Navy SBIR/STTR Program Transition Strategies (CPP, RIF, TAP, II.5, etc.) Mr. John R. Williams Director, Navy SBIR & Technology Transfer Programs November 2011 www.navysbir.com

Upload: sheila-bentley

Post on 31-Dec-2015

51 views

Category:

Documents


0 download

DESCRIPTION

Navy SBIR/STTR Program Transition Strategies (CPP, RIF, TAP, II.5, etc.). Mr. John R. Williams Director, Navy SBIR & Technology Transfer Programs November 2011 www.navysbir.com. Acquisition Driven Process, with Strong Technology Pull. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Navy SBIR/STTR Program Transition Strategies (CPP, RIF, TAP, II.5, etc.)

Navy SBIR/STTR ProgramTransition Strategies

(CPP, RIF, TAP, II.5, etc.)

Navy SBIR/STTR ProgramTransition Strategies

(CPP, RIF, TAP, II.5, etc.)

Mr. John R. WilliamsDirector, Navy SBIR & Technology Transfer Programs

November 2011

www.navysbir.com

Page 2: Navy SBIR/STTR Program Transition Strategies (CPP, RIF, TAP, II.5, etc.)

Acquisition Driven Process, withStrong Technology Pull

Acquisition Driven Process, withStrong Technology Pull

• SBIR/STTR projects derive from SYSCOM-generated Topics announced in quarterly solicitations.

• Over 90% of Navy Topics are selected by PEO/PM/FNC office and address one of their specific needs, not just “sponsored”.

• Topics/Phase I/Phase II awards selections based on acquisition R&D priorities.

• PEO gets back 90% of their SBIR/STTR “tax” back.• Many contracts awarded/monitored by lab employees with

Acquisition Office POC involved. Labs funded through SBIR Admin fund (additional tax taken above the 2.5%) which helps to ensure dedicated workforce.

Page 3: Navy SBIR/STTR Program Transition Strategies (CPP, RIF, TAP, II.5, etc.)

SBIR

Pr

ogra

mD

irect

or

SBIR

SYS

COM

Pr

ogra

m

Man

ager

sPE

O S

BIR

Tech

nolo

gyM

anag

ers

SBIR

Fie

ld

Offi

ces

John Williams, Navy SBIR/STTR DirectorDean PutnamSBIR, PMNAVSEA

Donna MooreSBIR, PMNAVAIR

Paul LambertSBIR, PMMARCOR

Tracy FrostSBIR, PMONR

Elizabeth AltmannSBIR, PMSPAWAR

Eric PittSBIR, Technical LiaisonPEO Carriers

Glen SturtevantSBIR, Technical LiaisonPEO Ships

Douglas MarkerSBIR, Technical LiaisonPEO IWS

Theresa CramerSBIR, Technical LiaisonPEO LCS

Bill BankheadSBIR, Technical LiaisonPEO Subs

James WoodNSWC Carderock

John DementNSWC Crane

Joe GarciaNSWC Dahlgren

Nancy JohnsonNSWC Indian Head

Jack GriffinNUWC Newport

Kamala Massary SBIR, Technical LiaisonPEO (A)

Jim Alper SBIR, Technical LiaisonPEO (T)

Edmund Anderson SBIR, Technical LiaisonPEO (W)

David ParkSBIR, Technical LiaisonPEO (JSF)

Jamie Guerrero SBIR, Technical LiaisonNAVAIR (1.0)

Dr. Mark HusniNAVAIR Lakehurst

Dr. Michael SeltzerNAWC- WD China Lake

Jerry RubinskyNAWC- ADPatuxent River

Clifton PhillipsSBIR, Technical LiaisonPEO Space

Butch WrenAvionics & Sensor Patuxent River

Paul HalloranSBIR, Technical LiaisonPEO Land Systems

Steve HartlePropulsion and PowerPatuxent River

Dr. Thomas FranzNAWC- TSD Orland

Kimberly BerchCPP PMPatuxent River

Doug SchaeferSBIR PMNavy

Michelle WillisCPP PM

Dusty LangSTTR PM

Lee Ann BoyerCPP PM

John McDonnellSBIR, Technical LiaisonPEO C4I

Al SweenySBIR, Technical LiaisonJPEO JTRS

Navy SBIR Managers at SYSCOM, PEO and Warfare Centers

Navy SBIR Managers at SYSCOM, PEO and Warfare Centers

3

Steve SullivanSTTR PMNavy

Page 4: Navy SBIR/STTR Program Transition Strategies (CPP, RIF, TAP, II.5, etc.)

