August 2017
September 2017
September 2017
October 2017
November 2017
Jan/Feb 2018
March 2018
July 2018
September 2018
September 2018
Walker Riverside AAP
Adopted 2007 Review: Include in Development and Allocations LDD
Benwell Scotswood AAP
Adopted 2009 Review: Include in Development and Allocations LDD
Figure 4 Development Plans Progress
Newcastle Local Plan - Annual Monitoring Report 17
3. Effectiveness of Planning Policies 3.1 This chapter forms the body of the monitoring report, focusing on assessing the
implementation of the city’s adopted planning policies. A set of indicators (Figure 5) are used to assess the progress of meeting the policy targets as well as policy effectiveness. In the interest of keeping this document short and interesting, not all indicators will be reported on each year, and instead a selection will be chosen that highlight interesting facts or show important trends.
EC1 Amount of floorspace (sq m) developed for employment by type in 2014-2015
EC2 Employment Land Availability by type
EC3 Levels of vacancy within main centres
EC4 Total amount of completed floorspace (sq m) for town centre uses in 2014-2015
EC5 Completed retail (A1) and eating and drinking establishments (A3/A4) floorspace (sq m) by site
EC6 Development permitted (sq m) for town centre uses in 2014-2015
EC7 Permitted town centre uses by site
PP1 Nitrogen Dioxide Levels in Air Quality Management Areas
PP2 Number of Listed buildings
PP3 Not reported
PP4 Not reported
PP5 Not reported
PP6 Change in areas of biodiversity importance
PP7 Green Belt additions and deletions
PP8 Number of Parks with Green Flag Awards
MW1 Not reported
MW2 Not reported
MW3 Capacity of new waste management facilities
MW4 Amount (tonnes) of municipal waste arising and managed by management type
Figure 5 Schedule of Indicators
Newcastle Local Plan - Annual Monitoring Report 18
4. Economy
Employment development during 2014-15
4.1 Take up during the last quarter of 2014 and first quarter of 2015 was buoyant. In terms of demand, Professional services and Media Tech sectors were increasingly active and likely to drive take-up levels over the remainder of 2015. Consequently, available stock has further been absorbed and city centre Grade A availability is now limited. This will be partially be eased by the completion of the Rocket at Stephenson Quarter. Prime rents remained stable at £21.50.
B1a
B1b
B1c B1 (total)
B2
B8
Total
Total (sqm)
19,190 1,827 1,648 22,665
Figure 6 Indicator EC1: Amount of floorspace (sq m) developed for employment by type in 2014-2015
Note: Only sites providing more than 500 sq m (or 500 sq m net increase) have been counted.
Site B1a B1b B1c B2 B8
Kings House, Forth Banks
14,020
Former S & N Brewery, West of St James Boulevard
4,379
Former Jap Cars & Parts
258
Warburtons, 26 – 28 Shelley Road, Newcastle
336
Carr and Earl Ltd Hunters Road
355
Walker Library Welbeck Road
440 250
Tenerife Buildings Station Road
92
Shepherds Offshore Ltd/Land on former Neptune Yard
906 907
Trojan Scaffolding Ltd Bells Close Industrial Est
172
Tesco Extra Brunton Lane
102 102
Unit 1 Ruby Park Brunswick
375
Unit 9 Bells Close Industrial Estate
Figure 7 Supplementary table in support of Indicator EC1 giving breakdown of completed floorspace for employment uses by site
Newcastle Local Plan - Annual Monitoring Report 19
Note: Only sites providing approximately 500sqm gross (or 500sqm net increase) have been counted. 4.2 Use Class B1 office development completed during the monitoring year was
relatively modest, the largest office development being at Kings Horse, Forth Banks.
Emerging Land Availability
4.3 The Employment Land Review (ELR) identifies a number of employment sites which should be retained and protected for employment use. These locations are appropriate to develop and provide suitable accommodation for existing and new businesses. Figure 8 provides a break-down of the employment land available by type.
Use Class B1 B2 & B8 Airport Total Site Area (ha) 16.66 36.2 46.01 98.87
Figure 8 Indicator EC2 Employment Land Availability by type, ELR 2014. Note: These figures are based on the emerging employment land portfolio of sites identified as actually or potentially available for employment uses.
Prospects for the Future 4.4 Economic growth is expected to be slow in the short term following the recession,
however, the medium to longer term economic outlook is more positive. The ELR includes a delivery strategy setting out short/medium and long term delivery of the employment land sites.
4.5 The Accelerated Development Zone (ADZ) will help delivery of the Urban Core sites. Walker Riverside delivery will be facilitated by the Low Carbon Enterprise Zone. An Enterprise Zone at the Airport will assist with delivery. Further employment sites will be delivered predominantly by bespoke private sector development, supported by available public sector funding. The Council will seek to target appropriate public sector resources through implementation of the Council’s Corporate Plans, City Deal: ADZ, making the best use of Council assets, working with the LA7 and the creation of the North East Combined Authority (NECA) to enable delivery. Leisure, Culture and Tourism
4.6 The popularity of health clubs, gyms and other fitness centres continues with two new gyms opening between April 2014 and March 2015. Speedflex in the Fleming Business Centre, Jesmond is a new training concept using speedflex machines for circuit training led by a personal trainer. Budget gyms are a particular growth area. Pure Gym, a national low cost operator, has opened on Saint James Boulevard providing 1,598 square metres of floorspace. The gym is intended to cater for the student population and workers and residents living in the city centre.
4.7 The monitoring year has also seen three new hotels open. Tune Hotel, Proctor House, Side has seen the re-use of a Grade II listed building within the Central Conservation Area. The building had been vacant for many years and is now a 104-bed hotel. Baron House, Neville Street, a former office block has been converted into a Hampton by Hilton hotel providing 160 bedrooms. The unlisted 1970s concrete former office block building is also in the Central Conservation Area,
Newcastle Local Plan - Annual Monitoring Report 20
opposite Central Station, the main public transport hub of the city centre. Notification of a prior approval for a change of use from offices to apartments at 89-91 Jesmond Road has seen the development of 1017 square metres Apart Hotel. The development comprises 16 serviced apartments and studios. The building is within the South Jesmond Conservation Area.
Retail
4.8 Within the City Centre, the redevelopment of Eldon Square continues with £17
million investment in the new restaurant quarter, which will provide 21 new catering units within the current Sidgate and High Friars Malls.
4.10 Outside of the City Centre, retail development has been limited to convenience
goods retailing. Lidl has opened its new larger store on Shields Road on the edge of Shields Road at Walkergate local centre. The new store comprises 1,286 square metres of retail (A1) floorspace. Marks and Spencer’s Simply Food Convenience Store in Gosforth began trading December 2014. Planning permission has also been granted for a 1,532 square metres Aldi food store which will provide an anchor store for the Walker Road local centre.
Retail Centre Number of Retail Units
Number of Vacant Units
Percentage % Vacant
Newcastle Primary Shopping Area
777 106 14
Adelaide Terrace District Centre
103 12 12
Chillingham Road District Centre
92 3 3
Denton Park District Centre
25 2 8
Gosforth High Street District Centre
103 13 13
Kingston Park District Centre
27 1 4
Shields Road District Centre
234 42 18
Figure 9 EC3 Levels of vacancy within main centres.
4.11 The vacancy rate in the Core Shopping Area is currently high due to the vacant units in Sidgate and High Friars Malls in Eldon Square Shopping Centre. As discussed previously, Intu Eldon Square are progressing with a major refurbishment to create a new restaurant quarter. The vacancy rate for the District Centres is an improving picture from the previous monitoring year with all of the vacancy rates improving within the District Centres, with the exception of Gosforth High Street District Centre, which has seen its vacancy rate increase slightly from 12% to 13%.
Newcastle Local Plan - Annual Monitoring Report 21
A1 Flexible A1/A2/A3/A4/A5
C1 D2 Total
Floorspace 2,126 525 9407 2352 14,410 Figure 10 EC4 Total amount of completed floorspace (sqm) for town centre uses in 2014-2015.
Note: Only sites providing approximately 500sqm gross (or 500sqm net increase) have been counted.
Site Location In Centre Edge of Centre
Out of Centre
On sites not specifically allocated for retail or mixed uses on the Proposals Map
Proctor House 15 & 23-29, Side
2,399
Lidl 505, Shields Road
1,286
Downing Plaza
Heber Street 525
Baron House Neville Street 5,991 Former Multi York Furniture Ltd
Great North Road
840
Nelson House, The Fleming Business Centre
Burdon Terrace
754
Malhotra 92-96 Saint James Boulevard
1,598
89-91 Jesmond Road
1,017
TOTAL 10,513 1,286 2,611 Figure 11 EC5 Completed floorspace (sqm) for town centre uses by site.
A1 A2 A3 A4 A5 C1 D2 Total Floorspace 7,005 1,271 901 1,501 4,657 15,335
Figure 12 EC6 Development Permitted (sqm) for town centre uses in 2014-2015.
