nauset regional high school...2019/01/09  · nauset regional high schooleastham ma grades 9 to 12...

33
Nauset Regional High School Feasibility Phase School Building Committee January 9, 2019 PROJECT MANAGEMENT Massachusetts School Building Authority

Upload: others

Post on 14-Mar-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Nauset Regional High School...2019/01/09  · Nauset Regional High SchoolEastham MA Grades 9 to 12 905 students 181,000 gsf MSBA Study Scope Version 10.30.2017 High School Space Summary

Nauset Regional High School Eastham, MA

Nauset Regional High SchoolFeasibility Phase

School Building CommitteeJanuary 9, 2019

PROJECT MANAGEMENT Massachusetts School Building Authority

Page 2: Nauset Regional High School...2019/01/09  · Nauset Regional High SchoolEastham MA Grades 9 to 12 905 students 181,000 gsf MSBA Study Scope Version 10.30.2017 High School Space Summary

Nauset Regional High School Eastham, MA

EDUCATIONAL VISIONING

Faculty Staff Workshop1/2/2019

Page 3: Nauset Regional High School...2019/01/09  · Nauset Regional High SchoolEastham MA Grades 9 to 12 905 students 181,000 gsf MSBA Study Scope Version 10.30.2017 High School Space Summary

Nauset Regional High School Eastham, MA

Faculty InputGeneral Space Needs beyond MSBA Template:

Science Space Needs beyond MSBA Template:

• Four Additional General Classrooms

• Black Box / Lecture Hall for 50-70

• Student Commons

• Health Classroom

• Language Lab

• Teacher Meeting Space: small departmental areas and large collaborative space

• Marine Biology Lab

• Biotechnology Lab

• Robotics Lab

• Forensics Lab

Preferences• Greater visibility

• Department-based organization

• Arts spaces in closer proximity

• More space for display

newvistadesign Envisioning 21st Future Ready Schools 2 | P a g e

o A cultural Hub from Brewster to Provincetown o Learning spaces for summer and weekends too o Support the elderly community o 24/7 space

• Our location, though beautiful, is a challenge: o Advantages/problematic o Remote o National seashore o Effects how community interacts o Rich artistic culture o Not just a High School - but Community Center with year-round activities o Not just for students o School and students have transcended physical plant

• Growth Mindset and student agency are important

• Avoid cookie cutter design

• An Aquatic Community Center? Possible conversations with YMCA o Options for yoga/fitness - beyond gym

• Accommodation - gender neutral bathrooms

• We are too distant from the real-world o Need virtual connections for speakers o A space for virtual interactions o Places for presentation

• Testing - have so many AP tests o Turns campus upside down o Need multi-purpose space

• Campus is very separate and fragmented o We need a place to come together

• Our campus style arrangement has pros and cons o How does it affect students - positively or negatively?

§ A nightmare in winter o But, they get outside 4 times a day

• Tech integration is essential: o Real world connection o Global connection o Maker space

• Universal design o i.e. Franklin - voice lift in every classroom - serves students with cochlear implant

• Think about proximity of certain disciplines o Natural blending of topics

• Promote visible learning

Page 4: Nauset Regional High School...2019/01/09  · Nauset Regional High SchoolEastham MA Grades 9 to 12 905 students 181,000 gsf MSBA Study Scope Version 10.30.2017 High School Space Summary

Nauset Regional High School Eastham, MA

STUDY SCOPE

Page 5: Nauset Regional High School...2019/01/09  · Nauset Regional High SchoolEastham MA Grades 9 to 12 905 students 181,000 gsf MSBA Study Scope Version 10.30.2017 High School Space Summary

Nauset Regional High School Eastham, MA

Grades9 to 12

905 students

181,000 gsf

MSBA Study Scope

Version 10.30.2017

High School Space Summary

Date: 11/26/18 Enter Submittal

Nauset Regional HS

ROOM TYPE

ROOM

NFA1 # OF RMS area totalsROOM

NFA1 # OF RMS area totalsROOM

NFA1 # OF RMS area totals Comments

46,160 9,720 43,770 (List classrooms of different sizes separately)

Classroom - General (A BLDG:1st) 815 8 6,520 850 31 26,350 825 SF min - 950 SF max

Classroom - General (A BLDG:2nd) 900 8 7,200 900 4 3,600Classroom - General (N BLDG) 775 14 10,850Classroom - General (N BLDG) 715 4 2,860Teacher Planning Various 3 480 100 31 3,100 Computer Seminar (N BLDG - 2nd Flr) 600 1 600Language Lab 900 1 900Small Group Seminar A-BLDG + E-BLDG 355 4 1,420 500 2 1,000 Science Classroom / Lab (E BLDG - 1st Flr) 1,435 4 5,740 1,440 8 11,520 3 x85% ut=20 Seats-1 per /day/student

Science Classroom / Lab (E BLDG - 1st Flr) 770 1 770Science Classroom / Lab (E BLDG - 2nd Flr) 1,600 4 6,400Science Classroom / Lab (E BLDG - 2nd Flr) 1,210 1 1,210Science Classroom / Lab (Marine Biology) 1,440 1 1,440Science Classroom / Lab (Biotechnology) 1,440 1 1,440Science Classroom / Lab (Forensics) 900 1 900Science Classroom / Lab (Robotics) 1,440 1 1,440Prep Room (E BLDG - 1st/2nd Flr) Various 8 1,490 200 8 1,600 Central Chemical Storage Rm (E BLDG - 1st Flr) 120 1 120 200 1 200 Science Dir. Office (E BLDG - 2nd Flr) 370 1 370IB Office (E BLDG - 2nd Flr) 130 1 130

3,255 0 10,070 (List classrooms of different sizes separately)

Self-Contained SPED Varies 3 2,170 950 7 6,650 825-950 SF equal to surrounding classrooms

Self-Contained SPED Toilet 60 7 420 Life Skills (D-BLDG) 810 1 810Resource Room 275 1 275 500 3 1,500 1/2 size Genl. Clrm.

