    Table of contentsTitle PageIntroduction

    Telecommunication spaces

    General specifications

    Safety and other considerations

    Temperature and humidity

    Main telecom room

    Clustered buildings

    Mobile Service Room

    Floor telecom closets

    Roof-top mobile-service room

    Home consolidation cabinets

    Office consolidation cabinets

    Office consolidation cabinets (commercial shell and core)

    Electro-mechanical

    Pathway

    General specifications

  • 8/9/2019 New Du Guideline V5.pdf

    3/72

    IntroductionWe are pleased to issue this document on Telecommunications Infrastructure Standardsfor Buildings to:

    introduce the new design guidelines for in-building fiber infrastructure to enable propertydevelopers to deliver high-quality, future-proof telecommunications and multimedia

    services to their tenants assist property developers through a “No Objection Certificate” (Building NOC) process

    that includes design drawing validation, material samples checking and site inspectionsduring implementation

    The new design guideline in this document is based on our prior experience of offering qualitytelecommunications services across key developments in UAE.

    We advise our clients to use qualified and certified professionals in all aspects of the applicationand implementation of these design guidelines during building construction.

    Developers are encouraged to engage with us at an early stage so that any process and / ordesign issues may be resolved. If property developers or tenants have special requirements thatmay not be covered by these guidelines it is necessary to engage with our design teams at anearly stage of development planning, to enable seamless delivery of premium

    telecommunications services at launch.We look forward to feedback from developers as it helps us understand your issues andincorporate valid suggestions in future designs.

  • 8/9/2019 New Du Guideline V5.pdf

    4/72

    This document covers the following building types:

    single villa and villa complexes residential towers and groups of residential towers commercial towers and groups of commercial towers shopping malls groups of shops and retail outlets hospitals, hotels and other bulk service applications warehouses and sheds

    The document is structured to cover all aspects of infrastructure for:

    telecommunication spaces pathways electro-mechanical cables duct entry

    All telecom spaces, pathways, ducts and cabling system specified in this document are for the

    exclusive use of du.

    The contents of this document are subject to revision without notice due to continued progress in

    methodology, design and manufacturing and for the purpose of regulatory compliance.

    There are separate documents that cover developing outside plant (OSP) for master plans. Please

    contact us on [email protected] if you require more information about these areas.

    mailto:[email protected]:[email protected]:[email protected]:[email protected]

  • 8/9/2019 New Du Guideline V5.pdf

    5/72

    Telecommunication SpacesGeneral specifications

    A number of telecom rooms will be required in a building depending on its characteristics. Thefollowing room types are required and the details of these rooms shown below:

    main telecom room

    mobile-service room roof-top mobile-service room floor telecom closet

    In multi-storey buildings the telecom rooms should be vertically aligned and linked by a sharedcontainment system. This containment system must not reduce the minimum requested space.

    All telecom rooms must be dedicated to the use of du. The rooms must be easily accessible to dupersonnel 24 hours a day and secured from unauthorized entry.

    Telecom rooms must not be in close proximity to any sources of the following:

    heat moisture corrosive atmospheric or environmental conditions high voltages radio frequency interference (RFI) electro-magnetic interference (EMI)

  • 8/9/2019 New Du Guideline V5.pdf

    6/72

    All telecom spaces and pathways must be pest controlled using best available practices. It should benoted that rodents often gnaw cables resulting in damage and the potential for service disruption.

    Hence, special attention should be given to preventing rodents from entering telecom spaces andpathways. This could involve the installation of covers to cable trays; if this is the case these coversmust be removable to allow for the installation of additional cables.

    The walls, floor, and ceiling should be painted and treated with anti-dust and anti-static coating tominimize dust and static electricity. Walls and ceilings shall receive primer and finish coat of light colorpaint.

    In order to move equipment into and out of telecom rooms, all entrances must not be smaller than

    900mm x 2100mm (WxH)

    Safety and other considerations

    All telecom rooms must comply with municipality and national authority standards and regulations,such as those issued by civil defense and utility companies. Notwithstanding this, it is expectedthat the following will be provided:

    all telecom spaces should be fitted with smoke detectors connected to the building managementsystem

    all telecom spaces should be fitted with normal and emergency lighting all containment openings to telecom spaces must be sealed with a regulation fire retardant

    material all doors to telecom rooms must be of solid wood core or steel construction, fire retardant with a

    minimum rating of 2 hours. all doors to telecom rooms must be outward opening with an automatic door closer system fitted

    on the hinged edge all doors to telecom rooms must be labeled. the room must be free from contaminants and pollutants.

  • 8/9/2019 New Du Guideline V5.pdf

    7/72

    required in the building (more than G+10) the 1 st mobile service landing room can be shared with theMTR. The minimum room dimension should be 4mx4mx3m (WxDxH) depending on the functions andfeatures of the building. The room specifications are detailed in Table-1 and Appendix_1_Figure-5 to 9.

    If the architectural design limits the room sharing, then two dedicated rooms with minimum sizes of 3mx3 m x 3m (WXDXH) each must be provided. The room specifications are detailed in Table-2 and

    Appendix_1_Figure-1 to 3, 18. Refer to appendix_1_Figure-14 to 16 for Rack elevation layouts details.

    The 3 m clearance height specified is the minimum finished clearance after taking into accountallowances for raised floors (if used), overhead cable trays and any other obstructions such aslighting fixtures and beams. In areas where overhead trays are used, a minimum headroom access of300mm is required above the tray.

    Depending on the telecom room usage, a “raised floor” might be required inside the MTR having activeequipment, particularly commercial or mixed used buildings. A minimum of 300mm height above the basefloor of the room should be provided. Tile Cutting details are specified in appendix_1_Figure-25. In othercases involving residential buildings, raised floor is not mandatory, and will be further advised during theNOC stage.

