Page 1: NCC for your Data Center in Finland · 2019. 4. 18. · 5 2/7/2017 NCC Building NCC Data Center concept Electricity Immediate capacity 2-30 MW (110 kV Fingrid line) Construction of

Custom title slide Click on the picture

icon to change photo

2/7/2017 NCC Building 1

NCC for your Data Center in Finland

Page 2: NCC for your Data Center in Finland · 2019. 4. 18. · 5 2/7/2017 NCC Building NCC Data Center concept Electricity Immediate capacity 2-30 MW (110 kV Fingrid line) Construction of

Safety, cyber security and protected Data privacy • Finland is #1 safest country in the world (World Economic Forum 2015)

• No earthquakes, floods, tsunamis, tornadoes or political instabilities

• Guaranteed right of privacy of all information and stable and transparent legislation

• Governmental support – tax reductions and free business support services for foreign

investors

Cyber secure and safe environment and governmental support

Why Finland? You name it, we have it

Energy prices and Sustainable solutions • One of Europe’s lowest energy pricing and 99,99982% reliable power grid

• Free natural cooling – annual mean temperature in Helsinki region 5,9 °C

• Renewable energy sources and possibility to sell excess heat

Low operational costs and Total cost of ownership (TCO)

International connection HUB and developed ICT sector • Direct optical fiber sea cable from Helsinki to Rostock 144 Tbit/s total capacity

• Finland is #1 country in ICT readiness sector (World Economic Forum 2015)

• International cyber security cluster and availability of skilled work-force

Fastest data transmission and International ICT community

Largest foreign Data Centers in Finland

NCC Building 2/7/2017 2

Page 3: NCC for your Data Center in Finland · 2019. 4. 18. · 5 2/7/2017 NCC Building NCC Data Center concept Electricity Immediate capacity 2-30 MW (110 kV Fingrid line) Construction of

Medium right picture Click on the picture

icon to change photo

2/7/2017 NCC Building 3

We are ready to go! Project team and partners

Page 4: NCC for your Data Center in Finland · 2019. 4. 18. · 5 2/7/2017 NCC Building NCC Data Center concept Electricity Immediate capacity 2-30 MW (110 kV Fingrid line) Construction of

Title 2 column Blue top

2/7/2017 NCC Building 4

NCC Data Center concept

• Module architecture scalable

according to Client’s needs

• 2 to 30 MW of critical power

(110kV grid)

• PUE level <1,15

• 10 month construction time

• Excess heat recovery system

• Ready Tier 3 engineering

solutions

• VDC

• LEED / BREEAM certification

Page 5: NCC for your Data Center in Finland · 2019. 4. 18. · 5 2/7/2017 NCC Building NCC Data Center concept Electricity Immediate capacity 2-30 MW (110 kV Fingrid line) Construction of

Title and content

Blue top

2/7/2017 NCC Building 5

NCC Data Center concept

Electricity Immediate capacity 2-30 MW (110 kV Fingrid line)

Construction of electrical connections on municipal land without

redemption

Additional energy source – natural gas, wind power, solar panels

Cooling system

IT Cooling System based on direct free air cooling system with

redundancy of N+1

Support rooms cooling based on close control units and

centralized chiller with redundancy of N+1

Excess heat recovery system Based on water heat pumps and heat recovery coils

Possibility to sell excess heat to district heating system (Fortum)

Page 6: NCC for your Data Center in Finland · 2019. 4. 18. · 5 2/7/2017 NCC Building NCC Data Center concept Electricity Immediate capacity 2-30 MW (110 kV Fingrid line) Construction of

Title on picture

with textbox Click on the picture

icon to change photo

Data Center by NCC in Järvenpää

Data Center land plot 1

Data Center land plot 2

Data Center Land plot 1 – 2,8 ha

Data Center Land plot 2 - 12,5 ha

Expansion possibilities

Building right > 50%

Electricity, fiber connections, district heating, natural gas

Municipalities on board

Approved city plan (Asemakaava)

We are looking for

• Owner

• (Co-) investor

• Customer

• Operator

• Partner

and / or

Page 7: NCC for your Data Center in Finland · 2019. 4. 18. · 5 2/7/2017 NCC Building NCC Data Center concept Electricity Immediate capacity 2-30 MW (110 kV Fingrid line) Construction of

Title 2 column Blue top

2/7/2017 NCC Building 7

NCC Data Center concept

IDEAS OR SUGGESTIONS? Contact US!

www.ncc.fi/datacenter

www.ncc.group/datacenter

Jari ”Harppi” Harapainen [email protected] +358 50 323 7582

Elizaveta ”Liza” Ageeva [email protected] +358 43 826 7610

Jenni Ijäs [email protected] +358 50 406 2822

Mika Ukonmaanaho [email protected] +358 50 377 2935

Page 8: NCC for your Data Center in Finland · 2019. 4. 18. · 5 2/7/2017 NCC Building NCC Data Center concept Electricity Immediate capacity 2-30 MW (110 kV Fingrid line) Construction of

Logotype

8 2/7/2017 NCC Building