Small Group Room 500 3 1,500 1/2 size Genl. Clrm.

6,150 0 6,700 Art Classroom - 25 seats (C-BLDG) 2,000 1 2,000 1,200 2 2,400 Assumed use - 25% Population - 5 times/week

Art Office 150 1 150Art Workroom w/ Storage & kiln 150 2 300 Digital Arts / MIDI 420 1 420Band - 50 - 100 seats 1,650 1 1,650 1,500 1 1,500 Assumed use - 25% Population - 5 times/week

Chorus - 50 - 100 seats (B BLDG) 1,330 1 1,330 1,500 1 1,500 Ensemble 200 1 200 Music Practice Various 3 250 75 4 300 Music Office 200 1 200Music Storage 75 2 150 500 1 500

16,595 0 9,600 Jewelry / Metals (C-BLDG) 2,110 1 2,110 1,200 3 3,600 Assumed use - 50% Population - 5 times/week

Ceramics w/ Storage (C-BLDG) 2,240 1 2,240 2,000 3 6,000 Assumed use - 50% Population - 5 times/week

Photography w/ Dark Room (C-BLDG) 1,595 1 1,595Video Lab (B BLDG) Various 2 2,405Fashion Design/Graphics (B BLDG) 1,070 1 1,070Business (B BLDG) Various 3 2,940Woodworking (C-BLDG) 2,635 1 2,635Culinary Arts (C-BLDG) 1,600 1 1,600

30,550 900 21,268 Gymnasium 18,800 1 18,800 12,000 1 12,000 PE Alternatives 3,065 1 3,065 3,000 1 3,000 Health Classroom 900 1 900Gym Storeroom Varies 2 990 300 1 300 Locker Rooms - Boys / Girls w/ Toilets Varies 2 6,250 5,068 1 5,068 5.6 sf/student total

Phys. Ed. Storage Varies 2 440 500 1 500 Athletic Director's Office / Other Office Varies 5 780 150 1 150 Health Instructor's Office w/ Shower & Toilet 250 1 250 Laundry 225 1 225

4,985 0 5,556 Media Center / Reading Room 4,800 1 4,800 5,556 1 5,556 Computer LabOffice 185 1 185

7,700 2,500 8,910 Auditorium (D-BLDG) 5,690 1 5,690 6,033 1 6,033 2/3 Enrollment @ 10 SF/Seat - 750 seats MAX

Stage (D-BLDG) 1,410 1 1,410 1,600 1 1,600 Auditorium Storage (D-BLDG) 430 1 430 476 1 476 Make-up / Dressing Rooms (D-BLDG) 130 1 130 300 2 600 Controls / Lighting / Projection (D-BLDG) 40 1 40 200 1 200 Black Box / Presentation 2,500 1 2,500

7,150 0 8,182 Cafeteria / Student Lounge / Break-out 5,035 1 5,035 4,525 1 4,525 3 seatings - 15SF per seat

Chair / Table Storage NA 376 1 376 Scramble Serving Area NA 600 1 600 Kitchen 1,855 1 1,855 2,205 1 2,205 1600 SF for first 300 + 1 SF/student Add'l

Staff Lunch Room 260 1 260 476 1 476 20 SF/Occupant

740 0 910 Medical Suite Toilet 45 1 45 60 1 60 Nurses' Office / Waiting Room 370 1 370 250 1 250 Interview Room 165 1 165 100 2 200 Examination Room / Resting 80 2 160 100 4 400

5,255 0 4,089 General Office / Waiting Room / Toilet Various 1,915 453 1 453 Teachers' Mail and Time Room 100 1 100 Duplicating Room 200 1 200 Records Room 200 1 200 Principal's Office w/ Conference Area 375 1 375 Principal's Secretary / Waiting 125 1 125 Assistant Principal's Office - AP1 150 1 150 Assistant Principal's Office - AP2 150 0 - Supervisory / Spare Office 120 1 120 Conference Room 450 1 450 Guidance Office Various 1,915 150 5 750 supervisory / Spare Office 100 1 100 Guidance Storeroom (B BLDG) 515 1 515 100 1 100 Career Center 376 1 376 Records Room 138 1 138 Teachers' Work Room (B BLDG) 460 1 460 453 1 453 Technology Support (B BLDG) 450 1 450

360 0 2,304 Custodian's Office 150 1 150 Custodian's Workshop 250 1 250 Custodian's Storage 375 1 375 Recycling Room / Trash 400 1 400 Receiving and General Supply 376 1 376 Storeroom 553 1 553 Network / Telecom Room 360 1 360 200 1 200

1,450 0 0 TV Studio 1,450 1 1,450

Total Building Net Floor Area (NFA) 130,350 13,120 121,359

Proposed Student Capacity / Enrollment 905 200

% of GFA -13,120 Other Occupied Rooms (list separately) #DIV/0! Non-Programmed space areas are

