ext. Requestor Information ext. Issuer Information ext. Buyer Information State of Maine Master Agreement Expiration Date: Master Agreement Description: Effective Date: 07/26/19 07/15/19 07/31/20 Guardrail Components William Allen 207-624-7871 NULL [email protected] SHARON KRECHKIN 207-624-3038 [email protected] Sharon Krechkin 207-624-3038 [email protected] MA 18P 19072600000000000010 NEW Authorized Departments 17A TRANSPORTATION Vendor Line #: Vendor Address Information Alias/DBA Vendor Name Vendor ID Vendor Information Vendor Contact Information ext. 1 VC1000011794 C A NEWCOMB & SONS FENCE AND GUARDRAIL CO PO BOX 206 US Alisa Morrell 2078482795 [email protected] CARMEL, ME 04419

Upload: others

Post on 19-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: NEW State of Maine€¦ · Caribou (04736) Luke Moir (207-592-2893) SUPPLEMENTAL SPECIFICATIONS SECTION 606 GUARDRAIL 606.01 DESCRIPTION. The work shall consist of furnishing and

ext.

Requestor Information

ext.

Issuer Information

ext.

Buyer Information

State of Maine

Master Agreement

Expiration Date:

Master Agreement Description:

Effective Date:

07/26/19

07/15/19 07/31/20

Guardrail Components

William Allen 207-624-7871 NULL [email protected]

SHARON KRECHKIN 207-624-3038 [email protected]

Sharon Krechkin 207-624-3038 [email protected]

MA 18P 19072600000000000010

NEW

Authorized Departments

17A TRANSPORTATION

Vendor Line #:

Vendor Address Information

Alias/DBA

Vendor NameVendor ID

Vendor Information

Vendor Contact Information

ext.

1

VC1000011794 C A NEWCOMB & SONS FENCE AND GUARDRAIL CO

PO BOX 206

US

Alisa Morrell

2078482795

[email protected]

CARMEL, ME 04419

Page 2: NEW State of Maine€¦ · Caribou (04736) Luke Moir (207-592-2893) SUPPLEMENTAL SPECIFICATIONS SECTION 606 GUARDRAIL 606.01 DESCRIPTION. The work shall consist of furnishing and

Vendor Line #:

Commodity Line #:

Commodity Code:

Commodity Description:

Commodity Specifications:

Commodity Information

Vendor Name:

1

C A NEWCOMB & SONS FENCE AND GUARDRAIL CO

1

57028

C

Commodity Extended Description: Guardrail Components

Contract Amount Service Start Date Service End Date

UOM Unit Price

Delivery Days Free on Board

Catalog Name Discount

Quantity

%

Discount Start Date Discount End Date

0.00000 $0.00

15

$0.00

Guardrail Components 0.0000

07/15/19 07/31/20

Page 3: NEW State of Maine€¦ · Caribou (04736) Luke Moir (207-592-2893) SUPPLEMENTAL SPECIFICATIONS SECTION 606 GUARDRAIL 606.01 DESCRIPTION. The work shall consist of furnishing and

1

TERMS& CONDITIONS

MA 190726-010

COMMODITY ITEM: Guardrail Components

CONTRACT PERIOD: Through July 31, 2020. The State of Maine with vendor approval can opt to issue

up to two (2) one (1) year extensions.

CONTACT PERSON: The contact person will help consumers place orders, inquire about orders that have

not been delivered, all shipping issues, quality issues, and any issues pertaining to this Master Agreement.

All orders not submitted through a DO will be sent through the contractor’s contact person. The contact

person will be: Billy Cichocki Tel: 207-848-2903 Email: [email protected]

EXTENSION OF CONTRACT: The Director of Procurement Services may, with the consent of the

contractor extend the Contract period beyond the indicated expiration date.

CANCELLATION OF CONTRACT: The Division of Procurement Services reserves the right to cancel

a contract with a thirty-day written notice OR cancel immediately if the contractor does not conform to

terms and conditions and specifications of contract.

PRICES: All pricing is with shipping terms of “Free on Board (FOB) – Destination”. The State intends for

this to mean that all goods shall be priced to include shipping charges, if any, to the State’s desired location.

The “FOB – Destination” shipping term is also intended to mean that the State shall not bear any

responsibility for the goods in question until the State takes possession of them at the destination point of

delivery.

QUANTITIES: It is understood and agreed that the contract will cover the actual quantities required by

State Agency over the length of the contract.

PROCUREMENT CARD: State policy requires vendors to accept the State of Maine Procurement Card

(P-Card) as a form of payment, with very rare exceptions. Your company will be required to accept these

cards. The pricing offered to the State of Maine shall be the final cost to the State of Maine regardless of

payment method. No surcharge or other compensation will be allowed. The State of Maine reserves the

right to reject your bid if you are unwilling to accept this condition.

ORDERING PROCEDURE: Delivery orders (DO) will be created in AdvantageME for all orders over

$5000.00. If a DO is used, the DO will be e-mailed to the email address set up in AdvantageME by the

Vendor as a .pdf file. Orders less than $5000.00 can be ordered using a DO or P-Card.

QUARTERLY REPORT: The Division of Procurement Services requires a quarterly report of sales be

faxed to 207-287-6578 within 30 days of the end of each calendar quarter. It will be the responsibility of the

vendor to produce a quarterly report. The report must include the dollar value of goods purchased, broken

down by Department as well as the total dollar value of purchases made by all Departments.

DELIVERY: The Contractor will be responsible for the delivery of material in first class condition at the

point of delivery, and in accordance with good commercial practice. The Vendor must minimally provide a

forty-eight (48) notice prior to any delivery.

Page 4: NEW State of Maine€¦ · Caribou (04736) Luke Moir (207-592-2893) SUPPLEMENTAL SPECIFICATIONS SECTION 606 GUARDRAIL 606.01 DESCRIPTION. The work shall consist of furnishing and

2

Region Office

Telephone Delivery Location (ZIP Code) Delivery Notice Contact Person

Southern 207-885-

7000 Scarborough (04070) Troy Leonard (207-441-5439)

Mid-Coast 207-624-

8200 Washington (04574) Terry Fitzgerald (207-557-5385)

Western 207-562-

4228

Dixfield (04224) Dan Bradbury (207-592-3600)

Solon (04979)

Eastern 207-941-

4500 Carmel (04419)

Jeff Lary (207-592-2567)

Northern 207-764-

2060 Caribou (04736) Luke Moir (207-592-2893)

SUPPLEMENTAL SPECIFICATIONS SECTION 606 GUARDRAIL

606.01 DESCRIPTION. The work shall consist of furnishing and delivering guardrail components in accordance with these specifications. 606.02 MATERIALS. Guardrail components shall meet the applicable requirements of the following:

➢ Standard Specifications (Sec. 700), Maine Department of Transportation (most current revision) ➢ Standard Details, Maine Department of Transportation (most current revision) ➢ AASHTO Guide to Standardized Highway Barrier Hardware. (download available at:

https://transportationops.org/research/update-aashto-guide-standardized-highway-barrier-hardware) 606.11 GUARDRAIL ORDERS. Guardrail orders will be written notification through the region placing the order. All orders shall be delivered within 30 days of the date of written notification. Not more than 5 percent of any quantity can be ordered for rush delivery (2-week period). 606.12 BASIS OF PAYMENT. The accepted quantities of guardrail components will be paid for at the contract unit price for the items specified.