    The floor level of the room must be constructed at the same level as the outside access or corridor. If thiscannot be met, then a suitable ramped entry with an anti-slip surface must be provided. A threshold stepof 100mm must also be provided inside the room under the raised floor to prevent any ingress of waterfrom outside the room.

    The door of the main telecom room must have outward opening with size not smaller than 900mmx 2100mm (WxH). The door should be labeled

    Main Telecom Room‟ “ ت ا ص ي ل س ي ر ل ر ل

    All cables in the main telecom room must be properly routed to the desired destinations. For this purpose,

    an adequately sized cable tray system must be installed to maintain the connectivity as described in Appendix_1_Figure-20 to 21.

    Clustered buildings group of towers:

  • 8/9/2019 New Du Guideline V5.pdf

    8/72

    Floor Telecom Closet

    A floor telecom closet must be provided on each floor of all multi-storey buildings. The floor telecom closetis required to provide a flexible point for the installation, pulling and maintenance of telecom cables. FTCmust have a minimum dimension of 2m x 1m x 3 m (WXDXH).

    The floor telecom closet should be provided with two outward opening doors with a minimum totalopening of 1500mm x 2100mm (WxH). The door should be labeled (Floor Telecom Closet ت ا م د ة خ ر جي ق ب ا ط ل ت ا )ص

    In the case of a multi-storey villas, townhouses, G+1 warehouses or small retail shops, floor distributionboxes will be required with a minimum size of 300 x 300 x 150 mm (WxHxD), as an alternative to replaceFTC.

    In high rise buildings which usually exceed 30 floors, proper planning and consideration must be given tothe FTC space and dimension, which might be increased. It is highly advisable to seek du advice and payclose attention during NOC stage to understand the concept of high rise building infrastructure design.

    Refer to Table-4,5 and Appendix_1_Figure-4 for the complete detailed layouts of FTC.

    Roof-top Mobile-service room (up to G+10)

    Roof-top mobile-service rooms must be provided on the roof of all multi-tenant buildings up to G+10 andaccess must be provided to the building riser system.

    The door dimension must be 900mm x 2100mm (WxH) and opening outwards and should be labeled‘

    Roof Telecom Room’

    ح ط س ل ى ك ع ر م ل ف ا ه ل ت ا م د ر خ The roof-top mobile room must have a minimum.غdistributed floor load rating of 10 kN/m2

    An opening must be provided with a dimension of 600mm x 400mm (WxH), 500mm below the roomceiling in walls facing the building ‟s roof-top area.

  • 8/9/2019 New Du Guideline V5.pdf

    9/72

    wall mount or flushed mount installation at 1.2 meter high measured from the finishedfloor level up to the bottom edge of the cabinet.

    fitted with RJ45 UTP patch panel and cable management fitted with 2-core fiber terminal box fitted with dual 13A switched socket power outlet fed from a dedicated circuit breaker on

    the domestic supply sufficient cable entries to accommodate the incoming fiber optic and UTP cables located in an accessible area close to the entrance; avoiding areas such as kitchen,

    laundry room or bedroom adequate ventilation with ambient temperature maintained at 20°C - 30°C. adequate safe working space around the location with ambient lighting

    not close to sources of water or heat and any electrical distribution or bus bars. labeled with villa or flat number

    A layout of a typical home consolidation cabinet is provided in Appendix_1_Figure-11 to 13

    For 2 bedroom apartments or above and small villas:

    minimum internal dimensions 860mm x 600mm x 150 mm (HxWxD) which is suitable tosupport up to 24-ports UTP connections.

    wall mount or flushed mount installation at 1.2 meter high measured from the finishedfloor level up to the bottom edge of the cabinet.

    fitted with RJ45 UTP patch panel and cable management fitted with 2-core fiber terminal box fitted with dual 13A switched socket power outlet fed from a dedicated circuit breaker on

    the domestic supply sufficient cable entries to accommodate the incoming fiber optic and UTP cables located in an accessible area close to the entrance; avoiding areas such as kitchen,

    laundry room or bedroom adequate ventilation with ambient temperature maintained at 20°C - 30°C. adequate safe working space around the location with ambient lighting not close to sources of water or heat and any electrical distribution or bus bars. labeled with villa or flat number

  • 8/9/2019 New Du Guideline V5.pdf

    10/72

  • 8/9/2019 New Du Guideline V5.pdf

    11/72

    to the desired destination through appropriate cable trays containments. In such scenario, the buildingtenants will need to discuss the requirements with du at the time of fit-out.

    Refer to appendix_1_Figure-4 for the floor telecom closet detailed layouts.

    Electro-Mechanical

    Main Telecom Room:

    For Active MTR, the following requirements need to be provided.

    SMDB inside the room fed from essential power supply (with generator back up) for fixedequipment. Refer to the single line diagram in appendix_1_Figure_27

    2 nos. 13A twin sockets fed from the essential power supply with dedicated 20A circuit breaker. AC & DC earth bars connected to the dedicated earth pits with resistance less than 1ohm. Dedicated A/C system (ducted split FCU) with duty & standby units with proper interlocking, to

    maintain the room temp. at 20+/-3 deg. Cel Heat dissipation can be considered at 300 Watts/sq.mtr.+3kW per rack. Room should be provided with adequate lighting and comply with the fire and safety requirements

    like smoke detector, fire alarm, emergency light etc. as per local authority standards. Any watersprinklers to be avoided.

    2 nos. handheld CO2 cylinder extinguishers to be provided inside the room. Add 1x63A TP isolator fed with dedicated feeder from essential power supply (with generator

    back up) for GSM equipment – if MTR is shared between du fixed and Mobile services. Heat dissipation to be Increased by 8kW for GSM equipment- if MTR is shared between du Fixed

    and mobile services

    For Passive MTR, the following requirements need to be provided.

    2 nos. 13A twin sockets fed from the essential power supply with dedicated 20A circuit breaker. One earth bar connected to the telecom earth pit with resistance less than 1ohm. Room must be provided with adequate lighting.

