Page 1: NC-H-Z-Z-006

5101209

Cheves Hydropower Project

Document Numbering System

Page 2: NC-H-Z-Z-006

FM

57_0

.do

t 200

2041

5

J09 2012-04-30 Updated document MDW

J08 2012-05-03 Additional information site areas MDW

J07 2011-08-18 Revised T and EM DNS MDW

A06 2011-02-22 Added SIGT contract identification code, removed T MDW

A05 2011-02-09 Added EM, H and T contract identification code ALI

A04 2011-01-26 Added DICTUC contract identification code MDW

A03 2011-01-20 Added X-Contract as type of document MDW

A02 2010-12-08 Updated document MDW

A01 2010-11-14 Internal MDW

Revision Date Description Prepared Checked Approved

This document has been prepared by Norconsult AS for the Client and the Project stated below. The content of the document is the property of Norconsult. The document shall only be used for the purpose stated in Norconsult’s contract with the Client, and shall not be copied, used or distributed for other purposes.Client

SN PowerDocument title Date

Cheves Hydropower Project 2010-11-14Prepared by

Document Numbering System MDWChecked by

Approved by

GuSolProject no. Document no. Revision

5101209 NC-H-Z-Z-006 J09

Page 3: NC-H-Z-Z-006

FM

57_0

.do

t 200

2041

5

TABLE OF CONTENT

1 INTRODUCTION.............................................................................................................................42 DOCUMENT NUMBERING SYSTEM, FORMAL DELIVERABLES......................................5

2.1 System.......................................................................................................................................52.2 Originator Code.......................................................................................................................52.3 Document Type........................................................................................................................52.4 Contract Identification Code..................................................................................................52.5 Area Code.................................................................................................................................62.6 Equipment Code (only EM-contract)....................................................................................62.7 Running Number.....................................................................................................................7

2.7.1 Civil Drawings, Main Numbers................................................................................72.7.2 Civil Drawings, Numbers based on Section of Area...............................................72.7.3 Electromechanical Drawings, Numbers based on Section or Function Code.......72.7.4 Hydraulic Steelworks Drawings, Main Numbers....................................................72.7.5 SIGT road drawings, Main Numbers.......................................................................8

2.8 Revision Index..........................................................................................................................83 document numbering system, Process documents..............................................................................9

Page 4: NC-H-Z-Z-006

FM

57_0

.do

t 200

2041

5

1 INTRODUCTION

This document describes the document numbering system (DNS) to be used on all deliverables for Cheves Hydropower Project except the T-contract. The document numbering system of the T-contractor can be found in Appendix 1.

The procedure contains document numbering system for formal deliverables and process documents. NOTE: The document manager shall be contacted if a document number for a formal deliverable is required.

Page 5: NC-H-Z-Z-006

FM

57_0

.do

t 200

2041

5

2 DOCUMENT NUMBERING SYSTEM, FORMAL DELIVERABLES

2.1 System

The following DNS shall be applied for all deliverables to Cheves Hydropower Project except the T-contract.

CC - T - X - Y - ZZZ - RRR

where:

CC T X Y ZZZ RRROriginator Code Document

TypeContract Identification Code

Area Code Serial Number Revision Index

NC… C … W A … Z A … Z 001-099 A01-Z99

Table 2.1.1

The revision index does not form part of the document number.

For serial number check “Document List Norconsult Deliverables”, NC-L-Z-Z-001.

2.2 Originator Code

NC → Engineering ContractorEM → EM ContractorH → H ContractorST → SIGTABB → EM Contractor (BOP) [Consortium ABB/Jeumont/Rainpower]JE → EM Contractor (Generator) [Consortium ABB/Jeumont/Rainpower]RP → EM Contractor (Turbine) [Consortium ABB/Jeumont/Rainpower]

2.3 Document Type

C → CalculationsD → DrawingsE → Equipment ListsH → Handbooks, Manuals, Procedures, etc (Plant data)L → Lists (Checklist, Requisition List, Bills of Material, etc)R → Reports, Notes, Memos, etcO → Operation / Maintenance DocumentationP → Plans (Document Plan, Progress Plan, Manpower Plan, etc)Q → Quality Assurance Plan (QA Plan)S → SpecificationsW → Work DescriptionsX → ContractsT → Test Report

2.4 Contract Identification Code

Z → General (common for all contracts)C → Civil ContractD → DICTUCH → Hydraulic Steelworks ContractN → Electro Mechanical Contract

Page 6: NC-H-Z-Z-006

FM

57_0

.do

t 200

2041

5

T → Transmission Line Contract

2.5 Area Code

Z → General (common for project)/Other locations

A → Huaura Dam and Intake (includes all construction works at Huaura, incl. road works)

B → Transfer Tunnel

C → Checras Headworks (includes all construction works at Checras, incl. road works)

D → Adit 1 (includes tunnel, tunnel portal, rig and spoil area, and road works)

E → Surge Tunnel (includes tunnel and portal)

F → Headrace Tunnel (includes headrace tunnel from Checras to Power House, incl. steel lined tunnel and construction adit at Checras)

G → Access Tunnel (includes access tunnel, adit to headrace tunnel, adit to power house, adit to tailrace tunnel)

H → Access Tunnel Portal and Switchyard Area (incl. road works)

I → Power House and Transformer Cavern

J → Tailrace Tunnel (includes tunnel and portal area (incl. road works))

K → Picunche Dam

2.6 Equipment Code (only EM-contract)

For the electromechanical related documentation, the following letter code shall be applied to determine what equipment the document applies to.

