national transmission and despatch … no 6...section-iv: schedules to bid schedule-a 1 3 4 6 7 =...
TRANSCRIPT
BIDDING DOCUMENT NO. CPP-04M-2016
TRANSMISSION SCHEME FOR DISPERSAL OF POWER FROM 1320MW HUBCO
POWER PLANT AND INTERCONNECTION OF LAHORE HVDC CONVERTER
STATION WITH LAHORE SOUTH AND LAHORE NORTH SUB-STATIONS
AMENDMENT NO. 06
The Bidding Document No. CPP-04M-2016 is amended by revising certain pages
mentioned below. The Bidder shall replace and add these pages in his copy of the Bidding
Documents, read the revised text/clauses and shall acknowledge receipt of this amendment.
i. Pages to be replaced/ revised:
Volume-I:
Section Document Page No. Replacement Page No.
IFB 1, 2 1 R6, 2 R6
Section-II Bid Data Sheet 2-2, 2-7 2-2 R6, 2-7 R6
Schedule-A to Bid (Prices) 4-5 R3, 4-10A R3 4-5 R6, 4-10A R6
Schedule-B to Bid (Prices) 4-16 R3, 4-21A R3 4-16 R6, 4-21A R6
Schedule-C to Bid (Delivery) 4-27 R3, 4-32A R3 4-27 R6, 4-32A R6
Section-VII Special Provisions 7-13 7-13 R6
NATIONAL TRANSMISSION AND DESPATCH
COMPANY LIMITED (NTDC)
Section-IV: SCHEDULES TO BID SCHEDULE-A
1 3 4 6 7 = 5x6 8 9 = 7+8 10
1 3,520 km
3 320 km
TOTAL FOR LOT-III
Name___________________________________________________________
In the capacity of _________________________________________________
Signed__________________________________________________________
Duly authorized to sign the Bid for and on behalf of____________________
Date: ___________________________________________________________
* (vi) Total inland transportation charges include loading, unloading and other local costs/taxes (without custom duties, import taxes and sales tax) for delivery to NTDC Jamshoro Store in Pak Rs.
FOR AAAC Greeley CONDUCTOR AND Alumoweld SHIELD WIRE
CONDUCTOR & SHIELDWIRE
Furnish 9.78mm dia Alumoweld Shield Wire
Sales and
Other Taxes
per Item
(To be offered from within the Purchaser's country)
Domestic
Value added
in Percent
* Total FCS (at sites stores
with in NTDC's jurisdiction
price including transportation
charges, loading, unloading
all type of duties and without
sales tax (Pak Rs)
Quantity of
Measurment
NOTES:
(i) The applicable specifications alongwith their ammendments placed in volume-2 are to be read carefully before filling up the schedule of prices.
(ii) In Case of Discrepancy, between unit price and total, the unit price will prevail.
(iii) In Column 4: In accordance with margins of preference ITB Clause 42, applicable only in case of International Competative Bidding Domestic Value Added comprises domestic labor, the domestic content of materials, domestic
overheads and profits from the stage of mining the raw material until final assembly.
(iv) In Column 6: Currency in accordance with ITB Clause 13. Price shall include all custom duties and sales and other taxes already paid or payable on the components and raw material used in the manufacturer or assembly of the
item or the custom duties and sales and other taxes already paid on previously imported items.
(v) In Column 8: Payable in the Purchaser's country if Contract is awarded.
Furnish 927.2 KCM AAAC Greeley Conductor
Description Total EXW
Price per Item
Total Price per
Item including
Taxes
Country of
Origin
SCHEDULE OF PRICES FOR (LOT-III)
2 5
Item No. Unit Unit Price EXW
(EX-Works)
R6
CPP-04M-2016 4-5 R6 Procurement of Material
Section-IV: SCHEDULES TO BID SCHEDULE-A
1 3 4 6 7 = 5x6 8 9 = 7+8 10
2440,000 Nos.
Name___________________________________________________________
In the capacity of _________________________________________________
Signed__________________________________________________________
Duly authorized to sign the Bid for and on behalf of____________________
Date: ___________________________________________________________
SCHEDULE OF PRICES FOR (LOT-VIA)
FOR DISC INSULATORS
(To be offered from within the Purchaser's country)
Item No. Description Domestic Value
added in Percent
Country of
Origin
Unit Price EXW
(EX-Works)
Quantity of
Measurment
Fog type Disc Porcelain Disc Insulators with clevis &
tongue coupling of 160 kN E&M strength
TOTAL FOR LOT-VIA
NOTES:
(i) The applicable specifications alongwith their ammendments placed in volume-2 are to be read carefully before filling up the schedule of prices.