Navy SBIR Initiatives that Assist and Accelerate Transition to Phase III

Navy SBIR Initiatives that Assist and Accelerate Transition to Phase III

• Transition Assistance Program (TAP) – Available to all Navy Phase II companies, provides Business Acceleration Manager who helps with DoD customer marketing and Phase III strategies

• Opportunity Forum – Annual June event with over 1200 attendees, third SBC’s, Primes and Navy PoR or R&D Managers

• Commercialization Pilot Program (CPP) – 1% of SBIR funds used by Navy so we can provide additional non-monetary transition support to SBIR firms

• Phase II.5 - Provides SBIR/STTR funding, above normal < $1M Phase II levels, to firms with high Phase III potential

• RIF – Rapid Innovation Fund, new program that provides Phase III funding to SBIR and other firms

Page 5: Navy SBIR/STTR Program Transition Strategies (CPP, RIF, TAP, II.5, etc.)

• Objective– Accelerate transition to Phase III– All current Phase IIs are eligible

• Key Program Elements– Market research provided– Phase III strategy development– Training webinars on advanced topics– Advanced Assistance options provided– Marketing materials developed

• Partnering/Investment event– Opportunity Forum – 1300 Attendees– Prime Integrator partnering

5

Forum Year

# Finalists Total amount received (18 mo.)

% Finalists

2001 59 $62,214,941 45%

2002 61 $114,726,540 62%

2003 54 $177,411,414 64%

2004 94 $189,815,733 75%

2005 150 $222,375,541 55%

2006 162 $216,688,622 64%

2007 172 $254,471,907 53%

◦ Virtual Acquisition Showcase – www.virtualacquisitionshowcase.com

Transition Assistance Program (TAP) Opportunity Forum Started in 2000

Transition Assistance Program (TAP) Opportunity Forum Started in 2000

Page 6: Navy SBIR/STTR Program Transition Strategies (CPP, RIF, TAP, II.5, etc.)

CPP Historical Perspective in Navy

• 2006 - CPP legislation goal: “… accelerate the transition of technologies, products, and services developed under SBIR to Phase III, including the acquisition process.” Allowed 1% of SBIR funds to “manage acceleration” efforts, but CPP funds cannot be added to Phase II awards.

• 2007 - Navy pilots SBIR Accelerated Transition (SAT) by providing substantially higher SBIR funding to promising Phase II projects, either as a mod or second Phase II award. Put out original Phase II.5 guidance.

• 2007 to 2009 - SYSCOM’s used CPP 1% to develop processes and tools to address goal of “accelerate the transition … to Phase III”.

• 2010 – pulled together SYSCOM best practices, developed Navy-wide terminology and rules for accelerating from Phase II – III.

6

Page 7: Navy SBIR/STTR Program Transition Strategies (CPP, RIF, TAP, II.5, etc.)

How Much Should Navy Invest in Phase II?How Much Should Navy Invest in Phase II?

Studied past Phase II funding levels and successes• Norm was that 90% of Phase II projects funded within a tight range to

specific dollar amount• Process didn’t provide “carrot” for Navy customer to invest or SBIR firm to

seek out and fulfill Navy need• Big successes came from projects that obtained non-SBIR matching funding

during Phase II• Industry funds projects in “Gated” fashion and GAO report recommended

that DoD do the same• Gated process allows funding same number of Phase II’s but those with

greater potential obtain higher funding levels• Gated process is more man-power intensive on Navy but mandates “go – no

go” decisions and brings in non-SBIR funds, thus increasing overall SBIR funding levels

Page 8: Navy SBIR/STTR Program Transition Strategies (CPP, RIF, TAP, II.5, etc.)

Ending FYNumber of Contracts

2004 43

2007 58

2010 58

Page 9: Navy SBIR/STTR Program Transition Strategies (CPP, RIF, TAP, II.5, etc.)

Year 6

te

CONTRACTTYPE -

Non-SBIR $

FFP Contract

CPFF or FFP Contract

CPFF or FFP Contract Any

TRL - 0-3 2-5 4 7 6-9

Phase III

variable

Enhancement*~ 12 mo.

$≤ 750k SBIR

Cont. Dev. 12 – 18 mo.

AT (Accelerated Transition)* ≤ 2 yr.

