new paradigm of the city kt smart...
TRANSCRIPT
KT Smart City
2019. 10 | Enterprise Service Business Unit
New Paradigm of the City
1. New Paradigm of the City, ‘Smart City’
2
Urbanization Problems 4th Industrial Revolution National Project
• Traffic, Energy, Safety problems
due to urbanization
• ICT based solution is required
•New technologies such as AI, Big Data, IoT etc.
• Smart City itself is a test bed of4th industrial revolution
• Smart City is designated as one of the 8 leading projects
• Creating a Smart City boom
2. Introduction of KT Smart City
3
Leading Smart City providerwith the best ICT capability
1 Having BestImplementation Capability
2 IntegratedPlatform/Network Infra.
3 Securing Core future Technology
Over 60 projects experience in Koreaincluding Dongtan Smart City(2004~)
Various global project implementationin Middle East, South Asia
TTA Certified Smart City integrated platform
wired/wireless network infra including5G, IoT, Giga-internet etc.
Optimization of ‘Seoul late-nightbus’ route using Big Data
AI Speaker with IPTV
Various IoT services
3. Smart City Framework
4
KT Smart City Platform
IoTSensor
CCTVDigitalSinage
MobileDevice
Mobility Safety Administration Energy Environment Public welfare
DroneOutdoorFacility
Service Layer(Data Sharing)
Platform Layer(Data processing)
Network Layer(Data transmission)
Sensor Layer(Data gathering)
WiredWi-Fi5G NB-IoT
Provide Customized Information
InterfaceWith
ExternalSystem
InterfaceWithBig
DataPlatform
LTE-M
Provide User Activity Information
4. Smart City Services
Mobility
SafetyAdmini-stration
Energy
Welfare
Environ-ment
5
5. Smart City Platform
6
5G
1
2
3
5G
“Readiness”
Citizen
“Satisfaction”
Advanced
“Usability”
Telco’s first TTA certifiedSmart City platform(’18.9)
Installed and operatingin Paju, Pangyo Smart City
Platform designed for 5G technology(Gateway)
As-was To-be(5G)Hyper-connected
[mMTC]
Ultra-low latency[URLLC]
0.3 m/s 0.1 m/s
10K/Server 50K/Server+
Easy SW developmentfor citizen-oriented service
KT platform
ServiceService Service
Service
Reliable solution with variousexperience in smart-space project
Providing 114 senior care-check serviceas a basic platform function
<wire: 114 ARS> <wireless: All mobile carrier>
+
6. KT Network Infra.
ReliablePrecise Economical
7
Innovative
5G
7. KT Big Data
8
User analysis Route analysis Interval optimization
Optimization of ‘Seoul late-night bus’ route
Bus route planning
Infection analysis Sensitivity analysis Spread prediction
Preventing bird flu spread
Data systemization
8. Digital Twin for Smart City
9
Digital Twin
Actual City Virtual City
Input: Data + simulation of urban problem
Output: optimal city construction and operation policycitizen participation
(opinion for operation)
=citizen participation
(opinion for construction)
9. Smart Mobility(MaaS+)
10* MaaS: Mobility as a Service
1 Providing various information
• Providing information on transportation, accommodation, restaurants, etc.
• Encouragement of tourists by delivering information and transportation convenience
Integrated Reservation and Billing
• Multi payment with one pass for user convenience
• Providing various information such as local tourism information, things to do, food, etc. and supporting integrated reservation/payment
2 User oriented service
• Providing user-oriented transportation service through integration of domestic transportation
• Customized optimal route and modal for each user
3
Sharing economySmart mobilityPublic transportation
,
10. Air Map Korea
11* MaaS: Mobility as a Service
park, road, school, public building
<App. Service for fine dust distribution>
<IoT sensor installed at each village for detail data collection>
<IoT senor installmenton phone booth>
Fine dust collectionusing IoT sensor
11. AI Hotel
12* MaaS: Mobility as a Service
World’s First Display based
AI Hotel Service Launched
(’18.7)
01. New user experience 02. Smart room control 03. Multi languages & etc.
AI assistant for 24 hours
(concierge)
IoT based room control
Touch & Voice Control
Multi language andmusic contents
for foreign tourist
Hey genie, Towel please~! Genie, control room temperature
12. KT Smart City Goal
mobility
Over 13 years and 60 projects experience
Demand analysisDifferentiated
Competitiveness
Safety
Admini-stration
Environment
Energy
Publicwelfare
Build-up ofStandard Smart
City model
Creation ofsustainable profit
Master plan(+12)
Design(+11)
Construction(+20)
Oversea project(+15)
5G
NB-IoT
Word 1st Service
1st commercialization
AI/Block Chain+ AI IP TV
Big Data Late-night bus
CityAnalysis User
Analysis Tech.Analysis
IoTMakers Open platform
13
platform Network
ConnectedCar
Environ-ment
EnergyCulture/
tour
Sensor H/W Device
13. Reference: (1)Pangyo Autonomous driving city
14
Location : Seongnam city, Gyeonggi Province
Area : 430,000㎡
Construction period : ’18.9 ~ ’19.12(24 billion won)
• Build Monitoring center/platform
• Build Big data system
• IoT Service implementation
• V2X device and high- definition map
Build Autonomous driving test bed
• IaaS* system for start-up and R&D
• Big Data system for R&D activityand new business model creation
• Support system for start-up
Build Start-up support infra.
• Smart City Master planning• Smart City basic and detail design
Smart City Master plan/design
Intersect Signaling Service
Pedestrian Care
Road Condition Monitoring
Autonomous Road Surveilance
* IaaS: Infrastructure as a Service
Introduction
Development concept
Services
13. Reference: (2)Sihwa MTV Smart City
Smart Green: Eco-friendly city
Smart Business: Advanced city image
Smart Hub: co-working with others
Location: Siheung city, Gyeonggi Province
Area : 9,760 ㎢
Construction period: ‘11.09~’17.11
remark: waterfront development(K-water)
Over 10 services- water supply, Safety CCTV, traffic information, Bus Information Service, traffic signal control, traffic CCTV, IT support, media board, environment information
15
Smart Green
Eco-friendly High-tech. industry Sustainability
Smart Business
Smart Hub
Core of high tech. industry for the 21st century
13. Reference: (3)KAIA Smart City R&D project
16
Introduction
• (Background)- 9 national major project selection(’16.8)- Smart City project is required for improvement in quality of life and enforcement of city competitiveness
• (Supervisor)- KAIA(Korea Agency for Infrastructure TechnologyAdvancement)
• (Project period)’18~’22(5 years) /128 billion won
• (location) - Daegu Metropolitan City(2 core task site)- Siheung City, Gyeonggi Province(3 core task site)
• (project organization)- 1 core task(platform), 2core task(demonstration) , 3core task(demonstration)
• (KT role)- Project managing of 3 core task and sub tasks- Interface with 1 and 2 core tasks
[Data hub]
• Data hub platformdevelopment
• Service interface
• Fine dustsimulationbased oncrowd sourcing
• Care service for ‘live alone senior’ using VR and monitoring system
[Enviroment]
[Energy][Welfare]
• Total energy management for home/building etc.
• Energy management with AMI tech.
EnvironmentLiving lag.
EnergyLiving lag.
WelfareLiving lag.
Jungwang-dong