2019 AASHTO COBS Annual Meeting T-11: TC for Research Waseem Dekelbab, PhD, PE, PMP Montgomery, AL June 25, 2019 NCHRP BRIDGE AND STRUCTURE RESEARCH UPDATES

Upload: others

Post on 08-Aug-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: NCHRP BRIDGE AND STRUCTURE RESEARCH UPDATES...FY 2020 NCHRP Submitted Problem Statements 127 Problem Statements ($56 M) New Problem Statements: 114 ($46 M) AASHTO Committees: 77 ($31

2019 AASHTO COBS Annual Meeting

T-11: TC for Research

Waseem Dekelbab, PhD, PE, PMP

Montgomery, AL

June 25, 2019

NCHRP BRIDGE AND STRUCTURE

RESEARCH UPDATES

Page 2: NCHRP BRIDGE AND STRUCTURE RESEARCH UPDATES...FY 2020 NCHRP Submitted Problem Statements 127 Problem Statements ($56 M) New Problem Statements: 114 ($46 M) AASHTO Committees: 77 ($31

OUTLINE

• FY 2020 NCHRP Program Funding

• NCHRP Bridge and Structure Projects– Funded (FY 2020)

– Completed/Published/In progress

Page 3: NCHRP BRIDGE AND STRUCTURE RESEARCH UPDATES...FY 2020 NCHRP Submitted Problem Statements 127 Problem Statements ($56 M) New Problem Statements: 114 ($46 M) AASHTO Committees: 77 ($31

NATIONAL

COOPERATIVE

HIGHWAY

RESEARCH

PROGRAM

FY 2020 NCHRP Program Funding

Page 4: NCHRP BRIDGE AND STRUCTURE RESEARCH UPDATES...FY 2020 NCHRP Submitted Problem Statements 127 Problem Statements ($56 M) New Problem Statements: 114 ($46 M) AASHTO Committees: 77 ($31

FY 2020 NCHRP Submitted

Problem Statements127 Problem Statements

($56 M)

New Problem Statements: 114 ($46 M)

AASHTO Committees: 77

($31 M)

Member Departments:

34 ($14 M)

FHWA: 3

($1 M)

Continuations: 13 ($10 M)

Page 5: NCHRP BRIDGE AND STRUCTURE RESEARCH UPDATES...FY 2020 NCHRP Submitted Problem Statements 127 Problem Statements ($56 M) New Problem Statements: 114 ($46 M) AASHTO Committees: 77 ($31
Page 6: NCHRP BRIDGE AND STRUCTURE RESEARCH UPDATES...FY 2020 NCHRP Submitted Problem Statements 127 Problem Statements ($56 M) New Problem Statements: 114 ($46 M) AASHTO Committees: 77 ($31

FY 2020 NCHRP Programming

Problem Statements Submitted (Million) Programmed (Million)

Continuations 13 ($10) 11 ($7.740)New 114 ($46) 58 ($25.590)Total 127 ($56) 69 ($33.330)

New Problem Statements Submitted by:

AASHTO Committees 77 ($31) 46 ($20.195)Member Departments 34 ($14) 11 ($5.045)FHWA 3 ($1) 1 (0.350)

Page 7: NCHRP BRIDGE AND STRUCTURE RESEARCH UPDATES...FY 2020 NCHRP Submitted Problem Statements 127 Problem Statements ($56 M) New Problem Statements: 114 ($46 M) AASHTO Committees: 77 ($31

Continuations

11 Projects

$7,740,000

7 Special projects

$6,620,000 (86%)

Synthesis, IDEA, Domestic Scan, Legal Studies, NCHRP Implementation, and Research for Administration of Highway &Transportation Agencies (CEOs)

4 Continuation projects

$1,120,000 (14%)

Page 8: NCHRP BRIDGE AND STRUCTURE RESEARCH UPDATES...FY 2020 NCHRP Submitted Problem Statements 127 Problem Statements ($56 M) New Problem Statements: 114 ($46 M) AASHTO Committees: 77 ($31

AASHTO Committees # of Problems Submitted # of Problems Programmed

Active Transportation 2 1

Bridges and Structures 4 3

Design 1 1

Design - Geometric Design 5 4

Design - Roadside Safety 5 3

Environment and Sustainability 10 3

Funding and Finance 2 1

Knowledge and Management 1 1

Maintenance 5 2

Materials and Pavement 4 4

Planning 1 1

Performance-Based Management 3 3

Public Transportation 5 3

Research and Innovation 6 2

Research and Innovation & Planning 1 1

Right of Way, Utilities and Outdoors 5 2

Safety 5 5

Traffic Engineering 2

Transportation System Security and Resilience 3 3

Data Management and Analytics and Trasp. System Security and Resilience

1 1

Transportation Systems Management and Operations 4 2

Urban Freight 2 1

Total 77 46

Page 9: NCHRP BRIDGE AND STRUCTURE RESEARCH UPDATES...FY 2020 NCHRP Submitted Problem Statements 127 Problem Statements ($56 M) New Problem Statements: 114 ($46 M) AASHTO Committees: 77 ($31

