new procedures for sourcing public works construction webinar presentors: richard sawyer / gsfic...
TRANSCRIPT
![Page 1: New Procedures for Sourcing Public Works Construction Webinar Presentors: Richard Sawyer / GSFIC Darryl Mitchell / SPD](https://reader035.vdocuments.us/reader035/viewer/2022062717/56649e1c5503460f94b0a660/html5/thumbnails/1.jpg)
New Procedures for Sourcing Public Works Construction
Webinar Presentors: Richard Sawyer / GSFIC Darryl Mitchell / SPD
![Page 2: New Procedures for Sourcing Public Works Construction Webinar Presentors: Richard Sawyer / GSFIC Darryl Mitchell / SPD](https://reader035.vdocuments.us/reader035/viewer/2022062717/56649e1c5503460f94b0a660/html5/thumbnails/2.jpg)
Page 2
Purpose and Objectives of this Webinar
Purpose
Introduce State Agencies to new procedures for sourcing Public Works Construction projects that exceed Agency Delegated Purchase Authority (DPA) as a result of the transfer of specific procurement responsibilities from DOAS to GSFIC
Objectives
▪ Define Public Works Construction ▪ Highlight key factors influencing the decision to transfer
procurement responsibility ▪ Highlight benefits and enhanced services▪ Discuss new procedures for processing public works
construction procurements that exceeds Agency DPAs▪ Conduct “walk-through” of new procedures
![Page 3: New Procedures for Sourcing Public Works Construction Webinar Presentors: Richard Sawyer / GSFIC Darryl Mitchell / SPD](https://reader035.vdocuments.us/reader035/viewer/2022062717/56649e1c5503460f94b0a660/html5/thumbnails/3.jpg)
Page 3
Definition
Public Works Construction as defined by State Law {O.C.G.A 36-91-2 (12)} encompasses the building, altering, repairing, improving, or demolishing of any public structure or building or other public improvements of any kind to any public real property other than those projects covered by Chapter 4 of Title 32 (State, County and Municipal Road Systems). Such term does not include the routine operation, repair, or
maintenance of existing structures, buildings, or real property.
![Page 4: New Procedures for Sourcing Public Works Construction Webinar Presentors: Richard Sawyer / GSFIC Darryl Mitchell / SPD](https://reader035.vdocuments.us/reader035/viewer/2022062717/56649e1c5503460f94b0a660/html5/thumbnails/4.jpg)
Page 4
Key Decision FactorsPrimary motivation for transfer of procurement responsibility is to provide an enhanced experience to our Agency customers while simultaneously improving the effectiveness of construction related procurements
Why GSFIC? ▪ Construction procurement and administration is “core function” of
GSFIC’s Construction Division▪ Extensive experience in construction management services▪ Staffed with construction contract specialists, project managers,
engineers and architects ▪ Resident technical expertise in planning, design and
administration of construction projects▪ Offers other project-related services, program development,
project management, and specification/plan review. ▪ Currently works regularly with many of the Agencies on larger
construction projects
Memorandum of Agreement signed Dec 2007Official Transfer Date: 1 January 2008
![Page 5: New Procedures for Sourcing Public Works Construction Webinar Presentors: Richard Sawyer / GSFIC Darryl Mitchell / SPD](https://reader035.vdocuments.us/reader035/viewer/2022062717/56649e1c5503460f94b0a660/html5/thumbnails/5.jpg)
Page 5
Benefits and Enhanced Services
MORE FLEXIBILITY ▪ Agencies can choose to work with GSFIC in the same
manner as they have with DOAS, or utilize GSFIC assistance.
For example, Agencies not required to have completed “Project Manual” prior to submitting requirements. GSFIC can engage and assist “at any phase” of the project.
▪ GSFIC will utilize a construction contract essentially the same as DOAS, so Agencies are already familiar with it.
▪ Agencies will have more options, both in available contract documents and construction delivery methods.
▪ No Change Order approval required
![Page 6: New Procedures for Sourcing Public Works Construction Webinar Presentors: Richard Sawyer / GSFIC Darryl Mitchell / SPD](https://reader035.vdocuments.us/reader035/viewer/2022062717/56649e1c5503460f94b0a660/html5/thumbnails/6.jpg)
Page 6
New Procedures
• Biggest change is the “manner” in which Agencies “communicate and submit” their construction requirements into the procurement process
• Rest of the process basically unchanged • GSFIC Agency Request Form
▪ Straight-forward, customer friendly▪ Questionnaire format ▪ Available on the web at http://gsfic.georgia.gov
• Under News and Events; Click DOAS Transfers Agency Construction Procurement Responsibilities to GSFIC
▪ Designed to assess specific project needs▪ Customized total procurement solution for each customer
![Page 7: New Procedures for Sourcing Public Works Construction Webinar Presentors: Richard Sawyer / GSFIC Darryl Mitchell / SPD](https://reader035.vdocuments.us/reader035/viewer/2022062717/56649e1c5503460f94b0a660/html5/thumbnails/7.jpg)
Page 7
GSFIC Website
![Page 8: New Procedures for Sourcing Public Works Construction Webinar Presentors: Richard Sawyer / GSFIC Darryl Mitchell / SPD](https://reader035.vdocuments.us/reader035/viewer/2022062717/56649e1c5503460f94b0a660/html5/thumbnails/8.jpg)
Page 8
WEBLINK http://gsfic.georgia.gov/00/channel_title/0,2094,77323081_101950022,00.html
![Page 9: New Procedures for Sourcing Public Works Construction Webinar Presentors: Richard Sawyer / GSFIC Darryl Mitchell / SPD](https://reader035.vdocuments.us/reader035/viewer/2022062717/56649e1c5503460f94b0a660/html5/thumbnails/9.jpg)
Page 9
GSFIC WebsiteAgency Request Form- Key Elements
• Description of Proposed Construction Project• Estimated Project Cost• Proposed Funding Source• Agency Documents Currently Developed/Available• “Select” Types of GSFIC Services Requested
▪ Procurement Services - Construction
▪ Procurement Services - Design
▪ Programming / Project Development Assistance
▪ Design Review Assistance
▪ Project Management
▪ Other
• Agency Authorization Signature Required
SUBMIT FORM TO:
Jim Hyde, GSFIC Bidding Manager, [email protected] or fax (404) 463-5699
![Page 10: New Procedures for Sourcing Public Works Construction Webinar Presentors: Richard Sawyer / GSFIC Darryl Mitchell / SPD](https://reader035.vdocuments.us/reader035/viewer/2022062717/56649e1c5503460f94b0a660/html5/thumbnails/10.jpg)
Page 10
Summary
• Transfer provides enhanced service levels and improved effectiveness in the area of public works construction procurement
• Primary change involves method for submitting requirements• GSFIC Agency Request Form assessable on-line:
http://gsfic.georgia.gov/00/channel_title/0,2094,77323081_101950022,00.html
Send complete form to:
Jim Hyde, GSFIC Bidding Mgr at [email protected]
or fax (404) 463-5699
• Effective Date: 1 February 2008• Changes to GPM NLT 29 February 2008
![Page 11: New Procedures for Sourcing Public Works Construction Webinar Presentors: Richard Sawyer / GSFIC Darryl Mitchell / SPD](https://reader035.vdocuments.us/reader035/viewer/2022062717/56649e1c5503460f94b0a660/html5/thumbnails/11.jpg)
Page 11
Questions?
?