National Mission for Clean Ganga

Annexure-II

Submission of Monthly Progress Report for September, 2020 by Jharkhand State (Hon’ble NGT in the matter of O.A No. 673/2018 dated 06.12.2019)

Sl. No. Activity to be monitored Timeline Submission of Progress by State/UT-Compliance Status

1

Ensure 100% treatment of sewage at least in-situ remediation

31.03.2020 NEERI site visit at drains was done from 03.03.2020 to 07.03.2020. Proposal to go ahead for adoption of in-situ remediation at drains is received from NEERI. Regular consultation with NEERI is in progress. Proposal for DPR Preparation and Support in Implementation is Received on 25.09.2020 Allocation of state fund for this project and Approval on selection of CSIR-NEERI on nomination basis for preparation of DPR to adopt in-situ remediation at drains at identified ULBs viz. Chas, Ranchi, Mango and involvement of CSIR – NEERI for complete implementing including tendering is under process from competent authority from approx. 98 MLD of waste water will be treated. 15 MLD STP Plant at Phusro is under process of Approval at NMGC. 50 MLD STP is under operational at Jamshedpur which is operated by JUSCO. 31.5 MLD Lagoon Based STP is under operation by Bokaro Steel Limited. There are two schemes at Chottagovindpur – 46 MLD and Bagera – 37 MLD for Water Treatment Plant designed with sludge drying pit along the banks of River Subarnarekha.( Annexure -1)

2 Commencement of setting up of

STPs and connecting all the drains and other sources of generation of sewage to the STPs must be ensured

31.03.2020 Detailed status of various ongoing projects related to Sewerage /Septage Treatment at these 8 ULBs are enclosed as Annexure -2

3 Timeline for completing all steps of action plans including completion of setting up STPs and their commissioning

31.03.2021 Detailed status of various ongoing projects related to Sewerage /Septage Treatment at these 8 ULBs are enclosed as Annexure -2

5 Chief Secretaries may set up appropriate monitoring mechanism at State level • Specifying accountability of

nodal authorities not below the Secretary level

• Chief Secretaries may have an accountable person attached in their office for this purpose.

22.01.2020

22.01.2020

• Monitoring at State level must take place

Fortnightly Commencing 21.12.2019

Fortnight monitoring of 7 polluted river stretches will initiated from Sept’2020.

Sr. No.

Activity to be monitored

Timeline

Submission of Progress by State/UT-Compliance Status

6

Progress report may be furnished by the States / UTs to

• Secretary, Ministry of Jal Shakti

• Member Secretary, CPCB

Monthly (preferably before 20th of every

month)

6.1

Progress report may be comprised of details along with completion timelines on:

6.1(i)

Identification of polluting sources including drains contributing to river pollution and action as per NGT order on in-situ treatment

NEERI site visit at drains was done from 03.03.2020 to 07.03.2020. Proposal to go ahead for adoption of in-situ remediation at drains is received from NEERI. Regular consultation with NEERI is in progress. Proposal for DPR Preparation and Support in Implementation is Received on 25.09.2020 Allocation of state fund for this project and Approval on selection of CSIR-NEERI on nomination basis for preparation of DPR to adopt in-situ remediation at drains at identified ULBs viz. Chas, Ranchi, Mango and involvement of CSIR – NEERI for complete implementing including tendering is under process from competent authority from approx. 98 MLD of waste water will be treated. 15 MLD STP Plant at Phusro is under process of Approval at NMGC. 50 MLD STP is under operational at Jamshedpur which is operated by JUSCO. 31.5 MLD Lagoon Based STP is under operation by Bokaro Steel Limited.

6.1(ii)

Status of STPs, I&D and Sewerage networks: Details of existing infrastructure, Gap Analysis, proposed along with completion timeline

Detailed status of various ongoing projects of STP, Sewerage network, gap analysis, timeline etc. at the identified 6 ULBs are enclosed as Annexure -2

6.1(iii)

(iii)Status of CETPs Details of Existing CETP and ETP Infrastructure, Gap Analysis, Proposed along with completion timeline, No. of industries and complying status

Details pertaining to the Status of compliance of ETPs are enclosed as Annexure - 4.

6.1(iv)

Status of Solid waste management & details of processing facilities: Details of Existing Infrastructure, Gap Analysis, Proposed along with completion timeline

Details attached as Annexure - 3(a&b)

6.1(v) Latest water quality of polluted river, its tributaries, drains with flow details and ground water quality in the catchment of polluted river;

Details attached as Annexure - 5

6.1(vi) Preventing dumping of waste and scientific waste management including bio-medical wastes, plastic wastes and decentralizing waste processing, including

District Magistrate has been directed to ensure that illegal dumping of waste and to promote scientific waste management practices including bio-medical wastes, plastic wastes and decentralizing waste processing. Action has been taken against the violators at the district level and Seminars/awareness programs are organized on Waste Management Rules.

