Bharya Engineering & Contracting Co. Ltd Plot No. 85/86/87 Vingunguti Industrial Area P.o Box 1698, Dar es salaam Tanzania Tel: +255 222 135 784 Fax: +255 222 123 695 Hotline: +255 786 700 500 cell: +255 788 777 788 www.becco.co.tz [email protected] Specialized in the field of Civil Engineering: Earth Works Mega Drainage & Irrigation Infrastructures Slurry Seals Surface Dressings All Asphalt Works

Upload: others

Post on 21-Aug-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: new-profile · 2017. 1. 27. · Title: new-profile Created Date: 6/1/2016 6:15:13 PM

Bharya Engineering & Contracting Co. LtdPlot No. 85/86/87 Vingunguti Industrial AreaP.o Box 1698, Dar es salaamTanzania

Tel: +255 222 135 784Fax: +255 222 123 695Hotline: +255 786 700 500cell: +255 788 777 [email protected]

Specialized in the field of Civil Engineering:Earth Works

Mega Drainage & Irrigation InfrastructuresSlurry Seals

Surface DressingsAll Asphalt Works

Page 2: new-profile · 2017. 1. 27. · Title: new-profile Created Date: 6/1/2016 6:15:13 PM

Becco LimitedSince 1972

Specialized inCivil Engineering Works

Together We BuildTanzania

Page 3: new-profile · 2017. 1. 27. · Title: new-profile Created Date: 6/1/2016 6:15:13 PM

Becco Limited, a company established in the year 1972, having vast experience of 54 years in Civil Works Construction Industry, specializing in Road Construction Works. The company is registered with Tanzania Contractor’s Registration Board (CRB), as a Class 1 (ONE) Civil Works Contractor in The United Republic of Tanzania. The company has played an important role in the development of infrastructure projects throughout Tanzania. We execute government and private owned projects in the capacities of main and sub-contractor.

www.becco.co.tz [email protected]

Who We Are?

Our History

Our Mission Statements

Becco Ltd maintains an excelling record of success to its reputation. Embedded in our culture of hard work, honesty, and getting the job done right, we mean proactive action on win -win situations. Becco Limited is now running by third generation of Mr. Sarbjit Singh Bharya who was the founder of Bharya Engineering & Contracting Company Limited; Mr. Gurpal Singh Bharya(C.E.O) & Mr. Manraj Singh Bharya (Managing Director)

The executive Team is present to establish, communicate, and lead a compelling & inspirational vision for Becco with the Best Machinery/Tools & PersonnelProviding leadership to the operating and functional groups by aligning strategies and goals to ensure sustainability, growth and quality perfection in all our works. Committed to provide directions, motivations, resources and guideline to ensure our company remains ethical, innovative and safety at all time.

Bharya Engineering & Contracting Co. Ltd

Page 4: new-profile · 2017. 1. 27. · Title: new-profile Created Date: 6/1/2016 6:15:13 PM

www.becco.co.tz [email protected]

Our Area of Expertise

We offer commitment at all levels of construction projects, from all logistics to management services. Over 54 years now, we have successfully met our client’s demand on cost effective and responsive services.

Bharya Engineering & Contracting Co. Ltd

Becco Limited deliver high quality and innovative transportation & infrastructure in an ethical and environmentally sound manner by supporting and encouraging the professional development of our employees and being responsible to the communities in which we work.

Our main area of specialization is in the fields of Civil Engineering works includes but not limited to bulk earthworks, civil services, hauling, drainage infrastructure development as well as offering a broad range of specialized construction disciplines that include Aggregates crushing, concrete production, road seals, and asphalt batching and paving.

Page 5: new-profile · 2017. 1. 27. · Title: new-profile Created Date: 6/1/2016 6:15:13 PM

www.becco.co.tz [email protected]

1. Earthworks Becco Limited have a dedicated team who have experience worldwide in general earthworks, drilling and blasting services.

Our equipment and plant ranges from mini diggers to general and heavy duty earth moving excavators, wheel loaders, bulldozers and haulage dump trucks which suits quarry & borrow pits operation, construction of back slopes and side slopes of road works and embankment.

Our team of quantity and land surveyors plays a vital role for setting out design and review of the overall layout in connection with quantifying of work.

Bharya Engineering & Contracting Co. Ltd

Specialized in the field of Civil Engineering:Earth Works

Mega Drainage & Irrigation InfrastructuresSlurry Seals

Surface DressingsAll Asphalt Works

Page 6: new-profile · 2017. 1. 27. · Title: new-profile Created Date: 6/1/2016 6:15:13 PM

www.becco.co.tz [email protected]

Becco contractors has a vision to maintain to be amongst the best Tanzania civil contractors.

