ncpc file #: 7624 st. elizabeths west campus · • i-295 malcolm x interchange improvements,...

22
Submitted by the General Services Administration Preliminary Site Development Plans NCPC File #: 7624 St. Elizabeths West Campus I-295 /Malcolm X Interchange Improvement Project ______________

Upload: others

Post on 20-Jun-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: NCPC File #: 7624 St. Elizabeths West Campus · • I-295 Malcolm X interchange improvements, inclusive of six new bridges, one existing bridge widening, and additional retaining

Submitted by the General Services Administration

Preliminary Site Development Plans

NCPC File #: 7624

St. Elizabeths West CampusI-295 /Malcolm X Interchange Improvement Project

______________

Page 2: NCPC File #: 7624 St. Elizabeths West Campus · • I-295 Malcolm X interchange improvements, inclusive of six new bridges, one existing bridge widening, and additional retaining

2

Project Information

Project summary:The General Services Administration submitted for preliminary approval an access roadway project associated with theSaint Elizabeths West Campus development. This project consists of the following:

• An Off-Site Access Road through Shepherd Parkway connecting to the previously approved and constructed On-SiteAccess Road and connecting to an improved I-295/Malcolm X Interchange;

• Two retaining walls support the Off-Site Access Road: The retaining wall along the eastern side (adjacent to ShepherdParkway) is designated RW-1 and the retaining wall along the western side (between NB I-295 and the Off-Site AccessRoad) is designated RW-2. These wall heights range from less than 5 feet to as tall as 20 feet.

• I-295 Malcolm X interchange improvements, inclusive of six new bridges, one existing bridge widening, and additionalretaining walls to accommodate access to the Off-Site Access Road. These wall heights range from less than 5 feet toup to 32 feet.

• 80% of the retaining walls are less than 15 feet. The other 20% are between 15 and 32 feet.• Landscape, lighting, signage, utilities and site work within the Limits of Disturbance (LOD) associated with the

construction of these Off-Site Transportation Improvements.• More than a mile long and• Requires a land transfer from NPS

Commission meeting date: May 7, 2015

NCPC review authority: USC 40 8722 (b)(1) and (d)

Applicant request: Preliminary site development approval

Delegated / consent / open / executive session: Open

NCPC Review Officer: Hart

NCPC File number: 7624

Page 3: NCPC File #: 7624 St. Elizabeths West Campus · • I-295 Malcolm X interchange improvements, inclusive of six new bridges, one existing bridge widening, and additional retaining

3

Project Location

Page 4: NCPC File #: 7624 St. Elizabeths West Campus · • I-295 Malcolm X interchange improvements, inclusive of six new bridges, one existing bridge widening, and additional retaining

4

Existing Conditions

Page 5: NCPC File #: 7624 St. Elizabeths West Campus · • I-295 Malcolm X interchange improvements, inclusive of six new bridges, one existing bridge widening, and additional retaining

5

Project Area

Page 6: NCPC File #: 7624 St. Elizabeths West Campus · • I-295 Malcolm X interchange improvements, inclusive of six new bridges, one existing bridge widening, and additional retaining

6

Limits of Disturbance

Page 7: NCPC File #: 7624 St. Elizabeths West Campus · • I-295 Malcolm X interchange improvements, inclusive of six new bridges, one existing bridge widening, and additional retaining

7

Wall Heights – Northern Section

Page 8: NCPC File #: 7624 St. Elizabeths West Campus · • I-295 Malcolm X interchange improvements, inclusive of six new bridges, one existing bridge widening, and additional retaining

8

Wall Heights – Middle Section

Page 9: NCPC File #: 7624 St. Elizabeths West Campus · • I-295 Malcolm X interchange improvements, inclusive of six new bridges, one existing bridge widening, and additional retaining

9

Wall Heights – Southern Section

Page 10: NCPC File #: 7624 St. Elizabeths West Campus · • I-295 Malcolm X interchange improvements, inclusive of six new bridges, one existing bridge widening, and additional retaining

10

Landscape Design Concept

Page 11: NCPC File #: 7624 St. Elizabeths West Campus · • I-295 Malcolm X interchange improvements, inclusive of six new bridges, one existing bridge widening, and additional retaining

11

Roadway Landscaping

Page 12: NCPC File #: 7624 St. Elizabeths West Campus · • I-295 Malcolm X interchange improvements, inclusive of six new bridges, one existing bridge widening, and additional retaining

12

Roadway Landscaping

Page 13: NCPC File #: 7624 St. Elizabeths West Campus · • I-295 Malcolm X interchange improvements, inclusive of six new bridges, one existing bridge widening, and additional retaining

13

Roadway Landscaping

Page 14: NCPC File #: 7624 St. Elizabeths West Campus · • I-295 Malcolm X interchange improvements, inclusive of six new bridges, one existing bridge widening, and additional retaining

14

Roadway Section with Landscaping

Page 15: NCPC File #: 7624 St. Elizabeths West Campus · • I-295 Malcolm X interchange improvements, inclusive of six new bridges, one existing bridge widening, and additional retaining

15

Roadway Section with Landscaping

Page 16: NCPC File #: 7624 St. Elizabeths West Campus · • I-295 Malcolm X interchange improvements, inclusive of six new bridges, one existing bridge widening, and additional retaining

16

Area of Potential Effects

Page 17: NCPC File #: 7624 St. Elizabeths West Campus · • I-295 Malcolm X interchange improvements, inclusive of six new bridges, one existing bridge widening, and additional retaining

17

Detail Section

Design specifics:• Three 11-foot travel

lanes• 10-foot shared use

path• Handrails, fencing,

lighting• Bio-retention areas

Page 18: NCPC File #: 7624 St. Elizabeths West Campus · • I-295 Malcolm X interchange improvements, inclusive of six new bridges, one existing bridge widening, and additional retaining

18

View Simulation – Westward along Malcolm X Avenue

Existing View Proposed View

Page 19: NCPC File #: 7624 St. Elizabeths West Campus · • I-295 Malcolm X interchange improvements, inclusive of six new bridges, one existing bridge widening, and additional retaining

19

View Simulation – Looking eastward from JBAB

Existing View Proposed View

Page 20: NCPC File #: 7624 St. Elizabeths West Campus · • I-295 Malcolm X interchange improvements, inclusive of six new bridges, one existing bridge widening, and additional retaining

20

Section

Page 21: NCPC File #: 7624 St. Elizabeths West Campus · • I-295 Malcolm X interchange improvements, inclusive of six new bridges, one existing bridge widening, and additional retaining

21

Proposed Signage

Page 22: NCPC File #: 7624 St. Elizabeths West Campus · • I-295 Malcolm X interchange improvements, inclusive of six new bridges, one existing bridge widening, and additional retaining

22

Proposed Lighting