(ii) In Case of Discrepancy, between unit price and total, the unit price will prevail.
(iii) In Column 4: In accordance with margins of preference ITB Clause 42, applicable only in case of International Competative Bidding Domestic Value Added comprises domestic labor, the domestic content of materials,
domestic overheads and profits from the stage of mining the raw material until final assembly.
(iv) In Column 6: Currency in accordance with ITB Clause 13. Price shall include all custom duties and sales and other taxes already paid or payable on the components and raw material used in the manufacturer or
assembly of the item or the custom duties and sales and other taxes already paid on previously imported items.
(v) In Column 8: Payable in the Purchaser's country if Contract is awarded.
* (vi) Total inland transportation charges include loading, unloading and other local costs/taxes (without custom duties, import taxes and sales tax) for delivery to NTDC Jamshoro Store in Pak Rs.
Total EXW
Price per Item
Sales and
Other Taxes
per Item
Total Price per
Item including
Taxes
* Total FCS (at sites stores
with in NTDC's jurisdiction
price including
transportation charges,
loading, unloading all type
of duties and without
sales tax (Pak Rs)
2
Unit
DISC INSULATORS
5
R6
CPP-04M-2016 4-10A R6 Procurement of Material
Section-IV: SCHEDULES TO BID SCHEDULE-A
Total Price
1 3 5 6 7 8 9 10
1 3,520 km
3 320 km
TOTAL FOR LOT-III
Name___________________________________________________________
In the capacity of _________________________________________________
Signed__________________________________________________________
Duly authorized to sign the Bid for and on behalf of____________________
Date: ___________________________________________________________
SCHEDULE OF PRICES FOR (LOT-III)
2
Item No.
C&F (Karachi) CIF (Karachi) CIF Karachi
FOR AAAC Greeley CONDUCTOR AND Alumoweld SHIELD WIRE
(To be offered from outside the Purchaser's country)
Customs, sales
and Other Taxes
per Item
Total Price per Item
including Customs
Taxes
Cost in Bidding CurrencyUnit
Unit Price
Description Quantity of
MeasurmentFOB
NOTES:
(i) In Case of Discrepancy, between unit price and total, the unit price will prevail.
(ii) Currency of bid price of imported goods on FOB, C&F and CIF basis shall be either in the currency of bidders home country or in US Dollars.
(iii) In Column 5, 6 and 7: Currency in accordance with ITB Clause 13.
Country of
Origin
4
CONDUCTOR & SHIELDWIRE
Furnish 9.78mm dia Alumoweld Shield Wire
Furnish 927.2 KCM AAAC Greeley Conductor R6
CPP-04M-2016 4-16 R6 Procurement of Material
Section-IV: SCHEDULES TO BID SCHEDULE-A
Total Price
1 3 5 6 7 8 9 10
2
440,000 Nos.
Name___________________________________________________________
In the capacity of _________________________________________________
Signed__________________________________________________________
Duly authorized to sign the Bid for and on behalf of____________________
Date: ___________________________________________________________
SCHEDULE OF PRICES FOR (LOT-VIA)
FOR DISC INSULATORS
(To be offered from outside the Purchaser's country)
Item No. Description Country of
Origin
Quantity of
Measurment
Unit
Cost in Bidding Currency
Customs, sales
and Other
Taxes per Item
Total Price per Item
including Customs
Taxes
Unit Price
FOB C&F (Karachi) CIF (Karachi) CIF Karachi
NOTES:
(i) In Case of Discrepancy, between unit price and total, the unit price will prevail.
(ii) Currency of bid price of imported goods on FOB, C&F and CIF basis shall be either in the currency of bidders home country or in US Dollars.
(iii) In Column 5, 6 and 7: Currency in accordance with ITB Clause 13.
