navigating new frontiers - pbnchina.com presentation_en.pdf · navigating new frontiers from air to...

30
Navigating New Frontiers From Air to Ground June 4 th 2014 Airbus ProSky Li Cunmei Customer Affairs Director- China

Upload: buikhanh

Post on 06-Feb-2018

219 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Navigating New Frontiers - pbnchina.com Presentation_EN.pdf · Navigating New Frontiers From Air to Ground June 4th 2014 Airbus ProSky Li Cunmei Customer Affairs Director- China

Navigating New Frontiers From Air to Ground

June 4th 2014

Airbus ProSky Li Cunmei

Customer Affairs Director- China

Page 2: Navigating New Frontiers - pbnchina.com Presentation_EN.pdf · Navigating New Frontiers From Air to Ground June 4th 2014 Airbus ProSky Li Cunmei Customer Affairs Director- China

13/06/2014 Airbus ProSky Corporate Presentation

About Airbus ProSky The ATM Services Company by Airbus

Page 3: Navigating New Frontiers - pbnchina.com Presentation_EN.pdf · Navigating New Frontiers From Air to Ground June 4th 2014 Airbus ProSky Li Cunmei Customer Affairs Director- China

© AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document. Company Confidential 5

Demand Growth Economic Cost of Delay Environmental Cost of Delay

• Air traffic demand growth is the a

challenge facing the industry

• Economic cost of delay is enormous

and will only get worse as traffic

demand grows

• Carbon footprint of aviation growing

with demand while environmental

pressures increase

Passenger Air Traffic to Double by 2030

Cargo Air Traffic to Triple by 2030 Emissions Reduced 50% by 2050

Carbon Reductions Require Efficiencies

Cost per Every Minute of Delay: $102

Annual Cost of US Delays 2010: $ 32.9B

$8.3B

$16.7B

$4.0B $3.9B

Costs To Passengers

Costs to Airlines

Impact on GDP

Costs from Lost Demand

Source: ICAO, Airbus GMF 2010

Source: ICAO, Airbus GMF 2010

Source: FAA NEXTOR Delay Impact Study 2010 Source: IATA Pathway to Carbon Neutral Aviation 2010

Source: Eurocontrol Westminster Cost of Delay Study Source: ICAO Environmental Report 2010

Global Market Dynamics – Air Traffic is doubling every 15 years

13/06/2014 Airbus ProSky Corporate Presentation

Page 4: Navigating New Frontiers - pbnchina.com Presentation_EN.pdf · Navigating New Frontiers From Air to Ground June 4th 2014 Airbus ProSky Li Cunmei Customer Affairs Director- China

© AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document.

Potential Impact of ATM Bottleneck is a true challenge

Airbus ProSky Corporate Presentation

*Data from Airbus Global Market Forecast 2012-2030

** Source: Eurocontrol Westminster Cost of Delay Study

The situation requires a systemic change

Limited airspace & resources

4.8% annual

air traffic

growth by

2030*

1,390 new

aircraft per

year from

2011-2030*

Extra Fuel Consumption

Delays

Cost per Every

Minute of Delay:

$102**

Airborne holding and surface

Queuing

Performance Based ATM

Collaborative Decision Making

Ground and Air timely coordination

Innovative Solutions

13/06/2014 Airbus ProSky Company Presentation

Page 5: Navigating New Frontiers - pbnchina.com Presentation_EN.pdf · Navigating New Frontiers From Air to Ground June 4th 2014 Airbus ProSky Li Cunmei Customer Affairs Director- China

© AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document.

“Airbus ProSky, the ATM Services Company of Airbus”,

created to boost ATM:

Airbus ProSky, leading ATM Modernization

• Beyond designing always more efficient and intelligent aircraft, Airbus has become a key driving force in

Air Traffic Management.

• Airbus ProSky created to lead Modernization of ATM through Performance, Transformation and Innovation

13/06/2014 Airbus ProSky Corporate Presentation

Page 6: Navigating New Frontiers - pbnchina.com Presentation_EN.pdf · Navigating New Frontiers From Air to Ground June 4th 2014 Airbus ProSky Li Cunmei Customer Affairs Director- China

© AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document.

