ELECTRIC RESOURCE MAP Wind Landfill Hydroel ectric Solar Natural Gas Geot hermal Donald Von Raesfeld Power Plant | 147 MW Cogeneration Plant #1 | 7 MW Gianera Generating Station | 49.5 MW 230 kV Transmission Line | 400 MW Capacity Jenny Strand Solar PV System | 100 kW Tasman Parking Structure Solar PV | 400 kW Ameresco Santa Clara Landfill Gas | 750 kW LEGEND Rosamond Solar | 20 MW Manzana Wind Power | 50 MW Altamont Wind Projects | 49.5 MW Ameresco Vasco Landfill Gas | 4.6 MW NCPA Combustion Turbine Facilities | 31 MW M-S-R Big Horn I Wind | 105 MW M-S-R Big Horn II Wind | 17 MW Western Area Power Administration (WAPA) | 136 MW Stony Creek Hydroelectric | 11.6 MW Grizzly Hydroelectric | 20 MW NCPA Lodi Energy Center Natural Gas | 72 MW G2 Landfill Gas | 1.3 MW NCPA Geothermal | 52 MW Friant I Small Hydroelectric | 25 MW Friant II Small Hydroelectric | 7 MW Tri-Dam Large & Small Hydroelectric | 109.5 MW Tri-Dam Small Hydroelectric | 16.2 MW NCPA Calaveras Hydroelectric | 91.4 MW Ameresco Forward Landfill Gas | 4.6 MW SVP Jointly Owned Transmission Projects California-Oregon Transmission Project Tesla-Midway Transmission Service IN TOWN RESOURCES Santa Clara, CA Central 40 Solar | 40 MW Viento Loco Wind | 200 MW

Upload: others

Post on 05-Dec-2021

9 views

Category:

Documents


0 download

TRANSCRIPT

ELECTRICRESOURCE

MAP

Wind LandfillHydroelectricSolar Natural GasGeothermal

Donald Von Raesfeld Power Plant | 147 MW

Cogeneration Plant #1 | 7 MW

Gianera Generating Station | 49.5 MW

230 kV Transmission Line | 400 MW Capacity

Jenny Strand Solar PV System | 100 kW

Tasman Parking Structure Solar PV | 400 kW

Ameresco Santa Clara Landfill Gas | 750 kW

LEGEND

Rosamond Solar | 20 MW

Manzana Wind Power | 50 MW

Altamont WindProjects | 49.5 MW

Ameresco Vasco Landfill Gas | 4.6 MW

NCPA Combustion Turbine Facilities | 31 MW

M-S-R Big Horn I Wind | 105 MW M-S-R Big Horn II Wind | 17 MW

Western Area Power Administration (WAPA) | 136 MW

Stony Creek Hydroelectric | 11.6 MW

Grizzly Hydroelectric | 20 MW

NCPA Lodi Energy Center Natural Gas | 72 MW

G2 Landfill Gas | 1.3 MW

NCPA Geothermal | 52 MW

Friant I Small Hydroelectric | 25 MW

Friant II Small Hydroelectric | 7 MW

Tri-Dam Large & Small Hydroelectric | 109.5 MW

Tri-Dam Small Hydroelectric | 16.2 MW

NCPA Calaveras Hydroelectric | 91.4 MW

Ameresco Forward Landfill Gas | 4.6 MW

SVP Jointly Owned Transmission Projects

California-Oregon Transmission Project Tesla-Midway Transmission Service

IN TOWN RESOURCES Santa Clara, CA

Central 40 Solar | 40 MW

Viento Loco Wind | 200 MW

M-S-R Big Horn I Wind ProjectLocation: Brickleton,WAOwnership: Avangrid (PPA)Size: 200 MW; 105 MW to

SVPCompleted: 2006

M-S-R Big Horn II Wind ProjectLocation: Brickleton,WAOwnership: Avangrid (PPA)Size: 50 MW; 17 MW to SVPCompleted: 2010

Manzana Wind Power ProjectLocation: Kern County, CAOwnership: Avangrid (PPA)Size: 189 MW; 50 MW to SVPCompleted: 2012

