new generation in advanced sub sea services i …underwater broco cutting. installation ofck de...

10
# 24, 11 th Alley, Homaee St., Resalat highway, Tehran, IRAN Tel: (+98) 21 – 22302961 Cell: (+98) 912 300 6883 (+98) 912 357 7992 Email: [email protected] www. Iratech.ir Page 1 of 10 IRATECHTM SUB SYSTEMS OFFSHORE TRACK RECORD 2010 IRATECH SUB SYSTEMS 2010

Upload: others

Post on 15-May-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: New Generation in Advanced Sub Sea Services I …Underwater broco cutting. Installation ofck de support columns. Survey and inspection of concrete moulds and support columns. Anode

INTERNATIONAL DIVING & ROV CONTRACTOR New Generation in Advanced Sub Sea Services

# 24, 11th Alley, Homaee St., Resalat highway, Tehran, IRAN                Tel: (+98) 21 – 22302961  Cell: (+98) 912 300 6883  ‐ (+98) 912 357 7992  Email: [email protected] 

                                                                                                   www. Iratech.ir                                                                                                    Page 1 of 10

   

IRATECHTM SUB SYSTEMS 

 

OFFSHORE TRACK RECORD 

2010 

IRATECH S

UB SYSTEMS 20

10

Page 2: New Generation in Advanced Sub Sea Services I …Underwater broco cutting. Installation ofck de support columns. Survey and inspection of concrete moulds and support columns. Anode

INTERNATIONAL DIVING & ROV CONTRACTOR New Generation in Advanced Sub Sea Services

# 24, 11th Alley, Homaee St., Resalat highway, Tehran, IRAN                Tel: (+98) 21 – 22302961  Cell: (+98) 912 300 6883  ‐ (+98) 912 357 7992  Email: [email protected] 

                                                                                                   www. Iratech.ir                                                                                                    Page 2 of 10

Hydro Turbines Maintenance and Rehabilitation Client  GEOSUB, CARTU GROUP  Location Black Sea, Kobuleti, Georgia Energy Hydro Power Plant Rehabilitation:  

Installation of Runner Blades and Wicket Gate. 

 Survey and inspection of Kaplan Turbine, Runner Blades, Wicket Gates. 

Cleaning. Dam wall inspection. Carry out video survey. 

Removal of metal construction wreck. 

Underwater broco cutting.  

Installation of deck support columns. 

Survey and inspection of concrete moulds and support columns. 

Anode installation. 

Support vessel propulsion system survey. 

 We were providing 2 Divers for our clients. (Depth: 50 Meters)

Feb ‐ Sep 2010 (Done) 

Sea bed Survey & Positioning and MappingClient  IBPS, NSQ, IOOC Location Qeshm Oil Field, Persian GulfSea bed over all Survey and mapping including positioning of Well head. 

 This project was included a sea bed survey deploying SONAR system in order to map the sea bed and position well head and condition of cement around well head (including size, height) and height of casing from sea bed. Total zero visibility. This project was done by a 3 men team and usage of our Side Scan Sonar system in 2 days. (Depth: 58 Meters) 

Aug 2010(Done) 

IRATECH S

UB SYSTEMS 20

10

Page 3: New Generation in Advanced Sub Sea Services I …Underwater broco cutting. Installation ofck de support columns. Survey and inspection of concrete moulds and support columns. Anode

INTERNATIONAL DIVING & ROV CONTRACTOR New Generation in Advanced Sub Sea Services

# 24, 11th Alley, Homaee St., Resalat highway, Tehran, IRAN                Tel: (+98) 21 – 22302961  Cell: (+98) 912 300 6883  ‐ (+98) 912 357 7992  Email: [email protected] 

                                                                                                   www. Iratech.ir                                                                                                    Page 3 of 10

Sea bed Survey & Monitoring Client  COSL, GPT, NIDC Location South Pars gas Field, Phases 17 & 18, Persian Gulf Sea Bed Inspection and Survey for installation of COSL FORCE JACKUP RIG. 