Page 5: NEW State of Maine€¦ · Caribou (04736) Luke Moir (207-592-2893) SUPPLEMENTAL SPECIFICATIONS SECTION 606 GUARDRAIL 606.01 DESCRIPTION. The work shall consist of furnishing and

STATE OF MAINE

GENERAL TERMS AND CONDITIONS FOR GOODS AND/OR SERVICES UNDER

BUYER PURCHASE ORDERS (BPOs) AND MASTER AGREEMENTS (MAs)

Page 1 of 5

1. DEFINITIONS: The following definitions are applicable to these standard terms and conditions:

a. The term “Buyer” or “State” shall refer to the Government of the State of Maine or a person

representing the Government of the State of Maine.

b. The term “Department” or “DAFS” shall refer to the State of Maine Department of Administrative

and Financial Services.

c. The term “Bureau” or “BGS” shall refer to the State of Maine Bureau of General Services.

d. The term “Division” shall refer to the State of Maine Division of Purchases.

e. The term “Contractor”, “Vendor”, or “Provider” shall refer to the organization that is providing

goods and/or services through the contract to which these standard terms and conditions have been

attached and incorporated.

f. The term “Contract” or “Agreement” shall refer to the contract document to which these standard

terms and conditions apply, taking the format of a Buyer Purchase Order (BPO) or Master

Agreement (MA) or other contractual document that is mutually agreed upon between the State and

the Contractor.

2. WARRANTY: The Contractor warrants the following:

a. That all goods and services to be supplied by it under this Contract are fit and sufficient for the

purpose intended, and

b. That all goods and services covered by this Contract will conform to the specifications, drawing

samples, symbols or other description specified by the Division, and

c. That such articles are merchantable, good quality, and free from defects whether patent or latent in

material and workmanship, and

d. That all workmanship, materials, and articles to be provided are of the best grade and quality, and

e. That it has good and clear title to all articles to be supplied by it and the same are free and clear

from all liens, encumbrances and security interest.

Neither the final certificate of payment nor any provision herein, nor partial nor entire use of the articles

provided shall constitute an acceptance of work not done in accordance with this agreement or relieve the

Contractor liability in respect of any warranties or responsibility for faulty material or workmanship. The

Contractor shall remedy any defects in the work and pay any damage to other work resulting therefrom,

which shall appear within one year from the date of final acceptance of the work provided hereunder. The

Division of Purchases shall give written notice of observed defects with reasonable promptness.

3. TAXES: Contractor agrees that, unless otherwise indicated in the order, the prices herein do not

include federal, state, or local sales or use tax from which an exemption is available for purposes of this

order. Contractor agrees to accept and use tax exemption certificates when supplied by the Division as

applicable. In case it shall ever be determined that any tax included in the prices herein was not required to

be paid by Contractor, Contractor agrees to notify the Division and to make prompt application for the

refund thereof, to take all proper steps to procure the same and when received to pay the same to the

Division.

4. PACKING AND SHIPMENT: Deliveries shall be made as specified without charge for boxing,

carting, or storage, unless otherwise specified. Articles shall be suitably packed to secure lowest

Page 6: NEW State of Maine€¦ · Caribou (04736) Luke Moir (207-592-2893) SUPPLEMENTAL SPECIFICATIONS SECTION 606 GUARDRAIL 606.01 DESCRIPTION. The work shall consist of furnishing and

Revised 1/10/2014 Page 2 of 5

transportation cost and to conform to the requirements of common carriers and any applicable

specifications. Order numbers and symbols must be plainly marked on all invoices, packages, bills of

lading, and shipping orders. Bill of lading should accompany each invoice. Count or weight shall be final

and conclusive on shipments not accompanied by packing lists.

5. DELIVERY: Delivery should be strictly in accordance with delivery schedule. If Contractor's

deliveries fail to meet such schedule, the Division, without limiting its other remedies, may direct expedited

routing and the difference between the expedited routing and the order routing costs shall be paid by the

Contractor. Articles fabricated beyond the Division’s releases are at Contractor’s risk. Contractor shall not

make material commitments or production arrangements in excess of the amount or in advance of the time

necessary to meet delivery schedule, and, unless otherwise specified herein, no deliveries shall be made in

advance of the Division’s delivery schedule. Neither party shall be liable for excess costs of deliveries or

defaults due to the causes beyond its control and without its fault or negligence, provided, however, that

when the Contractor has reason to believe that the deliveries will not be made as scheduled, written notice

setting forth the cause of the anticipated delay will be given immediately to the Division. If the

Contractor’s delay or default is caused by the delay or default of a subcontractor, such delay or default shall

be excusable only if it arose out of causes beyond the control of both Contractor and subcontractor and

without fault of negligence or either of them and the articles or services to be furnished were not obtainable

from other sources in sufficient time to permit Contractor to meet the required delivery schedule.

6. FORCE MAJEURE: The State may, at its discretion, excuse the performance of an obligation by a

party under this Agreement in the event that performance of that obligation by that party is prevented by an

act of God, act of war, riot, fire, explosion, flood or other catastrophe, sabotage, severe shortage of fuel,

power or raw materials, change in law, court order, national defense requirement, or strike or labor dispute,

provided that any such event and the delay caused thereby is beyond the control of, and could not

reasonably be avoided by, that party. The State may, at its discretion, extend the time period for

performance of the obligation excused under this section by the period of the excused delay together with a

reasonable period to reinstate compliance with the terms of this Agreement.

7. INSPECTION: All articles and work will be subject to final inspection and approval after delivery,

notwithstanding prior payment, it being expressly agreed that payment will not constitute final acceptance.

The Division of Purchases, at its option, may either reject any article or work not in conformity with the

requirements and terms of this order, or re-work the same at Contractor’s expense. The Division may reject

the entire shipment where it consists of a quantity of similar articles and sample inspection discloses that

ten (10%) percent of the articles inspected are defective, unless Contractor agrees to reimburse the Division

for the cost of a complete inspection of the articles included in such shipment. Rejected material may be

returned at Contractor’s risk and expense at the full invoice price plus applicable incoming transportation

charges, if any. No replacement of defective articles of work shall be made unless specified by the

Division.

8. INVOICE: The original and duplicate invoices covering each and every shipment made against this

order showing Contract number, Vendor number, and other essential particulars, must be forwarded

promptly to the ordering agency concerned by the Vendor to whom the order is issued. Delays in receiving

invoice and also errors and omissions on statements will be considered just cause for withholding

settlement without losing discount privileges. All accounts are to be carried in the name of the agency or

institution receiving the goods, and not in the name of the Division of Purchases.

