NC 73 TRANSPORTATION/LAND USE CORRIDOR STUDY
American Planning Association Conference
March 20, 2005
NC
73
Tra
nsp
orta
tion
/ N
C 7
3 T
ran
spor
tati
on/
Lan
d U
se S
tud
yL
and
Use
Stu
dy
2
PARTICIPATING CITIES, COUNTIES AND
AGENCIES
Cabarrus County • Mecklenburg County • Lincoln County • Concord • Kannapolis • Davidson • Huntersville
• Cornelius • Mecklenburg-Union MPO/ Cabarrus- Rowan MPO/ Lake
Norman RPO
NC
73
Tra
nsp
orta
tion
/ N
C 7
3 T
ran
spor
tati
on/
Lan
d U
se S
tud
yL
and
Use
Stu
dy
3
INSERT SLIDE THAT SHOWS BETTER MAP OF REGION AND WHERE NC 73 IS IN RELATION TO CHARLOTTE AND I-85
NC
73
Tra
nsp
orta
tion
/ N
C 7
3 T
ran
spor
tati
on/
Lan
d U
se S
tud
yL
and
Use
Stu
dy
4
WHY A PLAN FOR NC 73 IS NEEDED?
• NC 73 is the region’s only major east-west highway alternative to I-85
• Located in rapidly growing area
NC
73
Tra
nsp
orta
tion
/ N
C 7
3 T
ran
spor
tati
on/
Lan
d U
se S
tud
yL
and
Use
Stu
dy
5
THE FACTS
GROWTH RATES 1990-2000Cabarrus County- 32.5%Lincoln County- 26.8%Mecklenburg County- 36.0%
Nearly 900,000 persons live in the three counties
NC
73
Tra
nsp
orta
tion
/ N
C 7
3 T
ran
spor
tati
on/
Lan
d U
se S
tud
yL
and
Use
Stu
dy
6
MORE FACTS ...
• ADT: • Population: Between 2000-2020,
population to double from 105,000 to 218,000
Add picture of Birkdale
NC
73
Tra
nsp
orta
tion
/ N
C 7
3 T
ran
spor
tati
on/
Lan
d U
se S
tud
yL
and
Use
Stu
dy
7
MORE FACTS…No Unified Vision/Regulations
•Cabarrus County Thoroughfare Plan calls for 120’ Wide Road; No funding for improvements
•Mecklenburg- Union MPO 2025 Plan calls for 100’ Wide Road; Funding ANTICIPATED BY 2025 for partial stretch between Davidson/ Concord Road and I-77 ONLY.
•1991 Lincoln County Thoroughfare Plan does not specifically call for any major improvements on NC 73.
•NCDOT TIP calls for widening of NC 73… but there is no funding available.
NC
73
Tra
nsp
orta
tion
/ N
C 7
3 T
ran
spor
tati
on/
Lan
d U
se S
tud
yL
and
Use
Stu
dy
8
MORE FACTS...• Study Area lies in 2 MPO’s/1
RPO
NC
73
Tra
nsp
orta
tion
/ N
C 7
3 T
ran
spor
tati
on/
Lan
d U
se S
tud
yL
and
Use
Stu
dy
9
PROJECT HISTORY
• In 1990’s, local chambers of commerce foresaw a need to form a unified vision for the NC 73 corridor.
• Chambers recognized a need to speed up NCDOT funding for major improvements on NC 73.
• Town of Davidson invited Centralina to convene stakeholders and move the project forward in late 2001.
NC
73
Tra
nsp
orta
tion
/ N
C 7
3 T
ran
spor
tati
on/
Lan
d U
se S
tud
yL
and
Use
Stu
dy
10
PROJECT HISTORY
• COG working with local stakeholders and NCDOT in 2002 developed work plan and secured funding.
• 11 firms bid on Study; 4 firms interviewed; Charlotte office of HNTB selected.
• $320,000 in local and NCDOT funds.
• COG managed project.
NC
73
Tra
nsp
orta
tion
/ N
C 7
3 T
ran
spor
tati
on/
Lan
d U
se S
tud
yL
and
Use
Stu
dy
11
WHAT DID THE 8 LOCAL GOVERNMENTS
GET? • A UNIFIED PLAN FOR THE NC 73 CORRIDOR that addresses:
the integration of transportation with LOCAL land use policies and projections
what improvements are needed
curb-cut/access management policies
bicycle lanes, sidewalks
transit and multi-modal needs
• AND...
NC
73
Tra
nsp
orta
tion
/ N
C 7
3 T
ran
spor
tati
on/
Lan
d U
se S
tud
yL
and
Use
Stu
dy
12
WHAT DIDTHE REGION GET?
A unified voice for the NC 73 corridor
Model for transportation/ land use planning along along NC 73 and other nearby roads.
Coordinated planning efforts along NC 73 through a Council of Planning.
Better position for receiving NCDOT funding.
NC
73
Tra
nsp
orta
tion
/ N
C 7
3 T
ran
spor
tati
on/
Lan
d U
se S
tud
yL
and
Use
Stu
dy
13
PROJECT COMPONENTS• Land Use/Transportation and
Environmental Inventory
• Existing and Projected Conditions and Deficiencies
• Alternative Scenario Development
• Development of Corridor Plan
• Implementation Strategies
• Adoption of Plan and MOU; creation of a Council of Planning between NCDOT and 8 local governments, MPO’s/RPO.
NC
73
Tra
nsp
orta
tion
/ N
C 7
3 T
ran
spor
tati
on/
Lan
d U
se S
tud
yL
and
Use
Stu
dy
14
COUNCIL OF PLANNING• Meets quarterly to discuss growth
issues along the Corridor
• Tracks growth and development
• Allows for input by local governments on major projects/conditional uses/ordinance amendments
• Funded by local governments
• Administered by COG
NC
73
Tra
nsp
orta
tion
/ N
C 7
3 T
ran
spor
tati
on/
Lan
d U
se S
tud
yL
and
Use
Stu
dy
15
FOR MORE INFORMATION...
Bill Duston, AICP
Centralina COG
(704) 348-2709
Donal Simpson, FAICP
HNTB
(704) 372-8020