 Due  to problem while  installation on  location, Pre  installation Sea bottom survey using our Inspection ROV, deploying Echo sounder, Sonar and CCTV for record and reporting to customer  were  done.  Still  photography  when  needed  was  performed;  also  a  post installation report was prepared by an overall inspection. Reports were delivered on DVD and Hard copy, Including Sonar images. (Depth: 60 Meters)

Mar 2010(Done) 

Jackup Rig Legs and Spot cans InspectionClient  ABAN, IOOC  Location Sirri Oil Field, Persian GulfSea Bed Inspection and Survey for installation of COSL FORCE JACKUP RIG. 

 Post  installation  survey of  Spot  cans  conditions plus  all  3  legs over  all  conditions was done by our diving team on Super Jack up Rig Deep Driller 4. Our 5 man Team of divers including supervisor were on this  job. CCTV, UW Camera and Lighting were used and a report on DVD along with Hard copy was delivered. (Depth: 50 Meters)

Jan 2010(Done) 

Inspection and Survey Client  PERSIAN OFFSHORE, IOTC  Location Eastern & Southern Jetties, Kharg Island,  Persian GulfEastern & Western Jetties Survey and Inspection. 

 Inspection and overall survey of piles and  jetties  legs as pre maintenance, CP metering and  thickness  measuring  along  with  Anodes  condition  report.  Later  maintenance, scrapping and clearing  jetties  from any marine growth,  installation of new anodes and test them again. Report all operation by post survey using CCTV and Still camera.  Not only  the operation side but also much documentation and engineering were done with our team. This was a 14 months job, where the Site manager and Diving Supervisor were  from  Iratech  Team.  All  jobs  were  done  by  Air  spread  Divers.  (Depth: Max  30 meters).

Dec 2009(Done) 

 

IRATECH S

UB SYSTEMS 20

10

Page 4: New Generation in Advanced Sub Sea Services I …Underwater broco cutting. Installation ofck de support columns. Survey and inspection of concrete moulds and support columns. Anode

INTERNATIONAL DIVING & ROV CONTRACTOR New Generation in Advanced Sub Sea Services

# 24, 11th Alley, Homaee St., Resalat highway, Tehran, IRAN                Tel: (+98) 21 – 22302961  Cell: (+98) 912 300 6883  ‐ (+98) 912 357 7992  Email: [email protected] 

                                                                                                   www. Iratech.ir                                                                                                    Page 4 of 10

Engineering, Fabrication and InstallationClient  DOS, DANA  Location South Pars Gas Field, Phases 15 & 16,  Persian GulfDesign, Fabrication and Installation of Cementing Unit on PN3 JACKUP RIG. 

 Our  Team  including  Engineers, Welders  and  Inspectors managed  to  design  base  and requirements  for  installation of a Cement Unit on a Drilling Rig. Measuring, Fabrication including Welding of all Bases on Deck, Connecting Lines, removal of obstacles and finally MPI  inspection  for  certifying  the Welding  all were  done  onboard  in  a  2 weeks  time according to client requirements and schedule. (Onboard)

Dec 2009(Done) 

Obstacles clearing Client  GEOTEC, CARTU GROUP  Location Caspian Sea, KazakhstanRemoval of obstacles and steel plates.   

Removal of Steel Plates, survey, depth reading. 

Underwater broco cutting.  

Survey of support vessel propulsion system. Our Team including 2 divers and one diver medic did attend a 3 months job onboard. 

Oct ‐ Dec 2009 (Done) 

Trenching Support Client  FSDS, SAIPEM & AGIP  Location Caspian Sea, KazakhstanSurvey and Trenching support of vessel. 

  Installation and removal of a bell mouth on the power cable and Methanol 

pipeline.  

Pre‐trench survey of the underwater pipeline and power cable.  

Inspection of the trencher machines and their positions on the pipes.  