Page 7: NEW State of Maine€¦ · Caribou (04736) Luke Moir (207-592-2893) SUPPLEMENTAL SPECIFICATIONS SECTION 606 GUARDRAIL 606.01 DESCRIPTION. The work shall consist of furnishing and

Revised 1/10/2014 Page 3 of 5

9. ALTERATIONS: The Division reserves the right to increase or decrease all or any portion of the work

and the articles required by the bidding documents or this agreements, or to eliminate all or any portion of

such work or articles or to change delivery date hereon without invalidating this Agreement. All such

alterations shall be in writing. If any such alterations are made, the contract amount or amounts shall be

adjusted accordingly. In no event shall Contractor fail or refuse to continue the performance of the work in

providing of articles under this Agreement because of the inability of the parties to agree on an adjustment

or adjustments.

10. TERMINATION: The Division may terminate the whole or any part of this Agreement in any one of

the following circumstances:

a. The Contractor fails to make delivery of articles, or to perform services within the time or times

specified herein, or

b. If Contractor fails to deliver specified materials or services, or

c. If Contractor fails to perform any of the provisions of this Agreement, or

d. If Contractor so fails to make progress as to endanger the performance of this Agreement in

accordance with its terms, or

e. If Contractor is adjudged bankrupt, or if it makes a general assignment for the benefit of its creditors

or if a receiver is appointed on account of its insolvency, or

f. Whenever for any reason the State shall determine that such termination is in the best interest of the

State to do so.

In the event that the Division terminates this Agreement in whole or in part, pursuant to this paragraph with

the exception of 8(f), the Division may procure (articles and services similar to those so terminated) upon

such terms and in such manner as the Division deems appropriate, and Contractor shall be liable to the

Division for any excess cost of such similar articles or services.

11. NON-APPROPRIATION: Notwithstanding any other provision of this Agreement, if the State does

not receive sufficient funds to fund this Agreement and other obligations of the State, if funds are de-

appropriated, or if the State does not receive legal authority to expend funds from the Maine State

Legislature or Maine courts, then the State is not obligated to make payment under this Agreement.

12. COMPLIANCE WITH APPLICABLE LAWS: Contractor agrees that, in the performance hereof,

it will comply with applicable laws, including, but not limited to statutes, rules, regulations or orders of the

United States Government or of any state or political subdivision(s) thereof, and the same shall be deemed

incorporated herein by reference. Awarding agency requirements and regulations pertaining to copyrights

and rights in data. Access by the grantee, the subgrantee, the Federal grantor agency, the Comptroller

General of the United States, or any of their duly authorized representatives to any books, documents,

papers and records of the Contractor which are directly pertinent to that specific contract for the purpose of

making audit, examination, excerpts, and transcriptions. Retention of all required records for three years

after grantees or subgrantees make final payments and all other pending matters are closed. Compliance

with all applicable standards, orders, or requirements issued under section 306 of the Clean Air Act (42

U.S.C. 1857(h), section 508 of the Clean Water Act, (33 U.S.C. 1368), Executive Order 11738, and

Environmental Protection Agency regulations (40 CFR part 15). (Contracts, subcontracts, and subgrants of

amounts in excess of $100,000). Mandatory standards and policies relating to energy efficiency which are

Page 8: NEW State of Maine€¦ · Caribou (04736) Luke Moir (207-592-2893) SUPPLEMENTAL SPECIFICATIONS SECTION 606 GUARDRAIL 606.01 DESCRIPTION. The work shall consist of furnishing and

Revised 1/10/2014 Page 4 of 5

contained in the state energy conservation plan issued in compliance with Energy Policy and Conservation

Act (Pub. L. 94-163, 89 Stat. 871).

13. INTERPRETATION: This Agreement shall be governed by the laws of the State of Maine as to

interpretation and performance.

14. DISPUTES: The Division will decide any and all questions which may arise as to the quality and

acceptability of articles provided and installation of such articles, and as to the manner of performance and

rate of progress under this Contract. The Division will decide all questions, which may arise as to the

interpretation of the terms of this Agreement and the fulfillment of this Agreement on the part of the

Contractor.

15. ASSIGNMENT: None of the sums due or to become due nor any of the work to be performed under

this order shall be assigned nor shall Contractor subcontract for completed or substantially completed

articles called for by this order without the Division’s prior written consent. No subcontract or transfer of

agreement shall in any case release the Contractor of its obligations and liabilities under this Agreement.

16. STATE HELD HARMLESS: The Contractor agrees to indemnify, defend, and save harmless the

State, its officers, agents, and employees from any and all claims and losses accruing or resulting to any and

all contractors, subcontractors, material men, laborers and other persons, firm or corporation furnishing or

supplying work, services, articles, or supplies in connection with the performance of this Agreement, and

from any and all claims and losses accruing or resulting to any person, firm or corporation who may be

injured or damaged by the Contractor in the performance of this Agreement.

17. SOLICITATION: The Contractor warrants that it has not employed or written any company or

person, other than a bona fide employee working solely for the Contractor to solicit or secure this

Agreement, and it has not paid, or agreed to pay any company, or person, other than a bona fide employee

working solely for the Contractor any fee, commission, percentage, brokerage fee, gifts, or any other

consideration, contingent upon, or resulting from the award for making this Agreement. For breach or

violation or this warranty, the Division shall have the absolute right to annul this agreement or, in its

discretion, to deduct from the Agreement price or consideration, or otherwise recover the full amount of

such fee, commission, percentage, brokerage fee, gifts, or contingent fee.

18. WAIVER: The failure of the Division to insist, in any one or more instances, upon the performance

of any of the terms, covenants, or conditions of this order or to exercise any right hereunder, shall not be

construed as a waiver or relinquishment of the future performance of any such term, covenant, or condition

or the future exercise of such right, but the obligation of Contractor with respect to such future performance

shall continue in full force and effect.

19. MATERIAL SAFETY: All manufacturers, importers, suppliers, or distributors of hazardous

chemicals doing business in this State must provide a copy of the current Material Safety Data Sheet

(MSDS) for any hazardous chemical to their direct purchasers of that chemical.

20. COMPETITION: By accepting this Contract, Contractor agrees that no collusion or other restraint of

free competitive bidding, either directly or indirectly, has occurred in connection with this award by the

Division of Purchases.

Page 9: NEW State of Maine€¦ · Caribou (04736) Luke Moir (207-592-2893) SUPPLEMENTAL SPECIFICATIONS SECTION 606 GUARDRAIL 606.01 DESCRIPTION. The work shall consist of furnishing and

Revised 1/10/2014 Page 5 of 5

21. INTEGRATION: All terms of this Contract are to be interpreted in such a way as to be consistent at

all times with this Standard Terms and Conditions document, and this document shall take precedence over

any other terms, conditions, or provisions incorporated into the Contract.