#DIV/0! required to be included in the#DIV/0! following submittals:#DIV/0! Schematic Design Submittal

Unoccupied MEP/FP Spaces #DIV/0! Design Development SubmittalUnoccupied Closets, Supply Rooms & Storage Rooms #DIV/0! 60% Construction DocumentsToilet Rooms #DIV/0! 90% Construction DocumentsCirculation (corridors, stairs, ramps & elevators) #DIV/0! Final Construction DocumentsRemaining3 #DIV/0! -13,120

Total Building Gross Floor Area (GFA)2 178,000 0 181,000

Grossing factor (GFA/NFA) 1.37 0.00 1.49

1 Individual Room Net Floor Area (NFA)

2 Total Building Gross Floor Area (GFA) Includes the entire building gross square footage measured from the outside face of exterior walls

3 Remaining Includes exterior walls, interior partitions, chases, and other areas not listed above. Do not calculate this area, it is assumed to equal the difference between the Total Building Gross Floor Area and area not accounted for above.

Architect Certification

Name of Architect Firm:

Name of Principal Architect:

Signature of Principal Architect:

Date:

I hereby certify that all of the information provided in this "Proposed Space Summary" is true, complete and accurate and, except as agreed to in writing by the Massachusetts School Building Authority, in accordance with the guidelines, rules, regulations and policies of the Massachusetts School Building Authority to the best of my knowledge and belief. A true statement, made under the penalties of perjury.

Proposed Space Summary - NRHS. (DRAFT)

CORE ACADEMIC SPACES

SPECIAL EDUCATION

ART & MUSIC

MSBA Guidelines(refer to MSBA Educational Program & Space Standard Guidelines)

MEDIA CENTER

New

ADMINISTRATION & GUIDANCE

VOCATIONS & TECHNOLOGY

HEALTH & PHYSICAL EDUCATION

DINING & FOOD SERVICE

Includes the net square footage measured from the inside face of the perimeter walls and includes all specific spaces assigned to a particular program area including such spaces as non-communal toilets and storage rooms.

CUSTODIAL & MAINTENANCE

OTHER

NON-PROGRAMMED SPACES

PROPOSED

MEDICAL

AUDITORIUM / DRAMA

Existing Conditions

Page 6: Nauset Regional High School...2019/01/09  · Nauset Regional High SchoolEastham MA Grades 9 to 12 905 students 181,000 gsf MSBA Study Scope Version 10.30.2017 High School Space Summary

Nauset Regional High School Eastham, MA

MSBA Study ScopeSpace Template, continued:

Version 10.30.2017

High School Space Summary

Date: 11/26/18 Enter Submittal

Nauset Regional HS

ROOM TYPE

ROOM

NFA1 # OF RMS area totalsROOM

NFA1 # OF RMS area totalsROOM

NFA1 # OF RMS area totals Comments

46,160 9,720 43,770 (List classrooms of different sizes separately)

Classroom - General (A BLDG:1st) 815 8 6,520 850 31 26,350 825 SF min - 950 SF max

Classroom - General (A BLDG:2nd) 900 8 7,200 900 4 3,600Classroom - General (N BLDG) 775 14 10,850Classroom - General (N BLDG) 715 4 2,860Teacher Planning Various 3 480 100 31 3,100 Computer Seminar (N BLDG - 2nd Flr) 600 1 600Language Lab 900 1 900Small Group Seminar A-BLDG + E-BLDG 355 4 1,420 500 2 1,000 Science Classroom / Lab (E BLDG - 1st Flr) 1,435 4 5,740 1,440 8 11,520 3 x85% ut=20 Seats-1 per /day/student

Science Classroom / Lab (E BLDG - 1st Flr) 770 1 770Science Classroom / Lab (E BLDG - 2nd Flr) 1,600 4 6,400Science Classroom / Lab (E BLDG - 2nd Flr) 1,210 1 1,210Science Classroom / Lab (Marine Biology) 1,440 1 1,440Science Classroom / Lab (Biotechnology) 1,440 1 1,440Science Classroom / Lab (Forensics) 900 1 900Science Classroom / Lab (Robotics) 1,440 1 1,440Prep Room (E BLDG - 1st/2nd Flr) Various 8 1,490 200 8 1,600 Central Chemical Storage Rm (E BLDG - 1st Flr) 120 1 120 200 1 200 Science Dir. Office (E BLDG - 2nd Flr) 370 1 370IB Office (E BLDG - 2nd Flr) 130 1 130

3,255 0 10,070 (List classrooms of different sizes separately)

Self-Contained SPED Varies 3 2,170 950 7 6,650 825-950 SF equal to surrounding classrooms

Self-Contained SPED Toilet 60 7 420 Life Skills (D-BLDG) 810 1 810Resource Room 275 1 275 500 3 1,500 1/2 size Genl. Clrm.

Small Group Room 500 3 1,500 1/2 size Genl. Clrm.