 Our Team including One diver and one diver medic did attend a 3 months job onboard. 

Jun ‐ Aug 2009 (Done) 

IRATECH S

UB SYSTEMS 20

10

Page 5: New Generation in Advanced Sub Sea Services I …Underwater broco cutting. Installation ofck de support columns. Survey and inspection of concrete moulds and support columns. Anode

INTERNATIONAL DIVING & ROV CONTRACTOR New Generation in Advanced Sub Sea Services

# 24, 11th Alley, Homaee St., Resalat highway, Tehran, IRAN                Tel: (+98) 21 – 22302961  Cell: (+98) 912 300 6883  ‐ (+98) 912 357 7992  Email: [email protected] 

                                                                                                   www. Iratech.ir                                                                                                    Page 5 of 10

Jackets Installation Support Client  ALFA DARYA, SGK, IOEC  Location South Pars Gas Field, Phases 15 & 16,  Persian GulfJacket Installation in South Pars Phases 15/16 (SPD15/SPD16). 

 The project  for  installation of 2  Jackets  (SPD15/SPD16) was offered  to SANAT GOSTAR KISH Company. The Technical Proposal for Bidding was done with our experts, including providing QHSE manual, Risk Assessment, safety procedures.   We  supply  three  members  of  team  (One  Supervisor  +  two  Divers),  all  certified commercial divers/supervisor according to HSE/IMCA regulation where  they have done an excellent  job and  letter of appreciation was  issued  for them  for a 2 month accident free job. (Depth: 60 Meters) 

Oct 2009(Done) 

IRATECH S

UB SYSTEMS 20

10

Page 6: New Generation in Advanced Sub Sea Services I …Underwater broco cutting. Installation ofck de support columns. Survey and inspection of concrete moulds and support columns. Anode

INTERNATIONAL DIVING & ROV CONTRACTOR New Generation in Advanced Sub Sea Services

# 24, 11th Alley, Homaee St., Resalat highway, Tehran, IRAN                Tel: (+98) 21 – 22302961  Cell: (+98) 912 300 6883  ‐ (+98) 912 357 7992  Email: [email protected] 

                                                                                                   www. Iratech.ir                                                                                                    Page 6 of 10

Free Span Correction + Spool Piece MetrologyClient  ALFA DARYA, SPEC, IOEC  Location Sirri Island, Persian GulfMetrology of Spool Piece for SPEC co. plus Free Span correction. 

 We  provide  2 member  (One  Supervisor &  Diver Medic,  One  Diver)  for  5 Man  team, working  for Free span and crossing correction of 32” pipe  line  from Assaluyeh  to Sirri, where  it did cross a 4” Electrical supply and Fiber Optic the crossing was corrected and free span rectified.  As  for  SPEC  Company measuring  the  Spool  piece was  done with  CCTV monitoring.  A video was provided  for client satisfaction  (available  for sample). The whole  job was  for IOEC which ALFA DARYA Co. was acting as contractor.   

Jul 2009(Done) 

 

SPM & PLEM Installation and maintenance.Client  LAMNALCO, BP  Location Supsa Terminal, Georgia / Persian Gulf, Sharjah, UAESurvey and Trenching support of vessel. 

  Inspection and maintenance on Blue Water CALM buoy lazy ‘S’ configuration 

with the mid water buoy and the PLEM in 50m water depth.  

Removal and installation of a spreader bar on subsea hoses.  

Inspection of SPM chain angles, wear down and cleaning from marine growth.  

Take the CP and UT readings on PLEM and SPM.  

Support vessel and pilot boat hull, intakes and propulsion system survey and inspection, cleaning.  

 Our Team including One diver and one Assistant Air Supervisor were doing a big excellent quality job onboard. 