Page 10: NEW State of Maine€¦ · Caribou (04736) Luke Moir (207-592-2893) SUPPLEMENTAL SPECIFICATIONS SECTION 606 GUARDRAIL 606.01 DESCRIPTION. The work shall consist of furnishing and
Page 11: NEW State of Maine€¦ · Caribou (04736) Luke Moir (207-592-2893) SUPPLEMENTAL SPECIFICATIONS SECTION 606 GUARDRAIL 606.01 DESCRIPTION. The work shall consist of furnishing and

MANUFACTURER

NAME

MANUFACTURER PART NUMBER ITEM DESCRIPTION EXTENDED DESCRIPTION UNIT OF

MEASURE

LIST PRICE DELIVER

Y DAYSGregory 1010G-1060G W-BEAM RADIUS (5° INCR.) 12GA W-BEAM RADIUS (5° INCR.) 12GA EA $ 99.00 15Transpo 117458G Spring, Die., Quadguard Spring, Die., Quadguard EA $ 44.00 15Gregory 1178G THRIE BEAM RADIUS (5° INCR.) 12 GA THRIE BEAM RADIUS (5° INCR.) 12 GA EA $ 290.00 15Highway 11G W-BEAM RAIL PUNCHED 3' 1" 12 GA W-BEAM RAIL PUNCHED 3' 1" 12 GA EA $ 72.00 15Gregory 12513G THRIE BEAM RAIL PUNCHED 1' 6" 12 GA THRIE BEAM RAIL PUNCHED 1' 6" 12 GA EA $ 139.00 15Elderlee 130A 10/12.5"/5’10:6’8/SP CAT (GUARDRAIL) 10/12.5"/5’10:6’8/SP CAT (GUARDRAIL) EA $ 330.00 15Highway 142682G 8' W6 X 8.5 STEEL POST 8' W6 X 8.5 STEEL POST EA $ 58.00 15Elderlee 14329G STEEL YIELDING TERMINAL POST (SYTP) IN TUBE STEEL YIELDING TERMINAL POST (SYTP) IN TUBE EA $ 150.00 15Elderlee 14578G STEEL YIELDING TERMINAL POST (SYTP)-1/2” HOLES STEEL YIELDING TERMINAL POST (SYTP)-1/2” HOLES EA $ 70.00 15Gregory 19582G THRIE BEAM BRIDGE BACKING PLATE 5/8" THRIE BEAM BRIDGE BACKING PLATE 5/8" EA $ 99.00 15Highway 19818A STEEL SOIL TUBE W/ 2" X 2" X 8" TUBE WELDED STEEL SOIL TUBE W/ 2" X 2" X 8" TUBE WELDED EA $ 162.00 15Gregory 209G THRIE BEAM RAIL STANDARD PUNCH 12 GA THRIE BEAM RAIL STANDARD PUNCH 12 GA EA $ 139.00 15Highway 21G W-BEAM BCT CABLE PANEL 12 GA W-BEAM BCT CABLE PANEL 12 GA EA $ 104.00 15Gregory 23200G W-BEAM MELT CABLE PANEL 12 GA W-BEAM MELT CABLE PANEL 12 GA EA $ 122.00 15Highway 24501G 6' 6" W6 X 8.5 STEEL POST 6' 6" W6 X 8.5 STEEL POST EA $ 44.00 15Highway 26924G 7' W6 X 8.5 STEEL POST 7' W6 X 8.5 STEEL POST EA $ 48.00 15Gregory 3000G CABLE 3/4" X 6' 6" WITH NUTS AND WASHERS CABLE 3/4" X 6' 6" WITH NUTS AND WASHERS SET $ 79.00 15Highway 3003G CABLE 3/4" X 10' WITH NUTS AND WASHERS CABLE 3/4" X 10' WITH NUTS AND WASHERS SET $ 104.00 15Gregory 3010G 3/4" CABLE CLAMPS FORGED 3/4" CABLE CLAMPS FORGED EA $ 7.00 15Elderlee 3012G CAT CABLE ASSEMBLY 3/4” x 8’0” DBL SWG CAT CABLE ASSEMBLY 3/4” x 8’0” DBL SWG EA $ 133.00 15AM Tim 3074B WD 3’6” POST#2, 3, 4, 5, 6 CAT WD 3’6” POST#2, 3, 4, 5, 6 CAT EA $ 39.00 15AM Tim 3075B WD 3’6” POST #1 CAT WD 3’6” POST #1 CAT EA $ 52.00 15Elderlee 30G 12/12.5'/6'3"/S SRT-1 ANC (GUARDRAIL) 12/12.5'/6'3"/S SRT-1 ANC (GUARDRAIL) EA $ 203.00 15Elderlee 3100B WD BLOCK 1’2” #1 CAT WD BLOCK 1’2” #1 CAT EA $ 17.00 15Elderlee 3101B WD BLOCK 1’2” #2-6 CAT WD BLOCK 1’2” #2-6 CAT EA $ 17.00 15Elderlee 31G 12/12.5' CAT (GUARDRAIL) 12/12.5' CAT (GUARDRAIL) EA $ 261.00 15Trinity 3240G 5/16 Flat Washer (F844) 5/16 Flat Washer (F844) EA $ 0.29 15Trinity 3245G 5/16 Hex Nut (A563) 5/16 Hex Nut (A563) EA $ 0.29 15Gregory 3300G 5/8" ROUND WASHER KEG (1000 PCS) 5/8" ROUND WASHER KEG (1000 PCS) KEG $ 267.00 15Gregory 3320G 5/8 RECTANGLE WASHER KEG (1000 PCS) 5/8 RECTANGLE WASHER KEG (1000 PCS) KEG $ 812.00 15Highway 3340G DR NUT KEG 5/8 (1000 PCS) DR NUT KEG 5/8 (1000 PCS) KEG $ 325.00 15Highway 3360G SPLICE BOLT KEG (1000 PCS) 5/8 X 1 1/4 SPLICE BOLT KEG (1000 PCS) 5/8 X 1 1/4 KEG $ 325.00 15Elderlee 33794A CAT-350 HARDWARE PACKAGE (See Note 2) CAT-350 HARDWARE PACKAGE (See Note 2) PKG $ 900.00 15Elderlee 33795G 6’6” (1980) ANGLE STRUT 6’6” (1980) ANGLE STRUT EA $ 81.00 15Highway 3380G BRACKET BOLT KEG 5/8 X 1 1/2 HEX HEAD (1000 PCS) BRACKET BOLT KEG 5/8 X 1 1/2 HEX HEAD (1000 PCS) KEG $ 638.00 15Elderlee 33852G SRT/HBA HARDWARE PACKAGE (See Note 2) SRT/HBA HARDWARE PACKAGE (See Note 2) PKG $ 418.00 15Elderlee 33875G 6'6" (1980) ANGLE STRUT 6'6" (1980) ANGLE STRUT EA $ 81.00 15Elderlee 33875G CAT 6'6" ANGLE STRUT CAT 6'6" ANGLE STRUT EA $ 79.00 15Elderlee 33876A SRT/HBA POST 1 TOP (W6 x 8.5) SRT/HBA POST 1 TOP (W6 x 8.5) EA $ 162.00 15Elderlee 33877A SRT/HBA POST 2 TOP (W6 x 8.5) SRT/HBA POST 2 TOP (W6 x 8.5) EA $ 104.00 15Elderlee 33878A SRT/HBA POST 1 & 2 BOT (TS 6 x 4) SRT/HBA POST 1 & 2 BOT (TS 6 x 4) EA $ 215.00 15Elderlee 33879G SRT ANGLE STRUT 2” X 2” X 3/8” SRT ANGLE STRUT 2” X 2” X 3/8” EA $ 104.00 15Elderlee 33880G SRT 1” x 6” x 8” BEARING PLATE SRT 1” x 6” x 8” BEARING PLATE EA $ 41.00 15Trinity 33908G Post Sleeve - CCT - Terminal Post Post Sleeve - CCT - Terminal Post EA $ 42.00 15Trinity 33909G CRP - Cable Bracket CRP - Cable Bracket EA $ 29.00 15Trinity 33910G CRP - Terminal Post No. 4 Thru 7 CRP - Terminal Post No. 4 Thru 7 EA $ 122.00 15Trinity 33916B Concrete Reinforcing Cage Concrete Reinforcing Cage EA $ 111.00 15Trinity 33934A CRP - Lower Post CRP - Lower Post EA $ 226.00 15Trinity 33935A CRP - Upper Post CRP - Upper Post EA $ 261.00 15Trinity 33954G Cass - TL4 Post - short Cass - TL4 Post - short EA $ 77.00 15Trinity 33955G CRP - Terminal Post No. 8 & 9 CRP - Terminal Post No. 8 & 9 EA $ 122.00 15Trinity 33982G Cass-TL Post Sleeve - 27" Cass-TL Post Sleeve - 27" EA $ 46.00 15Gregory 3400G CENTER BOLT KEG 5/8 X 2" BUTTON HEAD (1000 PCS) CENTER BOLT KEG 5/8 X 2" BUTTON HEAD (1000 PCS) KEG $ 522.00 15Highway 3495G CENTER BOLT BOX BUTTON HEAD 5/8 X 9 1/2 (200 PCS) CENTER BOLT BOX BUTTON HEAD 5/8 X 9 1/2 (200 PCS) KEG $ 243.00 15Gregory 3580G 5/8" X 18" BUTTON HEAD BOLT 5/8" X 18" BUTTON HEAD BOLT EA $ 3.00 15Elderlee 39G 12/12.5'/6'3"/S SRT-2 (GUARDRAIL) 12/12.5'/6'3"/S SRT-2 (GUARDRAIL) EA $ 2,036.00 15Gregory 3G BACK UP PLATE W-BEAM 12GA BACK UP PLATE W-BEAM 12GA EA $ 9.00 15Am Tim 4063B 6" X 8" 6' CRT WOOD POST 6" X 8" 6' CRT WOOD POST EA $ 34.00 15Am Tim 4064B 6" X 8" 6' SOLID WOOD POST 6" X 8" 6' SOLID WOOD POST EA $ 34.00 15Highway 4075B 14" X 6" X 8" WOOD BLOCK INCL HARDWARE 14" X 6" X 8" WOOD BLOCK INCL HARDWARE SET $ 9.00 15Am Tim 4076B 14" ROUTERED WOOD BLOCK INCL HARDWARE 14" ROUTERED WOOD BLOCK INCL HARDWARE SET $ 10.00 15Trinity 4211G 5/16 Dia. Hex Bolt x 1 3/4" (A307) 5/16 Dia. Hex Bolt x 1 3/4" (A307) EA $ 1.16 15

