new ways of working at statistics sweden – a description with emphasis
DESCRIPTION
New ways of working at Statistics Sweden – a description with emphasis. … on preparatory sub-processes Eva Elvers Statistics Sweden [email protected]. Outline of the presentation. Work during 2007, the Lotta-project New and renewed departments 2008 The statistical production process - PowerPoint PPT PresentationTRANSCRIPT
New ways of working at Statistics Sweden
– a description with emphasis
… on preparatory sub-processes
Eva Elvers
Statistics Sweden
Outline of the presentation
• Work during 2007, the Lotta-project
• New and renewed departments 2008
• The statistical production process
• The preparatory sub-processes
• Some concluding remarks
Work during 2007 – structure
The so-called Lotta-project
• Standardisation: processes and tools
• Quality assurance
• Competence development and
management issues
• Communication and involvement
Work during 2007 – some areas
• SOA, Service Oriented Architecture
• Structured data warehouses
• Data collection, coding
• Questionnaires: design, construction, …
• Editing: several studies
• Communication of quality with users
• Process data and metadata
New organisation 2008
New and renewed departments:
• A new Process Department
• Dep. Research and Development changed
– IT and methodological architecture
– Quality
– Projects
• Other changes, e.g.
– Communication
– National Accounts
Process department
• Management
• Process owners and ‘assistants’
five broad process areas
• Maintenance and test, models
• Process implementation
• Centralised Methodology
• Centralised IT
How-to-do and support
• Standard methods and tools – successively
decisions
• Checklists – tool and assistance
• ‘Business Operation Support System’ (BOSS)
initiated; general texts and checklists first
• Networks
• Respond to questions, suggestions, …
• Implementation order?
• Develop
Plan and design
2
Build and test
3
Collect
4
Process
5
Analyse
6
Publish and communicate
7
The statistics production process
Support and infrastructure
Evaluate and feed back 8
Establish user needs
1
SCB
Here emphasis on processes 2-3
2. Plan and design - process
• Design a new survey
(production process)
• Re-design an existing survey
• Continuous improvements;
adjustments for a new
production round/year
Choose, allocate, and plan
• Choose methods and tools within each
process based on recommendations, and
• also so that they fit together, for
the whole production process
• Allocate resources between processes –
how?
• Plan production flow, staff and times
Knowledge needed
… for choices and for improvements
Process data (paradata)
• Quality – indicators
• Costs
Study Q/C - relationship
Q: value added – measure?!
Influence on quality components, e.g. accuracy
3. Build …
… according to design
• Questionnaire
• Production tools: Use or adjust
existing tool or develop tool, if needed
• Communication between tools, so
production flow
Test – in what senses?
Different methods and competences:
• Statistical methods
• Qualitative methods
• IT
Exchange between these three:
• how-to-think
• methodology
• concepts