Sep 2008      ‐ May 2009 

(Done) 

IRATECH S

UB SYSTEMS 20

10

Page 7: New Generation in Advanced Sub Sea Services I …Underwater broco cutting. Installation ofck de support columns. Survey and inspection of concrete moulds and support columns. Anode

INTERNATIONAL DIVING & ROV CONTRACTOR New Generation in Advanced Sub Sea Services

# 24, 11th Alley, Homaee St., Resalat highway, Tehran, IRAN                Tel: (+98) 21 – 22302961  Cell: (+98) 912 300 6883  ‐ (+98) 912 357 7992  Email: [email protected] 

                                                                                                   www. Iratech.ir                                                                                                    Page 7 of 10

South Pars Gas Development, Assaluyeh to Sirri Island Pipe Laying ProjectClient  ALFA DARYA, SGK, KITO, 

NIOC Location South Pars, Persian Gulf

Pipe laying support on C‐MASTER DP3 barge from Assaluyeh to Sirri (207 KM). 

 South Pars Gas Development, Company: NIOC, Client: IOEC, IDRO, OIEC, Contractor: SGK Providing all Technical data, proposal for NIOC including Diving Operation procedure, Risk Assessment, Emergency plan, Regulations and Quality Assurance along with all Docs needed and requested by Client.  Providing a member of diving team (supervisor& Diver Medic/Diver  if Needed)  in Diving activities which included Shore Pulling operation for laying 32"&4" gas pipeline for length of 1200 meters from sea to the beach and 32"pipeline laying operation for length of 207 KM from Assaluyeh to Sirri Island and daily inspection of stinger situation and pipe touchdown point with sea‐bed, Providing Daily, Detailed reports (Hard Copies) and Video in case asked by client. (6 Months Operation) All  operation was  done  in  accordance with  IMCA/HSE Guide  lines  for  diving  from DP vessel, a Recommendation letter was issued by client. (Depth 50 Meters)

Sep 2008(Done) 

 

 

IRATECH S

UB SYSTEMS 20

10

Page 8: New Generation in Advanced Sub Sea Services I …Underwater broco cutting. Installation ofck de support columns. Survey and inspection of concrete moulds and support columns. Anode

INTERNATIONAL DIVING & ROV CONTRACTOR New Generation in Advanced Sub Sea Services

# 24, 11th Alley, Homaee St., Resalat highway, Tehran, IRAN                Tel: (+98) 21 – 22302961  Cell: (+98) 912 300 6883  ‐ (+98) 912 357 7992  Email: [email protected] 

                                                                                                   www. Iratech.ir                                                                                                    Page 8 of 10

South Pars Gas Development, Assaluyeh to Sirri Island Pipe Laying ProjectClient  SGK, KITO, NIOC Location South Pars, Persian GulfPipe laying support on C‐MASTER DP3 barge from Assaluyeh to Sirri (207 KM). 

 South Pars Gas Development, Company: NIOC, Client: IOEC, IDRO, OIEC, Contractor: SGK Providing all Technical data, proposal for NIOC including Diving Operation procedure, Risk Assessment, Emergency plan, Regulations and Quality Assurance along with all Docs needed and requested by Client.  Providing a member of diving team (supervisor& Diver Medic/Diver  if Needed)  in Diving activities which included Shore Pulling operation for laying 32"&4" gas pipeline for length of 1200 meters from sea to the beach and 32"pipeline laying operation for length of 207 KM from Assaluyeh to Sirri Island and daily inspection of stinger situation and pipe touchdown point with sea‐bed, Providing Daily, Detailed reports (Hard Copies) and Video in case asked by client. (6 Months Operation) All  operation was  done  in  accordance with  IMCA/HSE Guide  lines  for  diving  from DP vessel, a Recommendation letter was issued by client. (Depth 50 Meters)

Sep 2008(Done) 

IRATECH S

UB SYSTEMS 20

10

Page 9: New Generation in Advanced Sub Sea Services I …Underwater broco cutting. Installation ofck de support columns. Survey and inspection of concrete moulds and support columns. Anode

INTERNATIONAL DIVING & ROV CONTRACTOR New Generation in Advanced Sub Sea Services