2 4
DISC INSULATORS
Fog type Disc Porcelain Disc Insulators with clevis &
tongue coupling of 160 kN E&M strength
TOTAL FOR LOT-VIA
R6
CPP-04M-2016 4-21A R6 Procurement of Material
Section-IV: SCHEDULES TO BID SCHEDULE-C
40%
Quantity
60%
Quantity
40%
Quantity
60%
Quantity
40%
Quantity
60%
Quantity
40%
Quantity
60%
Quantity
1
1 3,520 km 150 days 210 days 180 days 240 days
2 320 Km 150 days 210 days 180 days 240 daysFurnish 9.78mm dia Alumoweld Shield Wire
Delivery Period Required Delivery Period Offered
2 3 6
Delivery & Completion Schedule (LOT-III)
FOR AAAC GREELEY CONDUCTOR AND ALUMOWELD SHIELD WIRE
The delivery period shall start from the date of Notification of Award __________________________________________________
Furnish 927.2 KCM AAAC Greeley Conductor
CONDUCTOR & SHIELDWIRE
Item No. Description Quantity of
Measurment
Unit
C&F/CIF (Karachi) FCS (NTDC Site
Stores)
7
FCS (NTDC Site
Stores)
4 5
C&F/CIF (Karachi)
R6
CPP-04M-2016 4-27 R6 Procurement of Material
Section-IV: SCHEDULES TO BID SCHEDULE-C
40%
Quantity
60%
Quantity
40%
Quantity
60%
Quantity
40%
Quantity
60%
Quantity
40%
Quantity
60%
Quantity
1
1 440,000 Nos. 150 days 210 days 180 days 240 days
Delivery & Completion Schedule (LOT-VIA)
FOR DISC INSULATORS
The delivery period shall start from the date of Notification of Award __________________________________________________
Item
No.
Description Quantity of
Measurment
Unit Delivery Period Required Delivery Period Offered
C&F/CIF (Karachi)
DISC INSULATORS
Fog type Disc Porcelain Disc Insulators with clevis &
tongue coupling of 160 kN E&M strength
FCS (NTDC Site
Stores)
C&F/CIF (Karachi) FCS (NTDC Site
Stores)
2 3 4 5 6 7
R6
CPP-04M-2016 4-32A R6 Procurement of Material
Invitation for Bids 1R6
CPP-04M-2016 Procurement of Material
INVITATION FOR BIDS
Bidding Document No. CPP-04M-2016
1. National Transmission and Despatch Company (NTDC), a corporate entity
constituted after restructuring of WAPDA intends to procure material for following
500kV transmission lines:
i. 500kV D/C Quad Bundle transmission line from HUBCO Power Plant to
Matiari Sub-Station.
ii. 500kV D/C Quad Bundle transmission line for looping In/Out of Jamshoro-
Dadu Transmission Line at Matiari Sub-Station.
iii. 500kV D/C Quad Bundle transmission line for looping In/Out of one circuit
each of two proposed Lahore South to Lahore North transmission lines at
proposed Lahore HVDC Switching/Convertor Station.
through open tender financed under NTDC’s own resources. Bidding is open to all eligible Bidders.
2. The Purchaser invites sealed bids, under Single Stage-One Envelope bidding
procedure, from eligible firms or persons as defined under clause IB-3 of
Instructions to Bidders. The bidding is open to International Competition as per
policy of the government. National Transmission and Despatch Company now
invites sealed Bids from eligible Bidders for Procurement of material for
aforementioned 500kV D/C Quad Bundle transmission lines in Nine (09) lots given
below. The bidder may quote for any number of lots.
Sr.
No.
Lot Description Quantity
1. Lot-I Painted 500kV Double Circuit Steel Towers 540 Nos.
2. Lot-II 500kV Double Circuit Steel Towers 460 Nos.
3.
Lot-III AAAC Greeley Conductor &
Alumoweld Shield Wire
3520 km
320 km
Lot-IIIA ACSR Drake Conductor 780.8 km
4. Lot-IV OPGW along with accessories 340.4 km
5. Lot-V 500kV T/Line Hardware for AAAC Conductor,
ACSR Conductor, EHS Shield wire and OPGW Lot
6. Lot-VI Fog Type Disc Insulators 80kN 60,000 Nos.
Lot-VIA Fog Type Disc Insulators 160kN 440,000 Nos.