    Room should be provided with air conditioning system to maintain the room temp at 20+/-3 deg

  • 8/9/2019 New Du Guideline V5.pdf

    12/72

    Adequate lighting and 1x13A twin socket fed from the normal building supply with dedicated 20Acircuit breaker.

    Room should comply with the fire and safety requirements like smoke detector, fire alarm,emergency light etc. as per local authority standards. Any water sprinklers to be avoided.

    1x handheld CO2 cylinder extinguisher

    Refer to Appendix_1_Figure-10 for the complete detailed room layouts.

    PathwaysGeneral specifications

    The following requirements must be applied to all containment systems: the containment system must be designed so that installed cables do not exceed the minimum

    specified bend radius all metal containment parts must be free from sharp edges and earth bonded telecom riser openings must be sealed with a suitable fire retardant material cable trays must be easily accessible in common areas to facilitate any future provision of

    additional cables any cable trays that are in areas accessible to the public and less than 4.8m above the floor must

    be covered containment systems must not run through areas exposed to excessive heat, moisture, corrosive

    atmospheric or environmental conditions, high voltages, radio frequency interference (RFI) or

    electro-magnetic interference (EMI) for all containment systems a minimum separation must be maintained from sources of

    electromagnetic interference. the building developer may want to consider redundant containment systems, particularly in

  • 8/9/2019 New Du Guideline V5.pdf

    13/72

    Note : above cable trays requirements to be finalized during NOC stage.

    Vertical Containment - within homes

    In case of multi-floor apartments / villas, the UTP cables between the floors must run through 50mmdiameter PVC conduits via junction / pull boxes located on each floor. The junction / pull boxes must havea minimum dimension of 300mm x 300mm x 150mm (WxHxD). The slab opening for these conduits mustbe in a suitable and accessible location in every floor. It is recommended that all vertical conduit runs bealigned to ease the installation of cables.

    Horizontal Containment – multi-storey / multi-tenant buildings

    Floor telecom closet to consolidation points

    The horizontal containment for routing cables from the floor telecom closets to consolidation points on theserved floor can use a number of systems (cable trays, conduits, etc.). The solution will depend on thecharacteristics of the building type. Conduits must only be used when the consolidation point locationsare permanent, the cable density is low and the flexibility to modify the routing is not required.Specification for the size of this containment is given in Appendix_1_Figure-20 to 21

    Note : Intermediate PVC junction / pull boxes with minimum size of 300mm x 300mm x 150 mm (HxWxD)must be provided on individual runs that exceed 30m. PVC junction /pull boxes must also be providedwhere an individual conduit run has a sharp change in direction.

    The cable tray minimum dimensions are described below:

    one 200mm x 50mm (WxH) cable tray with Heavy Duty Return Flange (HDRF) as a mainroute from floor telecom closet to main corridors and then branches to each consolidationcabinet through cable trays of 50mm x 50mm (WxH)

  • 8/9/2019 New Du Guideline V5.pdf

    14/72

    Cluster of buildings – groups of towers

    Where a building consists of a group of towers (on a common shared podium) all of the requirements of asingle tower still apply. In addition, cable trays must be provided linking the main telecom rooms of alltowers, exact requirement to be finalized during NOC stage.

    One cable tray with the following dimension must be provided:

    300 x 100 (WxH) with Heavy Duty Return Flanged (HDRF)

    These trays should be readily accessible in common areas to facilitate any future provision of additionalcables. However, if these trays are in an area accessible to the public and are less than 4.8m above the

    floor then the trays should be covered. For more details, refer to Appendix_1_Figure-22.

    CablesGeneral specifications

    Specifications of all the cables to be used must be submitted to du for approval during the NOC stage.This must also include test reports showing that the performance of the cabling system meets definedrequirements. Cable test must be performed using power meter and OTDR tests, whichever is applicable.Details for cable labeling are included in Appendix_2.

    Fiber Optic Cables

    The quantity of fiber optic cables that must be provided and installed from the main telecom room to theconsolidation points or FTC depends on the characteristics of the building.

    Drop Fiber Cable

    indoor rated drop fiber

  • 8/9/2019 New Du Guideline V5.pdf

    15/72

    OSP Fiber Cable

    outdoor rated single mode compliant with ITU-T G.652D loose tube inner construction or Ribbon type for high density cables Fiber optic coloring code shall be in accordance to EIA/TIA-598

    Fiber Optic Cables Requirements – from main telecom room to consolidation points (direct fiber)

    2 core (individual pair) fiber optic cables will be required from Main Telecom Room up to each apartment,

    retail shop, and pre-defined office. It is recommended to apply direct fiber installation up to G+30 only tomaintain cable management inside the FTC and MTR.

    The fiber cables must be provided from the main telecom room to each consolidation point and should beof continuous lengths free from joints, branches or patching. By default, all the fiber cables should passthrough the floor telecom closet.

    The fiber cables should be labeled at both ends with a unique reference for the consolidation point servedand the room or area of origin. Labeling details are included in Appendix_2.

    All fiber optic cables should be terminated inside the Main Telecom Room and inside the unit CP cabinet.Refer to appendix_1_figure-19.

    Fiber Optic Cables Requirements – from main telecom room to FTC (multicore fiber)

    For high rise buildings exceeding G+30, a FTC must be selected for every 10 floors. Multicore fiber cablemust be installed in a mini ODF inside the FTC, where the number of fiber core will depend on thenumber of units in each served floor. 2 fiber cores per unit should be considered as the basic foundationof multicore fiber calculation.

    If there are unused fiber cores, these must be left un-terminated and coiled properly inside the mini ODFand the MTR ODF Refer to appendix 1 figure-26

  • 8/9/2019 New Du Guideline V5.pdf

    16/72

    2 single mode fiber pair cables must be provided from the main telecom room to the roof-top mobile-

    service rooms. 10m of spare fiber must be left neatly coiled.