Note: Only sites providing approximately 500sqm gross (or 500sqm net increase) have been counted.
Site Location In Centre Edge of Centre
Out of Centre
On sites not specifically allocated for retail/mixed uses on the Policies Map Lidl Shields Road 1,286
Newcastle Local Plan - Annual Monitoring Report 22
(at Walkergate)
Elim – Ark Youth and Community Building
Heaton Road 500
Aldi, Edgefield Avenue
Fawdon Park 1,532
On sites specially allocated for retail or mixed uses on the Proposals Map Tesco Extra, Brunton Lane
Kingston Park District Centre
636
Former Cradlewell Hotel
Jesmond Road Local Centre
676
Aldi Foodstore, Land between Walker Rd and Readhead Drive
Walker Road Local Centre
1,723
2 Ivy Road and 169 High Street
Gosforth High Street District Centre
1,455
Bruce Building, 101-115 Percy Street
Newcastle Retail Centre
800
Liquid/Envy Nightclub, 49 New Bridge Street West and John Dobson House
Newcastle Retail Centre
1,607
Chase, 10-15 Sandhill, Quayside
Newcastle Urban Core
825
JD Sports, 54 Northumberland Street
Newcastle Retail Centre
2,702
Former The Prince of Wales, 498 Westgate Road
West Road District Centre
736
14-30 West Road
West Road District Centre
857
TOTAL 12,017 2,818 500 Figure 13 EC7 Permitted town centre uses by site.
Newcastle Local Plan - Annual Monitoring Report 23
5 Housing and Population
Population 5.1 The Office of National Statistics (ONS) published 2014 mid-year population
estimate in June 2015. The population of Newcastle in mid-2014 was estimated at 289,835, which is an increase of 3,014 people from the 2013 mid-year estimates.
5.2 The Core Strategy and Urban Core Plan which was adopted in March 2015 is underpinned by the ONS 2011-based interim SNPPS. These projection have been extended to cover the plan period between 2010 and 2030. The Council commissioned St Chads to prepare a bespoke demographic projections model. The model forecasts that Newcastle’s population will increase from 276,700 in 2010 to 312,900 by 2030.
Figure 14 Newcastle historic and projected population
Figure 15 Newcastle Local Plan Population Projections
New housing development 5.3 Excluding student housing, the build rate in 2014/15 was 810 gross and 763 (net).
Appendix 1 provides schedules of completions and losses site-by-site in 2014/15.
240
250
260
270
280
290
300
310
320
19
81
19
83
19
85
19
87
19
89
19
91
19
93
19
95
19
97
19
99
20
01
20
03
20
05
20
07
20
09
20
11
20
13
20
15
20
17
20
19
20
21
20
23
20
25
20
27
20
29
Po
pu
lati
on
(th
ou
san
ds)
Newcastle historic and projected population change (1981 to 2030)
ONS MYE 1981-2010(Original)
ONS MYE 2001-2012(Census 2011 Revision)
CSUCP 2011 BasedPreferred
Newcastle 2010 2015 2020 2025 2030 CSUCP 2011 based 276.7 287.9 293.4 301.7 312.9
Newcastle Local Plan - Annual Monitoring Report 24
Cumulative Target (gross)
Cumulative Target (net)
Dwelling Complete (gross)
Dwelling Complete (net)
Cumulative since (gross) 2010
Cumulative since (net) 2010
2010/2011 520 280 496 +140 496 140
2011/2012 1040 560 456 +293 952 433
2012/2013 1560 840 462 -103 1414 330
2013/2014 2080 1120 585 +506 1999 836
2014/2015 2600 1400 806 +743 2805 1579
Figure 16 Housing Completions
2014-15 Gross Losses 63 Conversions 54 Demolitions 9
Figure 17 Losses 2014/15
5.4 Annual Monitoring Reports are to contain a ‘housing trajectory’ as a forward
planning tool designed to support the ‘plan, monitor and manage’ approach to housing delivery. The housing trajectory included in this Annual Monitoring Report shows the scale of the increase in the build rate required to meet the overall housing delivery target for Newcastle. Government requires us to show future housing completions not as a simple yearly average but as a meaningful reflection of how housing is expected to come forward. Newcastle housing trajectory is illustrated in Appendix 2.
Affordable Housing 5.5 Policy CS11 requires the need for all development of 15 or more dwellings should
provide 15% affordable homes and the need to deliver 150 affordable homes a year in Newcastle. In 2014-15 a total of 289 (gross) affordable homes were completed in Newcastle – as shown in the following table (Figure 18). This is above the target in the CSUCP.
Ref Site Planning Application Number of
Affordable Homes
1540 Land between Elswick Road & Bristol Terrace
2013/0495/01/DET 24
3096 Land at Birchvale / Greentree Square 2009/1603/01/DET 8 4395 British Bakeries Ltd 2007/2000/03/RES 4 4399 Land at Cypress Avenue 2013/0306/01/DET 15 4528 Lemington Middle School 2013/0489/01/DET 7 4846 Former Matchbox Community Centre 2013/1705/01/DET 5 4974 Former Stephen Easten 2010/0351/01/DET 42 5102 Land between 105 & 145 Middle Street 2012/1583/01/DET 14 5104 Site of Teasdale House 2013/0318/01/DET 40
Newcastle Local Plan - Annual Monitoring Report 25
5152 Land at Hadrians Way, Haig Cresc,Shafto St
2007/1300/15/RES 24
5202 Site of former Tyne Tees Television Studio
2013/0710/01/DET 30
5227 Land at corner of Roeburn Way 2013/1701/01/DET 9 5276 Saint Francis of Assissi Church 2012/1462/01/DET 16 5423 Wayside 8 5435 269-276 Westgate Road 11 5485 Chirton House 16
Moor House, Hamilton Crescent 16 Total 289
Figure 18 Affordable Housing Completions
Student Housing 5.6 The universities and further education college are a vital part of the economy of the
city and the student accommodation offer is an important part of ensuring that the city remains an attractive location where students want to come and study. In order to manage the growth of shared housing across the city the Council, in 2011 approved the Maintaining Sustainable Communities SPD. This document includes a policy on the development of houses in multiple occupation and other forms of shared accommodation and factors to be considered when determining planning application relating to this type of development, including purpose-built student accommodation.
5.7 Since 2011, the student housing market has continued to experience substantial growth. During 2014/15, 663 student units have been completed equating to 1150 new bedspaces.
Ref Site Planning Application Completions Bedspaces
4747 Tyneside Minimix Concrete site
2012/0407/01/DET 161 161
4223 Former Tyne Tees Studios 2012/0365/01/DET 57 57
3082 Former Magpies Club 2012/0224/01/DET 216 216
5260 Downing Plaza 2012/0803/01/DET 174 329
4483 1 - 7 Park Terrace, 1 - 10 Kensington Terrace
2011/0457/01/DET 38 347
5347 Albion House 2013/0398/01/DET 8 8
5444 1 - 3 Saint James Terrace 2014/0191/01/DET 9 32
Total 663 1150
Figure 19 Student Completions 2014/15
Newcastle Local Plan - Annual Monitoring Report 26
Five Year Land Supply 5.8 The National Planning Policy Framework (NPPF) and the Planning Practice
Guidance (PPG) seek to underpin the Government’s step change in housing delivery through a more responsive approach to land supply at the local level. As a Local Planning Authority, Newcastle City Council are required to identify and maintain a rolling five year supply of deliverable housing land, to ensure the continued supply of homes in the area.
5.9 The Council has prepared an interim Five Year Land Supply Report which covers the five year period from 1st October 2015 to 31st September 2020 (Appendix 2). This report sets out how Newcastle City Council has met its requirements and can demonstrated a five year supply of land for housing. The report takes into account the NPPF requirement for an additional 20% allowance on the five year land supply to create competition and choice in land supply, and the requirement to consider meeting any past shortfall in completion rates. The report concludes that the council has a five year land supply.
Newcastle Local Plan - Annual Monitoring Report 27
5.11
6. People and Place
Health and Wellbeing
Air Quality 6.1 Newcastle has two Air Quality Action Plans which show how we tackle problems
with the two air quality management areas (AQMAs) in Newcastle. City Centre AQMA Action Plan Gosforth AQMA Action Plan
6.2 These action plans set out measures we want to put in place to improve air quality
to meet standards set in the National Air Quality Strategy. Our Plan includes a number of measures for example working with bus operators to accelerate the use of cleaner buses and freight consolidation facilities for the City Centre/Eldon Square Shopping Centre.
6.3 In 2014 mean nitrogen dioxide levels within the City Centre AQMA achieved
40μg/m3. This is the fifth year in a row that nitrogen dioxide levels have shown a decrease in the City Centre AQMA. However, several streets within the City Centre, for example, Blackett Street (50μg/m3), Pilgrim Street (52μg/m3) and Percy Street (44μg/m3) continue to show high mean nitrogen dioxide levels with the highest being Mosley Street with 62μg/m3.