FY 2020 NCHRP New Projects

New

58 projects

$25,590,000

Other areas

55

$23,840,000

(93.2%)

CBS

3

$1,750,000

(6.8%)

Page 10: NCHRP BRIDGE AND STRUCTURE RESEARCH UPDATES...FY 2020 NCHRP Submitted Problem Statements 127 Problem Statements ($56 M) New Problem Statements: 114 ($46 M) AASHTO Committees: 77 ($31

NATIONAL

COOPERATIVE

HIGHWAY

RESEARCH

PROGRAM

NCHRP Bridge and Structure Projects

Page 11: NCHRP BRIDGE AND STRUCTURE RESEARCH UPDATES...FY 2020 NCHRP Submitted Problem Statements 127 Problem Statements ($56 M) New Problem Statements: 114 ($46 M) AASHTO Committees: 77 ($31

FY 2019 Funded Projects -Off cycle

Project Title Funds

22-41 Proposed Modification to AASHTO LRFD Bridge Design Specifications, Section 13—Railing (CBS, Off-cycle)

$250K

Page 12: NCHRP BRIDGE AND STRUCTURE RESEARCH UPDATES...FY 2020 NCHRP Submitted Problem Statements 127 Problem Statements ($56 M) New Problem Statements: 114 ($46 M) AASHTO Committees: 77 ($31

FY 2020 Funded Projects

Project Title Funds

C-01(12-119

Bridge Deck Overhangs with MASH-Compliant Railings(CBS#1)

$500K

C-05(12-120)

Developing High Strength Corrosion Resistant Steel Strands for Prestressing( COBS#2)

$600K+$150K

Page 13: NCHRP BRIDGE AND STRUCTURE RESEARCH UPDATES...FY 2020 NCHRP Submitted Problem Statements 127 Problem Statements ($56 M) New Problem Statements: 114 ($46 M) AASHTO Committees: 77 ($31

FY 2020 Funded Projects

Project Title Funds

C-04Rational Tolerances for Fabrication of Steel Bridge Members.(CBS#3)

$400K-contingency

C-23(14-45)

Model Procedures for Post-Event Bridge Damage Assessment and Engineering Evaluation (CBS#4)

$300K +$200K

Page 14: NCHRP BRIDGE AND STRUCTURE RESEARCH UPDATES...FY 2020 NCHRP Submitted Problem Statements 127 Problem Statements ($56 M) New Problem Statements: 114 ($46 M) AASHTO Committees: 77 ($31

NCHRP Bridge and Structure Projects Completed/Published/In progress

http://www.trb.org/Main/Blurbs/178610.aspx

Page 15: NCHRP BRIDGE AND STRUCTURE RESEARCH UPDATES...FY 2020 NCHRP Submitted Problem Statements 127 Problem Statements ($56 M) New Problem Statements: 114 ($46 M) AASHTO Committees: 77 ($31

NCHRP BRIDGE AND STRUCTURE PROJECT

HIGHLIGHTS

Project Title

12-94LRFD Minimum Flexural Reinforcement RequirementsTo be published as NCHRP Research Report 906

12-96Simplified Full-Depth Precast Concrete Deck Panel Systems NCHRP Research Report 895

14-35Contribution of Steel Casing to Single Shaft Foundation Structural ResistanceNCHRP Research Report 908

Page 16: NCHRP BRIDGE AND STRUCTURE RESEARCH UPDATES...FY 2020 NCHRP Submitted Problem Statements 127 Problem Statements ($56 M) New Problem Statements: 114 ($46 M) AASHTO Committees: 77 ($31

NCHRP BRIDGE AND STRUCTURE PROJECT

HIGHLIGHTS –TO BE COMPLETED IN JULY 2019

Project Title

12-105Proposed AASHTO Seismic Specifications for ABC Column Connections

12-108Guide Specification for Service Life Design of Highway Bridges --Ballot

15-54Proposed Modifications to AASHTO Culvert Load Rating Specifications

Page 17: NCHRP BRIDGE AND STRUCTURE RESEARCH UPDATES...FY 2020 NCHRP Submitted Problem Statements 127 Problem Statements ($56 M) New Problem Statements: 114 ($46 M) AASHTO Committees: 77 ($31

NCHRP BRIDGE AND STRUCTURE PROJECT

HIGHLIGHTS

Project Title

14-34,Part I

Proposed AASHTO Guide for Bridge Preservation Actions --Ballot

Page 18: NCHRP BRIDGE AND STRUCTURE RESEARCH UPDATES...FY 2020 NCHRP Submitted Problem Statements 127 Problem Statements ($56 M) New Problem Statements: 114 ($46 M) AASHTO Committees: 77 ($31

NEED HELP?

Waseem Dekelbab, PhD, PE, PMP

202-334-1409

[email protected]

Transportation Research Board

The National Academies of Sciences,

Engineering, and Medicine