    CAT6 Copper cables – from consolidation points to tenant outlets

    To deliver services from the consolidation points to the building outlets, unshielded twisted pair (UTP)copper cables must be provided. The complete design of this service is the responsibility of the buildingdeveloper. However, the following minimum requirements must be followed for the efficient and effectiveprovision of services:

    the cables must conform to a minimum of CAT6 specification (Category 6, 100 Ohm, 4pair 24 AWG as specified in ANSI/TIA/EIA 568-B.2 Addendum 1)

    the wiring must be in a‘

    star ’

    topology fanning out from the consolidation point. dual RJ45 outlets with spring load sliding shutters must be provided wherever service is

    required (all outlets should comply with the performance specifications as detailed in ANSI/TIA/EIA 568-B.2 Addendum 6)

    each socket in the dual RJ45 outlet must be wired back to the consolidation point

    outlets must not be cascaded or looped and there must be no splitting of cable pairs the maximum cable length from consolidation point to outlet must not exceed 90m at the consolidation point the cables should be terminated on an RJ45 patch panel and

    labeled with the socket and outlet served in each outlet the cable must be terminated to maintain the twists in each pair up to within

    5mm of the termination proper strain relief should be provided at the terminated ends of the cable the components of the CAT6 system must be from the same supplier or at least

    compatible to insure maximum performance design should incorporate built-in flexibility to meet the growing needs of the occupants the CAT6 cabling system must be tested using an appropriate field test instrument for

    li i h ANSI/TIA/EIA 568 B 2 C 6 ( i l if hi h ifi i

  • 8/9/2019 New Du Guideline V5.pdf

    17/72

    Bulk Service Application

    This kind of service solution usually applies to buildings that are having their own IT network and system

    operator, such as hotels, hospitals, schools, universities, banks, airports, warehouses, workshops and

    other similar establishments. Sharing the client server or IT room with du can be one solution to deliver

    the services simply and quickly which is convenient to both du and the client. In such case of room

    sharing, free space inside the client room needs to be provided and reserved for du usage. Free space

    could be either „rack unit space‟ in an existing client rack or a „ floor space ‟ inside the room to

    accommodate a floor mounted rack dedicated for du.

    Letter from the client should be submitted during the building NOC stage confirming the bulk service

    request with detailed information on the required telecom services.

    The consultant is advised to approach du prior to the Building NOC submission to be able to assess and

    decide if sharing the space with the client is the best approach or a dedicated du room is technically

    recommended for some reason or another.

    In case that a dedicated room is required by du, the room specifications as mentioned in the telecom

    spaces section must be followed. The final du requirements including space, containment, cabling and

    power will be finalized during the NOC stage.

    Cable connectivity between du and the client rack or room must conform to the cabling standard of du, as

  • 8/9/2019 New Du Guideline V5.pdf

    18/72

    final requirement will be finalized during the NOC stage. The business consolidation cabinet must be in a

    secured location. It is the responsibility of the building developer / consultant to coordinate with du at the

    NOC stage for any special or non-standard requirement.

    Entry Ducts The building developer must provide lead-in ducts from the main telecom room to the plot boundary. Theexact connection points at the plot boundary will depend on whether the du network already reaches theplot.

    Option 1 – du duct network already exists

    The building developer will be responsible to connect to the du ducting system.

    The operator will identify the location and quantity of their lead-in ducts.

    Option 2 – du duct network is still to be built

    The building developer will be responsible to extend the lead-in duct to 1m outside the plotboundary.

    The building developer is responsible for locating and clearly identifying lead-in ducts.

    In both cases the building developer will be responsible for the maintenance and repair of lead-in ducts.The lead-in ducts will be for the exclusive use of du. The quantity and size of these ducts for different kindof developments is detailed in Table-7. Refer to the Appendix_1_Figure-23 to 24.

  • 8/9/2019 New Du Guideline V5.pdf

    19/72

    In case of combined plots, two entry locations are still required for primary and secondary networkconnections; this will be advised by du at the design stage.

    Lead-In ducts - complex of villas

    In the case of a complex of villas the building developer must connect the lead-in ducts to each villa in thecomplex. The lead-in duct size must not be reduced until the branching point for an individual villa.

    Lead-In ducts – group of buildings

    In cases where the building developer wishes to share lead-in ducts between a group of buildings (not ona common shared podium), then the design needs must be discussed with du at the design stage.

    Lead-In ducts - building entry

    Where lead-in ducts cannot be routed directly into the main telecom room, Hot-Dip Galvanized (HDG)slotted steel cable trays must be provided as an alternative. These trays must be easily accessible in

    common areas to facilitate any future provision of additional cables. However, if these trays are in an areaaccessible to the public and are less that 4.8m above the floor then the trays must be covered.

    A cable tray of minimum dimensions 300mm x 100mm (WxH) with Heavy Duty Return Flange (HDRF) willbe required for each pair of D54 entry duct pipes.

    Lead-In ducts – entry box

    Entry boxes are required to install telecom cables through the lead-in duct. The type and size of entry/pullboxes will depend on the characteristics of the building development. The details for entry boxes areincluded in the text below and summarized in Table-7. The quantity and location of the entry boxes willdepend on the route from the main telecom room to the network

  • 8/9/2019 New Du Guideline V5.pdf

    20/72

    Responsibility MatrixItem No. Item description

    Building’sowner

    1 Lead-in ducts

    2 Manholes outside the building/villa boundaries (including cover)

    3 Pull box inside the building/villa boundaries (including the cover)

    4 OSP fiber optic cables for buildings connections (including supply & termination)

    5 OSP fiber optic cables for villas connections (including supply & termination)

    6 Fiber optic cables supply between du Main Telecom Rooms (cluster of buildings)

    7 Fiber optic cables pulling between du Main Telecom Rooms (cluster of buildings)

    8 Fiber optic cables supply from du Main Telecom Room up to the CP cabinet

    9 Fiber optic cables pulling from du Main Telecom Room up to the CP cabinet

    10 Fiber optic cables termination & testing inside MTR, CP & FTC (if required inside FTC)

    11 Horizontal cabling work inside the unit

    12Fiber optic termination components such as the floor mount and wall mount high densityfiber panel, FDH, optical patch panel, mini ODF, micro ODF, connectors, adaptors and racks

    13 Fiber optic splitter supply and installation

    14 Patch cords supply

  • 8/9/2019 New Du Guideline V5.pdf

    21/72

    LOCATION MAP

    GPS Coordinates- ( Latitude: 25.124348° Longitude: 55.409880°)

  • 8/9/2019 New Du Guideline V5.pdf

    22/72

    3m.