6.4 The mean nitrogen dioxide level for the Gosforth AQMA fell again in 2014 to
31μg/m3 continuing the downward trend for the seventh year in a row. Killingworth Road and Station Road levels fell slightly but continue to be of concern giving mean nitrogen dioxide levels of 39μg/m3 and 33μg/m3 respectively.
6.5 Monitoring outside the AQMAs does not show there to have been any breaches of the nitrogen dioxide limit values in 2013. The highest levels recorded were at West Copperas Lane (32μg/m3) and Birchfield Gardens (36μg/m3) close to the A1 were vehicles accelerate out of the valley through Denton.
6.6 Figure 20 shows the average nitrogen dioxide levels from 2008 to 2013 with the downward trend set to continue over the next few years.
Newcastle Local Plan - Annual Monitoring Report 28
Figure 20 PP1 NO2 Results 2008 to 2013 (Trend to 2017
6.7 The Council will continue to take a proactive approach to dealing with air pollution
and have recently been involved with a third successful bid for funding from the Department of Transport. The funding will allow a further 40 buses which travel through some of the City’s most polluted streets to be retrofitted with equipment which greatly improves their emissions to atmosphere.
Promoting Place making
6.8 Our built environment is what gives Newcastle its special identity. We need to
protect what we value, including the countryside and historic environment and improve, where needed the less positive aspects.
6.9 Quality design is encouraged through regular Significant Buildings and Housing Scheme Audits and the biennial Lord Major’s Design Awards.
Heritage 6.10 Our heritage, including the historic environment is an important element of local
characteristic and can contribute positively to creating a stronger sense of place. Heritage assets can also be enjoyed for their contribution to the quality of life.
6.11 There has been no loss of designated heritage assets and no deliberate damage
has been recorded. 6.12 1 entry was removed from 2014 English Heritage at Risk List, (Sallyport Tower,
Tower Street) and 6 were added (Presbytery attached to St Michael's church, Westmorland Road; Church of St Thomas the Martyr, Barras Bridge; Church of St
Newcastle Local Plan - Annual Monitoring Report 29
Matthew, Summerhill Street; Church of St Michael, Westmorland Road; St John's Cemetery, Newcastle upon Tyne; Westgate Hill Cemetery, Newcastle upon Tyne).
Indicators:
Number of scheduled monuments, grade I, II*, II Listed Buildings, Battlefields, Historic Parks and Gardens, Conservation Areas.
Number of heritage assets (national designations, local lists, Historic Environment Record).
Number of Grade I and II* Listed Buildings at risk. To enable us to monitor: Loss of heritage assets - No recorded losses (designated); Recorded damage to designated heritage assets - No deliberate damage has
been recorded. Some suffered damage from rain and floods; Additional designations – no new designations. 2 existing designations
merged into 1; Heritage Assets removed from risk register - 1 was removed from the 2014
English Heritage list: Sallyport Tower; Heritage Assets added to risk register - 6 were added to the 2014 English
Heritage list: (Presbytery attached to St Michael's church, Westmorland Road; Church of St Thomas the Martyr, Barras Bridge; Church of St Matthew, Summerhill Street; Church of St Michael, Westmorland Road; St John's Cemetery, Newcastle upon Tyne; Westgate Hill Cemetery, Newcastle upon Tyne).
PP2 - Number of Listed buildings
Entries Buildings/Structures
Grade I
53
128
Grade II*
222
2205
Grade II
556
1409
Total
830
3830 Figure 21
Locally listed sites/ buildings
272
Conservation Areas with Management Plans
12 (12 with character statements, 11 with management plans)
Scheduled Monuments 42
Newcastle Local Plan - Annual Monitoring Report 30
World Heritage Site 1 Registered Battlefields 1 (Newburn Ford) Registered Parks and Gardens
8
Figure 22
Heritage at Risk English Heritage 2015 Heritage At Risk Register: Grade 1 listed buildings 1 (All Saints Church) Grade II* listed buildings 8 (Keelmen’s Hospital, 5 – 13 Grey Street,
Presbytery attached to St Michael’s Church, Church of St Michael, Woolsington Hall, Christ Church (and hall attached), Church of St Thomas the Martyr, Church of St Matthew)
Grade II listed buildings 3 (Life Transformation Church, Church of St. Michael with St Lawrence, Church of St Luke)
Scheduled monument 1 (Dewley Hill) Registered battlefield 1 (Newburn Ford, shared with Gateshead) Conservation areas 0 Cemeteries 2 (St John’s Cemetery, Westgate Hill
Cemetery) Figure 23
Climate Change 6.13 Newcastle City Council is committed to working with residents and partners to
reduce the city’s carbon emissions by 34% (from 1990 levels) by 2020. The City is also committed to delivering a reduction in carbon emissions in excess of 20% by 2020 of citywide emissions, using a 2005 baseline, by signing the EU ‘Covenant of Mayors’ agreement. This commitment is acknowledged by the Local Plan with policies to ensure that development will contribute to these aims. Detailed policies will be included in our Development and Allocations DPD.
Figure 24: CO2 per person (tCO2)
Newcastle Local Plan - Annual Monitoring Report 31
Green Infrastructure and the natural environment 6.14 Progress on the new Biodiversity Action Plan (BAP) is being recorded on the
Biodiversity Action Reporting System (BARS); this is a web based information system. It is developed and supported by UK partnership between DEFRA, the Joint Nature Conservation Committee, Natural England, the Countryside Council for Wales, Scottish Natural Heritage, Northern Ireland Environment Agency, the Environment Agency, the Wales Biodiversity Partnership and the National Biodiversity Network Trust.
6.15 Newcastle has 26 Local Wildlife Sites (LWS), however all sites are due to be
reviewed in 2016 and designations considered by the Local Wildlife Sites Partnership.
6.16 There are also 35 Sites of Local Conservation Interest (SLCI). New SLCI
designation criteria was produced and the sites were reviewed in 2014.
Indicators:
PP6 - Change in areas of biodiversity importance Sixty Five percent of Newcastle’s Local Wildlife Sites (LWS) are under positive
management for 2014 -2015.
Green Belt and countryside 6.17 The revised Green Belt Boundary has been established in the Core Strategy and
Urban Core Plan. The remaining Green Belt will be protected in accordance with the National Planning Policy Framework.
Indicators:
PP7 - Green Belt additions and deletions
The revised Green Belt established in the Core Strategy and Urban Core
Plan has an area of 3,980 hectares. This represents a change of -410 hectares (-9%).
No applications were advertised as departures from Green Belt policies.
Green Infrastructure and the natural environment
Open Space Sport and Recreation 6.18 As green infrastructure and the natural environment are inter-related with open
space, sport and recreation, these topics are considered together. This approach is reflected in the Core Strategy and Urban Core Plan where it was decided to remove the dedicated policy on Open Space, Sport and Recreation. Reference to the requirement for the protection and enhancement of open space, sport and recreational facilities is contained within the Green Infrastructure and the Natural
Newcastle Local Plan - Annual Monitoring Report 32
Environment policy. 6.19 The policy, which is supported by our comprehensive evidence base, aims to
deliver a high quality and comprehensive network of interconnected green infrastructure and identifies a strategic green infrastructure network. Further development of green infrastructure requirements and its delivery across the City will be taken forward in the development of the DALDD over the next year.
6.20 Work commenced on developing a city wide Open Space Needs Assessment, this
is due for completion in the spring 2016. It will update the previous completed City of Newcastle’s Public Green Space, Sports and Recreation Needs and Opportunities Assessment (2009) and develop further the assumptions in the Addendum (2013). It will be used to inform the open space allocations and policy for the DALDD.
6.21 The Green Flag Award is the benchmark national standard for parks and green
spaces in the UK and applications for awards are judged against eight key criteria. There are two City Council maintained Green Flag Awarded Parks in 2014/2015, with a further park maintained by Newcastle University:
Heaton Park, Jesmond Vale Lane (NE6 5JS);
Jesmond Dene, Red Walk (NE7 7BQ);
King's Campus (Newcastle University)
Indicators: PP8 - Number of Parks with Green Flag Awards
6.22 There are currently 3 parks that have achieved Green Flag status:
Heaton Park, Jesmond Vale Lane (NE6 5JS); Jesmond Dene, Red Walk (NE7 7BQ); King's Campus (Newcastle University)
Plan for Built Facilities
6.24 The Council adopted a Plan for Built Facilities in October 2015. The Plan sets out
the requirements for built facilities to 2030 and follows on from the built facilities assessment report presented to cabinet in March 2015. This plan sets out any key issues that need to be addressed providing the Council with a long-term approach for investment and development of sports facilities. The Plan will help to bring investment into the city and will help sustain sports facilities for the next fifteen to twenty years. The Plan also gives direction to planners and developers in assessing the need to seek developer contributions or funding from the community infrastructure levy.