7. Lot-VII 1. Stock Bridge Dampers for
(a) Alumoweld Shield wire
(b) OPGW
2. Spacer Dampers for Greeley Conductor
3. Spacer Dampers for Drake Conductor
Lot
The successful bidder will have to supply the goods/material as per delivery
schedule as described in Section-IV Schedule-C to Bid “Delivery & Completion
Schedule”.
R6
R6
Invitation for Bids 2R6
CPP-04M-2016 Procurement of Material
3. Eligible Bidders may obtain further information, inspect and acquire the Bidding
Documents from the Office of the Purchaser, as below:
Chief Engineer (MP&M),
622-WAPDA House, Lahore
Telephone No. 92-42-99202597
Fax No. 92-42-99202173
4. A complete set of Bidding Documents may be purchased by an interested bidder on
submission of a written application to the above office and upon payment of a non-
refundable fee of Rs. ---------- from 23 January, 2017.
5. The Supplier/manufacturer must have at least 5 years design /manufacturing
experience of similar Equipment/Goods with 380kV or higher rating (as applicable)
and capacity and 3 years satisfactory operational experience of such goods/material.
The bidders, who are not manufacturers themselves, shall furnish an authorization
from the concerned manufacturer to submit a bid for supply of their goods to
Pakistan against this tender. Moreover, in case of foreign manufacturer, 100%
quantity of Equipment/Goods with 380kV or higher rating (as applicable) and
capacity covered in the respective lot should have been manufactured & supplied
in any two years (continuous period of 24 months) during the past five years by
the manufacturer of that Equipment/Goods as on the date of opening of Bid. A
minimum of 25% of the said quantity must have been supplied either to
NTDC/DISCOs in Pakistan or to any entity outside the country of manufacturer with
in last five years as on the date of bid opening.. In case of local manufacturer, the
past performance and supply record shall be taken into consideration for
determining the capability of the manufacturer to perform the contract to the
satisfaction of Engineer as per supply requirement of the bidding documents.
6. All bids must be accompanied by a Bid Security of not less than (2%) of total bid
price in the form of bank guarantee on the format of bid security form provided or in
the form of deposit at call or from a foreign bank duly counter guaranteed by a
Scheduled Bank in Pakistan or an insurance company having at least AA rating from
PACRA/JCR..
7. The bids must be delivered to the above office on or before 27 March, 2017 at
11:00 am. Bids will be opened at 11:30 am on the same day, in the presence of
Bidder’s representatives who choose to attend at the same address.
8. The bidders are requested to give their best and final price as no negotiations are
expected.
9. The bidder must quote for one or more complete lots. Bid covering only a part of the
lot will be rejected.
NTDC reserve all its rights regarding rejection of bids as defined in Clause 33(1) of
PPRA Rules 2004.
R6
Section II. Bid Data Sheet 2-2 R6
CPP-04M-2016 Procurement of Material
IB 3.1 (b) Delete IB 3.1 (b) and replace it with the following:
The invitation for Bids is open to all Bidders with qualification as described
below:
1. The Bidder shall be a manufacturer or Supplier legally registered for at
least five years. A copy of legal registration certificate shall be
submitted along with the Bid.
2. Manufacturing Experience Criteria
i. To be awarded a contract for any number of lots, the
Bidders/manufacturers must have at least 5 years design/manufacturing
experience of similar Equipment/Goods with 380kV or higher rating (as
applicable) and capacity. Details in this regard should be submitted in
the prescribed format given in QF-2, Section-V of Volume-1.
ii.(a)The foreign manufacturer shall demonstrate that it has supplied a
minimum of 100% of Equipment/Goods with similar or higher rating (as
applicable and above) and capacity covered in the respective lot in any
two (2) consecutive years (continuous period of 24 months) within the
last five (5) years as on the date of the bid opening.
(b) A minimum of 25% of the quantity on order must also have been
supplied either to NTDC/DISCOs in Pakistan or to any entity outside the
country of manufacturer with in last five years as on the date of bid
opening.