2. Asphalt Works

Becco owns Four modern computerized mixing Asphalt plants with production capacity ranges from 50 ton/hour up to 150 ton/hour along with fully equipped three complete sets of asphalt pavers and rollers. Through well and qualified experienced engineers and technical design for bituminous mixers for asphalt concrete surfacing AC10, AC14, AC20 and base courses DBM30 and DBM40 to meet client’s needs.

Bharya Engineering & Contracting Co. Ltd

Our engineers are mentored by senior staff and given sufficient time and resources to develop their skills in a friendly and supportive environment. In this way, we build technical expertise and deliver engineering excellence.

Page 7: new-profile · 2017. 1. 27. · Title: new-profile Created Date: 6/1/2016 6:15:13 PM

www.becco.co.tz [email protected]

3. Drainage Works and Structures

We own stone crushers and concrete batching plant, giving the company smooth running executions and timely supply of aggregates to its various project sites whenever is needed.

We are experienced in construction of open and subsurface drainage works ranging from box culverts, bridges, pipe culverts, perforated/non perforated pipes and geotextile fabric materials.

Bharya Engineering & Contracting Co. Ltd

We have well dedicated team in place to fulfill all activities that concern in civil works;- Drainages works and Structures, Pumping and Irrigation systems, wells and dams as well as road constructions.

Page 8: new-profile · 2017. 1. 27. · Title: new-profile Created Date: 6/1/2016 6:15:13 PM

www.becco.co.tz [email protected]

4. Our Equipments and Materials

Bharya Engineering & Contracting Co. Ltd

Becco’s construction materials facilities are much more than a source of materials, they are a reflection of our commitment to high standards. As a vertically integrated contractor, we produce high-quality aggregates, asphalt concrete, and ready-mixed concrete for internal use and for sale to third parties. We are also well equipped with high standard and new technology construction machines as we own the best Asphalt Plants the World has to offer today and it is the only in Tanzania - Mobile Double Drum Asphalt Plants, fully computerized for maximum Asphalt durability and quality.

Page 9: new-profile · 2017. 1. 27. · Title: new-profile Created Date: 6/1/2016 6:15:13 PM

www.becco.co.tz [email protected]

5. Occupational Health and Safety Policy

Bharya Engineering & Contracting Co. Ltd

The company aims to create and maintain an environment within which employees may execute their activities in a healthy and safe manner. We comply with OSHA to make sure safety is the first priority in our working environment for all projects in hand

100% OHS Certified

Page 10: new-profile · 2017. 1. 27. · Title: new-profile Created Date: 6/1/2016 6:15:13 PM

www.becco.co.tz [email protected]

Experience Certainty

Bharya Engineering & Contracting Co. Ltd

Becco as Class One Civil Engineering & Contracting Company, we have Constructed Approximately more than 1,200 kilometers of Gravel & Asphalt Standard Roads in various Regions around Tanzania.

We are also working with Municipal Councils and Government Parastatals as well as Private Organizations. Currently we are working with Tanzania Ports Authority in rehabilitation of access road to gate No. 8, gate No. 5, Mbagala Mbande Tarmac Road & Nyerere/Mandela RoadNew Service Roads.

Becco has a significant share in the construction of some of the largest piping, irrigation and dams projects in tanzania. Water supply & drainage works, at Monduli, Kigamboni and Mbalinzi in Tanzania People's Defense Force (T.P.D.F) Barracks.

We have also done Oxidation ponds & drainage work, at Lugalo barracks dar es salaam phase 2 under Ministry of water, Water and sewerage system at Isevya and Kaloleni Tabora under Ministry of Land and Housing, Mombo Irrigation scheme at

Participating in Emergency Works, We are flexible in working in the most dangerous situations which requires immediate attention for executing Emergency Works in any case of Heavy Floods etc. We were given instructions by the Ministry of Works of Tanzania to Construct the bridges at Mzinga, Kongowe, & Bunju in Dar es Salaam, that were destroyed completely by the devastating floods by continuous heavy rains. Immediate action was taken to ensure passable tarffic with proactive designs and implementation.

Page 11: new-profile · 2017. 1. 27. · Title: new-profile Created Date: 6/1/2016 6:15:13 PM

www.becco.co.tz [email protected]

List of Project Executed and Ongoing 2007 -2016

Bharya Engineering & Contracting Co. Ltd

No. PROJECT NAME CLIENT NAME NAME OF WORK PERFOMED AND DATE.