Page 12: NEW State of Maine€¦ · Caribou (04736) Luke Moir (207-592-2893) SUPPLEMENTAL SPECIFICATIONS SECTION 606 GUARDRAIL 606.01 DESCRIPTION. The work shall consist of furnishing and

Gregory 437G 22" STEEL BLOCK INCL HARDWARE 22" STEEL BLOCK INCL HARDWARE SET $ 22.00 15Highway 441G 14" STEEL BLOCK INCL HARDWARE 14" STEEL BLOCK INCL HARDWARE SET $ 14.00 15White Sign 48-2 PostYELSAFEHIT 48" 2 Post Yel/Yel SafeHit 48" 2 Post Yel/Yel SafeHit EA $ 28.00 15Trinity 4902G 1" Flat Washer (F436) 1" Flat Washer (F436) EA $ 1.16 15Trinity 4903G 1" Hex Nut (A194 2H) 1" Hex Nut (A194 2H) EA $ 2.32 15Brifen 4F11B1-L B1 Post-Left, Length = 49 7/16" B1 stamped on post B1 Post-Left, Length = 49 7/16" B1 stamped on post EA $ 79.00 15Brifen 4F11B1-R B1 Post-Right, Length = 49 7/16" B1 stamped on post B1 Post-Right, Length = 49 7/16" B1 stamped on post EA $ 79.00 15Brifen 4F11B2-L B2 Post-Left, Length = 49 7/16" B2 stamped on post B2 Post-Left, Length = 49 7/16" B2 stamped on post EA $ 79.00 15Brifen 4F11B2-R B2 Post-Right, Length = 49 7/16" B2 stamped on post B2 Post-Right, Length = 49 7/16" B2 stamped on post EA $ 79.00 15Brifen 4F11B3-L B3 Post-Left,56" Length W/Weakening Cut B3 stamped on post B3 Post-Left,56" Length W/Weakening Cut B3 stamped on post EA $ 79.00 15Brifen 4F11B3-R B3 Post-Right,56" Length W/weakening Cut B3 stamped on post B3 Post-Right,56" Length W/weakening Cut B3 stamped on post EA $ 79.00 15Highway 545G 6' W6 X 8.5 STEEL POST 6' W6 X 8.5 STEEL POST EA $ 41.00 15Trinity 5692G Terminal top 4th Cable Assembly - 60'-8" Terminal top 4th Cable Assembly - 60'-8" EA $ 478.00 15Trinity 5703B Cass - TL4 Cable Spacer - Black Cass - TL4 Cable Spacer - Black EA $ 6.00 15Trinity 5705B Cass - TL4 Cable Spacer - Yellow Cass - TL4 Cable Spacer - Yellow EA $ 8.00 15Trinity 5706B Cass - TL Sleeve Cover Cass - TL Sleeve Cover EA $ 8.00 15Trinity 5707T Cass - TL Post Strap Cass - TL Post Strap EA $ 6.00 15Trinity 5745B Rebar Rod - Terminal Post Rebar Rod - Terminal Post EA $ 7.00 15Trinity 5745B Rebar Rod - SJ Post - 38" Rebar Rod - SJ Post - 38" EA $ 8.00 15Trinity 5747B Sleeve Cap - Cass Post Sleeve Cap - Cass Post EA $ 4.65 15Trinity 5751G Cable - Field Splice Section - 938' - 8" Cable - Field Splice Section - 938' - 8" EA $ 2,262.00 15Trinity 5817G Terminal Top Cable Assembly 54' - 3" Terminal Top Cable Assembly 54' - 3" EA $ 383.00 15Trinity 5818G Terminal Middle Cable Assembly 48' - 0" Terminal Middle Cable Assembly 48' - 0" EA $ 383.00 15Trinity 5819G Terminal Bottom Cable Assembly 41' - 9" Terminal Bottom Cable Assembly 41' - 9" EA $ 383.00 15Trinity 5825G 5/16 Dia. Cable Lock Bolt (A307) 5/16 Dia. Cable Lock Bolt (A307) EA $ 1.45 15Trinity 5826G Cass Turnbuckle - 1" Cass Turnbuckle - 1" EA $ 78.00 15Trinity 5836B Concrete Reinforcing Ring Concrete Reinforcing Ring EA $ 4.64 15Trinity 5837B Sleeve Cap - Terminal Post Sleeve Cap - Terminal Post EA $ 3.50 15Trinity 5839B CCT - Sleeve Cover - Terminal Post CCT - Sleeve Cover - Terminal Post EA $ 2.32 15Trinity 5851B CRP REFLECTOR - MEDIUM CRP REFLECTOR - MEDIUM EA $ 14.00 15Trinity 5910G Cable Terminal - R.H.T. - 1" Cable Terminal - R.H.T. - 1" EA $ 87.00 15Transpo 605446G Cartridge Support, Quadguard, 605446G Cartridge Support, Quadguard, 605446G EA $ 49.00 15Transpo 605447G Cartridge Support, Quadguard, 605447G Cartridge Support, Quadguard, 605447G EA $ 52.00 15Am Tim 6058B 42 1/2" X 5 1/2" X 7 1/2" CRT WOOD POST (MELT/FLEAT/SRT) 42 1/2" X 5 1/2" X 7 1/2" CRT WOOD POST (MELT/FLEAT/SRT) EA $ 27.00 15Transpo 606027B Cartridge Assy- Type 1, Quadguard Cartridge Assy- Type 1, Quadguard EA $ 744.00 15Transpo 606129B Cartridge Assy- Type 2, Quadguard Cartridge Assy- Type 2, Quadguard EA $ 744.00 15Transpo 606241B Fender Panel, Quadguard Fender Panel, Quadguard EA $ 893.00 15Am Tim 60631B 22" ROUTERED WOOD BLOCK INCL HARDWARE 22" ROUTERED WOOD BLOCK INCL HARDWARE SET $ 22.00 15Transpo 607145B Diaphram Assy, Quad Beam, 1073mm (3'-6") Diaphram Assy, Quad Beam, 1073mm (3'-6") EA $ 1,700.00 15Transpo 607146B Diaphram Assy, Quad Beam, 1153mm (3'-9") Diaphram Assy, Quad Beam, 1153mm (3'-9") EA $ 1,700.00 15Transpo 607148B Diaphram Assy, Quad Beam, 1233mm (4'-0") Diaphram Assy, Quad Beam, 1233mm (4'-0") EA $ 1,700.00 15Transpo 607149B Diaphram Assy, Quad Beam, 1273mm (4'-2") Diaphram Assy, Quad Beam, 1273mm (4'-2") EA $ 1,700.00 15Transpo 607150B Diaphram Assy, Quad Beam, 1313mm (4'-4") Diaphram Assy, Quad Beam, 1313mm (4'-4") EA $ 1,700.00 15Transpo 607151B Diaphram Assy, Quad Beam, 1393mm (4'-7") Diaphram Assy, Quad Beam, 1393mm (4'-7") EA $ 1,810.00 15Transpo 607152B Diaphram Assy, Quad Beam, 1473mm (4'-10") Diaphram Assy, Quad Beam, 1473mm (4'-10") EA $ 1,810.00 15Transpo 607156B Diaphram Assy, Quad Beam, 1513mm (5'-0") Diaphram Assy, Quad Beam, 1513mm (5'-0") EA $ 1,810.00 15Transpo 607157B Diaphram Assy, Quad Beam, 1553mm (5'-1") Diaphram Assy, Quad Beam, 1553mm (5'-1") EA $ 1,810.00 15Transpo 607158B Diaphram Assy, Quad Beam, 1633mm (5'-4") Diaphram Assy, Quad Beam, 1633mm (5'-4") EA $ 1,970.00 15Transpo 607159B Diaphram Assy, Quad Beam, 1729mm (5'-8") Diaphram Assy, Quad Beam, 1729mm (5'-8") EA $ 1,970.00 15Transpo 607160B Diaphram Assy, Quad Beam, 1793mm (5'-11"), Quadguard Diaphram Assy, Quad Beam, 1793mm (5'-11"), Quadguard EA $ 1,970.00 15Transpo 607162B Diaphram Assy, Quad Beam, 1873mm (6'-2"), Quadguard Diaphram Assy, Quad Beam, 1873mm (6'-2"), Quadguard EA $ 2,030.00 15Transpo 607163B Diaphram Assy, Quad Beam, 1953mm (6'-5"), Quadguard Diaphram Assy, Quad Beam, 1953mm (6'-5"), Quadguard EA $ 2,041.00 15Transpo 607164B Diaphram Assy, Quad Beam, 2033mm (6'-8"), Quadguard Diaphram Assy, Quad Beam, 2033mm (6'-8"), Quadguard EA $ 2,088.00 15Transpo 607173B Diaphram Assy, Quad Beam, 673mm (2'-3") Diaphram Assy, Quad Beam, 673mm (2'-3") EA $ 1,508.00 15Transpo 607174B Diaphram Assy, Quad Beam, 753mm (2'-6") Diaphram Assy, Quad Beam, 753mm (2'-6") EA $ 1,508.00 15Transpo 607175B Diaphram Assy, Quad Beam, 833mm (2'-9") Diaphram Assy, Quad Beam, 833mm (2'-9") EA $ 1,508.00 15Transpo 607176B Diaphram Assy, Quad Beam, 913mm (3'-0") Diaphram Assy, Quad Beam, 913mm (3'-0") EA $ 1,625.00 15Transpo 607177B Diaphram Assy, Quad Beam, 993mm (3'-3") Diaphram Assy, Quad Beam, 993mm (3'-3") EA $ 1,606.00 15Transpo 610172G Hinge Plate, Quadguard Hinge Plate, Quadguard EA $ 93.00 15White Sign 6665B REFLECTIVE SHEETING 14" X 14" CHEVRON PATTERN REFLECTIVE SHEETING 14" X 14" CHEVRON PATTERN EA $ 20.00 15Gregory 6901B 22" PLASTIC BLOCK INCL HARDWARE 22" PLASTIC BLOCK INCL HARDWARE SET $ 15.00 15Gregory 6955B 14" PLASTIC BLOCK INCL HARDWARE 14" PLASTIC BLOCK INCL HARDWARE SET $ 6.00 15Highway 700A CABLE ANCHOR BRACKET BCT/MELT/SRT CABLE ANCHOR BRACKET BCT/MELT/SRT EA $ 41.00 15Gregory 705G 2 1/2" X 5 1/2" PIPE SLEEVE 2 1/2" X 5 1/2" PIPE SLEEVE EA $ 6.00 15

Page 13: NEW State of Maine€¦ · Caribou (04736) Luke Moir (207-592-2893) SUPPLEMENTAL SPECIFICATIONS SECTION 606 GUARDRAIL 606.01 DESCRIPTION. The work shall consist of furnishing and