6.1(vii) Ground water regulation Drinking water & Sanitation Dept. have identified the contaminated hand pumps and sealed those hand pumps whose water is not fit for drinking (Annexure - 6). Portable water is supplied to the Communities in the identified critical blocks through water tanker owned by local bodies and log book is maintained.

List of polluted blocks in Jharkhand have been identified and details is annexed as Annexure - 7 Periodic assessment of 24 districts and 260 blocks of Jharkhand for ground water resources was conducted by Jharkhand in 2009, 2011, 2013 & 2017 which also covers the area related to 7 polluted stretches and based on which a comparative statement of dynamic ground water resource is prepared which is annexed as Annexure -8. As per report of CGWA, Dhanbad and Bermo are among the overexploited blocks, Patratu, Silli and Bermo are among semi critical blocks along the seven polluted river stretches. CGWA is also preparing a policy for conservation of ground water with a robust institutional mechanism for surveillance and monitoring with a view to enhance the access to ground water for drinking purpose. Water Resource Department, Govt. of Jharkhand is framing Ground Water Development and Management (Control/ Regulation) Act which is under progress which shall be completed by 6monthsandthereafterdepartmentswillcompletetheformalities for enactment of Ground Water Development and Management Control/Regulation) Act within One Year.

6.1(viii) Adopting good irrigation practices Details of the Irrigation Projects taken by Water Resource Department along the polluted river stretches is attached as Annexure-8 Department of Agriculture is promoting and conducting workshops for the use of organic fertilizers. Promoting micro irrigation (drip & mini irrigation) system to save the quantity of water used during agriculture.

6.1(ix) Protection and management of

Flood Plain Zones (FPZ) District Magistrate has been directed to ensure that no encroachments

in the FPZ and necessary actions are taken. Apparently, no area under seven river stretches have issues related to flood plain zone. But, for protection and management of flood plain zone - RFP

Circulated on 17.06.2019 consultant have been appointed by 15.09.2019 and complete assignment along with the action plan (if required) which is to be submitted by them up to 30.06.2020 but the is pending due to COVID-19 Situation and will be submitted by 31.12.2020.

6.1(x) Rain water harvesting 144 nos. of RWH structure has been sanctioned for Rs. 5.89 Cr. which is under progress and targeted to be completed by June,2020. Agreement with consultant PKS Infra Engineer Pvt. Ltd. Ghaziabad, India has been deputed to preparation of DPR regarding Geophysical survey for Ground Water recharging/ Rain Water harvesting along the sevn polluted river stretches. Based on the DPR submitted and an Action Plan has been prepared and to be submitted by 30.04.2020 but due to COVID-19 it is likely to be submitted by 31.12.2020. Jharkhand Rain Water harvesting Regulation, 2017 Notified on 23.01.17. and implementation is ongoing. 54 nos. of RWH/ground water recharging structure have been constructed at Dhanbad by CGWB and 75 nos. of RGH structures have been constructed by the State Ground Water Directorate, Jharkhand. 214 nos. of water bodies has been sanctioned for Rs. 185.08 Cr. for restoration which is under progress and targeted to be completed by March, 2021.

6.1(xi) Maintaining minimum environmental flow of river

A study in this regard is to be done by the consultant PKS Infra under agreement no.- 03F2/19-20. And as per action plan suggested in the DPR flow up action will be taken up in the structures constructed along the polluted stretches. It is be noted that mandatorily min. 10% of Non-monsoon flow is to be maintained as e-flow in the river D/S of the structures like Dam & Barrage during Non-Monsoon period. Study has been carried out for one of the seven different river stretches. The D/S of Kanke Dam upto Kadal Bridge & has found requirement during fair weather to be 1.6 Cumecs for rest 06 stretches studies are being done by the consultant. The details are annexed as Annexure 9

6.1(xii) Plantation on both sides of the river

6.1(xiii) Setting up biodiversity parks on flood plains by removing encroachment

Serial No.

Name of the

River

River Stretch

Approx.

