New and/or Revised New and/or Revised Procedures as of 1-19- Procedures as of 1-19- 2000 2000 Certification Procedure (CP-201) Certification Procedure (CP-201) Volumetric Phase I Volumetric Phase I (TP-201.1) (TP-201.1) P/V Valve Integrity P/V Valve Integrity (TP-201.2B, (TP-201.2B, Appx. 1) Appx. 1) Spillage Spillage (TP-201.2C) (TP-201.2C) Dripless Nozzles Dripless Nozzles (TP--201.2D) (TP--201.2D) Overfill Protection Overfill Protection (TP-201.2O) (TP-201.2O) Liquid Retention Liquid Retention (TP-201.3E) (TP-201.3E) Fugitive Emissions Fugitive Emissions (TP-201.2F) (TP-201.2F)

Upload: baker-avila

Post on 31-Dec-2015

22 views

Category:

Documents


0 download

DESCRIPTION

Certification Procedure (CP-201) Volumetric Phase I(TP-201.1) P/V Valve Integrity(TP-201.2B, Appx. 1) Spillage(TP-201.2C) Dripless Nozzles(TP--201.2D) Overfill Protection(TP-201.2O) Liquid Retention(TP-201.3E) Fugitive Emissions(TP-201.2F). - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: New and/or Revised Procedures as of 1-19-2000

New and/or Revised New and/or Revised Procedures as of 1-19-2000Procedures as of 1-19-2000

Certification Procedure (CP-201)Certification Procedure (CP-201)Volumetric Phase IVolumetric Phase I (TP-201.1)(TP-201.1)P/V Valve IntegrityP/V Valve Integrity (TP-201.2B, Appx. 1)(TP-201.2B, Appx. 1)SpillageSpillage (TP-201.2C)(TP-201.2C)Dripless NozzlesDripless Nozzles (TP--201.2D)(TP--201.2D)Overfill ProtectionOverfill Protection (TP-201.2O)(TP-201.2O)Liquid RetentionLiquid Retention (TP-201.3E)(TP-201.3E)Fugitive EmissionsFugitive Emissions (TP-201.2F)(TP-201.2F)

Page 2: New and/or Revised Procedures as of 1-19-2000

EVR Implementation DatesEVR Implementation Dates

AAddoopptteedd bbyy BBooaarrdd NNoo 1155--DDaayy CChhggss.. 33--2233--0000AAddoopptteedd bbyy BBooaarrdd 1155--DDaayy CChhaannggeess DDaattee ffiilleedd

EEffffeeccttiivvee DDaattee AAllll nneeww cceerrttss aannddiinnssttaallllaattiioonnss

44--11--22000011

SSttaarrtt 44--YYeeaarr CClloocckk EExxiissttiinngg GGDDFFss 44--11--22000011

EEffffeeccttiivvee DDaattee CCeerrttiiffiiccaattiioonnss aannddNNeeww IInnssttaallllaattiioonnss

44--11--22000011

OOppeerraattiivvee DDaattee UUnnlleessss ssppeecciiffiieedd 44--11--22000011EEnndd 44--YYrr CClloocckk 44--11--22000055

Page 3: New and/or Revised Procedures as of 1-19-2000

Later Implementation DatesLater Implementation Dates

Nozzle Criteria “Driplessness” 4-1-2002Liquid Retention 350 ml/1,000 gals

200 ml/1,000 gals100 ml/1,000 gals

4-1-20014-1-20024-1-2003

Nozzle Spitting 1 ml/ test 4-1-2003Balance NozzleCk. Valve Leakrate

0.017 CFH at2 inches H2O

4-1-2001

Balance NozzleCk. Valve Leakrate

0.017 CFH at 2” 0.01 CFH at-100”

4-1-2001

In-StationDiagnostics

Failure of CentralVacuum/ProcessorA/L of ZeroAll other requirements

4-1-20014-1-20014-1-2004

Page 4: New and/or Revised Procedures as of 1-19-2000

Table 3-1Table 3-1

Containment BoxesLeakrate at +2.0 inches H2O 0.17 CFHNo Standing Fuel in Box

Compatibility withFuels

Materials Shall be Compatiblewith Fuel Blends Approved forUse in California

Page 5: New and/or Revised Procedures as of 1-19-2000

Table 4-1Table 4-1

Phase IIEmission

Factor

HC 0.38 pounds/1,000 gallonsIncludes:

