NEW DECK ADDITION North River, Tuscaloosa Alabama
![Page 2: New Deck Addition](https://reader031.vdocuments.us/reader031/viewer/2022022411/58eea4eb1a28ab137b8b4689/html5/thumbnails/2.jpg)
EXCAVATION OF NEW DECK AND FOUNDATION
No more digging, level and plumb. The hard part is done.
![Page 3: New Deck Addition](https://reader031.vdocuments.us/reader031/viewer/2022022411/58eea4eb1a28ab137b8b4689/html5/thumbnails/3.jpg)
THE LANDING HAD TO BE MADE FIRST
5' deck with 4 stringers for the connection of the original deck
The deck was built according to the existing topography with the consideration of the 2 air conditioner units.
![Page 4: New Deck Addition](https://reader031.vdocuments.us/reader031/viewer/2022022411/58eea4eb1a28ab137b8b4689/html5/thumbnails/4.jpg)
AFTER 8 A.M. , FULL ALABAMA SUNSHINE
Treads installed A few more post and handrails
![Page 5: New Deck Addition](https://reader031.vdocuments.us/reader031/viewer/2022022411/58eea4eb1a28ab137b8b4689/html5/thumbnails/5.jpg)
LIMESTONE STEPS WERE INSTALLED A WEEK PRIOR
Topography is well??,... very steep.You can not have a level playing field all the time!
We built the rails in the shade under the back porch.Still have to bring them up and place them.
![Page 6: New Deck Addition](https://reader031.vdocuments.us/reader031/viewer/2022022411/58eea4eb1a28ab137b8b4689/html5/thumbnails/6.jpg)
EARLY START @ 6 A.M.3 HOURS OF SHADE
Checking out before leaving the heat Almost Done
![Page 7: New Deck Addition](https://reader031.vdocuments.us/reader031/viewer/2022022411/58eea4eb1a28ab137b8b4689/html5/thumbnails/7.jpg)
THIS CONNECTS TO THE LIMESTONE STEPS WITH BOX WOOD TREES AT THE BASE OF THE PICTURE.
Deck finished and now the landscapers from PROSCAPE, Inc. will do the rest. It will be stained later to match the back.