new long range plan

5
New Long Range Plan Plan It 2035 To be adopted by BRTB on 11/20/11 Approved by federal gov’t in early 2012 Must meet federal air quality standards $8.8 billion dollars in regional projects

Upload: tarika

Post on 15-Jan-2016

39 views

Category:

Documents


0 download

DESCRIPTION

New Long Range Plan. Plan It 2035 To be adopted by BRTB on 11/20/11 Approved by federal gov’t in early 2012 Must meet federal air quality standards $8.8 billion dollars in regional projects. Upcoming BRTB Projects. Regional Freight Analysis Regional Transit Analysis - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: New Long Range Plan

New Long Range Plan

• Plan It 2035 – To be adopted by BRTB on 11/20/11

Approved by federal gov’t in early 2012

• Must meet federal air quality standards • $8.8 billion dollars in regional projects

Page 2: New Long Range Plan

Upcoming BRTB Projects• Regional Freight

Analysis

• Regional Transit Analysis

• Expanding Modeling

Capabilities

Page 3: New Long Range Plan

ENERGY PURCHASING

• Straight from the Grid

• Hedged Purchasing

• Power in Numbers

• $70,000,000.00+

Page 4: New Long Range Plan

CMAQ Grants (Congestion Mitigation and Air Quality Improvement)

• Reduce emissions from the on road transportation system

• Currently reviewing applications– 20% match for gov’t– 50% match for P3’s

Page 5: New Long Range Plan

Bike to Work Day

• Friday, May 20th

• 1,300+ Riders

• Rallies, Prizes, Fun

• Two Harford County Locations– Bel Air & APG

• www.Bike2WorkCentralMD.com