Plan for Playing Pitches
6.25 The Council adopted a Plan for Playing Pitches in October 2015. Sport England and
the National Governing Bodies (NGBs) were involved in the process. This Plan uses a nationally approved methodology on which its findings are based providing a
Newcastle Local Plan - Annual Monitoring Report 33
strategic approach to the provision and development of playing pitches and a process to enable the council to deliver and secure investment in playing pitches across the city. A key finding is that the city has insufficient accessible playing pitches to cope with the numbers of matches that will be generated by a growth in population. This will mean that some areas in the city, as well as upgrading existing facilities, will also require new outdoor facilities for sport. The Plan sets out a clear process that the council should follow, a priority is to establish a Pitches Review Group that will take forward the recommendations, monitor the plan and shape future delivery.
Newcastle Local Plan - Annual Monitoring Report 34
7. Transport and Accessibility 7.1 Transport and accessibility are fundamental to the delivery of the Core Strategy
and Urban Core Plan’s spatial strategy. The strategic transport policy sets out three main strands:
promote alternative travel choices to encourage a modal shift from sole
occupancy car use to more sustainable alternatives; improve the operation of our transport networks and improve our strategic
connections;
reduce the impacts of development, developers must take full consideration of sustainable travel options.
7.2 The challenge in the Urban Core is to develop and manage streets and places to
cater for both growth and create the sense of place. The changes will increase priority given to pedestrians and cyclists in parts of the Urban Core and improve the management of vehicular movements to, within and around the Urban Core.
7.3 The Urban Core section of the plan contains policies for:
1. Walking 2. Cycling 3. Public Transport 4. Freight and Servicing 5. General Traffic 6. Car Parking 7. Gateways and Arrival Points
7.4 The Transport Plan for the North East Combined Authority will show transport’s
role in achieving the goal of “More and Better Jobs” set out in the Strategic Economic Plan (SEP) for the North East. It will also demonstrate how, in transport terms, the North East Combined Authority works as a unified whole and relates to its immediate environs and the wider world. The Transport Plan will be completed by Autumn 2016.
Upgrading the Transport Network
7.5 The Council continue to work on a number of improvements that will help to
deliver the Council’s agreed priorities and policies in transport and associated areas.
7.6 We are taking measures to limit the increase in traffic by encouraging greater use
of public transport like buses and the Metro, and healthier ways to travel like cycling and walking. Though as our city grows and the economy improves we know that traffic is likely to grow in the years ahead and we have to take steps to
Newcastle Local Plan - Annual Monitoring Report 35
improve infrastructure to keep the city moving with a transport system that works. We have identified key areas to modernise and upgrade our transport network over the next five years so it will meet the needs of a flourishing modern city long into the future:
7.7 Around the city: Working with the Highways Agency and neighbouring councils we
will make improvements to the roads that go round the outside of Newcastle - in particular the A1 and the A19;
7.8 Across the city – Congestion is a common problem on these routes and there are
a number of bottlenecks and safety issues at some key junctions. We will make highways safer, provide better facilities for pedestrians and cyclists while smoothing the flow of traffic by making big improvements to critical junctions; and
7.9 Within the city centre: One of the most important parts of our plan is to continue to
renew the heart of the city. We want to make the city centre a safer and easier place to be. To do this we need to change the existing highways network to prioritise people, making it easier to get around and access services and shops.
Around the City
Working with Highways Agency undertake improvements to A1 and A19; Work has begun on upgrade of Coal House – Lobley Hill section of A1 and
Seaton Burn junction has been completed.
Across the City
An outline case has been prepared and submitted and a final case is being drafted for a scheme to improve the junction on the north side of Scotswood Bridge and the approaches to it.
Outline business cases have been submitted and full business cases are being developed for improvements at junctions on Cow Hill, Kenton Road-Grandstand Road, at Blue House, Osborne Road, and the Haddricks Mill roundabouts at South Gosforth.
Works from Broadway to Hollywood Avenue have been completed and additional works associated with Gosforth transport improvement project are due to begin early 2016.
Work is underway at Cowgate Roundabout and should be complete by mid 2016.
Within the City Centre 7.10 Funding awarded to work with Network rail to provide a direct pedestrian link from
Central Station to Stephenson Quarter (second phase of Central Gateway Project). A preferred option for the link and associated business case is being developed.
Newcastle Local Plan - Annual Monitoring Report 36
7.11 The following schemes have detailed designs that have been subject to public
engagement: o Barras Bridge and St Marys Place; o Percy Street;
o Claremont Road / Queen Victoria Road junction;
o Queen Victoria Road
7.12 Works on John Dobson Street Work are continuing on (Phase 1) along with
preparatory works for Phase 2.
Newcastle Local Plan - Annual Monitoring Report 37
8. Minerals and Waste
Minerals 8.1 The Council does not currently monitor production of secondary and recycled
aggregates in Newcastle. As part of the CSUCP monitoring, this will be recorded in the future.
Waste
8.2 The Council continues its commitment to take action to reduce, recover, recycle and
compost waste as far as possible and make adequate arrangements for the residual waste that requires disposal.
8.3 During 2014-2015 139,490 tonnes of municipal waste was collected. Residual waste that needed to be disposed to landfill also reduced in real terms for that period from 58,594 to 52,594.
8.4 No new waste management facilities were built.
8.5 The Council is currently addressing how MSW will be dealt with in the future. This includes discussions with a current private sector provider (SITA UK), who have a long term contract with the Council until 2024. This is currently being reviewed with a view to improving landfill diversion rates. This will require a variation of the existing contract, resulting in new contractual arrangements for MSW management and will provide the mechanism for achieving the aspirations of the Newcastle Waste Strategy. The proposals combined with front-end recycling initiatives in place, should result in landfill diversion of up to 80% of the MSW arisings.
Indicators:
MW4 - Capacity of new waste management facilities
There were no new waste management facilities created in 2014-15.
MW5 - Amount (tonnes) of municipal waste arising and managed by management type
07-08 08-09 09-10 10-11 11-12 12-13 13-14 14-15 Reused or recycled 44345 50344 61224 47025 56302 56018 53545
52594
Energy from
waste 0 0 0 14236 20221 29341 32738
36613
Other Landfill
Diversion 3538 4309 3176 2447 2115 797 3419
2878
Landfill 123282 108285 93168 91230 68732 58363 50242
46406
Total 171165 162938 157568 154938 147370 144519 139944
138490 Figure 24 Amount (tonnes) of municipal waste arising and managed by management type *Note: Some changes have been made to how we aggregate our data, to make our reporting more meaningful. This has
resulted in some minor discrepancies, when compared with previous reporting periods.
Newcastle Local Plan - Annual Monitoring Report 38
9. Conclusion 9.1 This is the tenth Annual Monitoring Report charting the city’s progress against its
planning policy framework. Overall, there have been a number of positive developments during this monitoring period, and only a few areas for concern.
9.2 Elements that can be highlighted as particularly positive are:
The Council has adopted the Core Strategy and Urban Core Plan.
The Council expects to adopt CIL in early 2016.
The Council is addressing air quality, improving public transport and the local network.
Creating new jobs through retail, office and manufacturing opportunities.
Allocating sufficient land to meet the Council’s 5 year land supply.