6,150 0 6,700 Art Classroom - 25 seats (C-BLDG) 2,000 1 2,000 1,200 2 2,400 Assumed use - 25% Population - 5 times/week

Art Office 150 1 150Art Workroom w/ Storage & kiln 150 2 300 Digital Arts / MIDI 420 1 420Band - 50 - 100 seats 1,650 1 1,650 1,500 1 1,500 Assumed use - 25% Population - 5 times/week

Chorus - 50 - 100 seats (B BLDG) 1,330 1 1,330 1,500 1 1,500 Ensemble 200 1 200 Music Practice Various 3 250 75 4 300 Music Office 200 1 200Music Storage 75 2 150 500 1 500

16,595 0 9,600 Jewelry / Metals (C-BLDG) 2,110 1 2,110 1,200 3 3,600 Assumed use - 50% Population - 5 times/week

Ceramics w/ Storage (C-BLDG) 2,240 1 2,240 2,000 3 6,000 Assumed use - 50% Population - 5 times/week

Photography w/ Dark Room (C-BLDG) 1,595 1 1,595Video Lab (B BLDG) Various 2 2,405Fashion Design/Graphics (B BLDG) 1,070 1 1,070Business (B BLDG) Various 3 2,940Woodworking (C-BLDG) 2,635 1 2,635Culinary Arts (C-BLDG) 1,600 1 1,600

30,550 900 21,268 Gymnasium 18,800 1 18,800 12,000 1 12,000 PE Alternatives 3,065 1 3,065 3,000 1 3,000 Health Classroom 900 1 900Gym Storeroom Varies 2 990 300 1 300 Locker Rooms - Boys / Girls w/ Toilets Varies 2 6,250 5,068 1 5,068 5.6 sf/student total

Phys. Ed. Storage Varies 2 440 500 1 500 Athletic Director's Office / Other Office Varies 5 780 150 1 150 Health Instructor's Office w/ Shower & Toilet 250 1 250 Laundry 225 1 225

4,985 0 5,556 Media Center / Reading Room 4,800 1 4,800 5,556 1 5,556 Computer LabOffice 185 1 185

7,700 2,500 8,910 Auditorium (D-BLDG) 5,690 1 5,690 6,033 1 6,033 2/3 Enrollment @ 10 SF/Seat - 750 seats MAX

Stage (D-BLDG) 1,410 1 1,410 1,600 1 1,600 Auditorium Storage (D-BLDG) 430 1 430 476 1 476 Make-up / Dressing Rooms (D-BLDG) 130 1 130 300 2 600 Controls / Lighting / Projection (D-BLDG) 40 1 40 200 1 200 Black Box / Presentation 2,500 1 2,500

7,150 0 8,182 Cafeteria / Student Lounge / Break-out 5,035 1 5,035 4,525 1 4,525 3 seatings - 15SF per seat

Chair / Table Storage NA 376 1 376 Scramble Serving Area NA 600 1 600 Kitchen 1,855 1 1,855 2,205 1 2,205 1600 SF for first 300 + 1 SF/student Add'l

Staff Lunch Room 260 1 260 476 1 476 20 SF/Occupant

740 0 910 Medical Suite Toilet 45 1 45 60 1 60 Nurses' Office / Waiting Room 370 1 370 250 1 250 Interview Room 165 1 165 100 2 200 Examination Room / Resting 80 2 160 100 4 400

5,255 0 4,089 General Office / Waiting Room / Toilet Various 1,915 453 1 453 Teachers' Mail and Time Room 100 1 100 Duplicating Room 200 1 200 Records Room 200 1 200 Principal's Office w/ Conference Area 375 1 375 Principal's Secretary / Waiting 125 1 125 Assistant Principal's Office - AP1 150 1 150 Assistant Principal's Office - AP2 150 0 - Supervisory / Spare Office 120 1 120 Conference Room 450 1 450 Guidance Office Various 1,915 150 5 750 supervisory / Spare Office 100 1 100 Guidance Storeroom (B BLDG) 515 1 515 100 1 100 Career Center 376 1 376 Records Room 138 1 138 Teachers' Work Room (B BLDG) 460 1 460 453 1 453 Technology Support (B BLDG) 450 1 450

360 0 2,304 Custodian's Office 150 1 150 Custodian's Workshop 250 1 250 Custodian's Storage 375 1 375 Recycling Room / Trash 400 1 400 Receiving and General Supply 376 1 376 Storeroom 553 1 553 Network / Telecom Room 360 1 360 200 1 200

1,450 0 0 TV Studio 1,450 1 1,450

Total Building Net Floor Area (NFA) 130,350 13,120 121,359

Proposed Student Capacity / Enrollment 905 200

% of GFA -13,120 Other Occupied Rooms (list separately) #DIV/0! Non-Programmed space areas are

#DIV/0! required to be included in the#DIV/0! following submittals:#DIV/0! Schematic Design Submittal

Unoccupied MEP/FP Spaces #DIV/0! Design Development SubmittalUnoccupied Closets, Supply Rooms & Storage Rooms #DIV/0! 60% Construction DocumentsToilet Rooms #DIV/0! 90% Construction DocumentsCirculation (corridors, stairs, ramps & elevators) #DIV/0! Final Construction DocumentsRemaining3 #DIV/0! -13,120

Total Building Gross Floor Area (GFA)2 178,000 0 181,000

Grossing factor (GFA/NFA) 1.37 0.00 1.49

1 Individual Room Net Floor Area (NFA)

2 Total Building Gross Floor Area (GFA) Includes the entire building gross square footage measured from the outside face of exterior walls

3 Remaining Includes exterior walls, interior partitions, chases, and other areas not listed above. Do not calculate this area, it is assumed to equal the difference between the Total Building Gross Floor Area and area not accounted for above.