    3 m .

    2 x handheld CO2cylinder

    extinguishers

    Smoke Detectorconnected to BMS

    NOTES:

    Main Telecom

    d u

    F i b e r

    E n

    t r y c a

    b l e

    8 0 0 x

    8 0 0

    m m

    R A C K 2

    8 0 0 x

    8 0 0

    m m

    R A C K 1

    13A twin socket fed from utility powewith dedicated circuit breaker

    Containment System Under theRaised Floor

    A C C l e a n e a r t

    h b a r

    Building Riser

    Raised Floor

  • 8/9/2019 New Du Guideline V5.pdf

    23/72

  • 8/9/2019 New Du Guideline V5.pdf

    24/72

    4m.

    4 m .

    A C C l e a n e a r t

    h b a r

    D C C l e a n e

    a r t

    h b a r

    13A twin socket fed from utility powerwith dedicated circuit breaker

    Smoke Detectorconnected to BMS

    NOTES:

    B u

    i l d i n g R

    i s e r

    d uF i b

    er

    Containment System Under Raised Floor

    800x800mm

    RACK 2

    800x800mm

    RACK 1

    800x800mm

    RACK 2

    800x800mm

    RACK 1

    S M D B

    Active Component RacksPassive Component Racks

    Refer to s

    This Space is reservedfor du - UPS and

    Batteries

    2 x

    3 2 AT

    f ed

    2 x

    e

    High Density Floor Mount ODF Racks forBuilding Fibers

  • 8/9/2019 New Du Guideline V5.pdf

    25/72

    2m.

    1 m

    .

    Building Riser

    Smoke Detectorconnected to

    BMS2 x handheld CO2 cylinder

    extinguishers

    150 mm opening

    13A twin socket fed from utilitypower with dedicated circuit breakerMini - ODF

    Appendix 1 - Figure 4

  • 8/9/2019 New Du Guideline V5.pdf

    26/72

    4m.

    4 m .

    6 0 0 x

    6 0 0

    mm

    2 G R

    a c k

    D C

    S y s t em

    600x600mm

    3G Rack

    600x600mm

    4G Rack

    8 0 0 x

    8 0 0

    m m

    R A C K 2

    8 0 0 x

    8 0 0

    m m

    R A C K 1

    A C C l e a n e a r

    t h b a r

    D C C l e a n e a r

    t h b a r

    2 xe

    63A Three Pbuildin

    13A twin socket fed from utility powerwith dedicated circuit breaker

    13A twi

    1 3 A

    u t i l i t y

    Smoke Detector connected to BMS

    B u

    i l d i n g R

    i s e r

    d uF i b

    er

    Containment System at high Level

    High Density Floor Mount ODF racks

  • 8/9/2019 New Du Guideline V5.pdf

    27/72

    4m.

    4 m .

    6 0 0 x

    6 0 0

    mm

    2 G R

    a c k

    D C

    S y s t em

    600x600mm

    3G Rack

    600x600mm

    4G Rack

    A C C l e a n e a r t

    h b a r

    D C C l e a n e a r t

    h b a r

    2

    63A Three Pbuildin

    13A twin socket fed from utility powerwith dedicated circuit breaker

    13A twin

    1 3 A

    u t i l it

    Smoke Detector connected to BMS

    B u

    i l d i n g

    R i s e r

    d uF i b

    Containment System at high Level

    W a l

    l M o u n

    t O D F

  • 8/9/2019 New Du Guideline V5.pdf

    28/72

    AC Clean earth bar

    Building Riser

    du Fiber Entry cable

    Containment System underRaised Floor

    DC Clean earth bar

    S M D B

    2 x handheldCO2 cylinder

    extinguishers

    5m.

    63A Three Phase Isolator fed from

    essential building power (for GSMEquipments)

    600x600mm

    4G Rack

    6 0 0 x

    6 0 0

    m m

    2 G

    R a c

    k

    600x600mm3G Rack

    DCSystem

    Smoke Detectorconnected to BMS

    2 x

    3 2 AT h r e

    ePh

    a s eI s ol a

    t or

    f e d f r om S MDB- d

    u ( F i x

    e d

    E q ui pm

    en

    t s )

    800x800mm

    RACK 2

    800x800mm

    RACK 1

    800x800mm

    Ac tiveRack

    This Space isreserved for

    UPS and

    Batteries

    High Density Floor MountODF racks 13A twin socket fed from

    utility power with dedicatedcircuit breaker

  • 8/9/2019 New Du Guideline V5.pdf

    29/72

    AC Clean earth bar

    13A twin socket fed fromutility power with dedicated

    circuit breaker

    DC Clean earth bar

    S M D B

    4m.

    63A Three Phase Isolator fed fromessential building power (for GSM

    Equipments)

    600x600mm

    4G Rack

    6 0 0 x

    6 0 0

    m m

    2 G

    R a c

    k

    600x600mm3G Rack

    DCSystem

    800x800mm

    Ac tiveRACK

    Smoke Detectorconnected to BMS

    2 x 32A Three Phase Isolatorfed from SMDB-du (Fixed

    Equipment)

    High Density Floor Mount ODF racks

    Containment System underRaised Floor

    du Fiber Entry cable 800x800mm

    RACK 1

    This Space isreserved for

    UPS andBatteries

    2

    xh an

    d h

    eld

    C O2

    c yl i n

    d e

    ex

    t i n g ui sh

    er

    BuildingRiser

  • 8/9/2019 New Du Guideline V5.pdf

    30/72

    Building Riser

    du Fiber Entry cable

    Active Component Racks

    5m.