Airspace Services ATFM /CDM Airport Solutions

Airbus ProSky Solutions to Modernize Air Traffic Management Efficiently

13/06/2014 Airbus ProSky Corporate Presentation

Page 7: Navigating New Frontiers - pbnchina.com Presentation_EN.pdf · Navigating New Frontiers From Air to Ground June 4th 2014 Airbus ProSky Li Cunmei Customer Affairs Director- China

© AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document.

Airbus ProSky Customer Base: ANSPs and Airports

13/06/2014 Airbus ProSky Corporate Presentation

SENEAM

Aerocivil Colombia

Page 8: Navigating New Frontiers - pbnchina.com Presentation_EN.pdf · Navigating New Frontiers From Air to Ground June 4th 2014 Airbus ProSky Li Cunmei Customer Affairs Director- China

© AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document.

Airbus ProSky Airlines Customers

13/06/2014 Airbus ProSky Corporate Presentation

Page 9: Navigating New Frontiers - pbnchina.com Presentation_EN.pdf · Navigating New Frontiers From Air to Ground June 4th 2014 Airbus ProSky Li Cunmei Customer Affairs Director- China

13/06/2014 Airbus ProSky Corporate Presentation

PBN deployment: what’s next?

Navigating New Frontiers

From Air to Ground

Page 10: Navigating New Frontiers - pbnchina.com Presentation_EN.pdf · Navigating New Frontiers From Air to Ground June 4th 2014 Airbus ProSky Li Cunmei Customer Affairs Director- China

© AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document.

We have been there, what’s next?

13/06/2014

RNP AR deployment in China for

challenging environment

• ALI

• LHASA

• LINZHI

• RIKAZE

• BANGDA

• KANGDING

• Etc…

Page 11: Navigating New Frontiers - pbnchina.com Presentation_EN.pdf · Navigating New Frontiers From Air to Ground June 4th 2014 Airbus ProSky Li Cunmei Customer Affairs Director- China

© AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document.

PBN deployment shifting from challenging airports to busy airports

13/06/2014 Airbus ProSky Corporate Presentation

More efficient use of Airspace

Airspace redesign

Sequencing & mixed mode

Capacity study

Public procedures

Simplified approval process for airlines

SUA & FUA ConOps

Air Traffic Forecast

Page 12: Navigating New Frontiers - pbnchina.com Presentation_EN.pdf · Navigating New Frontiers From Air to Ground June 4th 2014 Airbus ProSky Li Cunmei Customer Affairs Director- China

© AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document.

ADVANCED RNP (Advanced features: RF, FRT, …)

What’s new: PBN manual 4th edition

RNAV 5 RNAV 1

RNAV 2 RNP 4

TERMINAL APPROACH

RNP1 RNP

APCH

RNP AR

APCH

EN-ROUTE EN-ROUTE TERMINAL

RNAV

On Board Perf. Monitoring and Alerting system not mandatory

RNP

On Board Perf. Monitoring and Alerting system mandatory

RNAV 10 RNP 2

Page 23

RNP 0.3

for helicopter

New operations

Page 23

Page 13: Navigating New Frontiers - pbnchina.com Presentation_EN.pdf · Navigating New Frontiers From Air to Ground June 4th 2014 Airbus ProSky Li Cunmei Customer Affairs Director- China

© AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document.

A-RNP, RNP APCH & RNP AR APCH

Page 25

ICAO PBN Manual 4th Edition Volume II A-1-1

Application of navigation specification by flight phase

Page 14: Navigating New Frontiers - pbnchina.com Presentation_EN.pdf · Navigating New Frontiers From Air to Ground June 4th 2014 Airbus ProSky Li Cunmei Customer Affairs Director- China

© AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document.

