![Page 2: NEW ELEMENTARY SCHOOL - apsva.us](https://reader031.vdocuments.us/reader031/viewer/2022012301/61e23503225af85426721187/html5/thumbnails/2.jpg)
23 JunePFRC
Project Parameters1. New Elementary School for the Henry Community 2. Support Strategic Plan Goal #4 – Provide Optimal
Learning Environments3. Address capacity by providing 725 seats4. Open by start of school 20195. Multi‐story building in northwest corner of site6. Structured parking 7. Project cost $59 million
2
![Page 3: NEW ELEMENTARY SCHOOL - apsva.us](https://reader031.vdocuments.us/reader031/viewer/2022012301/61e23503225af85426721187/html5/thumbnails/3.jpg)
23 JunePFRC
Concept DesignSiting and Massing:
general building location, shape, size, and height
General site layout and circulation: frontage bus loop/service accesspick-up and drop-off
Structured parking:rough target on number of parking spotsplay area above parking
Items for consensus 3
![Page 4: NEW ELEMENTARY SCHOOL - apsva.us](https://reader031.vdocuments.us/reader031/viewer/2022012301/61e23503225af85426721187/html5/thumbnails/4.jpg)
23 JunePFRC
June 15, 2016
NEW ELEMENTARY SCHOOL AT THOMAS JEFFERSON MIDDLE SCHOOL
Massing and Site Update
4
![Page 5: NEW ELEMENTARY SCHOOL - apsva.us](https://reader031.vdocuments.us/reader031/viewer/2022012301/61e23503225af85426721187/html5/thumbnails/5.jpg)
23 JunePFRC Comparison between 4.2 and 4.3
Scheme 4.2a: “Biscuit”
• 1st floor exterior footprint: 27,828 gsf• Gym on third floor• Building slightly cantilevers out as it goes up• 4 stories• Linear feet of exterior skin: 3,341 linear feet• Energy Use Intensity (EUI): 18 kBTU/sf/yr• Annual energy cost: $50,201• Roof space suitable for solar panels: 26,700 sf• Post energy production EUI: 4
Scheme 4.3a: “Lobster”
• 1st floor exterior footprint: 38,723 gsf• Gym on ground floor• Building significantly steps back as it goes up• Part 3 story, part 4 story• Linear feet of exterior skin: 3,769 linear feet• Energy Use Intensity (EUI): 18 kBTU/sf/yr• Annual energy cost: $50,652• Roof space suitable for solar panels: 53,760 sf • Post energy production EUI: -2.5
5
![Page 6: NEW ELEMENTARY SCHOOL - apsva.us](https://reader031.vdocuments.us/reader031/viewer/2022012301/61e23503225af85426721187/html5/thumbnails/6.jpg)
23 JunePFRC 4.2a “Biscuit” 4.3a “Lobster”6
![Page 7: NEW ELEMENTARY SCHOOL - apsva.us](https://reader031.vdocuments.us/reader031/viewer/2022012301/61e23503225af85426721187/html5/thumbnails/7.jpg)
23 JunePFRC 4.2a “Biscuit” 4.3a “Lobster”
Northern-most extent of facades of 4 story building massing in “Biscuit”
Northern-most extent of facade of 4 story building massing in “Lobster”
80’ further south
7
![Page 8: NEW ELEMENTARY SCHOOL - apsva.us](https://reader031.vdocuments.us/reader031/viewer/2022012301/61e23503225af85426721187/html5/thumbnails/8.jpg)
23 JunePFRC Scheme 4.3b8
![Page 9: NEW ELEMENTARY SCHOOL - apsva.us](https://reader031.vdocuments.us/reader031/viewer/2022012301/61e23503225af85426721187/html5/thumbnails/9.jpg)
23 JunePFRC Scheme 4.3b 225 garage spots, 50 feet between garage and MS9
![Page 10: NEW ELEMENTARY SCHOOL - apsva.us](https://reader031.vdocuments.us/reader031/viewer/2022012301/61e23503225af85426721187/html5/thumbnails/10.jpg)
23 JunePFRC Scheme 4.3b10
![Page 11: NEW ELEMENTARY SCHOOL - apsva.us](https://reader031.vdocuments.us/reader031/viewer/2022012301/61e23503225af85426721187/html5/thumbnails/11.jpg)
23 JunePFRC Scheme 4.3b11
![Page 12: NEW ELEMENTARY SCHOOL - apsva.us](https://reader031.vdocuments.us/reader031/viewer/2022012301/61e23503225af85426721187/html5/thumbnails/12.jpg)
23 JunePFRC Scheme 4.3b12
![Page 13: NEW ELEMENTARY SCHOOL - apsva.us](https://reader031.vdocuments.us/reader031/viewer/2022012301/61e23503225af85426721187/html5/thumbnails/13.jpg)