Appendix 1 Housing Completions Ref Address 1 Application Reference Sum of
Completion Affordable Losses
through Conversion
Losses through Demolition
3423 Burgess House 93 - 105 Saint James Boulevard
2014/00137/NRE 0 0
4859 Former Trinity College Kenton Lodge 2013/1685/01/DET 0 0
5149 Land to the north of Hawthorn Grange 2014/0157/01/DET 0
5266 611 West Road 2012/0987/01/DET 0 5385 Former Harehills Centre 2013/1836/01/DET 0 0
5391 Land south of Broughton Close 2014/0085/01/DET 0 0
5400 Former Magistrates Court 2013/1207/01/DET 0
5418 Land at Westway Garages 2014/1364/01/DET 0
5510 125 Brighton Grove 2014/1310/01/DET 0
5515 8 Portland Terrace 2014/00539/NRE 0
5525 5 Clarence Street 2013/0731/01/DET 0
5528 13 Adeline Gardens 2014/1781/01/DET 0
5339 113 High Street 2013/0559/01/DET 1 5536 265 Shields Road 2014/00656/NRE 1 4691 311A Two Ball Lonnen 2008/1364/02/REN 1
5255 2 The Roman Way 2012/0725/01/DET 1 5310 Clarendon Mews 2013/0421/01/DET 1 5316 82 Moor Road North 2012/1638/01/DET 1
5346 4 Byker Bridge 2013/0673/01/DET 1 5348 Hopkirk Building 250 Shields Road 2013/0658/01/DET 1
5374 Adj 12A Elsdon Road 2013/1036/01/DET 1
5378 241 Chillingham Road 2013/1476/01/DET 1
5443 552 Welbeck Road 2014/0553/01/DET 1
5472 222A Westgate Road 2014/0709/01/DET 1 2
5484 Blockbuster Video Express 2014/0812/01/DET 1
5514 Site of Jesmond Dene Towers 2014/0212/01/DET 1
43A & 43B Leazes Terrace 1 1
5349 22 Severus Road 2013/0628/01/DET 2 5471 17 Severus Road 2014/0675/01/DET 2 1
3265 2 - 3 Victoria Terrace 2013/0922/01/DET 2 0
4642 790 Shields Road 2013/1059/01/DET 2 1 4887 223 Shields Road 2010/0279/01/DET 2 1 5059 Land adj to 40 Trentham Avenue 2011/0416/01/DET 2 0
5085 78 The Drive 2011/0663/01/DET 2 0 5308 41 Brighton Grove 2013/0282/01/DET 2 1 5309 43 Brighton Grove 2013/0281/01/DET 2 1 5441 679 West Road 2014/0395/01/DET 2 5497 10 Falconar Street 2014/1174/01/DET 2 1 5328 290 - 292 2013/0763/01/DET 3 0 64 Rothbury Terrace 3 7
4626 1 Osborne Avenue 2012/0670/01/DET 4 1
4520 99 - 107 Shields Road 2007/1999/01/DET 5
5511 Dene Hotel 36 - 42 Grosvenor Road 2014/1196/01/DET 5
4846 Former Matchbox Community Centre 2013/1705/01/DET 6 5 0
4757 Land adjacent to DSS Offices 2011/1257/01/DET 7
3492 Murton House (Floor 1) 2013/0251/01/DET 8 0
4517 Norden House (Floor 2) 2013/00411/NRE 8
5423 Wayside 8 8 5227 Land at corner of Roeburn Way 2013/1701/01/DET 9 9
5435 269-276 Westgate Road 11 11
1100 Land at Rutland Avenue 2010/0188/01/DET 12 0
2642 Cell G, Newcastle Great Park 1999/1300/175/RES 12 0
5102 Land between 105 & 145 Middle Street 2012/1583/01/DET 14 14
5276 Saint Francis of Assissi Church 2012/1462/01/DET 16 16
5485 Chirton House 16 16 Moor House, Hamilton Crescent 16 16 31
5424 Cambrian phase 3 2013/1346/01/DET 18 4395 British Bakeries Ltd 2007/2000/03/RES 21 4
3096 Land at Birchvale / Greentree Square 2009/1603/01/DET 21 8 0
1540 Land between Elswick Road & Bristol Terrace
2013/0495/01/DET 24 24
4565 Cell F West Phase 1 Residential 1999/1300/144/RES 30
5202 Site of former Tyne Tees Television Studio 2013/0710/01/DET 30 30 0
4528 Lemington Middle School 2013/0489/01/DET 34 7
5104 Site of Teasdale House 2013/0318/01/DET 40 40
4974 Former Stephen Easten 2010/0351/01/DET 42 42 0
4399 Land at Cypress Avenue 2013/0306/01/DET 45 15
2670 Site of Hillsview Primary School 2012/0079/01/DET 52 0
2646 Cell C, Newcastle Great Park 2012/1607/01/DET 66 0
5152 Land at Hadrians Way, Haig Cresc,Shafto St
2007/1300/15/RES 72 24
4568 NGP Cell F Phase 2 Residential 1999/1300/183/RES 111
76, 78, 80 & 82 Broadmead Way 2
1458 Walker Road 1 73 Saint Georges Terrace 1
1538 to 1546A Walker Road 6
Gr fl Flat 3 Wingrove Road 1
140 Ethel Street 2
4-6 Thorntree Drive 1
2 Grey Street 1 Total 806 289 54 9
Appendix 2 Five Year Land Supply Report
1. Introduction 1.1 The National Planning Policy Framework (NPPF) and the Planning Practice
Guidance (PPG) seek to underpin the Government’s step change in housing delivery through a more responsive approach to land supply at the local level. As a Local Planning Authority, Newcastle City Council are required to identify and maintain a rolling five year supply of deliverable housing land, to ensure the continued supply of homes in the area.
1.2 This document is an interim report which covers the five year period from 1st October
2015 to 31st September 2020. It is the council’s intention to publish a revised five year land supply report that will cover the period April 1st 2016 to 31st March 2021 in spring 2016.
1.3 This report sets out how Newcastle City Council has met its requirements and can
demonstrated a five year supply of land for housing. The report takes into account the NPPF requirement for an additional 20% allowance on the five year land supply to create competition and choice in land supply, and the requirement to consider meeting any past shortfall in completion rates.
1.4 Section 3 of this report set provides a full methodology setting out how this has been
calculated. A list of available and suitable sites, with a commentary on their deliverability (as of September 2015) is provided in Appendix 1. This information will be updated on an annual basis to reflect any new sites that become available and any change in circumstance with existing sites. It may be updated throughout the year if necessary, but as required by the Planning Practice Guidance, this annually produced report provides the Council’s position on the five year land supply position for the year from 1st April 2015.
1.5 The conclusions in the Five Year Land Support Report are based on information that was available at the time of the study and the council does not accept liability for any factual inaccuracies or omissions. The information will be a snapshot of the data captured at a point in time. Information will be compiled with all due care and attention, however inevitably discrepancies may occur. The document should therefore be considered as a live one that will be updated.
2. National policy 2.1 The NPPF states at paragraph 47 that local planning authorities should: “identify
and update annually a supply of specific deliverable sites sufficient to provide five years worth of housing against their housing requirements with an additional buffer of 5% (moved forward from later in the plan period) to ensure choice and competition in the market for land. Where there has been a record of persistent under delivery of housing, local planning authorities should increase the buffer to 20% (moved forward from later in the plan period) to provide a realistic prospect of achieving the planned supply and to ensure choice and competition in the market for land; identify a supply of specific, developable sites or broad locations for growth, for years 6-10 and, where possible, for years 11-15;”
2.2 In terms of the ‘type’ of sites which can be included in the five year housing supply: NPPG offers the following advice:
“Deliverable sites for housing could include those that are allocated for housing in the development plan and sites with planning permission (outline or full that have not been implemented) unless there is clear evidence that schemes will not be implemented within five years. However, planning permission or allocation in a development plan is not a prerequisite for a site being deliverable in terms of the five-year supply. Local planning authorities will need to provide robust, up to date evidence to support the deliverability of sites, ensuring that their judgements on deliverability are clearly and transparently set out. If there are no significant constraints (e.g. infrastructure) to overcome such as infrastructure sites not allocated within a development plan or without planning permission can be considered capable of being delivered within a five-year timeframe. “- see Paragraph: 031 Reference ID: 3-031-20140306
3. Calculating Newcastle’s Five Year Land Supply
Approach to Calculation Five Year Land Supply 3.1 This section of the report sets out Newcastle’s methodology for calculating its five
year deliverable supply. Calculating a five year land supply includes four stages;
1. Identifying the five year period; 2. Identifying the housing requirement for the five year period; and 3. Identifying and assessing sites that have the potential to deliver housing in
the five year period to determine the supply. 4. Calculating the Five year land supply by comparing the supply against the
requirement. Stage 1: Five Year Period 3.2 The first stage in calculating the five year land supply is to establish what period the
five years will cover and to identify the start date. This interim report cover the period from 1st October 2015 to 31 September 2020. The table below shows Newcastle’s monitoring periods.
Q1 1 April to 30 June Q2 1 July to 31 September Q3 1 October to 31 December Q4 1 January to 31 March
Figure 25 Newcastle monitoring quarters
3.3 Usually the five year land supply would be reported from 1 April to 31 March.
However, as this report was prepared following the publication of this years second quarter monitoring data, the council has based this interim report on information available as of the 1st October 2015.
Stage 2: Identifying the level of housing requirement for the five year period; 3.4 The future housing requirement for Newcastle is set out in the Core Strategy and
Urban Core Plan which was adopted in March 2015. Policy CS10 requires provision for 19,000 (gross), 17,000 (net) new dwellings between 2010 and 2030. As shown in Figure 2 below, the housing requirement in policy CS10 is phased to reflect the release of land to meet the housing needs.
2010-15 2015-20 2020-2025 2025-30 CSUCP Target (net)
1400 4800 5400 5400
Target (gross) 2600 5100 5650 5650 Per Annum (net)
280 960 1080 1080
Figure 26 CSUCP Policy CS10 Housing Requirements
3.5 The housing requirement for 2015 (Quarters 3&4) to 2021 (Quarter 1&2) is 4860. Figure 27 below illustrates the calculations.
