Page 1: NEA Follow-up Characterization Needs and Issues: Radar and Optical Lance Benner Jet Propulsion Laboratory California Institute of Technology

NEA Follow-up Characterization Needs and Issues: Radar and Optical

Lance BennerJet Propulsion Laboratory

California Institute of Technology

Page 2: NEA Follow-up Characterization Needs and Issues: Radar and Optical Lance Benner Jet Propulsion Laboratory California Institute of Technology

Spatially resolve objects with up to 4-meter resolution: Greatly exceeds any ground- or space-based optical telescope;3-D shapes, convex hulls, sizes, surface features, spin states, surface roughness and density, regolith distrubutions, constrain composition; gravitational environments.

Identify binary and ternary objects: orbital parameters, masses and bulk densities, orbital dynamics, constrain bulk porosity.

Improve orbits: Very precise: for ARM targets, measure distances to < 10 meters. Shrink uncertainties by many orders-of-magnitude for newly-discovered NEOs. Prevent loss of objects. Predict motion for decades to centuries. Radar observations of previously-known NEOs can reduce uncertainties by several tens of percent.

What Can Radar Do?

Page 3: NEA Follow-up Characterization Needs and Issues: Radar and Optical Lance Benner Jet Propulsion Laboratory California Institute of Technology

Arecibo: 305 m

Goldstone70 m

Capabilities are complementary

Page 4: NEA Follow-up Characterization Needs and Issues: Radar and Optical Lance Benner Jet Propulsion Laboratory California Institute of Technology

Arecibo Goldstone Diameter 305 m 70 m

Transmitter power 900 kW 450 kW

Transmitter frequency 2.38 GHz 8.56 GHz

System temperature 23 K 17 K

Sky coverage ~1/3 ~80%

Declination coverage -1 to +38 > -35 deg

Finest range resolution 7.5 m 3.75 m

Arecibo is ~20x more sensitive. Goldstone sees more of the sky and can track several times longer. Arecibo is easier to schedule on short notice. Goldstone resolves slow rotators 3.6x more finely. Airspace coordination is necessary at Goldstone but not at Arecibo.

Page 5: NEA Follow-up Characterization Needs and Issues: Radar and Optical Lance Benner Jet Propulsion Laboratory California Institute of Technology

Near-Earth Asteroids Observed by RadarH > 27: N =10; 2.6% of all NEAs detected by radar

Page 6: NEA Follow-up Characterization Needs and Issues: Radar and Optical Lance Benner Jet Propulsion Laboratory California Institute of Technology

2005 YU55: 2011 Nov. 9, GoldstoneRounded shape, evidence for boulders, an equatorial bulge, and craters

Diameter ~ 360 meters, 1.875 m x 0.005 Hz

Busch et al., in prep.

Page 7: NEA Follow-up Characterization Needs and Issues: Radar and Optical Lance Benner Jet Propulsion Laboratory California Institute of Technology

Goldstone Bistatic Radar Image of 2012 XB112H = 29.7, D ~ 2 m, Resolution = 3.75 m x 0.25 Hz

Resolved in Doppler frequency but not in range: too small

Target-of-opportunity piggybacked on observations of 4179 Toutatis

R

ange

Doppler frequency

Page 8: NEA Follow-up Characterization Needs and Issues: Radar and Optical Lance Benner Jet Propulsion Laboratory California Institute of Technology

Radar Contributions to ARMRadar AstrometryMeasure distances to < 10 meters; can prevent loss of objects

Facilitate detection of perturbations from solar radiation pressure: provides area/mass ratio.

ARM targets are too small for radar images; no 3D models.

Echo Power Spectra: Resolve in Doppler FrequencyEcho bandwidths can provide rotation period, pole direction, the convex hull, and other shape information.

If area/mass ratio is known, bandwidths constrain the mass and bulk density.

Convex hull places upper bounds on optical and radar albedos & constrains composition.

Radar albedo gives an estimate of surface density. Circular polarization ratio gauges near-surface roughness and (in some cases) composition.