1. REHABILITATION OF ACCESS ROAD TO GATE NO. 05 AT DAR ES SALAAM PORT CONTRACT

TANZANIA PORTS AUTHORITY

Mill out existing asphalt, break 8788 m2 of 250mm thick concrete pavement

Excavate and remove to spoil G15 and stabilize to C1 200mm sub-base layer, concreting of 250mm rigid reinforced concrete class 30.

Introduce new bituminous base DBM40 80mm regu letting layer on milled asphalt and apply 50mm AC20 asphalt concrete, construction of open drainage structure, kerbstones and installation of guardrails, road signs, and road markings. Commenced 15th January 2016

2 REHABILITATION OF ACCESS ROAD TO GATE NO. 08 AT DAR ES SALAAM PORT.

TANZANIA PORTS AUTHORITY

Scarify, excavate and remove to spoil existing road, fill G7, G15 and stabilize to CM 150mm subgrade & 200mm sub base layers

Introduce new bituminous base DBM40 – 175mm and apply 50mm AC20 asphalt concrete

Construction of rigid reinforced 450mm concrete pavements

Construction of drainage infrastructure 1200mm, 900mm and 600mm pipe culvert open and subsurface drains system

Construction of kerbstones and installation of guardrails, road signs and road markings.

3 PERIODIC MAINTENANCE WORKS ON IYAYI-TUNDUMA (TZ/ZAMBIA BORDER ) AND UYOLE – KASULU ROAD

TANROADS MBEYA Scarify and reshape existing road in highly deteriorated section to depth of scarification 200mm, water and compact.

Provide and place hot bituminous surface asphalt 50mm thick AC20 pre-mix and roll with vibratory roller. Completed 100% Sept 2015

4 PERIODIC MAINTENANCE OF KAWE – LUGALO, SPOT IMPROVEMENT OF BOKO – KUNDUCHI – BUYUNI, MOROCCO MLALAKUWA—FRICANA AND VETA – CHANG’OMBE – MOROCCO

TANROADS DAR ES SALAAM

Fill material classG-15, cement stabilized base materials C1 base crushed rock base materials CRR, prime coast on base course (MC 30, MC70), Gravel materials minimum.

G-25 compacted to 95% bituminous layer and seal MC 70 cutback

Page 12: new-profile · 2017. 1. 27. · Title: new-profile Created Date: 6/1/2016 6:15:13 PM

www.becco.co.tz [email protected]

Bharya Engineering & Contracting Co. Ltd

(KAWAWA ROAD) AND PATCHWORK OF REGIONAL ROADS.

bitumen spray rate 1 liter/m2, asphalt concrete AC14 – 40mm thick using 60/70 pen, Grade bitumen and 14mm chipping on shoulders. Completed 100% sept 2015.

5 CONSTRUCTION WORKS WITHIN PAP/IPTL TANZANIA LIMITED PREMISES

PAP/IPTL TANZANIA LIMITED

Construction, leveling, laying kerbstones, safety blocks, safety signs, road marking & erection of fuel tanks.

Drainage concrete system, stone pitching including tegeta river embankment protection.

Asphalt works DBM40 175mm thick 40/50 bitumen hot lay on heavy transfer route track coat k 160 emulsion at rate of 0.61/m2 50mm thick wearing course. Completed 100% 2014

6 PERIODIC MAINTENANCE OF GOBA – WAZO HILL – TEGETA KIBAONI AND SPOT IMPROVEMENT OF VETA JCT/CHANG’OMBE – MOROCCO AND PATCHWORK OF PAVED REGINAL ROADS

TANROADS DAR ES SALAAM

Excavating soft material situated within the depth ranges below surface level of 0.5m up to 1.5m, reinforced concrete pipe culverts.

Back filling using excavated material to concrete pipe culvert 900 mm diameters for accesses.

Concrete kerbing, open concrete chutes lining of open drains.

Precast concrete kerbs class 25/10. Completed 100% 2014.

7 SPORT IMPROVEMENT OF UHURU

TANROADS DAR ES SALAAM

Excavating of side drains, concrete pipe culvert 600mm.

Reinforcement steel – high yield steel to headwalls.