23 JunePFRC Scheme 4.3b13
![Page 14: NEW ELEMENTARY SCHOOL - apsva.us](https://reader031.vdocuments.us/reader031/viewer/2022012301/61e23503225af85426721187/html5/thumbnails/14.jpg)
23 JunePFRC Scheme 4.3b14
![Page 15: NEW ELEMENTARY SCHOOL - apsva.us](https://reader031.vdocuments.us/reader031/viewer/2022012301/61e23503225af85426721187/html5/thumbnails/15.jpg)
23 JunePFRC Scheme 4.3b15
![Page 16: NEW ELEMENTARY SCHOOL - apsva.us](https://reader031.vdocuments.us/reader031/viewer/2022012301/61e23503225af85426721187/html5/thumbnails/16.jpg)
23 JunePFRC Scheme 4.3b: 1st floor16
![Page 17: NEW ELEMENTARY SCHOOL - apsva.us](https://reader031.vdocuments.us/reader031/viewer/2022012301/61e23503225af85426721187/html5/thumbnails/17.jpg)
23 JunePFRC Scheme 4.3b17
![Page 18: NEW ELEMENTARY SCHOOL - apsva.us](https://reader031.vdocuments.us/reader031/viewer/2022012301/61e23503225af85426721187/html5/thumbnails/18.jpg)
23 JunePFRC Scheme 4.3b18
![Page 19: NEW ELEMENTARY SCHOOL - apsva.us](https://reader031.vdocuments.us/reader031/viewer/2022012301/61e23503225af85426721187/html5/thumbnails/19.jpg)
23 JunePFRC Scheme 4.3b19
![Page 20: NEW ELEMENTARY SCHOOL - apsva.us](https://reader031.vdocuments.us/reader031/viewer/2022012301/61e23503225af85426721187/html5/thumbnails/20.jpg)
23 JunePFRC Scheme 4.3b20
![Page 21: NEW ELEMENTARY SCHOOL - apsva.us](https://reader031.vdocuments.us/reader031/viewer/2022012301/61e23503225af85426721187/html5/thumbnails/21.jpg)
23 JunePFRC Scheme 4.3b21
![Page 22: NEW ELEMENTARY SCHOOL - apsva.us](https://reader031.vdocuments.us/reader031/viewer/2022012301/61e23503225af85426721187/html5/thumbnails/22.jpg)
23 JunePFRC Scheme 4.3b22
![Page 23: NEW ELEMENTARY SCHOOL - apsva.us](https://reader031.vdocuments.us/reader031/viewer/2022012301/61e23503225af85426721187/html5/thumbnails/23.jpg)
23 JunePFRC Scheme 4.3b: 1st floor23
![Page 24: NEW ELEMENTARY SCHOOL - apsva.us](https://reader031.vdocuments.us/reader031/viewer/2022012301/61e23503225af85426721187/html5/thumbnails/24.jpg)
23 JunePFRC Scheme 4.3b24
![Page 25: NEW ELEMENTARY SCHOOL - apsva.us](https://reader031.vdocuments.us/reader031/viewer/2022012301/61e23503225af85426721187/html5/thumbnails/25.jpg)
23 JunePFRC
Concept DesignSiting and Massing:
general building location, shape, size, and height
General site layout and circulation: frontage on South Old Glebebus loop/service access on north side of sitecombined pick-up and drop-off within parking garage
Structured parking:single level parking structure with maximum amount of parkingplay area above parking
Items for consensus 25
![Page 26: NEW ELEMENTARY SCHOOL - apsva.us](https://reader031.vdocuments.us/reader031/viewer/2022012301/61e23503225af85426721187/html5/thumbnails/26.jpg)
23 JunePFRC 26
![Page 27: NEW ELEMENTARY SCHOOL - apsva.us](https://reader031.vdocuments.us/reader031/viewer/2022012301/61e23503225af85426721187/html5/thumbnails/27.jpg)
23 JunePFRC
Discussion
New ES on Thomas Jefferson Site27
![Page 28: NEW ELEMENTARY SCHOOL - apsva.us](https://reader031.vdocuments.us/reader031/viewer/2022012301/61e23503225af85426721187/html5/thumbnails/28.jpg)
23 JunePFRC
NEXT STEPS
July 1 Concept Design to school board (information)
July 20 Concept Design to school board (action)
28
![Page 29: NEW ELEMENTARY SCHOOL - apsva.us](https://reader031.vdocuments.us/reader031/viewer/2022012301/61e23503225af85426721187/html5/thumbnails/29.jpg)
23 JunePFRC
ADJORN
For further information please contact:
APS Project ManagerSteve [email protected]
Web links:APS Project Website PFRC Project WebsiteSubmit Public Comment and Sign up for Email Distribution
County Project ManagerMarco [email protected]
29