(c) In case of local manufacturers, the past performance and supply record
shall be taken into consideration for determining the capability of the
manufacturer to perform the contract to the satisfaction of Engineer as
per supply requirement of the bidding documents.
iii. Copies of contract agreement for verification of above mentioned
manufacturing/supply record shall be submitted with the bid.
iv. The purchaser or its two (02) Nos. representatives may visit the
works/manufacturing facilities of any of the bidder(s) during evaluation of
bids to determine to its satisfaction whether the Bidder is qualified to
satisfactorily perform the contract. The Purchaser shall be the sole
judge in this regard and the Purchaser’s interpretation of the
Qualification Requirement shall be final and binding. Bidder shall be
responsible to arrange such visit and all relevant costs in this regard shall
also be borne by the bidder.
3. Performance Criteria
i. The Equipment/Goods supplied by the Bidder should have been in
satisfactory operation for a continuous period of at least three years on
the date of Bid opening.
R6
Section II. Bid Data Sheet 2-7 R6
CPP-04M-2016 Procurement of Material
B 23.2 (b) Name of the Project:
Procurement of Material for 500kV transmission lines:
i. 500kV D/C Quad Bundle transmission line from HUBCO Power
Plant to Matiari Sub-Station.
ii. 500kV D/C Quad Bundle transmission line for looping In/Out of
Jamshoro-Dadu Transmission Line at Matiari Sub-Station.
iii. 500kV D/C Quad Bundle transmission line for looping In/Out of
one circuit each of two proposed Lahore South to Lahore North
transmission lines at proposed Lahore HVDC
Switching/Convertor Station.
Identification No.: CPP-04M-2016
IB 24.1 (a) Deadline for Submission of Bid:
Date: 27 March, 2017
Time: 11:00 am
IB 24.1 (b) All Bids shall be submitted in person through representatives of the Bidders.
IB 27.1 Office of Chief Engineer (MP&M),
622-WAPDA House, Lahore
Telephone No. 92-42-99202597
Fax No. 92-42-99202173
Date: : 27 March, 2017
Time: 11:30 am
IB 28.2 Add the following new Sub Clause after GCC 28.1:
28.2 Bidders and their respective agents, manufacturers/suppliers,
representatives and anyone else on behalf of the Bidder will not
communicate or attempt to communicate directly or indirectly with the
Purchaser, including any employees, directors, officers, agents or
representatives of any of them during any part of the Competitive
Bidding Process, except as expressly directed or permitted by the
Purchaser. Bidders will also not engage in any form of political or
other lobbying whatsoever with respect to their Bids, or otherwise
attempt to influence the outcome of the Competitive Bidding Process.
In the event of any such communications or lobbying, Purchaser may
at any time reject the Bid of that Bidder without further consideration.
R6
R6
Section VII. Particular Conditions of Contract 7-13 R6
CPP-04M-2016 Procurement of Material
GCC Sub Clause 26.1 a. The Goods shall be subjected to the type, sample and routine
tests as described in the Specifications. The Supplier shall
provide free of charge all such assistance, instruments,
machines, labor and materials as are normally required for
carrying out such tests. All reasonable facilities as provided in
the specifications or followed by Trade & Industry in general
shall have to be offered to the Inspecting officers, by you at
your expense for carrying out Testing and Inspection.
b. To ensure the manufacture of Goods to be in conformity with
Contract requirements, the Supplier shall institute and follow
regular procedures for quality assurance during
manufacturing. The Supplier shall maintain an independent
quality control department, which shall be responsible for
enforcing the quality assurance programme. Upon Award of
the Contract, the Supplier and the Engineer(s) shall establish
mutually acceptable quality control and inspection procedure.
GCC Sub Clause 26.2 (a) Pre-shipment/FAT shall be carried out at the works of
manufacturer.
(b) Type testing shall be carried out at one of the STL member
Laboratories. The type tests that are not available with STL
Labs, shall be arranged at any independent lab accredited by
ISO/IEC 17025 outside the country of the manufacturer.
(c) All work covered by the Contract shall be subject to
surveillance, testing and inspection by the Chief Engineer
Design (NTDC) or his two (2) Nos.
representatives/Inspectors. The Chief Engineer Design
(NTDC) or his representatives/Inspectors may require
witnessing any or all the tests to be carried out. For such
purpose the Supplier shall provide free access at all times
during manufacturing, assembly and testing to the premises in
which the work is being carried out.
(d) Purchaser reserves the right for carrying out any of the tests as
specified in Volume-2 “Technical Provisions” at any laboratory/research institute after shipment to Pakistan at the
cost of the purchaser to satisfy that the material complies with
the intent of contract specifications.
R6