ROAD DEVELOPMENT WORKS TO BE IMPLEMENTED IN ULAANBAATAR CITY IN 2014 1 Implementation Agency of the Capital city Mayor DEPARTMENT OF ROADS

Upload: bayar-tsend

Post on 14-May-2015

174 views

Category:

Economy & Finance


5 download

TRANSCRIPT

Page 1: Nazg 388212240 road expo 05 2014 eng ROAD EXPO 2014

1

ROAD DEVELOPMENT WORKS TO BE

IMPLEMENTED IN ULAANBAATAR CITY

IN 2014

Implementation Agency of the Capital city Mayor

DEPARTMENT OF ROADS

Page 2: Nazg 388212240 road expo 05 2014 eng ROAD EXPO 2014

CAPITAL CITY ULAANBAATAR IS THE

HOME OF 1.3 MILLION POPULATION WHICH IS

43.7 PERCENT OF NATIONAL POPULATION

AND 321200 UNITS OF VEHICLES OR 54.1

PERCENT OF TOTAL REGISTERED VEHICLE

FLEET OF THE COUNTRY ARE PARTICIPATING

IN CITY’S DAILY TRAFFIC.

Implementation Agency of the Capital city Mayor

DEPARTMENT OF ROADS

Page 3: Nazg 388212240 road expo 05 2014 eng ROAD EXPO 2014

TOTAL LENGTH OF THE PAVED ROAD OF

MONGOLIA IS 4771 KM,OUT OF WHICH 657.67

KM OF ROADS BEEN USED IN ULAANBAATAR

CITY.

IN THE COUNTRY WE HAVE 12.335 L/

METER CONCRETE BRIDGES, OUT OF WHICH

ULAANBAATAR CITY HAS 3.606.6 L/METER

BRIDGES.

Implementation Agency of the Capital city Mayor

DEPARTMENT OF ROADS

Page 4: Nazg 388212240 road expo 05 2014 eng ROAD EXPO 2014

Ulaanbaatar city has 321.200 units of

vehicles. Out of which 170.000 are

participating in the city’s daily traffic and the

city inbound traffic from the country side reach

average 9000 units of vehicles daily.

Implementation Agency of the Capital city Mayor

DEPARTMENT OF ROADS

Page 5: Nazg 388212240 road expo 05 2014 eng ROAD EXPO 2014

CONTENT

ONE. Brief information on the projects and

measures implemented in the road sector

of Ulaanbaatar city in 2013

TWO. Projects and measures to be

implemented in the road sector of

Ulaanbaatar in 2014

Page 6: Nazg 388212240 road expo 05 2014 eng ROAD EXPO 2014

6

One.

Brief information on the projects and

measures implemented in the road

sector of Ulaanbaatar city in 2013

Total of 88 projects and measures are implemented, with

budgeted cost of 221.8 billion tugrugs, and 145.5 км

road and 368.7 l/мeter bridges are constructed.

Implementation Agency of the Capital city Mayor

DEPARTMENT OF ROADS

Page 7: Nazg 388212240 road expo 05 2014 eng ROAD EXPO 2014

Rehabilitation of 3.6 km road and extension of 1.2 km further in Zuun salaa

of Songino Khairkhan district

Client Ulaanbaatar Department of roadsContractor “ОDND” LLCWidth of the roadway 7 меterBase layer 4 смSurface layer 3 смOther parameters Has street lighting and pedestrian walkways.

Page 8: Nazg 388212240 road expo 05 2014 eng ROAD EXPO 2014

Rehabilitation and widening of 2.8 км paved road from Dorj street, Tuul

Jinpan intersection to east to Tsaiz market

Client Ulaanbaatar Department of roadsContractor “Bering” LLCWidth of the roadway 19.8 мeterBase layer 5 смSurface layer 4 смOther parameters Has street lighting and pedestrian walkways and drainage

system

Page 9: Nazg 388212240 road expo 05 2014 eng ROAD EXPO 2014

Rehabilitation and widening of 1.6 км paved road from east south

intersection of School #39 to Khuchit shonkhor market bus terminal

Client Ulaanbaatar Department of roadsContractor “Batcubic” LLCWidth of the roadway 7 меterBase layer 4 смSurface layer 3 смOther parameters Has street lighting and pedestrian walkways and drainage

system

Page 10: Nazg 388212240 road expo 05 2014 eng ROAD EXPO 2014

Rehabilitation of 1.7 км paved road from Bayanburd roundabout in

Chingeltei district to 32nd Roundabout

Client Ulaanbaatar Department of roadsContractor “Naranbulag Khan” LLCWidth of the roadway 7 меterBase layer 4 смSurface layer 3 смOther parameters Has street lighting and pedestrian walkways and drainage

system

Page 11: Nazg 388212240 road expo 05 2014 eng ROAD EXPO 2014

Construction of 0.2 км road and railway tunnel connecting Narnii road of

Bayanzurkh district with Bayanmongol khoroolol

Client Ulaanbaatar Department of roadsContractor “Tuuliin guur dalai” LLCWidth of the roadway 9 меterBase layer 4 смSurface layer 3 смOther parameters Has street lighting and drainage system