    6 0 0 x

    6 0 0

    m m

    2 G

    R a c

    k

    Smoke Detector

    connected to BMS

    Passive Component Racks

    600x600mm

    4G Rack

    600x600mm3G Rack

    DCSystem

    AC Clean earth bar

    DC Clean earth bar

    2 x handheldCO2 cylinder

    extinguishers

    S M D B

    800x800

    mmRACK 1

    800x800

    mmRACK 2

    800x800

    mmRACK 3

    800x800

    mmRACK 4

    13A twin socket fed from utilitypower with dedicated circuit

    breaker

    2 x 32A Three Phasfed from SMDB-du

    Equipm

    T h i s S p a c e

    i s r e s e r v e d

    f o r

    U P S a n

    d B a t

    t e r i e s

    Containment System underRaised Floor

    High Density Floor MountODF racks

  • 8/9/2019 New Du Guideline V5.pdf

    31/72

  • 8/9/2019 New Du Guideline V5.pdf

    32/72

  • 8/9/2019 New Du Guideline V5.pdf

    33/72

  • 8/9/2019 New Du Guideline V5.pdf

    34/72

  • 8/9/2019 New Du Guideline V5.pdf

    35/72

    42

    403938

    34353637

    33

    020304050607080910

    1314

    161718192021222324252627

    29303132

    11

    12

    28

    15

    41

    01i Patch

    Fiber

    10

    B A

    11

    B A

    12

    B A

    7

    B A

    8

    B A

    9

    B A

    4

    B A

    5

    B A

    6

    B A

    1

    B A

    2

    B A

    3

    B A

    Fiber Patch Panel – Supply andinstallation by du

    Building FiberTermination

    Area20 U – 24 U

    This Area isReserved for the

    Installation ofSplitters by du

    18 U

    Vertical rings

    Raised Floor Tiles

    42

    403938

    34353637

    33

    020304050607080910

    1314

    161718192021222324252627

    29303132

    11

    12

    28

    15

    41

    01

    Building FiberTermination

    Area20 U – 24 U

    This Area isReserved for the

    Installation ofSplitters by du

    18 U

    RACK-2

    Space Reserved for du

    RACK-1

    Appendix 1 - F

  • 8/9/2019 New Du Guideline V5.pdf

    36/72

  • 8/9/2019 New Du Guideline V5.pdf

    37/72

  • 8/9/2019 New Du Guideline V5.pdf

    38/72

  • 8/9/2019 New Du Guideline V5.pdf

    39/72

    Ring

    Ring

    Ring

    Opening for Fiber Cablesfrom Building Riser

    Du Fiber Entry Cables

    S p

    l i c i n g T r a y

    S p

    l i c i n g T r a y

    S p

    l i c i n g T r a y

    S p

    l i c i n g T r a y

    Ring

    Ring

    Ring

    Wall Mount ODF

    Perforated door

    Cable Tray at High Level For Building Fiber Cables

  • 8/9/2019 New Du Guideline V5.pdf

    40/72

    12cm (W)

    9 c m

    ( H )

    2 . 5 c m

    ( D )

    2 Core Fiber Cable EntOption -1

    2 Core Fiber Cable Entry tothe Access Terminal Box

    Option-3

    2 Core Fiber Cable Entry tothe Access Terminal Box

    Option-2

    2 Core Fiber LC/APC Adapter

    Minimum 1 meter Pigtail insi

    Terminate the end of the pigtai

    Terminate the end of the pigtail

    1 2

  • 8/9/2019 New Du Guideline V5.pdf

    41/72

  • 8/9/2019 New Du Guideline V5.pdf

    42/72

    Unit -01 Unit -03 Unit-05 Unit-7Unit -06 Unit -04 Unit-02Unit -X1

    Unit -01 Unit -03 Unit-05 Unit-7Unit -06 Unit -04 Unit-02Unit -X1

    Unit -01 Unit -03 Unit-05 Unit-7Unit -06 Unit -04 Unit-02Unit -X1

    Unit -01 Unit -03 Unit-05 Unit-7Unit -06 Unit -04 Unit-02Unit -X1

    Ground Floor

    1 st Floor

    5 th Floor

    10 th Floor

    20 th Floor

    30 th Floor

    Roof Floor

    Combined MTR and MobileService Room for Fixed and GSM

    services

    FTCROOM

    300mm Cable Tray for GSM Cables500mm Cable Tray for Building Fiber Cables

    Unit -01 Unit -03 Unit-05 Unit-7Unit -06 Unit -04 Unit-02Unit -X1

    50mm Cable Tray

    Schematic diagram with Combined MTR and Mobile Service roomsBuilding Type – Residential /Commercial/Mixed Use

    Mobile Service Room at Every 10th

    Floor

    Roof TopGSM room

    200mm Cable Tray forHorizontal Distribution

    200mm Cable Tray forHorizontal Distribution

    FTCROOM

    FTCROOM

    FTCROOM

    FTCROOM

    Mobile Service Room at Every 10 th Floor

    Mobile Service Room at Every 10 th Floor

  • 8/9/2019 New Du Guideline V5.pdf

    43/72

    Building1

    Building

    6

    Bu

    BuBuilding3

    Building2

    MainMTR

    MTR MTR

    MTR

    Plot Limit

    P l o t L i m i t

  • 8/9/2019 New Du Guideline V5.pdf

    44/72

    Entry Box60x60x80cm

    Ground Level

    PLOT LIMITPLOT LIMIT2W D

    2W D56 ducts from VillaEntry box to Villa Cabinet

    Single Villas infrastructure - Schematic diagram

  • 8/9/2019 New Du Guideline V5.pdf

    45/72

    Villa 01 Villa 02

    JRC12

    JRC12

    Duc

    Villa 03 Villa 04 Villa 05 Villa 06Villa 07 Villa 08 Villa 09 Villa 10 Villa 11 Villa 1

