Page 1: New Jersey Ave & O Street Park Renovation

p. 1 4/7/2021

BIRDS-EYE VIEW, LOOKING NORTHEAST

O S T N O R T H W E S T

THIRD COMMUNITY MEETING, APRIL 07 2021 Survey Results and Concept Review

New Jersey Ave & O Street Park Renovation

Page 2: New Jersey Ave & O Street Park Renovation

MEETING AGENDA

p. 2 4/7/2021

1 - PROJECT INTRODUCTION

2 - DESIGN TEAM INTRODUCTION

3 - RESULTS OF COMMUNITY SURVEY

4 - DESIGN PRECEDENTS AND CONCEPT

5 - QUESTION & ANSWER SESSION

Page 3: New Jersey Ave & O Street Park Renovation

EXISTING SITE – STREET VIEW

p. 3 4/7/2021

INTERSECTION OF O ST AND NJ AVE, LOOKING SOUTHWEST GAME TABLES AT SOUTHWEST CORNER

NORTHWEST CORNER OF PARK, LOOKING SOUTH TOWARD FIRE STATION AT NEW JERSEY AVE, LOOKING WEST

Page 4: New Jersey Ave & O Street Park Renovation

PROJECT GOALS

p. 4 4/7/2021

- Renovation of the existing New Jersey & O Street Park- Design shall address the following activities at a

minimum:- Water-play- Community Gathering- Space to host concerts, summer cinema- Relaxation - Contemplation- Leisure

- $1.1 million construction budget- Replace broken concrete paving- Preserve all existing trees, and if possible, facilitate the

opening of their root zones- Remove some portion of concrete sidewalks to

decrease impervious surfaces- Increase greenspace to provide a place for stormwater

runoff to percolate- Heavily planted ground-plane - Limit improvements to within the property. Broken

pavement within the ROW may be repaired.

PROGRAM ELEMENTS- Splash Pad / Water-play area / Misters- Sculptural Art / Commemorative Sculpture- Climbable sculptures- Summer performance space- New entry experience, aka “gateways” at NE and NW

corners.- ADA Improvements- Permeable Paving- Lighting- Seating – Mix of custom and DC park-standard

seating surfaces- Tables for gathering and games- New plantings

PROJECT TIMELINE- Design and Documentation: March 2021 – Fall 2021- Construction Start: Early Fall 2021- Completion: Late Spring 2022

Page 5: New Jersey Ave & O Street Park Renovation

SURVEY RESULTS

p. 5 4/7/2021

Page 6: New Jersey Ave & O Street Park Renovation

p. 6 4/7/2021

Page 7: New Jersey Ave & O Street Park Renovation

p. 7 4/7/2021

Page 8: New Jersey Ave & O Street Park Renovation

p. 8 4/7/2021

Page 9: New Jersey Ave & O Street Park Renovation

p. 9 4/7/2021

Page 10: New Jersey Ave & O Street Park Renovation

p. 10 4/7/2021

Page 11: New Jersey Ave & O Street Park Renovation

p. 11 4/7/2021

Other comments:

“Meeting with family/friends”

“I don't linger”

“Exercise routine”

“Cut through open space”

Page 12: New Jersey Ave & O Street Park Renovation

p. 12 4/7/2021

Other comments:

“Meeting friends in fresh air and

sunshine--crucial for those living in small

apartments!”

“I thought it had great potential but it

always looked gloomy”

“I loved that it was a nice, accessible

open space.”

“The park had very little use due to poor lighting at

night and no real attraction.”

Page 13: New Jersey Ave & O Street Park Renovation

p. 13 4/7/2021

Dark

Rundown

Lack of Amenities

Lack of Functionality

No Playground

Drug Dealing

Poor Sightlines

Poor Lighting

Deserted

Does Not Feel Safe

On a Busy Road

Not Clean

Not Welcoming

Prefer Other Parks

EXPERIENCE

USE

CONTEXT

PHYSICAL CHARACTERISTICS

8. If you did not use NJ & O Park before COVID-19 and the encampment, what kept you from visiting?

Page 14: New Jersey Ave & O Street Park Renovation

p. 14 4/7/2021

Other comments:

“Fence”

“Community garden”

“Lush native plantings”

“Farmer’s market”

Page 15: New Jersey Ave & O Street Park Renovation

p. 15 4/7/2021

Other comments:

“Given the small size of the park, I'd

prefer to see offerings that

require no permanent

installation of equipment.”

“Farmer’s market”

“Small food truck events , live music,

anything that would keep people

interested year round”

“Green space is rare in this community,

so I long for less permanent

equipment and more trees and

plantings”

Page 16: New Jersey Ave & O Street Park Renovation

p. 16 4/7/2021

Other comments:

“The survey is really geared

toward adding "stuff". I just want

to stress "grass and sun" is as adaptable /resilient /flexible

as it gets.”

“Better lighting would make this a

vibrant public space for many more hours a day”

“I would much prefer this to be a

usable green space encouraging natural habitat and giving a buffer to the dense

traffic.”

Page 17: New Jersey Ave & O Street Park Renovation

PRECEDENT IMAGES

p. 17 4/7/2021

Page 18: New Jersey Ave & O Street Park Renovation

CLIMBING FEATURES

p. 18 4/7/2021

Page 19: New Jersey Ave & O Street Park Renovation

Sculptural elements

p. 19 4/7/2021

Page 20: New Jersey Ave & O Street Park Renovation

CUSTOM SEATING

p. 20 4/7/2021

* MAJORITY OF SEATING TO BE COMPOSED OF METAL FOR GREATER DURABILITY

Page 21: New Jersey Ave & O Street Park Renovation

DPR STANDARD SITE FURNISHINGS

p. 21 4/7/2021

Page 22: New Jersey Ave & O Street Park Renovation

PLANTS

p. 22 4/7/2021

Hydrangea quercifolia ‘Pee Wee’Pee Wee Oak Leaf Hydrangea

Azalea x 'Girard's Crimson'Girard's Crimson Evergreen Azalea

Clethra alnifoliaSweet Pepperbush

Astilbe x arendsii ‘Bridal Veil’Bridal Veil Astilbe

Carex amphibolaCreek Sedge

Carex pensylvanicaPennsylvania Sedge

Pachysandra procumbensAllegheny spurge

Aster cordifolius 'Avondale'Common Blue Wood Aster

Page 23: New Jersey Ave & O Street Park Renovation

PARK DESIGN CONCEPT

p. 23 4/7/2021

Page 24: New Jersey Ave & O Street Park Renovation

CONCEPT USE DIAGRAM

p. 24 4/7/2021

SCULPTUREAREA

Page 25: New Jersey Ave & O Street Park Renovation

CONCEPT PLAN

p. 25 4/7/2021

SCULPTUREAREA

SCULPTURAL AREA

Page 26: New Jersey Ave & O Street Park Renovation

For Additional Questions, Contact:

p. 26 4/7/2021

DPR - Peter Nohrden [email protected] - Wayne Gore [email protected]

QUESTION & ANSWER

THANK YOU FOR YOUR TIME