new generation c-class overview and plant expansion · the plant expansion tells an important local...
TRANSCRIPT
New Generation C-Class overview and plant expansionBuffalo City Metropolitan Municipality Investment Conference
Abey Kgotle Executive Director: Human Resources & Corporate Affairs Mercedes-Benz South Africa Limited
Company Profile
2
Daimler footprint in South Africa
DAIMLER AGGovernance strategy
management
100%
MERCEDES –BENZ SOUTH AFRICA LTDEast London &
Zwartkop
DAIMLER TRUCKS AND
BUSES SOUTEHRN
AFRICA
MERCEDES –BENZ FINANCIAL
SERVICES
SANDOWN MOTOR
HOLDINGSKOPPIEVIEW
100% 100%
Manufacturing timeline – Passenger Cars
4
Car Distributors Assembly (CDA) founded in East London
First Mercedes-Benz vehicles built by CDA
Assembly of Honda cars starts
Assembly of W201 (C-Class precursor) starts
Assembly of W202
DCAG acquires 100% shareholding
C-Class CBU Production starts
New W204 C-Class launched
MMC Triton launched
W204 C-Class face-lift
W205 next generation C-Class
Production of 1 millionth Mercedes-Benz passenger car
Start of production of W205 Hybrid vehicles
Production of W205 AMG units begins
Introduction of W205 facelift vehicles
Investment announcement of the new generation C-Class.
1948
1958
1982
1993
1994
1998
2000
2007
2008
2011
2014
2015
2016
2017
2018
Product Portfolio
Mercedes-Benz Trucks
Mitsubishi Fuso Trucks
Mercedes-Benz Buses (Chassis)
Mercedes-Benz C-Class
5
C-Class Product Portfolio
6
HybridCombustion engine AMG
New Generation C-Class Progress
7
8
The plant expansion tells an important local story, 1800 + local
construction jobs, 22000m3 of concrete, 4000t of local steel,
38000m2 of corrugated claddingfor the new Generation C-Class
New
Bodyshop
650 local
workers
11500 m3
concrete
1000 tons
local steel
13575m2
sheeting
New Log
Warehouses
& sorter
650 local
workers
10000 m3
concrete
1480 tons
local steel
19380m2
sheeting
Assembly
250 local
workers
200 m3
concrete
1100 tons
local steel
Not
applicable
Paint shop
extension
300 local
workers
450 m3
concrete
650 tons
local steel
4800m2
sheeting
Building and infrastructure changes to support the plant expansion
10
▪ New warehouse Building 20 (GLT warehouse),
▪ New warehouse Building 34 (KLT warehouse),
▪ New Building 30 Body sorter
▪ New topcoat and polish lines & introduction
of new paint application technology
▪ Revitalisation of the balance for 2030+
▪ Integration of 3 new assembly lines
▪ New Marriage Station, Automatic application
cells (DVD, MFW, Roof etc.)
▪ New Generation C-Class specific Bodyshop
(adapted automation level), Variant scope increase
New Bodyshop New Bodyshop HOP & Refab @IDZ
(offsite)
Logistics Warehouses and Body Sorter New PaintshopAssembly Revitalisation
1
Local Market Optiisation
GLT Logistics WarehouseStatus: Complete
11
KLT Logistics WarehouseStatus: Complete 2
12
New Body SorterStatus: Complete 2
13
14