SVP

Altamont Wind ProjectsLocation: Alameda County, CAOwnership: sPowerSize: 49.5 MWProjected: 2020

NCPA Lodi Energy CenterLocation: Lodi, CAOwnership: NCPA (JPA)Size: 280 MW; 72 MW to SVPCompleted: 2012

Donald Von Raesfeld Power PlantLocation: Santa Clara, CAOwnership: Silicon Valley PowerSize: 147 MWCompleted: 2005

Cogeneration Plant #1Location: Santa Clara, CAOwnership: Silicon Valley PowerSize: 7 MWCompleted: 1981

NCPA Combustion Turbine FacilitiesLocation: Alameda & Lodi, CAOwnership: NCPA (JPA)Size: 75 MW; 31 MW to SVPCompleted: 1986

Gianera Generating StationLocation: Santa Clara, CAOwnership: Silicon Valley PowerSize: 49.5 MWCompleted: 1986

G2 Landfill GasLocation: Wheatland, CAOwnership: G2Energy (PPA)Size: 1.3 MWCompleted: 2009

Ameresco Santa Clara Landfill GasLocation: Santa Clara, CAOwnership: Ameresco (PPA)Size: 750 KWCompleted: 2009

Ameresco Forward Landfill GasLocation: Manteca, CAOwnership: Ameresco (PPA)Size: 4.6 MWCompleted: 2014

Ameresco Vasco Landfill GasLocation: Livermore, CAOwnership: Ameresco (PPA)Size: 4.6 MWCompleted: 2014Landfill

Geothermal

Natural Gas

Wind

Grizzly Hydroelectric ProjectLocation: Plumas CountyOwnership: Silicon Valley PowerSize: 20 MWCompleted: 1993

Western Area Power AdministrationLocation: Sacramento, CAOwnership: WAPA (PPA)Size: multiple; 136 MW toCompleted: 1985

NCPA Calaveras Hydroelectric ProjectLocation: Stanislaus River BasinOwnership: NCPA (JPA)Size: 252 MW; 91.4 MW to SVPCompleted: 1990

Location: Tuolumne County, CAOwnership: The Tri-Dam Project (PPA)Size: 16.2 MWCompleted: 2016

Tri-Dam Small Hydroelectric Project Friant I Small Hydroelectric ProjectLocation: Fresno County, CAOwnership: Friant Power Authority (PPA)Size: 25 MWCompleted: 2016

Friant II Small Hydroelectric ProjectLocation: Fresno County, CAOwnership: Friant Power Authority (PPA)Size: 7 MWCompleted: 2017

Stony Creek Hydroelectric SystemLocation: Stony Creek River SystemOwnership: Silicon Valley PowerSize: 11.6 MWCompleted: 1998

Tri-Dam Large & Small Hydroelectric ProjectLocation: Tuolumne County, CAOwnership: The Tri-Dam Project (PPA)Size: 109.5 MWCompleted: 2014

Hydroelectric

Solar

City of Santa Clara Electric Resource Map

Location: Sonoma/Lake County Ownership: NCPA (JPA)Size: 116 MW; 52 MW to SVPCompleted: 1983

NCPA Geothermal Project

Viento Loco WindLocation: Lincoln County, NMOwnership: Pattern Wind (PPA)Size: 200 MWProjected: 2021

Location: Santa Clara, CAOwnership: Silicon Valley PowerSize: 400 KWCompleted: 2013

Tasman Parking Structure Solar PV Rosamond SolarLocation: Kern County, CAOwnership: Recurrent Energy (PPA)Size: 20 MWCompleted: 2013

Jenny Strand Solar PV SystemLocation: Santa Clara, CAOwnership: Silicon Valley PowerSize: 100 KWCompleted: 2012

Central 40 SolarLocation: Merced County, CAOwnership: Central 40 LLC (PPA)Size: 40 MWProjected: 2020

NOTE | For pre-existing resources, the Completeddate indicates when SVP began taking deliveries.