A → (E3) GeneratorB → (E3) ExcitationC → (E4) Power TransformerD → (E5) High Voltage CablesE → (E6) HV GAS Insulated Switchgear (GIS)F → (E7) Generator Main Connection and Neutral Earthing EquipmentG → (E8) Generator Circuit BreakerH → (E9) Medium voltage switchgearI → (E10) Station Supply - Auxiliary TransformersJ → (E10) Station Supply - Low Voltage ACK → (E10) Station Supply - DC SystemL → (E10) Station Supply - Diesel GeneratorsM → (E11) Control, protection and communicationN → (E12) Cables and EarthingO → (M4) Turbines 1 and 2P → (M5) GovernorsQ → (M6) Inlet ValvesR → (M7) Inlet Pipes

Page 7: NC-H-Z-Z-006

FM

57_0

.do

t 200

2041

5

S → (M8) Cooling Water Plant + M9 Fire Water PlantT → (M10) Potable Water and Sanitary Water and M11 Dewatering Plant and

Drainage PlantU → (ON-SHORE) Light and Small PowerV → (ON-SHORE) Fire Alarm SystemW → (ON-SHORE) AISX → (ON-SHORE) CraneZ → Common

2.7 Running Number

2.7.1 Civil Drawings, Main Numbers

For civil related drawings, the following system for the running numbers shall be applied:

001-049 → Layout/Arrangement050-074 → Setting out075-124 → Excavation125-199 → Foundation200-224 → Embankment Fill225-499 → Formwork500-599* → Reinforcement600-759 → Geological rock support documentation850-899 → Steelworks900-919 → Project Site920-999 → Other

Running number 500-759 to be applied for reinforcement for Checras, Picunche and Huaura.

2.7.2 Civil Drawings, Numbers based on Section of Area

The running number of the formwork and reinforcement drawings shall for some of the main areas (A, B, C, etc) be further divided into subareas.

2.7.3 Electromechanical Drawings, Numbers based on Section or Function Code

The running number of the electromechanical drawings shall be divided into subareas, which reflect the function code of generator, turbine and other electrical equipment.

Alphanumerical Numbers to be defined by ABB/Jeumont/Rainpower.000 →

2.7.4 Hydraulic Steelworks Drawings, Main Numbers

The running number of the hydraulic steelwork drawings shall be as follow:001-100 → Layout / arrangement drawings101-200 → Block out drawings and foundation and bolt plan drawings201-300 → Detail / workshop drawings301-400 → Hydraulic units including piping, hydraulic system drawings, control cabinets,

electrical circuit diagram etc.401-500 → Complete specifications and design calculations500-601 → Test reports and certificates601-700 → Operation instructions

Page 8: NC-H-Z-Z-006

FM

57_0

.do

t 200

2041

5

700-701 → Maintenance instructions

2.7.5 SIGT road drawings, Main Numbers

The running number of the road drawings shall be as follow:001-049 → Layout/Arrangement050-074 → Setting-out075-099 → Typical sections100-199 → Details, ditches, concrete works, etc200-249 → Signal drawings250-400 → Cross sections

2.8 Revision Index

To be able to identify the state of the document and whether it is valid for construction, an alphanumeric revision system is used. The revision system is according to Norconsult’s CAD-standard. The letter identifies the state of the document: A → Internal/PreliminaryB → Issued for Information/CommentsC → Issued for IDCD → Issued for Approval by ClientE → Issued for Approval by GovernmentsF → Issued for TenderG → Issued for Fabrication/PrefabricationH → Issued for ConstructionJ → Issued for UseU → DeletedZ → As Built

The revisions are given running numbers (2 digits) after the letter.

Further information regarding the revision status can be found in the CAD-manual.

Page 9: NC-H-Z-Z-006

FM

57_0

.do

t 200

2041

5

3 DOCUMENT NUMBERING SYSTEM, PROCESS DOCUMENTS

Documents prepared as part of the process shall follow a different denomination scheme than the formal deliverables described above. The process documents are letters, memos etc. submitted as part of the ongoing work and as partial deliverables prepared prior to the main deliverables.

The naming of the document shall be as follows:

NNFFFYYYYMMDD-O - <Description>

Note: The description does not form part of the document number, but shall be included in the name of the file.

NN = Company Code (NC = Norconsult …)

FFF = initials of the person responsible for preparing the document

YYYYMMDD = year, month, day of submittal

O = Running number of the process documents the document responsible is preparing that day

<Description> = A short text (title) describing the contents of the document

Example doc. no: NCMDW20101114-4Example file name: NCMDW20101114-4-Description_of_document_numbering_system

Process document prepared by Martin D. Westeren, Norconsult, on the 14th November 2010, regarding “Description of document numbering system”. The document is the 4th process document submitted by Martin D. Westeren that day.