2015(Q3&4) 2016 2017 2018 2019 2020(Q1&2) CSUCP annual Requirement/ 6 months 4800/5 = 960 960/2 = 480
CSUCP annual Requirement 960
CSUCP annual Requirement 960
CSUCP annual Requirement 960
CSUCP annual Requirement 960
CSUCP annual Requirement/ 6 months 5400/5/= 1080 1080/2= 540
Total housing requirement = 4860 Figure 27 Annual Requirement
3.6 Between 2010 and 2015 (Q3&4), 1937 dwellings have been complete. This means
there has been an oversupply of 53 as shown in Figure 28. CSUCP Housing
Requirement Completions Supply
Cum
ulat
ive
CSU
CP
Targ
et
(net
)
Cum
ulat
ive
CSU
CP
Targ
et
(gro
ss)
Dw
ellin
g C
ompl
ete
(gro
ss)
Dw
ellin
g C
ompl
ete
(net
)
Cum
ulat
ive
sinc
e (g
ross
) 201
0
Cum
ulat
ive
sinc
e (n
et) 2
010
Def
icit
or o
ver
supp
ly o
f ho
usin
g ag
ains
t C
SUC
P ta
rget
(n
et)
2010/ 11 280 520 496 +140 496 140 -460
2011/ 12 560 1040 456 +293 952 433 -127
2012/ 13 840 1560 462 -103 1414 330 -510
2013/ 14 1120 2080 585 +506 1999 836 -284
2014/ 15 1400 2600 806 +743 2805 1579 +179
Figure 28 Delivery against housing requirement 2010-2015(Q1&2)
3.7 Once the five year requirement has been calculated the NPPF (paragraph 47)
requires local authorities to identify a 5% buffer to ensure choice and competition in the market but suggests this should be increased to 20% where there has been a record of persistent under delivery of housing. Where there has been a record of persistent under delivery of housing, the NPPF also requires local planning authorities to increase the buffer to 20% (moved forward from later in the plan period).
3.8 As illustrated in Figure 28, Newcastle has a persistent record of under delivery and
therefore will include a 20% buffer. An additional 20% buffer would increase the next five years (2015 (Q3&4) to 2020 (Q1&2)) requirement by 961 to 5764 (Figure 5).
3.9 In calculating the next 5-years requirement, Newcastle has adopted the “Sedgefield method” to deal with the historic shortfall. The Sedgefield method of calculating land supply involves adding any shortfall of housing from previous years within the first five years of a local plan. This approach is considered to be consistent with the PPG (Paragraph: 035 Reference ID: 3-035-20140306) which specifically advises that “Local planning authorities should aim to deal with any undersupply within the first 5 years of the plan period where possible”.
Net housing Requirement (CSUCP) 2010 -15 (Q1&2)
(280 x 5 + 960/2) 1880
Total net completion 1933 Under supply or over provision +53 Net housing requirement 2015 (Q3&4)-20 (Q1&2)
4860
Net housing requirement plus remaining undersupply/ over provision required
4807
20% Buffer 961 Five year land supply requirement 5768
Figure 29 Five year Land Supply Requirement
Stage 3: Identifying and assessing sites that have the potential to deliver housing in the five year period. 3.10 To calculate the housing land supply, the Council has to identify what land is
available and likely to be deliverable during the five year period. The NPPF states that “to be considered deliverable, sites should be available now, offer a suitable location for development now and be achievable with a realistic prospect that
2015/16 Q1&2
1880 3110 475 +354 3284 1937 +53
housing will be delivered on the site within five years and in particular that development of the site is viable”. Sites are assessed within the five year assessment against the three criteria of availability, suitability and achievability. Viability is a key consideration in the determination of site achievability.
3.11 Identifying sites that have the potential to deliver housing in the five year period is
split into two categories;
1. Site with Planning Permission - The NPPF indicates that sites with planning permission should be considered deliverable until permission expires, unless there is clear evidence that schemes will not be implemented within 5 years.
2. Sites without Planning Permission- National Planning Policy Guidance
indicates that planning permission is not a prerequisite for a site to be considered deliverable within five years. The Council will make an assumption that sites without planning consent will not deliver within five years unless there is evidence to suggest otherwise. Sites which are considered may start to deliver within five years include; Sites allocated in Core Strategy and Urban Core Plan that have developer
interest. Housing schemes the Council will deliver by the Fairer Housing Unit and
have council commitment that they will be delivered. Sites with planning permission consented after based date Applications for which there is a resolution to approve subject to a section
106 agreement Windfall sites
3.12 The PPG (Paragraph: 023 Reference ID: 3-023-20140306) advises that the local
planning authority should use the information on suitability, availability, achievability and constraints to assess the timescale within which each site is capable of development. The council will use data submitted by developers and local agents when assessing lead-in times and build-out rates by year. Unless the council has good reason not to do so, delivery forecast information received will be accepted. When no information is received, delivery information from previous years will be used to inform a delivery forecast. If no recent delivery information has been obtained, delivery assumptions will be applied. The assumptions for built out rates are set out in Newcastle’s Draft HELAA Methodology.2
Windfall 3.13 NPPF (Paragraph 48) states that Local Planning Authorities may make an
allowance for windfall sites in the five-year supply if they have compelling evidence that such sites have consistently become available in the local area and will continue to provide a reliable source of supply. Any allowance should be realistic having regard to the SHLAA, historic windfall delivery rates and expected future trends, and should not include residential gardens.
3.14 This is certainly the case in respect of small housing sites and the HELAA
2 Newcastle City Council Housing and Employment Land Availability Assessments Draft Methodology November 2015 http://www.newcastle.gov.uk/sites/drupalncc.newcastle.gov.uk/files/wwwfileroot/planning-and-buildings/planning-policy/newcastle_helaa_draft_methodology.pdf
incorporates a small site windfall allowance based upon a conservative assumption that unidentified developments of fewer than 5 homes will continue to yield at least 50 completions per annum.
3.15 Monitoring data (see figure 30) demonstrates that Newcastle has delivered 298
dwellings on sites less than 5, over the period 2010-2015. Therefore the Council will take a conservative estimate that estimates that an average of 50 dwellings will come for each year through this source.
Sites with planning permission less
than 5 dwellings. 2010/ 11 64 2011/ 12 46 2012/ 13 61 2013/ 14 72 2014/ 15 55
Figure 30 Sites with planning permission for less than 5 dwellings.
3.16 Office conversion to residential: On 30 May 2013 the government introduced a new
policy (through the Town and Country Planning (General Permitted Development) (Amendment) (England) Order 2013) that gives permitted development rights for the conversion of offices (class B1a) to dwellings (class C3) without the need for an application for planning permission, through a prior approval system, for a three year period. Dwellings arising from this source have the potential to contribute to the supply.
3.17` Losses – The CSUCP assumes that there will be 300 losses (60 per annum). The
following are known demolitions to the Council Banbury Road, North Kenton – approx. 80 units demolished Q2 2014/15 Yewcroft Avenue, Benwell – approx. 40 demolitions underway; Woodside Avenue, Walker – approx. 40 demolitions underway; St Anthony’s House, Walker – approx. 90 flats to be demolished in 2016/17
3.18 Therefore the Council will take a conservative estimate that estimates that an
average of 50 dwellings will be lost each year,
Stage 4; Calculating Five Year Land Supply 3.19 Appendix 1 provides a list of all known sites and sources of supply discussed
above. Assumptions are then made about the likely delivery rate of each site, identifying when development is likely to start on site and how many dwellings could be delivered each year. These assumptions are based on previous completion rates, known market interest in sites being developed and local knowledge. They take into account known constraints which may mean that some sites are unlikely to be available during the five year period. Appendix 1 provides details of all sites and potential numbers that could be delivered each year; this is summarized below:
3.20 Figure 31 below provides a summary of the Councils five year supply of deliverable
housing sites. The information is correct at 31 September 2015 and is based on monitoring data provided by Newcastle City Council.
3.21 The Council’s five year land supply is set out in the following table a Five year requirement Figure 5 4807 b Five year requirement + 20% Figure 5 5768 c The estimated five year supply Appendix 1 7127 d Five year supply as a percentage of requirement
(including buffer) (c÷b) x 100 123%
e Five year supply (in years) c÷(b÷5) 6.1 Figure 31 Five year Land Supply
3.22 Figure 31 shows that the identified sites are capable of delivering 7127, which exceeds the requirement (including 20% buffer) to provide 5768 dwellings. It demonstrates that the council has a 6.1 years (rounded) or 123% supply of sites between 1 October 2015 and 31 September 2020.
3.23 The council has identified that sufficient land that is available to meet its five year
housing land supply requirement.
Housing Trajectory 3.24 The NPPF requires Local Planning Authorities to prepare a housing trajectory. This
provides a position statement comparing past performance on housing supply with anticipated future rates of housing development. It sets out the strategic housing requirements for the Plan period, past completion rates, projected future supply informed by the Housing Employment Land Availability Assessment (HELAA) and existing commitments and actual performance, identifying any under supply or over provision against targets. The trajectory covers a 15-year period from the current date, identifying deliverable sites for the five-year period and developable sites for the following ten years.
3.25 Trajectories are a forward planning tool, designed to support the plan, monitor and
manage the approach to housing delivery by monitoring both past and anticipated completions across a period of time. To illustrate, if past completions show a shortfall against requirements they can be used to demonstrate that future completions will make up this shortfall. Alternatively, as they look forwards as well as backwards, they can help indicate at an early stage whether any steps need to be taken to ensure planned requirements are met. Trajectories also provide a means of further exploring and understanding the various components of past and future housing supply.