Cleaning and grabbing on shoulders. Premix surfacing layers (AC 20) and

(AC 14) – 40mm, 60/70 pen grade. Completed 100% August 2014

8 PERIODIC MAINTENANCE OF UKONGA JCT – G/MBOTO, CHANIKA (WIDENING)

TANROADS DAR ES SALAAM

Excavation of side drains, concrete pipe culvert – 600mm, provide steel reinforcements 5.5m BRC for drain placed with polythene sheet at joints

Cut and spoil including road bed preparation a fill material class G15. Completed 100% 2014

9 PERIODIC MAINTENANCE OF NYERERE ROAD ( INCLUSIVE OF UNPAVED SHOULDER)

TANROADS DAR ES SALAAM

Remove of existing slabs, excavation of side drains concrete pipe culvert 600mm, concrete in drainage

Page 13: new-profile · 2017. 1. 27. · Title: new-profile Created Date: 6/1/2016 6:15:13 PM

www.becco.co.tz [email protected]

Bharya Engineering & Contracting Co. Ltd

structure class 30 for kerbstones (620x200/175 ) including formwork. Premix surfacing layers (AC 20) – 50mm

Completed 100% December 2013

10 PERIODIC MAINTENANCE

WORKS ALONG SINGIDA/TABORA BORDER – NZEGA PAVED TRUCK TRACK ROAD (MAKOMERO SECTION)

TANROADS TABORA Provision of track coat, provide premix regulating layer, premix surfacing layer (AC14), Bitumen for asphalt concrete surfacing type 60/70 pen grade completed 100% November 2013

11 PERIODIC MAINTENANCE WORKS ALONG SINGIDA/TABORA BORDER – NZEGA PAVED TRUNK ROAD (REPAIR OF SHELUI – NZEGA ROAD EMBANKMENT)

TANROADS TABORA Breaking up of existing pavement providing base course premix surfacing layer.

pothole for patching, crack sealing and resealing completed 100% may 2013

12 PERIODIC MAINTENANCE OF KILWA, KAWAWA AND SPOT IMPROVEMENT OF NEW BAGAMOYO ROAD, PATCH OF PAVED TRUNK AND REGIONAL ROADS.

TANROADS DAR ES SALAAM

repair of walking, parking, restoration of shoulders asphalt overlay and construction of box culverts and patchworks. Completed 100% march 2013

13 PERIODIC MAINTENANCE WORKS ALONG SINGIDA/TABORA BORDER – NZEGA PAVED TRUNK

TANROADS TABORA scarify and remove existing bituminous

excavate and remove base course material

bituminous surfacing layer and bitumen for asphalt concrete surfacing type 60/70 pen grade completed 100% November 2012

14 REPAIR OF NEW BAGAMOYO, OHIO, MOROGORO, KILWA ROADS AND PATCH WORKS

TANROADS DAR ES SALAAM

Repair of walking and parking restoration of shoulders

overlay and construction of box culverts and patchworks. Completed 100% October 2012

15 PERIODIC MAINTENANCE OF MOROGORO ROAD

TANROADS DAR ES SALAAM

Cut and borrow to fill including road bed preparation Completed October 2010

16 PERIODIC AND ROUTINE/RECURRENT MAINTENANCE WORKS ALONG KIA-JCT-TCA JCT ROAD

TANROAD Completed October 2009

17 REHABILITATION OF TANROADS TANGA Completed 2008

Page 14: new-profile · 2017. 1. 27. · Title: new-profile Created Date: 6/1/2016 6:15:13 PM

www.becco.co.tz [email protected]

Bharya Engineering & Contracting Co. Ltd

BUMBULI DINDIRA 18 REHABILITATION OF SONI -

BUMBULI TANROADS Completed 2008

19 KISONGO A TO Z ROAD TANROADS Completed 2007 20 REHABILITATION OF MBELEI

MGWASHI TANROADS Completed 2007

21 REPAIR OF TANGERU ROAD SPOT MAINTENANCE WORKS ALONG TCA JCT MINJINGU ROAD ARUSHA

TANROADS Patching works spot overlaying researching including drainage works completed June 2015

22 REPAIR OF DODOMA – CHENENE & BICHA, BARAKA ROAD

TANROADS DODOMA REGION

Forming up filling works including drainage works along 65km road Completed june 2005

23 PERIODIC AND RECURRENT MAINTENANCE WORKS ALONG TCA JCT – MINJINGU ROAD – ARUSHA

TANROADS ARUSHA Spot researching of carriage way and shoulders including spot holes patching Completed 2004

Page 15: new-profile · 2017. 1. 27. · Title: new-profile Created Date: 6/1/2016 6:15:13 PM
Page 16: new-profile · 2017. 1. 27. · Title: new-profile Created Date: 6/1/2016 6:15:13 PM

[email protected]

BECCO LIMITED

Together we Build Tanzania