Architect Certification

Name of Architect Firm:

Name of Principal Architect:

Signature of Principal Architect:

Date:

I hereby certify that all of the information provided in this "Proposed Space Summary" is true, complete and accurate and, except as agreed to in writing by the Massachusetts School Building Authority, in accordance with the guidelines, rules, regulations and policies of the Massachusetts School Building Authority to the best of my knowledge and belief. A true statement, made under the penalties of perjury.

Proposed Space Summary - NRHS. (DRAFT)

CORE ACADEMIC SPACES

SPECIAL EDUCATION

ART & MUSIC

MSBA Guidelines(refer to MSBA Educational Program & Space Standard Guidelines)

MEDIA CENTER

New

ADMINISTRATION & GUIDANCE

VOCATIONS & TECHNOLOGY

HEALTH & PHYSICAL EDUCATION

DINING & FOOD SERVICE

Includes the net square footage measured from the inside face of the perimeter walls and includes all specific spaces assigned to a particular program area including such spaces as non-communal toilets and storage rooms.

CUSTODIAL & MAINTENANCE

OTHER

NON-PROGRAMMED SPACES

PROPOSED

MEDICAL

AUDITORIUM / DRAMA

Existing Conditions

Page 7: Nauset Regional High School...2019/01/09  · Nauset Regional High SchoolEastham MA Grades 9 to 12 905 students 181,000 gsf MSBA Study Scope Version 10.30.2017 High School Space Summary

Nauset Regional High School Eastham, MA

CoreAcad.

SpecialEd.

2500 sf

5000 sf

7500 sf

10000 sf

12,500 sf

15,000 sf

17,500 sf

20,000 sf

22500 sf

25000 sf

27500 sf

30,000 sf

Art / Music

Health/PE

MediaCenter

Dining/Food Sevice

Medical

43,770 sf

6,700 sf

10,070 sf

21,286 sf

5,556 sf

8,182 sf

910 sf

Cust./Maint.

4,089 sf

2,304 sf

OtherAdmin/Guidance

32,500 sf

35,000 sf

1,450 sf

5,255 sf

360 sf

905 student enrollment NRHS - MSBA Default Space Summary Template

37,500 sf

40,000 sf

45,000 sf

47,000 sf

42,500 sf

Voc/Tech

9,600 sf

Auditor./Drama

8,910 sf

7,700 sf

4,985 sf

30,550 sf

16,595 sf

3,255 sf

6,150 sf

7,150 sf

Key:NRHS Existing Net SFMSBA Default Net SF

46,160 sf

Page 8: Nauset Regional High School...2019/01/09  · Nauset Regional High SchoolEastham MA Grades 9 to 12 905 students 181,000 gsf MSBA Study Scope Version 10.30.2017 High School Space Summary

Nauset Regional High School Eastham, MA

GeneralClassrm.

TeacherPlanning

2,000 sf

4,000 sf

6,000 sf

8,000 sf

10,000 sf

12,000 sf

14,000 sf

16,000 sf

18,000 sf

20,000 sf

22,000 sf

24,000 sf

Sm. Grp.Seminar

PrepRoom

ChemicalStorage

26,350 sf

1,000 sf

3,100 sf1,600 sf

200 sf

26,000 sf

28,000 sf

905 student enrollment

Core Academic Spaces

NRHS - MSBA Default Space Summary Template

30,000 sf

32,000 sf

34,000 sf

ScienceLab

11,520 sf

120 sf1,490 sf

14,120 sf

480 sf

2,020 sf

27,430 sf

Key:NRHS Existing Net SFMSBA Default Net SF

Page 9: Nauset Regional High School...2019/01/09  · Nauset Regional High SchoolEastham MA Grades 9 to 12 905 students 181,000 gsf MSBA Study Scope Version 10.30.2017 High School Space Summary

Nauset Regional High School Eastham, MA

Self-Contained

Life Skills

500 sf

1,000 sf

1,500 sf

2,000 sf

2,500 sf

3,000 sf

3,500 sf

4,000 sf

4,500 sf

5,000 sf

5,500 sf

6,000 sf

S/C SPED Toilet

Sm GroupRoom

6,650 sf

420 sf 500 sf

6,500 sf

7,000 sf

905 student enrollment

Special Education Spaces

NRHS - MSBA Default Space Summary Template

7,500 sf

8,000 sf

8,500 sf

ResourceRoom

1,500 sf

0 sf275 sf0 sf 0 sf

810 sf

2,170 sf

Key:NRHS Existing Net SFMSBA Default Net SF

Page 10: Nauset Regional High School...2019/01/09  · Nauset Regional High SchoolEastham MA Grades 9 to 12 905 students 181,000 gsf MSBA Study Scope Version 10.30.2017 High School Space Summary

Nauset Regional High School Eastham, MA

Art CR Graphics/MIDI Lab

200 sf

400 sf

600 sf

800 sf

1,000 sf

1,200 sf

1,400 sf

1,600 sf

1,800 sf

2,000 sf

2,200 sf

2,400 sf

Band Rehearsal

EnsembleRoom

PracticeRooms

Music Storage

2,400 sf

1,500 sf

300 sf 300 sf

500 sf

2,600 sf

2,800 sf

905 student enrollment

Art / Music Spaces

NRHS - MSBA Default Space Summary Template

3,000 sf

3,200 sf

3,400 sf

ChoralRehearsal

Art Work-rm/office

1,500 sf

300 sf

0 sf 200 sf 200 sf150 sf 0 sf

1,650 sf

1,330 sf

420 sf

2,000 sf

Key:NRHS Existing Net SFMSBA Default Net SF

Page 11: Nauset Regional High School...2019/01/09  · Nauset Regional High SchoolEastham MA Grades 9 to 12 905 students 181,000 gsf MSBA Study Scope Version 10.30.2017 High School Space Summary

