new route suggestion

4
New route Suggestion : The route taken by 500k buses to ITPL is as shown in the map below(black route). Including the Uturn in !ront o! I"#$% the route is about &'k m. rom my eperience% it takes about *0 minutes during usual tra!!ic% and upto &.+5 hours during pe ak hours. The tra,el time has increased in the recent past% due to multiple !lyo,er constructions on this route as well. -n alternate route could be as shown in the map in red. This route is longer (appro +*km). ut% tra!!ic is usually much lesser% and a,erage commute time would be /0 minutes. -s o! now% T1 operates ig&02/ till 3ommasandra% and 400% /+ etc !rom 3ommasandra to ITPL. "o% this route should be !easible !or operating T1 buses.

Upload: rikki-das

Post on 03-Jun-2018

222 views

Category:

Documents


0 download

TRANSCRIPT

8/12/2019 New Route Suggestion

http://slidepdf.com/reader/full/new-route-suggestion 1/4

New route Suggestion :

The route taken by 500k buses to ITPL is as shown in the map below(black route). Including theUturn in !ront o! I"#$% the route is about &'km. rom my eperience% it takes about *0 minutes

during usual tra!!ic% and upto &.+5 hours during peak hours. The tra,el time has increased in the

recent past% due to multiple !lyo,er constructions on this route as well.

-n alternate route could be as shown in the map in red. This route is longer (appro +*km). ut%tra!!ic is usually much lesser% and a,erage commute time would be /0 minutes.

-s o! now% T1 operates ig&02/ till 3ommasandra% and 400% /+ etc !rom 3ommasandra

to ITPL. "o% this route should be !easible !or operating T1 buses.

8/12/2019 New Route Suggestion

http://slidepdf.com/reader/full/new-route-suggestion 2/4

Advantages:

Introducing this route will help to take some pressure o! the $uter #ing #oad.

 It will gi,e time bene!it to people tra,elling longer distances !rom silkboard side% as well.

Challenges :

&. There is one railway crossing near the 1armalarem railway station. re6uency o! trains

on this line is 6uite low as o! now. ut this is one thing to be taken into consideration%

while making a decision about the route.

+. 7uge humps on either side o! the railway crossing% which might make it di!!icult !or the

low !loor buses

/. - short narrow stretch near 8arthur arket.

Local Loop around ITPL:

9hen I tra,el in 500c:k% I ha,e noticed that most o! the time% when the bus starts !rom ITPL% the

 bus would still ha,e seats remaining. y the time it reaches "-P labs% the bus is almost !ull% and

many a times% the bus cannot take any more people in. This is to say that% although the bus goes

with a ITPL board% the catchment area is a good / km along the ITPL area. The suggested route

has the shortcoming that it does not co,er this region. This can be sol,ed to a good etend by

running a local loop around the area. The route that can be !ollowed is shown in the map below.

8/12/2019 New Route Suggestion

http://slidepdf.com/reader/full/new-route-suggestion 3/4

Local loop applied to other routes:

/&;1

7a,ing worked in ITPL !or * years% I ha,e seen that the ITPL company buses towards

Indiranagar% silkboard and old airport road where always e6ually crowded. That being the case% I

ha,e always wondered as to why the /&;1 8ol,o along old madras road to Indiranagar didn<t

 become as popular as the 500k series. $ne o! the reasons was the low !re6uency% and awareness

le,el. -nd I personally think that absence o! this last loop around the ITPL area would ha,e

contributed e6ually well.

5003

The route !ollowed by this bus is shown in the !ollowing map in black.

8/12/2019 New Route Suggestion

http://slidepdf.com/reader/full/new-route-suggestion 4/4

The map below shows an alternate route% in red% which would gi,e almost the same co,erage.

The stretch !rom =#puram to arathahalli is co,ered by 5003- as well. "o% I guess the loss o!

co,erage to this area by the modi!ication in this route is maneagable. -lso this a,oids a lot o!

tra!!ic !or the users o! this route.