    2W D56 ducts from each villa Entry box to Manhole- JRC 12

    2W D54 ducts between manholes

    2W D54 ducts between manholes

    PLOT LIMIT

    P L O T L I M I T

    Entry Box

    Lead in du

  • 8/9/2019 New Du Guideline V5.pdf

    46/72

    300mm (W) x 300mm (H)Opening for Cables Entry

    600mm (W)

    6 0 0 m

    m ( H )

    Tile Cutting Layout for 600mm X 600mm Tile

    150mm 150mm

    Appendix 1 - Figure 25

  • 8/9/2019 New Du Guideline V5.pdf

    47/72

  • 8/9/2019 New Du Guideline V5.pdf

    48/72

    32A TPMCCB

    32A TPMCCB

    32A TPMCCB

    32A TPMCCB

    spaces32A TPMCCB

    63A TP Iso.

    ESMDB-MTRSupplied by building

    contractor

    Essential DB

    ATS

    1 2 3

    3 x spares

    32A TPIsolator

    32A TPIsolator

    4Cx 10mm2 XLPE/SWA + 1CX10 ECC

  • 8/9/2019 New Du Guideline V5.pdf

    49/72

    A p p e n

    d i

    x

    -

    F i

    g u r e

    2 8

  • 8/9/2019 New Du Guideline V5.pdf

    50/72

  • 8/9/2019 New Du Guideline V5.pdf

    51/72

  • 8/9/2019 New Du Guideline V5.pdf

    52/72

  • 8/9/2019 New Du Guideline V5.pdf

    53/72

    A p p e

    n d i

    x

    -

    f i

    g u r e

    3 2

  • 8/9/2019 New Du Guideline V5.pdf

    54/72

    A p p e n

    d i

    x

    -

    F i

    g u r e

    3 3

  • 8/9/2019 New Du Guideline V5.pdf

    55/72

  • 8/9/2019 New Du Guideline V5.pdf

    56/72

  • 8/9/2019 New Du Guideline V5.pdf

    57/72

  • 8/9/2019 New Du Guideline V5.pdf

    58/72

  • 8/9/2019 New Du Guideline V5.pdf

    59/72

  • 8/9/2019 New Du Guideline V5.pdf

    60/72

  • 8/9/2019 New Du Guideline V5.pdf

    61/72

  • 8/9/2019 New Du Guideline V5.pdf

    62/72

  • 8/9/2019 New Du Guideline V5.pdf

    63/72

  • 8/9/2019 New Du Guideline V5.pdf

    64/72

  • 8/9/2019 New Du Guideline V5.pdf

    65/72

  • 8/9/2019 New Du Guideline V5.pdf

    66/72

    Labeling Scheme for 2 core SM Fiber cables using ferrule (during Cable pulling)

    Labeling Scheme for Cabinets inside apartments/offices/reception/retail shops etc..

    Floor number/name -Unit number/name Example – F1-ACP12

    Labeling Scheme for Cat 6 cables inside Units using ferrule (during Cable pulling)

    Labeling Scheme for Cat 6 RJ45 Patch Panel Number-Port numbe

    Example PP1 P 1

    2 Core SM Fiber Cables at MTR side 2 Core SM Fiber Cables at U

    F02-ACP04-C01Example for apartments Example for offices Example for Retail Shops

    FL03-OCP05-C01FL02-ACP04-C02 FL03-OCP05-C02

    GR-RCP01-C01GR-RCP01-C02

    Example for Reception Example for BMS roomGR-REP-C01GR-REP-C02

    B1-BMS-C01B1-BMS-C02

    MTR/FTR number-core numMTR01-C1MTR01-C2

    Example-

    Labeling Scheme for 2 Core Fiber Terminal BoxRack number-ODF number-ODF row/slot number-core numbersExample - RK2-ODF1-R1-C1,2Example - RK2-ODF1-S1-C3,4

    Note – Always Terminate the end of the pigtail-1 to Core-1 of SM fiber Cable

    Labeling Scheme for 2 core adapter inside Fiber Ter

    Vertical Orientation 12 Horizontal Or

    Labeling Scheme for 2 core SM Fiber cables after terminating inside Fiber ODF/patch Panel

    Floor number/name-unit number/name-ODF core number Example - FL10 -ACP012-ODF 95,96 Example - FL01 -ACP04

    Floor number/name-unit number/name-core number

  • 8/9/2019 New Du Guideline V5.pdf

    67/72

  • 8/9/2019 New Du Guideline V5.pdf

    68/72

    Combined Telecommunication Room Sizes-For Fixed and Mobile Services

    Table No -1

    Note: Provide 3 m (L) x 3 m (B) x 3 m (H) GSM room for every 10 th floor starting from the lowest basement.