$≤ 750k SBIRTTA Required

Phase 16 mo.

Phase 218-24 mo.

TTA Required

$80K $70k

Between $500K to $750K

Some Require TTP

$≤ 1.50M SBIR

NTE $150K NTE $1M NTE $1.5MNTE $2.65M

Opt. ~ 9 mo.

$≤ 250K

Year 1 Year 2 Year 3 Year 4 Year 5

FeasibilityTechnology

Development andPrototype Demo.

ACTIVITY -Prototype Testing & Evaluation

Technology Demonstration & Validation

SBIR FUNDS -

Option6 mo.

TTA –Technology Transition Agreement -3 -5 yr technical/funding strategy * Requires Non-SBIR Funding CommitmentTTA –Technology Transition Agreement -3 -5 yr technical/funding strategy * Requires Non-SBIR Funding Commitment9

Navy “Gated” Phase II.5 Structure (started ~07)Navy “Gated” Phase II.5 Structure (started ~07)

Phase II.5

Page 10: Navy SBIR/STTR Program Transition Strategies (CPP, RIF, TAP, II.5, etc.)

• The SYSCOM SBIR PM, Technical Monitor and PEO Sponsor decide which Phase II’s receive Phase II.5 funding

• The firms are identified in different ways at each SYSCOM but the request and start of due diligence process is internal

• How can a firm best prepare themselves for a Phase II.5?• Know who wants your technology in Phase III• What you need to overcome to get there• Address Risk, Funding, Competitive approaches, Partnering, Licensing, etc…• Plan transition early and often• Download TTP/TTA template from navysbir.com• Never to early to start to fill out and continuously update

How do I get Phase II.5 Funding?How do I get Phase II.5 Funding?

Page 11: Navy SBIR/STTR Program Transition Strategies (CPP, RIF, TAP, II.5, etc.)

11

Navy SBIR By The NumbersNavy SBIR By The Numbers

Page 12: Navy SBIR/STTR Program Transition Strategies (CPP, RIF, TAP, II.5, etc.)

CPP - Phase II.5 To DateCPP - Phase II.5 To Date

• From FY07 to FY09 Navy expended $9.0M in CPP funding (1% of our SBIR allocation for those three yrs)

• Funded 123 Phase II.5 projects FY07-FY09 with $104M SBIR funding, matched with $64M non-SBIR funds placed on Phase II.5 awards

• Projects support 23 of 45 DoN ACAT I designated programs including the newest Ships, Aircraft, Submarines, Weapons, C4I, and support systems.

• Through FY 2009 these 123 projects have received over $300M in Phase III Funding more than doubling the initial SBIR program investment in these projects.

Page 13: Navy SBIR/STTR Program Transition Strategies (CPP, RIF, TAP, II.5, etc.)

• Navy reviewed 51 Projects from 2006-2008 CPP starts that were completed prior to FY11

• 82.3% had signed TTP/TTAs• 84.3% included matching funds as part of the CPP

project• 58.8% of the projects had received funds above

the amount pledged in the CPP project mostly through Phase IIIs

• Highest success rates for transition were noted at the acquisition commands not those responsible for S&T/R&D

13

What Makes A Successful Phase II.5? (II.5 over $1M in SBIR funds)

What Makes A Successful Phase II.5? (II.5 over $1M in SBIR funds)

Page 14: Navy SBIR/STTR Program Transition Strategies (CPP, RIF, TAP, II.5, etc.)

“affordability as a requirement” – SBIR funds applied to programmatic needs

“incentivize productivity and innovation in industry” – use SBIR to reduce costs

“promote real competition” – SBIR allows PMs to introduce competition where there is none

“require open systems architectures” - SBIR companies validate and contribute to OA

“increase dynamic small business role in defense marketplace” – this defines SBIR

14 Sept 2010 Memo from Dr. Ashton Carter14 Sept 2010 Memo from Dr. Ashton Carter

• Deliver the warfighting capability we need for the dollars we have• Get better buying power for warfighter and taxpayer• Restore affordability to defense goods and services

• Improve defense industry productivity• Remove government impediments to leanness

• Avoid program turbulence• Maintain a vibrant and financially healthy defense industry

Obtain 2-3% net annual growth in warfighting capabilities withoutcommensurate budget increase by identifying and eliminating

unproductive or low-value-added overhead and transfer savingsto warfighting capabilities. Do more without more.