3.26 The housing trajectory looks more long-term than the five year land supply report,
covering five years of past completions (since the beginning of the Plan period) and projecting forward at least 15 years from the current date. The latest housing trajectory has been updated to include the findings of the latest residential monitoring exercise, however beyond the 2020 cannot be updated until the Council completes its HELAA. The Council are currently undertaking a call out for sites.
-200
0
200
400
600
800
1000
1200
1400
1600
1800
Housing Trajectory
Net additions Projected Completions CSUCP - net dwelling 'requirement' Annual Requirement
Schedule of site Year Land Supply of Deliverable sites (October 2015 - to September 2020)
Ward SHLAA
Ref Planning Appliction Site Name Total Built Outstanding
2015/16
Q3&4 2016/17 2017/18 2018/19 2019/20
2020/2021
Q1&2
Units
expected
first 5
years
Post 5
years
Site
s w
ith
Pla
nn
ing
Pe
rmis
sio
n
Benwell &
Scotswood 3038
DETAILED PERMISSION -
2014/1232/01/DET
Land at Gretna Rd/Benwell
Village 9 0 9 9 0 0 0 0 0 9 0
Benwell &
Scotswood 3106
DETAILED PERMISSION -
2007/1300/01/DET
Scotswood Development Area
(Phases 2 to 5) 1422 0 1422 0 0 0 90 90 90 270 1152
Benwell &
Scotswood 1603
UNDER CONSTRUCTION
- 2014/0745/01/DET Land at Buddle Road 29 0 29 0 29 0 0 0 0 29 0
Benwell &
Scotswood 5016
DETAILED PERMISSION -
2015/0960/01/DET Land At 442 Denton Road 9 0 9 0 9 0 0 0 0 9 0
Benwell &
Scotswood 5152
UNDER CONSTRUCTION
- 2007/1300/15/RES
Scotswood Development Area
(Phase 1) 377 123 254 105 80 69 0 0 0 254 0
Blakelaw 4429 DETAILED PERMISSON -
2015/0094/01/DET Springfield Centre 308 0 308 50 60 60 60 60 18 308 0
Blakelaw 5422 DETAILED PERMISSION -
2015/0043/01/DET
Land to the rear of former
Council Offices, Cypress
Avenue
37 0 37 20 17 0 0 0 0 37 0
Blakelaw 4399 UNDER CONSTRUCTION
- 2013/0306/01/DET Cypress Avenue, Fenham 57 51 6 6 0 0 0 0 0 6 0
Blakelaw 4602 UNDER CONSTRUCTION
- 2014/1465/01/DET
Land Bounded By Inchcliffe
Crescent and Cambo Green 26 0 26 0 26 0 0 0 0 26 0
Byker 1078 UNDER CONSTRUCTION
- 2012/1277/01/DET
The Malings / East Bank (former
Ice Factory & Heaney Works) 76 34 42 42 0 0 0 0 0 42 0
Byker 4228 UNDER CONSTRUCTION
- 2014/1797/01/DET IRDL site, Fossway 128 0 128 28 70 30 0 0 0 128 0
Castle 2642 UNDER CONSTRUCTION
- 1999/1300/175/RES Cell G, Newcastle Great Park 331 328 3 3 0 0 0 0 0 3 0
Castle 2646 UNDER CONSTRUCTION
- 2012/1607/01/DET Cell C, Newcastle Great Park 352 111 241 50 50 50 50 41 0 241 0
Castle 2647 UNDER CONSTRUCTION
- 2012/1607/01/DET Newcastle Great Park Cell E 150 0 150 0 80 70 0 0 0 150 0
Castle 2643 Outline Permission Newcastle Great Park Cell D 550 0 550 0 40 100 100 100 50 390 160
Castle 5006 DETAILED PERMISSION -
2015/0008/01/DET
Land south of Recreation
Ground, Dinnington (Phase 1) 75 0 75 0 40 35 0 0 0 75 0
Castle 5478 DETAILED PERMISSION -
2014/0697/01/DET
Former West Wideopen Club,
Darrell Street 16 0 16 0 16 0 0 0 0 16 0
Castle 4568 UNDER CONSTRUCTION
- 1999/1300/183/RES NGP Cell F Phase 2 Residential 347 205 142 93 49 0 0 0 0 142 0
East
Gosforth 5100
DETAILED PERMISSION -
2015/0572/01/DET
Council Offices, 5 Lansdowne
Terrace East, Gosforth 8 0 8 0 8 0 0 0 0 8 0
Elswick 3110 UNDER CONSTRUCTION
- 2014/0960/01/DET Northbourne Street 86 0 86 43 43 0 0 0 0 86 0
Elswick 1515 2014/0960/01/OUT Loadman Street 177 0 177 0 18 72 57 30 0 177 0
Fawdon 4288 UNDER CONSTRUCTION
- 2013/1465/01/DET Land at Newlyn Road 64 0 64 64 0 0 0 0 0 64 0
Kenton 5302 DETAILED PERMISSON -
2015/0253/01/DET Kirkwood Drive, Kenton 15 0 15 0 15 0 0 0 0 15 0
Lemington 2769 UNDER CONSTRUCTION
- 2012/1373/01/DET
Land at Burnham Avenue, West
Denton 33 16 17 17 0 0 0 0 0 17 0
Lemington 4528 UNDER CONSTRUCTION
2013/0489/01/DET Lemington Middle School 70 59 11 11 0 0 0 0 0 11 0
Newburn 4436 DETAILED PERMISSON -
2015/0874/01/DET
Throckley First School, Coach
Road 102 0 102 0 76 26 0 0 0 102 0
Newburn 5695 DETAILED PERMISSION -
2014/1486/01/DET
Throckley Nursing Home,
Ponteland Road 25 0 25 0 0 25 0 0 0 25 0
Newburn 5418 UNDER CONSTRUCTION
- 2014/1364/01/DET Land at Westway Garages 6 0 6 6 0 0 0 0 0 6 0
North
Heaton 5354
DETAILED PERMISSON -
2014/1344/01/DET
Motor World, 209 Chillingham
Road 6 0 6 0 6 0 0 0 0 6 0
North
Jesmond 4855
UNDER CONSTRUCTION
- 2012/1269/01/DET
Site of Jesmond Towers & La
Sagesse 48 6 42 42 0 0 0 0 0 42 0
North
Jesmond 4656
DETAILED PERMISSION -
2013/0248/01/DET
Orchard House, Fenwick
Terrace 11 0 11 0 11 0 0 0 0 11 0
Ouesburn 5356 DETAILED PERMISSION -
2013/0691/01/DET 12 Heaton Hall Road 6 0 6 0 6 0 0 0 0 6 0
Ouesburn 5694 DETAILED PERMISSION -
2015/0814/01/DET
Rialto Apartment, Melbourne
Street 6 0 6 6 0 0 0 0 0 6 0
Ouesburn 5734 DETAILED PERMISSION -
2015/0815/01/DET Maling Court, Unison Street 42 0 42 0 42 0 0 0 0 42 0
Parklands 4655 DETAILED PERMISSION -
2014/1457/01/DET
Newcastle Racecourse, High
Gosforth Park 14 0 14 0 14 0 0 0 0 14 0
South
Heaton 5432
DETAILED PERMISSION -
2015/0054/01/DET
Former Lloyds TSB, 165-169
Shields Road 22 0 22 0 22 0 0 0 0 22 0
South
Heaton 5687
DETAILED PERMISSION -
2015/0591/01/DET 86 - 88 Shields Road 8 0 8 8 0 0 0 0 0 8 0
South
Jesmond 5244
UNDER CONSTRUCTION
- 2012/1405/01/DET Eaga House, Archbold Terrace 80 0 80 0 80 0 0 0 0 80 0
South
Jesmond 5425 2014/00625/NRE Sandyford House 92 0 92 0 0 0 92 0 0 92 0
Walker 3158 DETAILED PERMISSION -
2015/0005/01/DET
PB2 - St. Anthony's Primary
School 43 0 43 0 43 0 0 0 0 43 0
Walker 5424 UNDER CONSTRUCTION
- 2013/1346/01/DET
Land at Station
Road/Caledonia Street 40 31 9 9 0 0 0 0 0 9 0
Walker 5656 UNDER CONSTRUCTION
- 2015/0183/01/DET
Site North of Readhead Drive,
West Carnaby Road 44 0 44 44 0 0 0 0 0 44 0
Walkgate 5298 DETAILED PERMISSION -
2015/1165/01/DET Daisy Hill Youth Centre 12 0 12 0 12 0 0 0 0 12 0
Walkergate 5101 UNDER CONSTRUCTION
- 2014/0800/01/DET
Walker Technology College,
Langley Road, Walkergate 116 2 114 15 32 32 32 3 0 114 0
West
Gosforth 4859
UNDER CONSTRUCTION
- 2013/1685/01/DET
Former Trinity College Kenton
Lodge 54 0 54 0 54 0 0 0 0 54 0
West
Gosforth 4495
DETAILED PERMISSION -
2015/0746/01/DET Central Newcastle High School 5 0 5 0 5 0 0 0 0 5 0
West