The use of RF legs

ICAO PBN Manual 4th Edition Volume II Appendix 1 to Part C

Page 27

“RF legs are an optional capability for use with RNP 1 and RNP APCH rather

than a minimum requirement. This functionality can be used in the initial and

intermediate approach segments, the final phase of the missed

approach, SIDs and STARs. The application of this appendix in the final

approach or the initial or intermediate phases of the missed approach is

prohibited. Such procedure segments wishing to apply RF would have to use

the RNP AR specification. ”

Page 15: Navigating New Frontiers - pbnchina.com Presentation_EN.pdf · Navigating New Frontiers From Air to Ground June 4th 2014 Airbus ProSky Li Cunmei Customer Affairs Director- China

© AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document.

RNP APCH RNP APCH with RF RNP AR NOTE:

RF are optional for RNP APCH

RF are required for A-RNP and RNP AR (RF in Final segment only possible for RNP AR)

RNP APCH, A-RNP & RNP AR protection area

Page 16: Navigating New Frontiers - pbnchina.com Presentation_EN.pdf · Navigating New Frontiers From Air to Ground June 4th 2014 Airbus ProSky Li Cunmei Customer Affairs Director- China

© AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document.

ADVANCED RNP: RF legs

Page 31

Without RF legs: trajectory on a TF/TF transition will depend of

the type of A/C, FMS, Speed, weight etc …

not repeatable trajectory

WPT1

WPT2

WPT3

Page 17: Navigating New Frontiers - pbnchina.com Presentation_EN.pdf · Navigating New Frontiers From Air to Ground June 4th 2014 Airbus ProSky Li Cunmei Customer Affairs Director- China

© AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document.

ADVANCED RNP: RF legs

Page 33

WPT1

WPT2

WPT3

With RF legs:

no transitions left to FMS

WPT4

Radius

tangential legs

no transition

Page 18: Navigating New Frontiers - pbnchina.com Presentation_EN.pdf · Navigating New Frontiers From Air to Ground June 4th 2014 Airbus ProSky Li Cunmei Customer Affairs Director- China

© AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document.

ADVANCED RNP features

Page 35

Function Optional/required

RF legs Required

Fixed Radius Transition (FRT) Optional

RNP scalability Optional

Higher continuity Optional

Baro VNAV Optional

Time Of Arrival Control (TOAC) Optional (and not yet

defined)

Page 19: Navigating New Frontiers - pbnchina.com Presentation_EN.pdf · Navigating New Frontiers From Air to Ground June 4th 2014 Airbus ProSky Li Cunmei Customer Affairs Director- China

© AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document.

ADVANCED RNP

Page 37

• Single assessment of A/C eligibility for

• RNAV 5, 2 and 1

• RNP 2, 1 and APCH

• Additional required or optional

functionality

• No modification of existing operations:

just add some functionalities

Related documents:

FAA AC 90-105 appendix 5

No EASA regulation for the moment

Will be a great tool for airspace

redesign thanks to the use of

RF legs

Page 20: Navigating New Frontiers - pbnchina.com Presentation_EN.pdf · Navigating New Frontiers From Air to Ground June 4th 2014 Airbus ProSky Li Cunmei Customer Affairs Director- China

© AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document.

RNP to ILS: Lower minima and safer trajectory

43

079° IDY 109.30

ILS-DME

Page 21: Navigating New Frontiers - pbnchina.com Presentation_EN.pdf · Navigating New Frontiers From Air to Ground June 4th 2014 Airbus ProSky Li Cunmei Customer Affairs Director- China

© AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document.

RNP AR to ILS: lower minima and safer trajectory

ILS OAS areas

RNP AR 0.1 areas

RNP AR 1 areas

Page 22: Navigating New Frontiers - pbnchina.com Presentation_EN.pdf · Navigating New Frontiers From Air to Ground June 4th 2014 Airbus ProSky Li Cunmei Customer Affairs Director- China

© AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document.