Nauset Regional High School Eastham, MA

Tech. Classroom

Tech. Shop

3,600 sf

905 student enrollment

Vocations & Technology Spaces

NRHS - MSBA Default Space Summary Template9,610 sf

500 sf

1,000 sf

1,500 sf

2,000 sf

2,500 sf

3,000 sf

3,500 sf

4,000 sf

4,500 sf

5,000 sf

5,500 sf

6,000 sf

6,500 sf

7,000 sf

7,500 sf

8,000 sf

8,500 sf

9,000 sf

6,000 sf

6,985 sf

Key:NRHS Existing Net SFMSBA Default Net SF

Page 12: Nauset Regional High School...2019/01/09  · Nauset Regional High SchoolEastham MA Grades 9 to 12 905 students 181,000 gsf MSBA Study Scope Version 10.30.2017 High School Space Summary

Nauset Regional High School Eastham, MA

Gym PE Alt

1,500 sf

3,000 sf

4,500 sf

6,000 sf

7,500 sf

9,000 sf

10,500 sf

12,000 sf

13,500 sf

15,000 sf

16,500 sf

18,000 sf

Gym Storerm

Health Classroom

PE Storage

AD Office Health Instr Office

Laundry

12,000 sf

300 sf

3,000 sf

500 sf150 sf

250 sf 225 sf

19,500 sf

21,000 sf

905 student enrollment

Health & Physical Education Spaces

NRHS - MSBA Default Space Summary Template

22,500 sf

24,000 sf

25,500 sf

Locker Rooms

5,068 sf

780 sf

0 sf 0 sf440 sf

6,250 sf

3,065 sf

990 sf900 sf

18,800 sf

Key:NRHS Existing Net SFMSBA Default Net SF

Page 13: Nauset Regional High School...2019/01/09  · Nauset Regional High SchoolEastham MA Grades 9 to 12 905 students 181,000 gsf MSBA Study Scope Version 10.30.2017 High School Space Summary

Nauset Regional High School Eastham, MA

Media Center

Computer Lab

500 sf

1,000 sf

1,500 sf

2,000 sf

2,500 sf

3,000 sf

3,500 sf

4,000 sf

4,500 sf

5,000 sf

5,500 sf

6,000 sf

Office

5,556 sf

0 sf

6,500 sf

7,000 sf

905 student enrollment

Media Center Spaces

NRHS - MSBA Default Space Summary Template

7,500 sf

8,000 sf

8,500 sf

0 sf / 0 sf 185 sf

4,800 sf

Key:NRHS Existing Net SFMSBA Default Net SF

Page 14: Nauset Regional High School...2019/01/09  · Nauset Regional High SchoolEastham MA Grades 9 to 12 905 students 181,000 gsf MSBA Study Scope Version 10.30.2017 High School Space Summary

Nauset Regional High School Eastham, MA

Audito-rium

Stage

500 sf

1,000 sf

1,500 sf

2,000 sf

2,500 sf

3,000 sf

3,500 sf

4,000 sf

4,500 sf

5,000 sf

5,500 sf

6,000 sf

Aud. Storage

Ctrl Rm

6,033 sf

476 sf200 sf

6,500 sf

7,000 sf

905 student enrollment

Auditorium / Drama Spaces

NRHS - MSBA Default Space Summary Template

7,500 sf

8,000 sf

8,500 sf

DressingRooms

600 sf

1,600 sf

40 sf0 sf430 sf

1,410 sf

5,690 sf

Key:NRHS Existing Net SFMSBA Default Net SF

Page 15: Nauset Regional High School...2019/01/09  · Nauset Regional High SchoolEastham MA Grades 9 to 12 905 students 181,000 gsf MSBA Study Scope Version 10.30.2017 High School Space Summary

Nauset Regional High School Eastham, MA

Cafeteria Chair Storage

500 sf

1,000 sf

1,500 sf

2,000 sf

2,500 sf

3,000 sf

3,500 sf

4,000 sf

4,500 sf

5,000 sf

5,500 sf

6,000 sf

Servery Staff LunchRoom

4,525 sf

600 sf476 sf

6,500 sf

7,000 sf

905 student enrollment

Dining / Food Service Spaces

NRHS - MSBA Default Space Summary Template

7,500 sf

8,000 sf

8,500 sf

Kitchen

2,205 sf

250 sf

1,855 sf

0 sf 0 sf376 sf

5,035 sf

Key:NRHS Existing Net SFMSBA Default Net SF

Page 16: Nauset Regional High School...2019/01/09  · Nauset Regional High SchoolEastham MA Grades 9 to 12 905 students 181,000 gsf MSBA Study Scope Version 10.30.2017 High School Space Summary

Nauset Regional High School Eastham, MA

Existing ConditionsUpdate

Page 17: Nauset Regional High School...2019/01/09  · Nauset Regional High SchoolEastham MA Grades 9 to 12 905 students 181,000 gsf MSBA Study Scope Version 10.30.2017 High School Space Summary

Nauset Regional High School Eastham, MA

Building A ObservationsPotential Opportunities for Reuse

Condition

LimitationsBenefits

• General Classrooms

• Structural: Framing sound

• Architectural: Requires all new finishes, insulation, and cladding. Further investigation required to evaluate roof and windows

