needs assessment cive 4312 hanadi rifai. engineering design process iteration needs assessment...
TRANSCRIPT
Needs AssessmentNeeds Assessment
CIVE 4312CIVE 4312
Hanadi RifaiHanadi Rifai
Engineering Design ProcessEngineering Design Process
Iteration
NeedsAssessment
ProblemFormulation
AbstractionAnd Synthesis
Analysis
Implementation
Establishing NeedEstablishing Need
Concern for health, safety and quality of Concern for health, safety and quality of life of publiclife of public
Redesign existing productRedesign existing product Better solution for a particular taskBetter solution for a particular task
All Problems are not EqualAll Problems are not Equal
Prediction Explanation Invention
Types of Problems
Success vs. FailureSuccess vs. Failure
Failure - inability of engineering solution to perform its intended function
Error - underlying cause for failure
Causes of FailureCauses of Failure
Concrete levelConcrete level - Specific physical source - Specific physical source (O-ring seal in Challenger)(O-ring seal in Challenger)
Process LevelProcess Level - Invalid assumptions or - Invalid assumptions or flawed execution (O-ring gaskets and putty flawed execution (O-ring gaskets and putty assumed sufficient on Challenger)assumed sufficient on Challenger)
Perspective LevelPerspective Level - Flawed value system - Flawed value system (Manufacturer of Challenger booster-(Manufacturer of Challenger booster-rocket overrode engineering rocket overrode engineering recommendations)recommendations)
Design ProposalDesign Proposal
Engineers often prepare formal design proposalsto justify expenditure of time, money and effort.
• Why?• Who?• Where?• How?• When?• What?• How much?
Structure of a ProposalStructure of a Proposal
Objective (Why?)Objective (Why?) Background (Who? Where?)Background (Who? Where?) Methodology (How? When?)Methodology (How? When?) Expected Results (What?)Expected Results (What?) Costs (How much will it cost?)Costs (How much will it cost?)
The design proposal is a plan
MethodologyMethodology
ApproachApproach TasksTasks Who will perform Who will perform
taskstasks Schedule of Schedule of
completioncompletion
Gantt ChartsGantt Charts
TasksTasks Q1Q1 Q2Q2 Q3Q3 Q4Q4
Gather DataGather Data
Conceptual Conceptual DesignDesign
Select Select AlternativeAlternative
ReportingReporting