Gregory 740G STEEL SOIL TUBE 6" X 8" X 60" STEEL SOIL TUBE 6" X 8" X 60" EA $ 122.00 15Gregory 742G STEEL SOIL TUBE 6" X 8" X 72" STEEL SOIL TUBE 6" X 8" X 72" EA $ 133.00 15Gregory 766G STEEL SOIL PLATE 24" X 24" STEEL SOIL PLATE 24" X 24" EA $ 41.00 15Gregory 775G BEARING PLATE BEARING PLATE EA $ 25.00 15Elderlee 775G SRT 6” x 8” x 5/8” BEARING PLATE SRT 6” x 8” x 5/8” BEARING PLATE EA $ 41.00 15Elderlee 782G CAT 8" x 8" x 5/8” BEARING PLATE CAT 8" x 8" x 5/8” BEARING PLATE EA $ 29.00 15White Sign 800BTB0170 BEAM REFLECTORS (SPECIFY WHITE/YELLOW) BOX 200CT BEAM REFLECTORS (SPECIFY WHITE/YELLOW) BOX 200CT BOX $ 580.00 15Gregory 907G BUFFER END SINGLE 12 GA BUFFER END SINGLE 12 GA EA $ 32.00 15Gregory 919G BCT DOUBLE BUFFER BCT DOUBLE BUFFER EA $ 75.00 15Gregory 9264G W-BEAM BRIDGE BACKING PLATE 5/8" W-BEAM BRIDGE BACKING PLATE 5/8" EA $ 43.00 15Gregory 926G W-BEAM MICHIGAN SHOE 10 GA W-BEAM MICHIGAN SHOE 10 GA EA $ 41.00 15Gregory 927G BENT LIP MICHIGAN SHOE W-BEAM BENT LIP MICHIGAN SHOE W-BEAM EA $ 41.00 15Gregory 957G BUFFER END THRIE BEAM 12 GA BUFFER END THRIE BEAM 12 GA EA $ 75.00 15Highway 9716A MELT STRUT MELT STRUT EA $ 116.00 15Gregory 975G MICHIGAN SHOE THRIE BEAM 10 GA MICHIGAN SHOE THRIE BEAM 10 GA EA $ 64.00 15Gregory 977G TRANSITION PANEL W-THRIE BEAM 10 GA TRANSITION PANEL W-THRIE BEAM 10 GA EA $ 145.00 15Elderlee 983G 10/NOSE PLATE/ CAT/ ROLLED 10/NOSE PLATE/ CAT/ ROLLED EA $ 177.00 15Elderlee 984G 10/SIDE PLATE CAT 10/SIDE PLATE CAT EA $ 116.00 15Elderlee 9852A SRT STRUT SRT STRUT EA $ 128.00 15Elderlee 9852A CAT CHANNEL STRUT X 6’6” (1980) CAT CHANNEL STRUT X 6’6” (1980) EA $ 145.00 15Highway 986G DOUBLE BUFFER DIAPHRAM PLATE DOUBLE BUFFER DIAPHRAM PLATE EA $ 46.00 15Gregory 987G MELT DOUBLE BUFFER MELT DOUBLE BUFFER EA $ 75.00 15Elderlee 9915A SPACER CHANNEL CAT SPACER CHANNEL CAT EA $ 348.00 15Elderlee 992G SRT HARDWARE PACKAGE (See Note 2) SRT HARDWARE PACKAGE (See Note 2) PKG $ 418.00 15Highway 9G W-BEAM RAIL STANDARD PUNCH 6'3" 12 GA W-BEAM RAIL STANDARD PUNCH 6'3" 12 GA EA $ 72.00 15Brifen A42 Locating Peg Locating Peg EA $ 1.16 15Brifen A52 Rigging Screw (Turnbuckle) Rigging Screw (Turnbuckle) EA $ 110.00 15Brifen A82 ‐ Amber Prismatic Reflector Prismatic Reflector EA $ 2.90 15Brifen A83 ‐ White Prismatic Reflector Prismatic Reflector EA $ 2.90 15

Elderlee Anchorage plate w/bolts-w-w Anchorage plate w/bolts welded -welded Anchorage plate w/bolts welded EA $ 99.00 15

BEAMSECTION94.5w84.5w2 BEAMSECTION94 1/2" w84 1/2" w2 9" 4 1/2" W-BEAM SECTION EA $70.0015

Gregory C3820 FL-MT 3/8" WIRE 20'-0" FL-MT 3/8" WIRE 20'-0" EA $ 99.00 15Elderlee CRTOPPOST CR New Top Post CR New Top Post EA $ 261.00 15Gregory DBMT FL-MT DEFLECTOR BOX FL-MT DEFLECTOR BOX EA $ 522.00 15Gregory E780 FLT-350 GROUND STRUT FLT-350 GROUND STRUT EA $ 46.00 15Elderlee ELDERLEESRT 27 CR P SRT 27 CR Post Top SRT 27 CR Post Top EA $ 261.00 15Elderlee ELDERLEESRT 27 HARD SRT 27 Hardware Package SRT 27 Hardware Package EA $ 394.00 15Elderlee ELDERLEESRT 27/31 C SRT 27/31 CR Post Bottom SRT 27/31 CR Post Bottom EA $ 306.00 15Elderlee ELDERLEESRT 31 CR P SRT 31 CR Post Top SRT 31 CR Post Top EA $ 261.00 15Elderlee ELDERLEESRT 31 HARD SRT 31 Hardware Package SRT 31 Hardware Package EA $ 394.00 15Brifen F11A-L A Post-Left A Post-Left EA $ 128.00 15Brifen F11A-R A Post-Right A Post-Right EA $ 128.00 15Gregory F1303 FLT-350 W-BEAM GUARDRAIL END SECTION 12Ga., 12'-6" FLT-350 W-BEAM GUARDRAIL END SECTION 12Ga., 12'-6" EA $ 150.00 15Gregory F1304 FLT-350 W-BEAM G.R. CENTER SECT. (4'-2" SPACING) 12'-6" FLT-350 W-BEAM G.R. CENTER SECT. (4'-2" SPACING) 12'-6" EA $ 75.00 15Gregory F3000 FLT-350 IMPACT HEAD FLT-350 IMPACT HEAD EA $ 574.00 15Gregory FLEAT 350-COMPLETE FLEAT 350 SYSTEM (COMPLETE WITH ALL HARDWARE) FLEAT 350 SYSTEM (COMPLETE WITH ALL HARDWARE) SET $ 1,450.00 15Gregory FLEAT MT350 FLEAT MT 350 FLEAT MT 350 SET $ 3,074.00 15Gregory FLEAT-350HRDWR FLEAT-350 HARDWARE PACKAGE (See Note 2) FLEAT-350 HARDWARE PACKAGE (See Note 2) PKG $ 99.00 15Gregory FLEAT-MTHDWR FLEAT-MT HARDWARE PACKAGE (See Note 2) FLEAT-MT HARDWARE PACKAGE (See Note 2) PKG $ 1,626.00 15CA Newcomb FLT-350-IMHEAD FLT-350 IMPACT HEAD FLT-350 IMPACT HEAD EA $ 348.00 15Gregory G1201 FL-MT W-BEAM G.R., SHORT SECT. (6'-3"SPACING) 12Ga., 6'-3" FL-MT W-BEAM G.R., SHORT SECT. (6'-3"SPACING) 12Ga., 6'-3" EA $ 60.00 15

LIN-DELINEATOR LINEAR DELINEATOR LINEAR DELINEATOR EA $696.00 15MSK-BOTTOM1 MSKT # 1 POST BOTTOM MSKT # 1 POST BOTTOM EA $348.00 15MSK-BOTTOM2 MSKT # 2 POST BOTTOM MSKT # 2 POST BOTTOM EA $174.00 15MSK-COMPLETE MSKT COMPLETE MSKT COMPLETE EA $1,914.00 15