• Mech/Elec/Plumb/Fire Protection: All new systems req’d

• Floor-to-floor heights

• Few windows

• Accessibility through Building B, adjacent classrooms

• Adequate room sizes

• Close proximity to teaching team

• Expandable module: could append four additional classrooms at west end

Page 18: Nauset Regional High School...2019/01/09  · Nauset Regional High SchoolEastham MA Grades 9 to 12 905 students 181,000 gsf MSBA Study Scope Version 10.30.2017 High School Space Summary

Nauset Regional High School Eastham, MA

Building B ObservationsPotential Opportunities for Reuse

Condition

LimitationsBenefits

• Media Center

• Cafeteria

• Student Center

• Science Classrooms

• Technology Classrooms

• Structural: Framing sound

• Architectural: Requires all new finishes, insulation, and cladding. Further investigation required to evaluate roof and windows

• Mech/Elec/Plumb/Fire Protection: All new systems req’d

• No visual connection between first- and second-floor spaces

• Views to bowl

• Wide variety of spaces, high volume

• Fully accessible

Page 19: Nauset Regional High School...2019/01/09  · Nauset Regional High SchoolEastham MA Grades 9 to 12 905 students 181,000 gsf MSBA Study Scope Version 10.30.2017 High School Space Summary

Nauset Regional High School Eastham, MA

Building C Observations Potential Opportunities for Reuse

Condition

LimitationsBenefits

• Art Workshops

• General Classrooms: capacity for 10 CR

• Technology labs

• Structural: Framing sound

• Architectural: Requires all new finishes, insulation, and cladding. Further investigation required to evaluate roof and windows

• Mech/Elec/Plumb/Fire Protection: All new systems req’d

• Floor-to-floor heights: With only 14’ clear, high bays cannot accommodate second floor

• Phasing challenges

• Close proximity to teaching team

• Loading access

• Ceiling height

Page 20: Nauset Regional High School...2019/01/09  · Nauset Regional High SchoolEastham MA Grades 9 to 12 905 students 181,000 gsf MSBA Study Scope Version 10.30.2017 High School Space Summary

Nauset Regional High School Eastham, MA

Building D Observations Potential Opportunities for Reuse

Condition

LimitationsBenefits

• Student Center

• Art/Tech Workshops

• Cafeteria

• Black Box

• Administration / Guidance

• Structural: Framing sound

• Architectural: Requires all new finishes, insulation, and cladding. Further investigation required to evaluate roof and windows

• Mech/Elec/Plumb/Fire Protection: All new systems req’d

• Space too small for Auditorium

• No proper flytower

• Back of house program not accommodated currently

• Control booth inaccessible

• Central campus location

• Wide structural spans, high volume

Page 21: Nauset Regional High School...2019/01/09  · Nauset Regional High SchoolEastham MA Grades 9 to 12 905 students 181,000 gsf MSBA Study Scope Version 10.30.2017 High School Space Summary

Nauset Regional High School Eastham, MA

Building E Observations Potential Opportunities for Reuse

Condition

LimitationsBenefits

• General Classrooms

• Science Labs: adequate room sizes with prep rooms adjacent

• Structural: Framing sound

• Architectural: Requires all new finishes, insulation, and cladding. Further investigation required to evaluate roof and windows

• Mech/Elec/Plumb/Fire Protection: All new systems req’d

• Phasing of heavy renovation, specialized swing space required for labs

• Floor-to-floor heights a challenge for proper ventilation

• Accessibility through Building N, adjacent classrooms

• Adequate room sizes

• Close proximity to teaching team, office space, prep

Page 22: Nauset Regional High School...2019/01/09  · Nauset Regional High SchoolEastham MA Grades 9 to 12 905 students 181,000 gsf MSBA Study Scope Version 10.30.2017 High School Space Summary

Nauset Regional High School Eastham, MA

Building F Observations Potential Opportunities for Reuse

Condition

LimitationsBenefits

• Cafeteria

• Structural: Framing sound

• Architectural: Requires all new finishes, insulation, and cladding. Further investigation required to evaluate roof and windows

• Mech/Elec/Plumb/Fire Protection: All new systems req’d

• Kitchen / servery grossly undersized• Central campus location

Page 23: Nauset Regional High School...2019/01/09  · Nauset Regional High SchoolEastham MA Grades 9 to 12 905 students 181,000 gsf MSBA Study Scope Version 10.30.2017 High School Space Summary

Nauset Regional High School Eastham, MA

Building G Observations Potential Opportunities for Reuse

Condition

LimitationsBenefits

• Gymnasium

• Fitness Center

• Structural: Framing sound

• Architectural: Requires all new finishes, insulation, and cladding. Further investigation required to evaluate roof and windows

• Mech/Elec/Plumb/Fire Protection: All new systems req’d

• Locker rooms inaccessible and decrepit with poor egress; basement spaces feel unsafe to students

• Current size is adequate for program (MSBA template allows 2/3 of current SF)

• Could serve as swing space for phasing

• Lower level spaces: potential storage or mechanical

Page 24: Nauset Regional High School...2019/01/09  · Nauset Regional High SchoolEastham MA Grades 9 to 12 905 students 181,000 gsf MSBA Study Scope Version 10.30.2017 High School Space Summary

Nauset Regional High School Eastham, MA

Building N Observations Potential Opportunities for Reuse

Condition

LimitationsBenefits

• General Classrooms

• Art

• Structural: Framing sound

• Architectural: Requires all new finishes and insulation. Further investigation required to evaluate roof and windows