Gosforth 5298 DETAILED PERMISSION 16-20 West Avenue, Gosforth 5 0 5 5 0 0 0 0 0 5 0
Westerhope 4221 DETAILED PERMISSION -
2013/1553/01/DET
Land at Wheatfield Road,
Westerhope 37 0 37 0 37 0 0 0 0 37 0
Westgate 1657 UNDER CONSTRUCTION
- 2015/0541/01/DET 50-52 Dean Street 5 0 5 5 0 0 0 0 0 5 0
Westgate 1400 2008/0500/01/DET Stephenson Quarter, South
Central Station 155 0 155 0 0 0 75 80 0 155 0
Westgate 3068 DETAILED PERMISSION -
2015/0315/01/DET
Land At Forth Banks/Pottery
Lane 280 0 280 0 280 0 0 0 0 280 0
Westgate 4455 DETAILED PERMISSION -
2015/0877/01/DET
1-9 Falconar Street And 87
Clayton Street 14 0 14 0 14 0 0 0 0 14 0
Westgate 5433
PERMITTED
DEVELOPMENT -
2014/00039/NRE
floors 1,2 & 3 Saint Nicholas
Chambers 15 0 15 0 15 0 0 0 0 15 0
Westgate 5373 DETAILED PERMISSION -
2013/1254/01/DET
Former Wildes Hairdressers, 129-
131 Grainger Street 6 0 6 6 0 0 0 0 0 6 0
Westgate 5483 DETAILED PERMISSION -
2013/1614/01/DET
Hanover Square Newcastle
upon Tyne 25 0 25 25 0 0 0 0 0 25 0
Westgate 5537 DETAILED PERMISSION -
2014/1568/01/DET 42-44 Leazes Park Road 5 0 5 5 0 0 0 0 0 5 0
Wingrove 5512 UNDER CONSTRUCTION
- 2014/0846/01/DET 17-21 North Terrace 16 0 16 16 0 0 0 0 0 16 0
Wingrove 5198 DETAILED PERMISSION -
2015/1068/01/DET
Former Car Showroom,
Westgate Road 18 0 18 0 18 0 0 0 0 18 0
Woolsington 5297 DETAILED PERMISSION -
2015/0308/01/DET
Site of former Redewood
School, Etal Lane 253 0 253 0 57 80 56 60 0 253 0
Woolsington 5391 DETAILED PERMISSION -
2014/0085/01/DET Land south of Broughton Close 9 0 9 9 0 0 0 0 0 9 0
Total 6377 966 5411 742 1474 649 612 464 158 4099 1312
Site
sallo
ca
ted
in t
he
Lo
ca
l Pla
n
Castle 2644 Allocated in the Local
Plan Newcastle Great Park Cell A 880 0 880 0 0 0 0 100 25 125 755
Castle 4706 Allocated in the Local
Plan
Newcastle Great ParkBrunton
Quarry 100 0 100 0 0 0 0 0 50 50 50
Castle 4707 Allocated in the Local
Plan Wideopen 100 0 100 0 0 35 35 30 0 100 0
Castle 4936 Allocated in the Local
Plan Hazlerigg 400 0 400 0 0 50 75 75 40 240 160
Castle 4657 Allocated in the Local
Plan Dinnington (south) 180 0 180 0 0 35 35 35 15 120 60
Castle 4959 Allocated in the Local
Plan
Newcastle Great Park
Expansion Cell 500 0 500 0 0 0 0 0 25 25 475
Newburn 4815 Allocated in the Local
Plan Dinnington (North) 70 0 70 0 35 35 0 0 0 70 0
Newburn 4944 Allocated in the Local
Plan Throckley North 480 0 480 0 0 50 60 60 30 200 280
Newburn 4947 Allocated in the Local
Plan Throckley South 73 0 73 0 35 38 0 0 0 73 0
Newburn 5415 Allocated in the Local
Plan Lower Callerton 800 0 800 0 0 60 70 70 30 230 570
Woolsington 4603 Allocated in the Local
Plan Middle Callerton East 460 0 460 0 0 75 105 105 70 355 105
Woolsington 4661 Allocated in the Local
Plan Kingston Park/Kenton Bank Foot 145 0 145 0 0 0 0 0 0 0 145
Woolsington 4663 Allocated in the Local
Plan Kingston Park NGA 90 0 90 0 0 0 0 30 30 60 30
Woolsington 4819 Allocated in the Local
Plan Kingston Park NGA 146 0 146 0 0 0 0 2 30 32 114
Woolsington 4820 Allocated in the Local
Plan Kingston Park NGA 95 0 95 0 0 15 30 30 20 95 0
Woolsington 4930 Allocated in the Local
Plan
Kingston Park NGA Kingston
Park 60 0 60 0 0 0 0 15 15 30 30
Woolsington 4949 Allocated in the Local
Plan Kingston Park NGA 70 0 70 0 0 30 40 0 0 70 0
Woolsington 4951 Allocated in the Local
Plan
Kingston Park NGA Kingston
Park NGA 1B 36 0 36 0 15 21 0 0 0 36 0
Woolsington 4958 Allocated in the Local
Plan Middle Callerton West 540 0 540 0 0 63 105 105 50 323 217
Woolsington 4961 Allocated in the Local
Plan Kingston Park/Kenton Bank Foot 90 0 90 0 0 0 0 10 20 30 60
Woolsington 5143 Allocated in the Local
Plan Upper Callerton 1200 0 1200 0 0 0 0 25 75 100 1100
Woolsington 4662 Allocated in the Local
Plan Kingston Park/Kenton Bank Foot 100 0 100 0 0 0 0 20 10 30 70
Total 6615 0 6615 0 85 507 555 712 535 2394 4221
Oth
er
site
s Benwell &
Scotswood 1518 Deliverable site Land at Dorcas Avenue 35 0 35 0 0 35 0 0 0 35 0
Benwell &
Scotswood 5660 Deliverable site Yewcroft Avenue 42 0 42 0 0 42 0 0 0 42 0
Blakelaw 2572 Deliverable site Site of 22-140 Roundhill Avenue 40 0 40 0 0 0 40 0 0 40 0
Blakelaw 5415 Deliverable site
Sheriff Leas - Corner of
Stamfordham Road/Springfield
Road
13 0 13 0 0 13 0 0 0 13 0
Castle 5006 Deliverable site Land south of Recreation
Ground, Dinnington (Phase 2) 93 0 93 0 0 30 30 33 0 93 0
Denton 2765 Deliverable site Phase 2, Dunblane Cresent,
West Denton 100 0 100 0 0 40 30 30 0 100 0
East Gosforth 5305 Deliverable site Jesmond Dene Nursery 40 0 40 0 0 20 20 0 0 40 0
Elswick 3058 Deliverable site Site of High Grove, Somerset
Place 50 0 50 0 0 50 0 0 0 50 0
Fawdon 5226 Deliverable site Afton Way, Fawdon 11 0 11 0 0 11 0 0 0 11 0
Fenham 4484 Deliverable site Westgate Community College
(north), Grange Street 60 0 60 0 0 30 30 0 0 60 0
Walkergate 5304 Deliverable site Daisy Hill Youth Centre,
Marmion Road 13 0 13 0 0 13 0 0 0 13 0
Westerhope 4482 Deliverable site Site of Chapel Park Middle
School 80 0 80 0 0 0 40 40 0 80 0
Westgate 1527 Deliverable site Land to the North of Cruddas
Park Shopping Centre 25 0 25 0 0 25 0 0 0 25 0
Westgate 1555 Deliverable site Site of former Snow Street
School, Douglas Terrace 23 0 23 0 0 23 0 0 0 23 0
Woolsington 3050 Deliverable site Land south Newbiggin Hall
shopping centre 9 0 9 0 0 9 0 0 0 9 0
Total
634 0 634 0 0 341 190 103 0 634 0
Estimated 5 year land supply
2015/16
Q3&4 2016/17 2017/18 2018/19 2019/20
2020/2021
Q1&2
Units
expected
first 5 years
Post 5
years
Gross 742 1559 1497 1357 1279 693 7127 5533
Losses 25 50 50 50 50 25 250
Windfall 25 50 50 50 50 25 250
Net 742 1559 1497 1357 1279 693 7127
5 Year Land Supply ofDeliverable sites (October to
September 2020)
Investment and DevelopmentDirectorate
Kath Lawless, (BSc, MSc) MRTPIAssistant Director Planning
Civic Centre, Newcastle upon Tyne, NE1 8QHTel. (0191) 211 5629www.newcastle.gov.uk
Drawn by: SE
Scale
Date: 10/02/2016
This map is based upon Ordnance Survey material with with the permission ofOrdnance Survey on behalf of the Controller of Her Majestry's Stationery Office.©Crown copyright. Unauthorised reproduction infringes Crown copyright and maylead to prosecution or civil proceedings. Newcastle City Council, 100019569, 2016.
1:48,000