Page 12: Nazg 388212240 road expo 05 2014 eng ROAD EXPO 2014

Rehabilitation of Selbe twin bridge 58х2 l/мeter

Client Ulaanbaatar Department of roads

Contractor “Мотоr service” LLC

Width of the roadway 24 меter

Other parameters Has street lighting and pedestrian walkways

Page 13: Nazg 388212240 road expo 05 2014 eng ROAD EXPO 2014

Rehabilitation of 4.5 км paved road from East intersection-Officer’s palace-

Chuluun ovoo to Trolleybus terminal

Client Ulaanbaatar Department of roadsContractor “Yalguusan” LLCWidth of the roadway 21 меterBase layer 4 смSurface layer 3 смOther parameters Has street lighting and pedestrian walkways and drainage

system

Page 14: Nazg 388212240 road expo 05 2014 eng ROAD EXPO 2014

Rehabilitation and widening of 3.2 км paved road from Sapporo

roundabout – Moscow street- Trade union street to 5 shar

Client Ulaanbaatar Department of roadsContractor “Тоtal inj” LLCWidth of the roadway 23 меterBase layer 4 смSurface layer 3 смOther parameters Has street lighting and pedestrian walkways and drainage

system

Page 15: Nazg 388212240 road expo 05 2014 eng ROAD EXPO 2014

Rehabilitation and widening of 3.4 км paved road from Trade union street

to Bayankhoshuu

Client Ulaanbaatar Department of roadsContractor “Huvai Mongolia” LLCWidth of the roadway 14 меterBase layer 4 смSurface layer 3 смOther parameters Has street lighting and pedestrian walkways and drainage

system

Page 16: Nazg 388212240 road expo 05 2014 eng ROAD EXPO 2014

Rehabilitation of 4.1 км paved road from Dund river – Trade union street

and 19th Micro district

Client Ulaanbaatar Department of roadsContractor “CFC group” LLCWidth of the roadway 14 меterBase layer 5 смSurface layer 4 смOther parameters Has street lighting and pedestrian walkways and drainage

system

Page 17: Nazg 388212240 road expo 05 2014 eng ROAD EXPO 2014

In 2014:

Roads to be rehabilitated – 54.9 км

Roads to be newly constructed – 40.4 км

Bridge repair, rehabilitation – 243.2 l/мeter

Surface drainage system – 9 locations

Underground tunnel for Vehicle traffic – 1

Flyover bridge for pedestrians – 2

Natural stone road – 1.84 км and total budgeted cost

is 74 billion 130 million tugrugs.

Implementation Agency of the Capital city Mayor

DEPARTMENT OF ROADS

Page 18: Nazg 388212240 road expo 05 2014 eng ROAD EXPO 2014

2.1. Major projects and measures to

be implemented over the years

НИЙСЛЭЛИЙН АВТО ЗАМЫН ГАЗАР

Implementation Agency of the Capital city Mayor

DEPARTMENT OF ROADS

Page 19: Nazg 388212240 road expo 05 2014 eng ROAD EXPO 2014

Rehabilitation and widening of 13.7 km paved road from Yarmag

bridge –Nisekh – Nisekh tollgate- Sonsgolon intersection to Yarmag

tollgate

Contractor “HKB International Holding” LLC

Work progress 65%

Note: The drainage and base course works done. As it listed in the projects that funding is “freezed” the implementation period is unknown so far.

Page 20: Nazg 388212240 road expo 05 2014 eng ROAD EXPO 2014

Rehabilitation and widening of

22.5 км paved road from Nisekh tollgate- Biocombinat to Shuvuun

Fabric /with 99.2 l/мeter bridge/

Contractor “Тоtal Inj” LLC

Work progress 75%

Note: Base layer is done. Out of 30.5 billion tugrug total budget 2 billion is allocated in 2012, 15 billion is allocated in 2013, and 13.5 billion is budgeted for the year 2014. Depending on the funding the work couldn’t be executed on its intended commissioning date.

Page 21: Nazg 388212240 road expo 05 2014 eng ROAD EXPO 2014

Construction of 4.5 км paved road in Selkhe summer housing area

Contractor “PCF” LLC

Implementation period 2014.06.15

Work progress 68%

Note: The embankment work is done and pavement for 1.8 km section is done. The pavement work on the remaining section will be done and also the pedestrian walkway and street lighting will be installed.

Page 22: Nazg 388212240 road expo 05 2014 eng ROAD EXPO 2014

Construction of 6.0 км paved road as the continuation of the

horisontal arterial road south of the railway line /from Dunjingarav trading

center to Uliastay intersection/

Contractor “Khansuun zam” LLC

Implementation period 2014.10.15

Work progress 10%

Note: The drinking water reserve fence which is under the road right of way is not possible to be relocated.