Page 9: NEA Follow-up Characterization Needs and Issues: Radar and Optical Lance Benner Jet Propulsion Laboratory California Institute of Technology

Goldstone Echo from ARM Candidate 2006 RH120

P = 2.7 minutes

Convex Hull: Silhouette from Echo Power Spectra

E.g.: 4769 Castalia

Solar radiation pressure perturbationdetected & area/mass ratio estimated.Rough surface.

Centraldip

Page 10: NEA Follow-up Characterization Needs and Issues: Radar and Optical Lance Benner Jet Propulsion Laboratory California Institute of Technology

The Smallest NEAs Observed by Radar

Asteroid H Observatory2006 RH120 29.5 Goldstone2007 EH 27.6 Arecibo2010 AL30 27.2 Goldstone2010 UM7 27.6 Arecibo2011 UB 27.5 Arecibo2012 BX34 27.6 Goldstone2012 DH54 27.7 Arecibo2012 DX 27.1 Arecibo2012 XB112 29.7 Goldstone2013 EC20 29.0 Arecibo

2006 RH120 and 2012 XB112 are ~2 m in diameter

Page 11: NEA Follow-up Characterization Needs and Issues: Radar and Optical Lance Benner Jet Propulsion Laboratory California Institute of Technology

Obstacles for Scheduling Radar Observations on Short Notice

1: Is the asteroid in the declination window?

2: Are the SNRs strong enough for a detection?

3: Are the 3 pointing uncertainties small enough (< 20 arcsec)? If not, can optical astrometry improve them sufficiently before the radar observations?

4: Can we get telescope time and observing personnel?

5: Goldstone: To transmit full power (450 kW), can we get radiation clearance in time? We can’t get it on Friday, Saturday, or Sunday and it usually takes at least two days.

6: If < 0.008 AU, then we need to receive with a different telescope. Can we schedule DSS-13 or Green Bank?

Page 12: NEA Follow-up Characterization Needs and Issues: Radar and Optical Lance Benner Jet Propulsion Laboratory California Institute of Technology

Goldstone can observe at ¼ power without radiation clearance, enabling rapid response, but still need telescope time, observing personnel, small pointing uncertainties, and strong SNRs.

Goldstone schedules fixed months in advance are difficult to change on short notice. To support ARM, priority of radar observations MUST increase.

At Goldstone, we can get radiation clearance faster if we already have it for another NEA with overlapping view periods. (e.g.: 2012 XB112)

For ARM targets, short notice is the biggest problem for scheduling radar observations because most targets will be close enough to detect for only a few days at best.

Maintenance at Arecibo is suffering due to NSF budget cuts.

The VLBA (radar speckle tracking: NEA spin states) and Green Bank (bistatic receiver for very close targets) might close due to NSF budget cuts.

Goldstone currently has only one functional spare klystron.

Other Issues: Radar

Page 13: NEA Follow-up Characterization Needs and Issues: Radar and Optical Lance Benner Jet Propulsion Laboratory California Institute of Technology

Principal Techniques for Optical Characterization

Calibrated Astrometry: Improve orbits, obtain better absolute magnitudes. H values for tiny NEAs are notoriously unreliable.

Lightcurves: Rotation periods and pole directions. NPA rotators and binaries. Convex shape models. Best estimates of absolute magnitudes. Small telescopes can help. Need more facilities in the southern hemisphere.

Photometric Colors: Identify optically bright and dark spectral classes. Can obtain with smaller telescopes and at fainter magnitudes than vis-IR spectroscopy (e.g., 0.6 m at Table Mountain). Need more help with this.

Vis-IR Spectroscopy: Spectral classes and compositions. Albedo constraints. NASA’s IRTF has a protocol for rapid responses to TOOs. Need access to more telescopes equipped for this, especially southern hemisphere.

IR radiometry: Albedos and diameters using thermal emission. Also: thermal inertias. Spitzer Space Telescope, Gemini, Subaru, IRTF, et al. Notpossible with small telescopes at low elevations.

Page 14: NEA Follow-up Characterization Needs and Issues: Radar and Optical Lance Benner Jet Propulsion Laboratory California Institute of Technology

International collaboration will be critical. Need to start establish international collaborations ASAP.