Objectives

Providing Incentives for Greater Efficiency in Industry

Adopting Government Practices that Encourage Efficiency

• LEVERAGING REAL COMPETITION: Avoid directed buys and other substitutes for real competition. Use technical data packages andopen systems architectures to support a continuous competitive environment.• USING PROPER CONTRACT TYPE FOR DEVELOPMENT AND PROCUREMENT: Phase out award-fee contracts and favor fixed-price orcost-type incentive contracts in which government and industry share equally in overruns and under-runs, and overruns have analytically based caps. Use cost-reimbursement contracts only when either government requirements or industry processes cannot be adequately specified to support pricing. Adjust sole-source fixed-price contracts over time to reflect realized costs. Work down under-finalized contract actions. Seek authority for multi-year contracts where significant savings are possible.

•ADOPTING “SHOULD-COST” AND “WILL-COST” MANAGEMENT: Use historically informed independent costestimation (“will-cost” estimates) to inform managing of programs to cost objectives (“should-cost” estimates).• STRENGTHENING THE ACQUISITION WORKFORCE: Achieve SECDEF goal of adding to government acquisitionworkforce with increased skill levels. Leverage unique qualities of non-profit FFRDCs and UARCs to augment acquisition workforce capability.• IMPROVING AUDITS: Improve consistency and quality of government audits, and focus them on value-added content.

14

Page 15: Navy SBIR/STTR Program Transition Strategies (CPP, RIF, TAP, II.5, etc.)

Navy SBIR Rapid Innovation Fund (RIF) Program

RIF Execution Strategy

Navy SBIR Rapid Innovation Fund (RIF) Program

RIF Execution Strategy

Page 16: Navy SBIR/STTR Program Transition Strategies (CPP, RIF, TAP, II.5, etc.)

RIF’s Background

• Congress authorized H.R. 6523, FY2011 NDAA at Sec. 1073 “Rapid Innovation Program” and “Explanatory Statement” pg. 447– “… accelerate the fielding of technologies developed pursuant to Phase II

SBIR projects … and others … to stimulate innovative technologies … and reduce acquisition costs … address technical risks … improve T&E outcomes … and rapidly insert such products … in primarily MDAPs …”

• Appropriated $105M RDT&E and $15M O&M• AT&L 12 August Memo Implementation Guidelines • $24M RDT&E released to DoN

• BAA released on 2 Sept 11 - Closed on 7 Nov 11• Currently in evaluation stage, hope to have selections

by mid January

04/19/23 16

Page 17: Navy SBIR/STTR Program Transition Strategies (CPP, RIF, TAP, II.5, etc.)

• Project Description/Executive Summary (300 words or less)• Technical Approach – How approach is innovative, feasible,

achievable, complete and supported by a proposed technical team that has the expertise and experience to accomplish the proposed tasks. (150 words or less)

• Operational Need – Describe your proposed technology’s contribution to the JUON, UON, UUN, Naval Challenge Areas or acquisition program need. (125 words or less)

• Cost Reasonableness – Describe the methods used to ensure that the proposed costs are realistic for the technical approach proposed. (125 words or less)

White Paper Format – 5 pages

Page 18: Navy SBIR/STTR Program Transition Strategies (CPP, RIF, TAP, II.5, etc.)

• Transition Plan – How project will be supported during the RIF effort and during the post-RIF period to transition by DoN program office, prime systems integrator, or both. Describe how the TRLs will mature and what will be required of the organizations supporting the transition of this technology. Include organization and points of contact information involved in the transition process. (125 words or less)

• Cost Matching – Describe matching funds, if any, to be provided to include the timing, source, amount, and planned use of the funds. (125 words or less)

• Program Goals – Describe how project addresses each RIF goal. (300 words or less)– Enhances Military Capability – Describe how project increases/improves the military capabilities in

relationship to identified JUON, UON, UUN, national security need, or Acquisition program.

– Accelerates Military Development Capability – Describe how proposal accelerates development and ability to deploy military capabilities required for use by the Department of the Navy.

– Acquisition Development Cost Reduction – Describe how effort reduces acquisition development and TOC of the identified Acquisition program.

– Fielded Systems Sustainment Cost Reduction – Describe how project reduces the sustainment costs of the identified fielded system or acquisition program.

• Project/Management Plan – Describe required to fully implement the project into a PoR or otherwise transition the technology for field use.

Page 19: Navy SBIR/STTR Program Transition Strategies (CPP, RIF, TAP, II.5, etc.)

19