Page 1: NEAREST kick-off Meeting 9-11 October, 2006 - Bologna NEARESTWP4 INGV: Leader PI: Paolo Favali

NEAREST kick-off Meeting 9-11 October, 2006 - Bologna

NEAREST NEAREST

WP4WP4

INGV: LeaderINGV: LeaderPI: Paolo FavaliPI: Paolo Favali

Page 2: NEAREST kick-off Meeting 9-11 October, 2006 - Bologna NEARESTWP4 INGV: Leader PI: Paolo Favali

ObjectivesObjectives

The WP is aimed at carrying out geophysical and The WP is aimed at carrying out geophysical and oceanographic measurements on the seafloor and in the oceanographic measurements on the seafloor and in the water column in the nearby of near-shore tsunamigenic water column in the nearby of near-shore tsunamigenic sources for the sources for the identifications of tsunami signalsidentifications of tsunami signals. .

The seafloor and water column measurements will be The seafloor and water column measurements will be performed performed by means of a deep seafloor multiparameter by means of a deep seafloor multiparameter observatoryobservatory of GEOSTAR type, developed in previous of GEOSTAR type, developed in previous EC projects and will be transmitted to shore in EC projects and will be transmitted to shore in real-real-timetime (some essential parameters). (some essential parameters).

WP4 - Tsunami signal detection

Page 3: NEAREST kick-off Meeting 9-11 October, 2006 - Bologna NEARESTWP4 INGV: Leader PI: Paolo Favali

• Use of already existing Use of already existing multiparameter seafloor multiparameter seafloor observatoryobservatory

• The observatory will be The observatory will be managed by MODUS managed by MODUS (Partner TFH)(Partner TFH)

Methodology

Page 4: NEAREST kick-off Meeting 9-11 October, 2006 - Bologna NEARESTWP4 INGV: Leader PI: Paolo Favali

• Specific set of sensors: -seismometer,

-hydrophone, -differential pressure

gauge for cross-checking of

different signals

SeismometerHydrophone

3D-ACM

•Unique time reference for easy comparison of the signals

DPGother sensors ?

Page 5: NEAREST kick-off Meeting 9-11 October, 2006 - Bologna NEARESTWP4 INGV: Leader PI: Paolo Favali

• The seafloor observatory will locally perform processing according to specifications identified by the partners

• A surface buoy, will perform real-time transmission of seafloor processing results to a shore station for data integration

• The buoy will be equipped with meteo and oceanographic sensor packages as well

Page 6: NEAREST kick-off Meeting 9-11 October, 2006 - Bologna NEARESTWP4 INGV: Leader PI: Paolo Favali

• Selection of new sensors Selection of new sensors

• Upgrading of the hardware and software of the Upgrading of the hardware and software of the Data Acquisition and Control System (DACS)Data Acquisition and Control System (DACS)

• Upgrading of the real-time communications Upgrading of the real-time communications (new protocol ?)(new protocol ?)

• Overall integration Overall integration

• Tests (use of already available signals, synthetic Tests (use of already available signals, synthetic signals, etc.)signals, etc.)

Work to be done (1/2)

Page 7: NEAREST kick-off Meeting 9-11 October, 2006 - Bologna NEARESTWP4 INGV: Leader PI: Paolo Favali

• Deep sea long-term mission (about 1 year, Deep sea long-term mission (about 1 year, R/V Urania): input from WP1 (Tsunami R/V Urania): input from WP1 (Tsunami source identification) and WP2 (Tsunami source identification) and WP2 (Tsunami source characterisation)source characterisation)

• Integration of seismic data in the marine Integration of seismic data in the marine data-base of the OBS data (WP3 – data-base of the OBS data (WP3 – seismological monitoring)seismological monitoring)

Work to be done (2/2)

Page 8: NEAREST kick-off Meeting 9-11 October, 2006 - Bologna NEARESTWP4 INGV: Leader PI: Paolo Favali

ISMAR-BO.ISMAR-BO. FFCUL, CSIC FFCUL, CSIC marine site selection and characterisation for marine site selection and characterisation for the pilot experimentthe pilot experimenton the basis of the knowledge of the areaon the basis of the knowledge of the area

ISMAR-BOISMAR-BO cruises responsiblecruises responsible

AWI, UGR, IM AWI, UGR, IM common requirements of sensor sampling rates common requirements of sensor sampling rates

TFH TFH MODUS for the pilot experiment MODUS for the pilot experiment (deployment/recovery) (deployment/recovery)

ISMARBO

FFCUL CSIC AWI UBO INGV TFH UGR IM CNRST XISTOS

H H M M Leader H H M

Partners involved WP4 Partners involved WP4

Page 9: NEAREST kick-off Meeting 9-11 October, 2006 - Bologna NEARESTWP4 INGV: Leader PI: Paolo Favali

Task 4.1 Definition of sensor requirements and sensor selection; Task 4.1 Definition of sensor requirements and sensor selection; requirements of the detection software (e.g., detection requirements of the detection software (e.g., detection algorithm, triggering threshold, messages).algorithm, triggering threshold, messages).

Task 4.2 Design and development of modifications (e.g., sensor Task 4.2 Design and development of modifications (e.g., sensor supports of the frame); design and development of the supports of the frame); design and development of the software.software.

Task 4.3 Integration of new sensors/devices and new software in Task 4.3 Integration of new sensors/devices and new software in the seafloor observatory, tests of the functionality in the seafloor observatory, tests of the functionality in

laboratory.laboratory.

Task 4.4 Preparation planning and implementation of a long-term Task 4.4 Preparation planning and implementation of a long-term (about 1 year) mission; cruises for deployment and (about 1 year) mission; cruises for deployment and

recovery. recovery.

Task 4.5 Data back-up, quality checks, preparation of the data Task 4.5 Data back-up, quality checks, preparation of the data base to be integrated with other data; pre-analysis of base to be integrated with other data; pre-analysis of ‘parent’ ‘parent’ tsunami signals.tsunami signals.

Page 10: NEAREST kick-off Meeting 9-11 October, 2006 - Bologna NEARESTWP4 INGV: Leader PI: Paolo Favali

D10D10 definition of sensors’, software definition of sensors’, software requirements for the deep-sea platformrequirements for the deep-sea platform

D11D11 detailed design for the integration of detailed design for the integration of new sensors and device in the deep-sea new sensors and device in the deep-sea platformplatform

D12D12 integration of new sensors, test of integration of new sensors, test of functionality of the deep-sea platformfunctionality of the deep-sea platform

D13D13 deployment procedure for the deep-sea deployment procedure for the deep-sea platformplatform

D14D14 deployment cruise of the deep-sea deployment cruise of the deep-sea platform and cruise reportplatform and cruise report

D15a recovery cruise of the deep-sea platform D15a recovery cruise of the deep-sea platform and data quality checksand data quality checks

D15bD15b cruise reportcruise report

WP4 DeliverablesWP4 Deliverables

m 4m 4

m 8m 8

m 11m 11

m 11m 11

m 12m 12

m 24m 24

m 24m 24