MSKT IMPACT HEADHEAD MSKT IMPACT HEAD MSKT IMPACT HEAD EA $986.0015

MSKT-HRDWR MSKT HARDWARE PACKAGE MSKT HARDWARE PACKAGE EA $128.00 15MSK-TOP1 MSKT # 1 POST TOP MSKT # 1 POST TOP EA $290.00 15MSK-TOP2 MSKT # 2 POST TOP MSKT # 2 POST TOP EA $174.00 15

Transpo Mush-Washer-Quadguard Mushroom Washer, Quadguard Mushroom Washer, Quadguard EA $ 142.00 15Highway N/A BRIDE ANCHOR PLATE WITH 7/8" X 8" BOLTS WELDED BRIDE ANCHOR PLATE WITH 7/8" X 8" BOLTS WELDED EA $ 185.00 15

Page 14: NEW State of Maine€¦ · Caribou (04736) Luke Moir (207-592-2893) SUPPLEMENTAL SPECIFICATIONS SECTION 606 GUARDRAIL 606.01 DESCRIPTION. The work shall consist of furnishing and

KL Jack N/A BRIDGE BOLTS 7/8" X 20" WITH NUT AND WASHER BRIDGE BOLTS 7/8" X 20" WITH NUT AND WASHER EA $ 37.00 15Transpo Nose Assy- Quadguard Nose Assy., Quadguard Nose Assy., Quadguard EA $ 744.00 15Nucor Nu-Guard SP80-SPost Nu-Guard SP80 Post Nu-Guard SP80 Post EA $68.00 15Nucor Nu-Guard-OBlock Nu-Guard Offset Block Nu-Guard Offset Block EA $12.00 15Gregory PBFMT FL-MT POST BREAKER FL-MT POST BREAKER EA $ 70.00 15Gregory S3000 SKT-350 IMPACT HEAD SKT-350 IMPACT HEAD EA $ 986.00 15Gregory S760 FLT-350 CABLE ANCHOR BRACKET FLT-350 CABLE ANCHOR BRACKET EA $ 46.00 15White Sign SH242GRS SAFE-HIT FLEXIBLE GUARDRAIL MARKER 42" SAFE-HIT FLEXIBLE GUARDRAIL MARKER 42" EA $ 23.00 15White Sign SH254GRS SAFE-HIT FLEXIBLE GUARDRAIL MARKER 54" W/SOIL ANCHOR SAFE-HIT FLEXIBLE GUARDRAIL MARKER 54" W/SOIL ANCHOR EA $ 29.00 15White Sign Sheet3x8-Color REFLECTIVE SHEETING 3" X 8" (SPECIFY COLOR) REFLECTIVE SHEETING 3" X 8" (SPECIFY COLOR) EA $ 2.30 15Gregory SKT-350 SKT 350 SKT 350 SET $ 1,914.00 15Gregory SKT-350HRDWR SKT-350 HARDWARE PACKAGE (See Note 2) SKT-350 HARDWARE PACKAGE (See Note 2) PKG $ 99.00 15Gregory SKTPOSTBOTTOM SKT 350/ Fleat #2 Post Bottom SKT 350/ Fleat #2 Post Bottom EA $75.00 15Gregory SKTPOSTTOP SKT 350 /Fleat #1 Post Top SKT 350 /Fleat #1 Post Top EA $75.00 15Gregory SKTPOSTTOP SKT 350/ Fleat #2 Post Top SKT 350/ Fleat #2 Post Top EA $50.00 15Gregory SKTSTEELPOST) SKT 350 Hardware PKG (Steel Post) SKT 350 Hardware PKG (Steel Post) EA $81.00 15Gregory SKTTUBEBOTTOM SKT 350/ Fleat #1 Post Tube Bottom SKT 350/ Fleat #1 Post Tube Bottom EA $238.00 15Elderlee SRT31SYTP6 SRT 31 SYTP 6' SRT 31 SYTP 6' EA $ 70.00 15Elderlee SRTSPLICEPANEL #3 SRT 31 Mid Splice Panel #3 SRT 31 Mid Splice Panel #3 EA $ 245.00 15Elderlee SS-351 SRT-350 HBA (COMPLETE WITH ALL HARDWARE) 6-POST SRT-350 HBA (COMPLETE WITH ALL HARDWARE) 6-POST SET $ 1,450.00 15Elderlee SS-444 SRT-350 (COMPLETE WITH ALL HARDWARE) 8-POST SRT-350 (COMPLETE WITH ALL HARDWARE) 8-POST SET $ 1,450.00 15Elderlee SS-546 CAT SYSTEM (COMPLETE WITH ALL HARDWARE) CAT SYSTEM (COMPLETE WITH ALL HARDWARE) SET $ 3,422.00 15Elderlee SS-546 Pedestal posts 22” Pedestal posts 22” EA $ 133.00 15Trinity T01 Tension Meter Kit Tension Meter Kit EA $ 2,668.00 15Transpo TRANSPOCHEVRON, QU Chevron, Quadguard Chevron, Quadguard EA $ 88.00 15White Sign UCHANNEL2.5x8 U-CHANNEL 2 1/2LB X 8' DELINEATOR POST U-CHANNEL 2 1/2LB X 8' DELINEATOR POST EA $ 28.00 15CA Newcomb Used #1 Panel1 Panel Used #1 Panel Used #1 Panel EA $ 75.00 15Voss VOSSRUBBER GASK Rubber Gasket Rubber Gasket EA $ 21.00 15Brifen W86 Retainer Pin Retainer Pin EA $ 12.00 15AM Tim WOODPOST6x8x4 6" X 8" 4' CRT WOOD POST 6" X 8" 4' CRT WOOD POST EA $ 30.00 15Brifen WRGT4‐M Anchor Assembly – Complete Anchor Assembly – Complete EA $ 655.00 15Brifen WRGTA1 Combination Fitting Assy,Inc:Nuts(2), Round, Steel Square,& Combination Fitting Assy,Inc:Nuts(2), Round, Steel Square,& EA $ 362.00 15Brifen WRGTA1‐C Coupler Fitting Assy, Inc: Nuts(2), Round, Steel Square, & Coupler Fitting Assy, Inc: Nuts(2), Round, Steel Square, & EA $ 110.00 15Nucor xBoltNu-Guard 5/8nu8nu2 Nu-Guard 5/8" x 3-1/2" Bolt Nu-Guard 5/8" x 3-1/2" Bolt EA $3.00 15

Nucor xBoltNu-Guard 5/8nu8nuBolt Nu-Guard 5/8" x 12" Bolt Nu-Guard 5/8" x 12" Bolt EA $4.0015

Brifen Z02 Repair Tool Rope Spreader Repair Tool Rope Spreader EA $ 395.00 15Brifen Z11L Line Post Z11L stamped on post Line Post Z11L stamped on post EA $ 74.00 15Brifen Z11R Line Post Z11R stamped on post Line Post Z11R stamped on post EA $ 74.00 15Brifen Z40 Socket – Galvanized Steel Socket – Galvanized Steel EA $ 41.00 15Brifen Z41 Post Excluder Post Excluder EA $ 2.30 15Brifen Z80 Post Cap Post Cap EA $ 4.60 15