    Table No -2

    Number of unitsMTR Size in Meter

    (L X B X H)Residential

    MTR Size in Meter(L X B X H)

    Commercial/Mixed Use Up to 300 units 3 x 3 X 3 3 x 4 x 3

    300 to 600 units 3 x 3 X 3 3 x 4 x 3

    600 to 1200 units 4 x 4 x 3 4 x 4 x 3

    More than 1200

    units

    Will be Advised at NOC Stage Will be advised at NOC Stage

    Note: Requirements of wall mount ODF inside FTRs will be advised at NOC stage

    Number of unitsCombined MTR and GSM

    Sizes in Meter(L X B X H)

    Residential

    Combined MTR and GSM Sizes inMeter

    (L X B X H)Commercial / mixed Use

    Up to 300 units 4 x 4 x 3 4 x 4 x 3

    300 to 600 units 4 x 4 x 3 4 x 4 x 3

    600 to 1200 units 4 x 5 x 3

    (Only for GPON Solution)

    5 x 5 x 3

    More than 1200units

    Will be Advised at NOCStage

    Will be Advised at NOC Stage

    Fiber Cables Termination details inside MTR and FTC for Residentail/Commercial

  • 8/9/2019 New Du Guideline V5.pdf

    69/72

    Fiber Cables Termination details inside MTR and FTC for Residentail/CommercialBuildings – Table-4

    Number of CommercialUnits

    Racks required toTerminate Building Fiber

    Cables Inside MTR

    Wall Mount ODF Indoor HighMulticore Fiber

    Cables(to connect wall

    Mount ODFsand MTR)

    Fiber Patch Paneland ODF Core

    quantity(angled adapter

    Type)

    Racks Units required toTerminate Building FiberCables in each 42 U Rack

    Up to 150 Units(G+15)

    One Number of 42 U 800X800, 19 inch Free standing

    Rack required

    Not Required Not required 4 Number of 96Core Fiber PatchPanel required

    20 U to 24 U

    150 to 300 Units(G+16 to G+30)

    Two Number of 42 U 800X800, 19 inch Free standing

    Rack required

    Not Required Not Required 7 Number of 96Core Fiber PatchPanel required

    20 U to 24 U in eachRack

    300 to 600 Units(G+31 to G+60 Floors)

    Minimum one number ofHigh density rack required

    Install wall

    mount mini ODFat every 10 th

    Floor(Starting from

    30 th Floor)

    Install and

    TerminateIndoor

    Multicore FiberCables

    Use High density

    angled adapterFiber patch Panels

    42 U

    600 to 1200 Units(Towers)

    (G+61 to G+120 Floors)

    Minimum two number ofHigh density rack required

    Install wallmount mini ODF

    at every 10 th Floor

    (Starting from

    30th

    Floor)

    Install andTerminate

    IndoorMulticore Fiber

    Cables

    Use High densityangled adapter

    Fiber patch Panels2 X 42 U

    For above 1200 Units(For above G+120)

    The requirements will advised at NOC stage

  • 8/9/2019 New Du Guideline V5.pdf

    70/72

    Fiber Cables Termination details inside MTR and FTC Mixed Use Buildings – Table-5

    Number ofCommercial

    Units

    Racks required toTerminate

    Building FiberCables Inside

    MTR

    Wall MountODF

    IndoorMulticore

    Fiber Cables(to connectwall MountODFs and

    MTR)

    Fiber PatchPanel andODF Corequantity(angledadapter

    Type)

    Racks Unitsrequired toTerminate

    Building FiberCables in each

    42 U Rack

    Up to 150 Units(Considering 50%

    Units to beResidential and50% Units to be

    Commercial)

    One Number of42 U 800 X

    800mm requiredfor Residential

    UnitsOne Number of

    42 U 800 X800mm requiredfor Commercial

    Units

    NotRequired

    Notrequired

    2 Numberof 96 CoreFiber Patch

    Panelrequired ineach rack

    20 U to 24 U ineach Rack

    150 to 300 Units(Considering 50%

    Units to beResidential and50% Units to be

    Commercial)

    One Number of42 U 800 X

    800mm requiredfor Residential

    UnitsOne Number of

    42 U 800 X

    800mm requiredfor Commercial

    Units

    NotRequired

    NotRequired

    4 Numberof 96 CoreFiber Patch

    Panelrequired ineach rack

    20 U to 24 U ineach Rack

  • 8/9/2019 New Du Guideline V5.pdf

    71/72

    Configuration specification for Wall mount ODF to hold Sub Racks for Optical Splitters

    Number of

    Units(Apartments,

    Retails)

    Number of

    Building FiberCore Spliced

    inside of WallMount ODF

    Requirement

    of 2:32Splitter Unit

    Requirement

    of 2:16Splitter unit

    Requirement of

    2:2 Splitter Unit

    Feeder Port/Cores

    required to terminateEntry Cables for 2:32

    splitter Ratio Scenario

    Feeder Ports/Cores

    required to terminateEntry Cables for 2:16

    splitter Ratio Scenario

    Up to 150Residential

    Units

    300 Cores 5 10 1 12 Cores 24 Cores

    Up to 300Residential

    Units

    600 Cores 10 19 1 24 Cores 48 Cores

    Up to 600Residential

    Units

    1200 Cores 19 38 1 48 Cores 76 Cores

    Note - Consultants and Contractors are advice to coordinate with du at NOC stage for the exact Splitter Ratio scenario and for the exact Splitter Size

  • 8/9/2019 New Du Guideline V5.pdf

    72/72

    Single Villa Complex of Villa(15 to 100) For Multi-tenant Buildings shopping Mall Warehouse and Shed Bulk Service

    Ducts 2 xD56 (50mm)2 xD56 (50mm) per Villa

    2xD54(100mm) for plot Entry

    2 XD54(100mm) PrimaryRoute and 2 XD54(100mm)

    Secondary Route

    2 XD54(100mm) PrimaryRoute and 2 XD54(100mm)

    Secondary Route

    2 xD56 (50mm) perWarehouse 2xD54(100mm)

    plot Entry

    2 XD54(100mm) PrimaryRoute and 2XD54(100mm)

    Secondary Route

    Entry Box600mm x600mm

    X800mm(LXBxD)per Villa600mm x600mm

    X800mm(LXBxD)per VillaNot Required Not Required

    600mm x600mmX800mm(LXBxD)per

    WarehouseNot Required

    Manhole Not RequiredJRC 12 for every 12 Villas + JRC

    12 for plot EntryJRC 12 JRC 12

    JRC 12 for every 12 Villas +JRC 12 for plot Entry

    JRC 12

    TABLE 7 - OSP TABLE