new x-band testing facility a.k.a. xbox 2

14
New X-band testing facility a.k.a. Xbox 2 N. Catalan. Lasheras for the X-band testing areas (XTA) activity group N. Catalan Lasheras

Upload: pegeen

Post on 20-Mar-2016

53 views

Category:

Documents


2 download

DESCRIPTION

New X-band testing facility a.k.a. Xbox 2. N. Catalan. Lasheras for the X-band testing areas (XTA) activity group. What is Xbox2?. A new test bench for testing RF structures at 12GHz above 100MV/m One structure/three months testing 50MW klystron fed by a 50Hz, 450kV modulator - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: New X-band testing facility  a.k.a. Xbox 2

New X-band testing facility a.k.a. Xbox 2N. Catalan. Lasheras for the X-band testing areas (XTA) activity group

N. C

atal

an L

ashe

ras

Page 2: New X-band testing facility  a.k.a. Xbox 2

What is Xbox2?

• A new test bench for testing RF structures at 12GHz above 100MV/m– One structure/three months testing

• 50MW klystron fed by a 50Hz, 450kV modulator• Full time operation expected from

October next year.• Possible extension in 2014-15 (Xbox3)

when Linac4 klystrons/waveguides are installed

N. C

atal

an L

ashe

ras

Page 3: New X-band testing facility  a.k.a. Xbox 2

#2 50 MW klystron (XL-5, CPI) test stand will be able to deliver to the testing area up to 130 MW x 250 ns pulses at 50 Hz repetition rate. The overall power consumption is 43 kW.

From last collaboration meeting. (I. Syratchev)

Page 4: New X-band testing facility  a.k.a. Xbox 2

Xbox1 in building 2013N

. Cat

alan

Las

hera

s

CTF3 klystron gallery CTF2

Page 5: New X-band testing facility  a.k.a. Xbox 2

N. C

atal

an L

ashe

ras

Building 150. 352 MHz test stand

Page 6: New X-band testing facility  a.k.a. Xbox 2

Proposed layout for Xbox2 in buidling 150N

. Cat

alan

Las

hera

s

Dmitry Gudkov. RF-PM

Page 7: New X-band testing facility  a.k.a. Xbox 2

Proposed layout for Xbox2 in buidling 150

Dmitry Gudkov. RF-PM

• Reusing:– Shielding blocks. More

will be needed (25 in stock)

– Demineralized Water (150l/min P<8-10bars)

– Electrical capacity (50kW)

• Top-left area used by the EBIS source tests at least until the end of 2013 (TBC)

N. C

atal

an L

ashe

ras

Page 8: New X-band testing facility  a.k.a. Xbox 2

Testing area inside the bunkerN

. Cat

alan

Las

hera

s Dmitry Gudkov. RF-PM

Page 9: New X-band testing facility  a.k.a. Xbox 2

Proposed layout for Xbox2 in buidling 150N

. Cat

alan

Las

hera

s

Raphael Leuxe EN-MMEDmitry Gudkov. RF-PM

Page 10: New X-band testing facility  a.k.a. Xbox 2

N. C

atal

an L

ashe

ras

Status of the Xbox

Preparation of the site• Final layout of the test stand. End

2012• Cleaning-up the area. End 2012• Safety file preparation• Shielding blocks transport• Water system modification• Electricity modification?• Cabling, Ethernet

Before LS1!!

Installation• Modulator and klystron

procurement. End of March 2013• RF network and components. End

of March 2013• Vacuum network, pumps and

valves. LLRF and controlsEnd of April 2013

Commissioning• Modulator/klystron unit April-May 2013• Water cut due to LS1 from mid-may• Conditioning of RF network August-October 2013

Page 11: New X-band testing facility  a.k.a. Xbox 2

PlanningN

. Cat

alan

Las

hera

s

Tight! Very tight!!

Page 12: New X-band testing facility  a.k.a. Xbox 2

: 20

: 16

: 20

: 6

Pulse compressor

: 5

3dB hybrid : 5

‘’Simple” -60 dB directional coupler.

Compact SLED type pulse compressor.

RF components procurement

Page 13: New X-band testing facility  a.k.a. Xbox 2

25 m

8 m

6 MW klystron’s cluster station#2 50 MW klystron station

Future test stand(s)

Page 14: New X-band testing facility  a.k.a. Xbox 2

Thanks for your attention!!

N. C

atal

an L

ashe

ras