Refueling EmissionsVentpipe Emissions

Pressure-Related Fugitives

UST PressureCriteria

(30 day rollingaverage)

Daily Average Pressure 0.25 in. H2ODaily High Pressure 1.50 in. H2ONon-Excluded Hours/Day = 0 0.05 in H2O

Page 6: New and/or Revised Procedures as of 1-19-2000

Table 4-1Table 4-1

Phase II Riser Minimum ID 1”Vapor Return

PipingMinimum 3” ID after first manifoldRecommended slope 1/4” per foot

Vapor Return Pipe Runs

The maximum allowable lengths ofpipe runs shall be established during

the certification process.Liquid

CondensateTraps

Must haveautomatic evacuation system

Page 7: New and/or Revised Procedures as of 1-19-2000

Table 5-1Table 5-1

Nozzle P at 60 CFH of N2 0.07 inches H2OHose P at 60 CFH of N2 0.09 inches H2O

Breakaway P at 60 CFH of N2 0.04 inches H2ODispenser P at 60 CFH of N2 0.08 inches H2O

Swivel P at 60 CFH of N2 0.02 inches H2ORiser to UST P at 60 CFH of N2 0.05 inches H2O

Nozzle toUST

P at 60 CFH of N2 0.35 inches H2OP at 80 CFH of N2 0.62 inches H2O

Page 8: New and/or Revised Procedures as of 1-19-2000

ISD Requirements ISD Requirements

The development of ISD shall address, at a minimum, the items listed below:

Instrument out of service Instrument not calibrated;Notification requirements of failure;Legal status of data;Reporting Requirements; andFalse positive reports of failure.

Page 9: New and/or Revised Procedures as of 1-19-2000

Duration and Limits of CertificationDuration and Limits of CertificationVapor recovery systems shall be certified for a period of time Vapor recovery systems shall be certified for a period of time

not to exceed four years; the certification Executive Order shall not to exceed four years; the certification Executive Order shall specify the date on which the certification shall expire if it is not specify the date on which the certification shall expire if it is not reissued.reissued.

Certification of a system shall include all components, and the Certification of a system shall include all components, and the expiration date of the certification shall apply to all system-expiration date of the certification shall apply to all system-specific components used on the system.specific components used on the system.

Modification of the certification for the purpose of adding Modification of the certification for the purpose of adding system-specific components may establish a new expiration system-specific components may establish a new expiration date for the system, providing the specified conditions are met.date for the system, providing the specified conditions are met.

Page 10: New and/or Revised Procedures as of 1-19-2000

Expired or Revoked CertificationsExpired or Revoked CertificationsVapor recovery systems shall be certified for a period of time Vapor recovery systems shall be certified for a period of time

not to exceed four years; the certification Executive Order shall not to exceed four years; the certification Executive Order shall specify the date on which the certification shall expire if it is not specify the date on which the certification shall expire if it is not reissued. reissued. ..

Certification of a system shall include all components, and the Certification of a system shall include all components, and the expiration date of the certification shall apply to all system-expiration date of the certification shall apply to all system-specific components used on the system.specific components used on the system.

Modification of the certification for the purpose of adding Modification of the certification for the purpose of adding system-specific components may establish a new expiration system-specific components may establish a new expiration date for the system, providing the specified conditions are met.date for the system, providing the specified conditions are met.

Page 11: New and/or Revised Procedures as of 1-19-2000

Expired or Revoked CertificationsExpired or Revoked Certifications

Systems that were installed as of the effective Systems that were installed as of the effective date of the adoption of a new standard, or the date of the adoption of a new standard, or the revocation or expiration of a certification, may revocation or expiration of a certification, may remain in use for the remainder of the useful remain in use for the remainder of the useful life or four years, whichever is shorter, life or four years, whichever is shorter, provided they comply with all of the provided they comply with all of the specifications of this section. This shall specifications of this section. This shall include all components and parts of the include all components and parts of the system, subject to the specified requirements.system, subject to the specified requirements.

Page 12: New and/or Revised Procedures as of 1-19-2000

Questions?Questions?