# 24, 11th Alley, Homaee St., Resalat highway, Tehran, IRAN                Tel: (+98) 21 – 22302961  Cell: (+98) 912 300 6883  ‐ (+98) 912 357 7992  Email: [email protected] 

                                                                                                   www. Iratech.ir                                                                                                    Page 9 of 10

South Pars Gas Development, Assaluyeh to Sirri Island Pipe Laying ProjectClient  SGK, KITO, NIOC Location South Pars, Phases 9 & 10, Persian Gulf Pipe laying support on C‐MASTER DP3 barge for phases 9 & 10 (105 KM). 

 South Pars Gas Development, Company: NIOC, Client: IOEC, IDRO, OIEC, Contractor: SGK Providing all Technical data, proposal for NIOC including Diving Operation procedure, Risk Assessment, Emergency plan, Regulations and Quality Assurance along with all Docs needed and requested by Client.  Providing a member of diving team (supervisor& Diver Medic/Diver if Needed) in 32"&4" pipeline laying operation at South Pars Gas Field. Diving activities was included Beach Pulling operation for laying 32"&4" gas pipeline for length of 2200 meters from sea to the beach and daily inspection of stinger situation and pipe touchdown point. This was 2 months project, which was appreciated by a Recommendation Letter upon completion. Part of job included Trench Inspection, Survey and Reporting. This Project was contracted for the ONLY IMCA Certificate which belong to One of our Team member as First Iranian who have been certified by IMCA/HSE/IDSA/DOL with competitive training abroad. (Depth: 50 Meters)

Jun 2007(Done) 

Jackup Rig Legs and Spot cans InspectionClient  ABAN  Location Aboozar Oil Field, Persian GulfSea Bed Inspection and Survey for installation of EE4 JACKUP RIG. 

 Post  installation  survey of  Spot  cans  conditions plus  all  4  legs over  all  conditions was done by our diving  team on  Jack up Rig Energy Explorer 4. Our 5 man Team of divers including supervisor were on this  job. CCTV, UW Camera and Lighting were used and a report on DVD along with Hard copy was delivered. (Depth: 50 Meters)

Jan 2007(Done) 

Mobin Petrochemical Cooling System Development Client  SADRA  Location Assaluyeh, South Pars, Persian Gulf Installation of Culverts for Cooling system of Mobin Petrochemicals Refinery 

 This was the biggest Construction project done  in  IRAN so far, where concrete modules were  placed on  sea  bottom  to  reach depth of  53 meters  to provide  constant  cooling water  for  refinery cooling system. A  four months Project. The only  team member who was IMCA certified belong to IRATECH.  We provide 3 Member of Diving team in Underwater 1000 Tons and 6000 Tons Culverts installation. Cutting of  9 hatch’s with weight of  approximately  8  Tons  and  removal of hatches from depth of 26 meters. During underwater cuttings, number of 18000 pieces cutting  rods  has  been  consumed  during  40  days.  Video  recording,  monitoring  & installation of omega seal for Mobin Project. (Depth: 50 Meters)

Oct 2006(Done) IR

ATECH SUB S

YSTEMS 2010

Page 10: New Generation in Advanced Sub Sea Services I …Underwater broco cutting. Installation ofck de support columns. Survey and inspection of concrete moulds and support columns. Anode

INTERNATIONAL DIVING & ROV CONTRACTOR New Generation in Advanced Sub Sea Services

# 24, 11th Alley, Homaee St., Resalat highway, Tehran, IRAN                Tel: (+98) 21 – 22302961  Cell: (+98) 912 300 6883  ‐ (+98) 912 357 7992  Email: [email protected] 

                                                                                                   www. Iratech.ir                                                                                                    Page 10 of 10

CLIENTS & COMPANIES (we worked with or participated in parts of operations):

     

  

DIVING & MARINE SERVICES

 

  

I   O   T   C   

 

 

IRATECH S

UB SYSTEMS 20

10