Page 23: Nazg 388212240 road expo 05 2014 eng ROAD EXPO 2014

10. Construction of the pedestrian flyover near the Central stadium in

Khan-uul district’s 8th khoroo

Contractor “MBAS" LLC, “Giatsint” LLC partnership

Implementation period 2014.05.20

Work progress 5%

11. Construction of the pedestrian flyover near the 100 ail

construction market in Sukhbaatar district’s 10th khoroo

Contractor “ZMZ” LLC

Implementation period 2014.05.20

Work progress 5%

Page 24: Nazg 388212240 road expo 05 2014 eng ROAD EXPO 2014

12. Construction of 17.6 км paved road from Bayanzurkh toll gate to

Yarmag Bridge alongside the North of Bogd Mountain

Contractor “ЭСТО” ХХК

Implementation period 2014.08.01

Work progress 60%

Тайлбар: Замын трасст орсон 23 объектыг нэн даруй чөлөөлөх шаардлагатай. Улсын баяр наадмаас өмнө ашиглалтад өгөхөөр зорьж байна.

Page 25: Nazg 388212240 road expo 05 2014 eng ROAD EXPO 2014

14. Rehabilitation and widening of Beijing street to be implemented

under the PRC Government grant funding

/0.9 км, 74 l/meter bridge/

Contractor “Beijing Construction engineering Group” LLC

Implementation period 2014.11.30

Work progress Work just has began.

Page 26: Nazg 388212240 road expo 05 2014 eng ROAD EXPO 2014

2.2. Projects and measures to be

implemented under new planning

НИЙСЛЭЛИЙН АВТО ЗАМЫН ГАЗАР

Implementation Agency of the Capital city Mayor

DEPARTMENT OF ROADS

Page 27: Nazg 388212240 road expo 05 2014 eng ROAD EXPO 2014

№ Name of the project and measures, location and capacity Comment

1

Rehabilitation of 1.3 км of paved road from Petrovis

Gasoline station to Tsaiz market intersection in Nalaikh

district

The open tender selection

process is ongoing.

2

Construction of 0.5 km of paved road and underground

tunnel from Narnii road to Ikh Mongol empire road

connecting under the railway

Detailed designing is ongoing.

3Rehabilitation of 2.5 km road and construction of 3.1 km

paved roads in Sharga Morit Valley

Detailed designing is ongoing.

4

Rehabilitation and widening of 0.54 km paved road from

Sukhbaatar district, 1st Khoroo, Choidog Street, Central

library to Central Hospital #1

The open tender selection

process is ongoing.

НИЙСЛЭЛИЙН АВТО ЗАМЫН ГАЗАР

Page 28: Nazg 388212240 road expo 05 2014 eng ROAD EXPO 2014

№ Name of the project and measures, location and capacity Comment

5

Rehabilitation and widening of 4.6 km paved road from

Khuvisgalchis street, Zuragt’s new bus terminal to

Bayankhoshuu intersection

The open tender selection

process is ongoing.

6 Rehabiliatation of 0.5 km paved road of Sansar Tunnel Detailed designing is ongoing.

7Construction of 1.2 km paved road from Bayanzurkh

district, 22nd khoroo, Monel to Zuun Altan-ulgii

The open tender selection

process is ongoing.

8Construction of 0.5 km approach road at Temporary

bridge next to the Yarmag existing bridge

The open tender selection

process is ongoing.

НИЙСЛЭЛИЙН АВТО ЗАМЫН ГАЗАР

Page 29: Nazg 388212240 road expo 05 2014 eng ROAD EXPO 2014

№ Name of the project and measures, location and capacity Comment

9

Construction of rain water drainage system in Chingeltei

district, 1st khoroo, Juulchin street, Gutal 22 nd outlet

and Jigjidjav street surroundings

The open tender selection

process is ongoing.

10

Construction of rain water drainage system in Bayangol

district, 3rd khoroo, Railway police department, Gan

zam hotel and its surroundings

The open tender selection

process is ongoing.

11

Construction of rain water drainage system in

Bayanzurkh district, 13 th Microdistrict, Building 21 nad

its surroundings

The open tender selection

process is ongoing.

12

Construction of rain water drainage system in Chingeltei

district, 5th and 6th khoroos and their surroundingsThe open tender selection

process is ongoing.

НИЙСЛЭЛИЙН АВТО ЗАМЫН ГАЗАР

Page 30: Nazg 388212240 road expo 05 2014 eng ROAD EXPO 2014

№ Name of the project and measures, location and capacity Comment

13

Construction of rain water drainage system for 2.3 km of

road from Amgalan- Botanic Trollyebus terminal to

Uliastay river Bridge

The open tender selection

process is ongoing.

14

Construction of new rain water drainage system in

Gandi Street and reinforcing the pavement /From

Dunjingarav intersection to Chinggis Avenue/

The open tender selection

process is ongoing.

15Construction of district rain water drainage system in

XIX microdistrict, 120 Myangat, Khan-uul district

The open tender selection

process is ongoing.

НИЙСЛЭЛИЙН АВТО ЗАМЫН ГАЗАР

Page 31: Nazg 388212240 road expo 05 2014 eng ROAD EXPO 2014

THANK YOU FOR YOUR

ATTENTION

ULAANBAATAR DEPARTMENT OF ROADS

2014