• Mech/Elec/Plumb/Fire Protection: All new systems req’d

• Classrooms undersized: less than 700 sf usable area once egress is accommodated (Minimum MSBA CR size 850 sf )

• Remote from campus center of gravity

• Adequate administration / guidance space

Page 25: Nauset Regional High School...2019/01/09  · Nauset Regional High SchoolEastham MA Grades 9 to 12 905 students 181,000 gsf MSBA Study Scope Version 10.30.2017 High School Space Summary

Nauset Regional High School Eastham, MA

CAMPUS ANALYSIS

Page 26: Nauset Regional High School...2019/01/09  · Nauset Regional High SchoolEastham MA Grades 9 to 12 905 students 181,000 gsf MSBA Study Scope Version 10.30.2017 High School Space Summary

Nauset Regional High School Eastham, MA

Campus Center of Gravity

Building N remote

Page 27: Nauset Regional High School...2019/01/09  · Nauset Regional High SchoolEastham MA Grades 9 to 12 905 students 181,000 gsf MSBA Study Scope Version 10.30.2017 High School Space Summary

Nauset Regional High School Eastham, MA

Opportunity for Connection to Athletic Fields

New Cafeteria, Kitchen, Locker Rms, Fitness atupper level

Page 28: Nauset Regional High School...2019/01/09  · Nauset Regional High SchoolEastham MA Grades 9 to 12 905 students 181,000 gsf MSBA Study Scope Version 10.30.2017 High School Space Summary

Nauset Regional High School Eastham, MA

Cafeteria Models

KK

a) Open Cafeteria, subdividable

b) Two Cafeterias, joined by common kitchen

c) Two Cafeterias across courtyard, served by common kitchen

Page 29: Nauset Regional High School...2019/01/09  · Nauset Regional High SchoolEastham MA Grades 9 to 12 905 students 181,000 gsf MSBA Study Scope Version 10.30.2017 High School Space Summary

Nauset Regional High School Eastham, MA

Ideal Art Workshop Layout

1. Ground level access with garage doors to exterior

2. Clean room space

3. Display along courtyard wall

Jewelry / Woodworking / Ceramics / Robotics

Messy

Clean

Display

Page 30: Nauset Regional High School...2019/01/09  · Nauset Regional High SchoolEastham MA Grades 9 to 12 905 students 181,000 gsf MSBA Study Scope Version 10.30.2017 High School Space Summary

Nauset Regional High School Eastham, MA

Program Adjacencies: Drama and Performing Arts

Auditorium

Cafeteria / Reception

Stage

Backstage

Woodworking

Page 31: Nauset Regional High School...2019/01/09  · Nauset Regional High SchoolEastham MA Grades 9 to 12 905 students 181,000 gsf MSBA Study Scope Version 10.30.2017 High School Space Summary

Nauset Regional High School Eastham, MA

Positive / Negative Open Space

Views

Amphitheater/ Outdoor

Classroom

Page 32: Nauset Regional High School...2019/01/09  · Nauset Regional High SchoolEastham MA Grades 9 to 12 905 students 181,000 gsf MSBA Study Scope Version 10.30.2017 High School Space Summary

Nauset Regional High School Eastham, MA

PROJECT SCHEDULE

Page 33: Nauset Regional High School...2019/01/09  · Nauset Regional High SchoolEastham MA Grades 9 to 12 905 students 181,000 gsf MSBA Study Scope Version 10.30.2017 High School Space Summary

Nauset Regional High School Eastham, MA

2017

2018

2019

2020

2021

2022

2023

Eligibility Period Feb ‘17 Nov ‘17

Forming the TeamNov ‘17 Jun ‘18

Feasibility StudyNov ‘18 Jun ‘19

Schematic DesignJuly ‘19

DD, CD’s & Bidding

2024

Apr ‘20

Building and Site ConstructionAug ‘24Jul ‘21

Eligibility Period Feb ‘17 Nov ‘17

Nauset Regional High School

Prepared by Daedalus Projects, Inc. 01/06/2019

Forming the TeamNov ‘17 Jun ‘18

Begin PDP Nov ‘18

SBC Meeting to Approve PDP

Submission Feb ‘19

Submit PDP to MSBA Mar ‘19

MSBA PDP Board Approval& Begin PSR

April ‘19

SBC Meeting toApprove PSR

& MSBA Submission May ‘19

MSBA PSR Board Approval

Jun ‘19

Public Outreach

Jan ‘19

Apr ‘20 July ‘20

Project Funding

Town MeetingsApr-May ‘20

Jun ‘20 May ‘21

May-Jun ‘21 Bidding

2019

Eligibility Period

Feasibility StudyNov ‘18 Jun ‘19

Eligibility Period Nov ‘17

Begin PDP Nov ‘18

SBC Meeting to Approve PDP

Submission Feb ‘19 SBC Meeting to

Approve PSR& MSBA Submission

May ‘19

Public Outreach

Apr ‘20 July ‘20

Project Funding

DD, CD’s & BiddingJun ‘20 May ‘21

May-Jun ‘21 Bidding

July ‘20

Project Funding

2022 2024

Building and Site ConstructionAug ‘24Aug ‘24Jul ‘21

Schematic DesignJuly ‘19 Apr ‘20

MSBA PDP Board Approval

MSBA PSR Board Approval

Jun ‘19