Optical telescopes have much less stringent pointing requirements than radar.

Need sufficiently bright magnitudes and favorable solar elongations.

Weather is critical.

Rapid response protocols vary among observatories.

Need a central clearinghouse to track observations of each ARM candidate.

Need access to more facilities in the southern hemisphere. Las Cumbres Observatory Global Telescope could really help with astrometry and lightcurves.

Identify mothballed or otherwise underutilized facilities to see if it would be worthreturning them to service (e.g., 100” on Mt. Wilson). Siding Spring and Kitt Peak

are threatened with closure and could thus be available to help.

Optical Observations: Issues

Page 15: NEA Follow-up Characterization Needs and Issues: Radar and Optical Lance Benner Jet Propulsion Laboratory California Institute of Technology
Page 16: NEA Follow-up Characterization Needs and Issues: Radar and Optical Lance Benner Jet Propulsion Laboratory California Institute of Technology

Enhancing Goldstone Radar Observations of NEAs Increase time on DSS-14 - The number of observed asteroids could be at least doubled (~50/year)- For short-notice targets-of-opportunity radiation clearance is an obstacle

Upgrade the klystrons at DSS-14- New X-band klystron design with 120 MHz bandwidth: 1.25 m resolution.- Retain current transmitter power of 450 kW- First light: 2017 (cost ~$10M)

- Increase the resolution to 1.25 m AND double the power to 900 kW- SIGNIFICANTLY better science- Preliminary cost estimate: $20-30M, first light ~2020

Add an 80 MHz, 80 kW transmitter to DSS-13 (34 m antenna)- 1.875 meter resolution. 2x finer than the best currently available- DSS-13 is largely underused; usually available. - Receive at DSS-28; 1/16th as sensitive as DSS-14 - Niche system for really close flybys - Receive at Arecibo. Boosts SNR substantially

Page 17: NEA Follow-up Characterization Needs and Issues: Radar and Optical Lance Benner Jet Propulsion Laboratory California Institute of Technology

1.25 m Resolution Plus Double TX Power at DSS 14 Means:

- We are in much better position to study small (and large) asteroids

- Asteroids that used to be too weak for radar become detectable

- Asteroids that are already observable will be stronger targets and we’ll get higher quality data

- More surface features will be visible

- Windows of opportunity to observe and improve the orbit will lengthen

- Shape models for significantly smaller objects, including some ARM targets

- Easier detection of asteroid satellites due to higher SNRs

- 1.25 m resolution facilitates detection of boulders on asteroid surfaces

- Enhaces bistatic tracks with Arecibo and Green Bank (5x and 2x increase in sensitivity): More opportunities to utilize 1.25 m resolution

- Improves radar speckle tracking at the VLBA and VLA. More spin states.

Page 18: NEA Follow-up Characterization Needs and Issues: Radar and Optical Lance Benner Jet Propulsion Laboratory California Institute of Technology

Enhancing Arecibo Radar Observations

1. Increase telescope time with additional funding.Easiest and fastest way to augment radar observations significantly. Easier to accomplish than at Goldstone.Enhanced funding will also help with overall maintenance, which is suffering again due to budget cuts from the NSF. 2. Switch Arecibo klystrons from S-band to 120 MHz klystrons at X-band. 6x finer range resolution & 3.6x finer Doppler resolution. Major changes necessary: improve X-band receivers,

adjust shape of dish, probably othersCost & timeline unknown

Page 19: NEA Follow-up Characterization Needs and Issues: Radar and Optical Lance Benner Jet Propulsion Laboratory California Institute of Technology

Enhancing Bistatic Radar Observations

Install new X-band datataking equipment at Arecibo and Green Bank to receive 1.25 m transmissions from DSS-14

Install new equipment at DSS-14 to receive 7 GHz, 1.875 m transmissions from DSS-13

Support radar speckle experiments (PI: M. W. Busch) with theVLBA and VLA.

Looming problem: The VLBA and Green Bank are facing budget cuts and may close. Closure of the VLBA would end mostradar speckle tracking and that technique’s potential for obtaining significantly more NEA pole directions.