CONCLUSION

• PBN deployment shifting from challenging airports to busy airports

• Airspace redesign

• Simplified approval process for airlines

• Advanced RNP is a new tool which allows:

• To have a common specification gathering

• More flexibility for airspace redesign thanks to RF legs

• To fill the gap between RNP APCH or RNAV(GNSS) and RNP AR

• Combining RNP and ILS technologies

• The best of RNP(accurate trajectory for initial and intermediate phase) and

ILS(lower minima)

• Needs to define procedure design criteria to properly connect both

• Define the SOP

13/06/2014

Page 23: Navigating New Frontiers - pbnchina.com Presentation_EN.pdf · Navigating New Frontiers From Air to Ground June 4th 2014 Airbus ProSky Li Cunmei Customer Affairs Director- China

13/06/2014 Airbus ProSky Corporate Presentation

Navigating New Frontiers

from Air to Ground

T-SMS: “PBN on the ground”

Page 24: Navigating New Frontiers - pbnchina.com Presentation_EN.pdf · Navigating New Frontiers From Air to Ground June 4th 2014 Airbus ProSky Li Cunmei Customer Affairs Director- China

© AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document.

What a pilot normally sees after he lands….

13/06/2014 Airbus ProSky Corporate Presentation

Page 25: Navigating New Frontiers - pbnchina.com Presentation_EN.pdf · Navigating New Frontiers From Air to Ground June 4th 2014 Airbus ProSky Li Cunmei Customer Affairs Director- China

© AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document.

What if you only see this?

13/06/2014 Airbus ProSky Corporate Presentation

Page 26: Navigating New Frontiers - pbnchina.com Presentation_EN.pdf · Navigating New Frontiers From Air to Ground June 4th 2014 Airbus ProSky Li Cunmei Customer Affairs Director- China

© AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document.

Automation Level – Cockpit vs Tower (Subjective) Action Implementation Scale

1950

www.britishairways.com http://www.airliners.net

2010

1

2

3

6

7

8

9

10

4

5 Cockpit

http://www.hinterlandtimes.com.au http://www.fraport.de 1

2

3

6

7

8

9

10

4 5

Tower

Page 27: Navigating New Frontiers - pbnchina.com Presentation_EN.pdf · Navigating New Frontiers From Air to Ground June 4th 2014 Airbus ProSky Li Cunmei Customer Affairs Director- China

© AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document.

T-SMS -Tower Surface Management System

The Automation tool for controller: optimization of airport airside

operations and safety in all weather conditions

13/06/2014

Page 28: Navigating New Frontiers - pbnchina.com Presentation_EN.pdf · Navigating New Frontiers From Air to Ground June 4th 2014 Airbus ProSky Li Cunmei Customer Affairs Director- China

© AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document.

Controller: “DLH501,

Follow the greens to A14.”

Pilot: “DLH501, following

the greens to A14.”

Controller: “DLH501, taxi

to A14 via L10, L, N4,

N and L3; hold short of N”

Pilot: “DLH501, taxi to A14

via L10, L, N4, N and L3;

holding short of N”

Advanced surface management functions

Airbus ProSky Corporate Presentation

Without TSMS

With TSMS

Route proposal

Route assignment

Possibility to

edit, delete

and assign

taxi routes

Propose a taxi

route to follow

considering

restrictions,

minimum

distance and

time

Unambiguous

indication of

individual routes

by automatically

switching

taxiway center

line lights and

stop bars

Phraseology will

be simplified to

“follow the

greens”

• TSMS, provides the world’s most advanced Guidance, Routing and Control functions

Routing Guidance – “Follow the Greens”

Control

•Conflict prediction analysis and

advice to resolution

•Lateral and longitudinal separation

13/06/2014

Page 29: Navigating New Frontiers - pbnchina.com Presentation_EN.pdf · Navigating New Frontiers From Air to Ground June 4th 2014 Airbus ProSky Li Cunmei Customer Affairs Director- China

© AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document.

T-SMS Video

13/06/2014

Page 30: Navigating New Frontiers - pbnchina.com Presentation_EN.pdf · Navigating New Frontiers From Air to Ground June 4th 2014 Airbus ProSky Li Cunmei Customer Affairs Director- China

Thank you Airbus ProSky

Navigating New Frontiers From Air to Ground