Length of the

Stretch (Kms)

No. of Villages/ Towns/ Cities along the river ( Approx. 10 Kms. from the

center of the identified river stretch length)

Population (as per Census 2011)

Approx Estimated Population

after 15 yrs. (for year

2035)

No. of Municipal

Drains falling into the main stream

Water Quality of

Each Darin

Quantity of

Sewage Discharged form

each drain

No. of Municipal

Drains divereted

or intercepted

before falling into the river

Existing Treatment

FacilityGap Analysis

Details on Current Method

adotped to prevent

discharge of

untreated sewage

prior to the completion

of proposed project

Propsed Treatment

Tentative

Budget Require

d

Funding Agency

Status

Timeline as per the order

of Hon'ble NGT

Curent Status Remarks

Details on Action Taken for Utilization of Treated Sewage

Quantity to minimise the abstraction of Ground

Water

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

NA

31.03.2021NEERI site visit at drains was done from 03.03.2020 to 07.03.2020.Proposal to goahead for adoption of insitu remediation at drains is received from NEERI. Regular consultantion with NEERI is in progress.Proposal for DPR Prepartion and Support in Implemnetaion is Recived on 25.09.2020Allocation of state fund for this project and Approval on selection of CSIR-NEERI on nomination basis for preparation of DPR to adopt insitu remediation at drains at identified ULBs viz. Chas, Ranchi,Mangao and involvement of CSIR – NEERI for complete

implementing including tendering is under process from competent authority.

At Present, under AMRUT Scheme, Septage Management scheme of Chas, in which septage treatment plant of 89 KLD is under construction and expected to be completed by Dec 2021

Revised timeline of 31.03.2022 is proposed for adoption of insitu remediation at drains

UD&HD, GoJ has already issued a policy for utilization of treated waste water from STPs called as Jharkhand Waste Water Policy 2017.The utilizaiton will be done as per the policy document.

1568881 GARGA

ALONG

TALMUCHU

8Chas Municipal

Corporation

Details on Municipal Drains which are dischaging into the identified river stretches

TABLE -2

NA NA 28.2 MLD243675

Please refer Annexure -1

NA

Please refer Annexure -1

Approx 41.50 Cr. of budget is proposed from State Fund for adoption of insitu remediation at

drains for treatment of 29 MLD waste water as per NEERI Site visit report.

(Budget include capex + 5 years of O&M)

41.50 Cr

State Fund

Serial No.

Name of the

River

River Stretch

Approx.

Length of the

Stretch (Kms)

No. of Villages/ Towns/ Cities along the river ( Approx. 10 Kms. from the

center of the identified river stretch length)

Population (as per Census 2011)

Approx Estimated Population

after 15 yrs. (for year

2035)

No. of Municipal

Drains falling into the main stream

Water Quality of

Each Darin

Quantity of

Sewage Discharged form

each drain

No. of Municipal

Drains divereted

or intercepted

before falling into the river

Existing Treatment

FacilityGap Analysis

Details on Current Method

adotped to prevent

discharge of

untreated sewage

prior to the completion

of proposed project

Propsed Treatment

Tentative

Budget Require

d

Funding Agency

Status

Timeline as per the order

of Hon'ble NGT

Curent Status Remarks

Details on Action Taken for Utilization of Treated Sewage

Quantity to minimise the abstraction of Ground

Water

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Details on Municipal Drains which are dischaging into the identified river stretches

TABLE -2

2 SANKH

KONGSERABASAR

TO BOLB

A

10No ULB falls under

the identified stretch of River

- -

UD&HD, GoJ has already issued a policy for utilization of treated waste water from STPs called as Jharkhand Waste Water Policy 2017.The utilizaiton will be done as per the policy document.

State Fund

NEERI site visit at drains was done from 03.03.2020 to 07.03.2020.Proposal to goahead for adoption of insitu remediation at drains is received from NEERI. Regular consultantion with NEERI is in progress.Proposal for DPR Prepartion and Support in Implemnetaion is Recived on 25.09.2020Allocation of state fund for this project and Approval on selection of CSIR-NEERI on nomination basis for preparation of DPR to adopt insitu remediation at drains at identified ULBs viz. Chas, Ranchi,Mangao and involvement of CSIR – NEERI for complete

implementing including tendering is under process from competent authority.

31.03.2021

16 MLD of STP of SBR Technology is under construction under Ranchi Smart City Mission. Tentative timline of completion of project is December 2021.

Revised timeline of 31.03.2022 is proposed for adoption of insitu remediation at drains

10 MLD of nature based STP is operational at Harmu River i.e. one of the Tributary of Subarnarekha River at Ranchi.

26 MLDPhytorid

Technology based STP

Approx 20 Cr. of budget is proposed from State Fund

for adoption of insitu remediation at drains for

treatment of 36 MLD waste water as per NEERI Site

visit report. (Budget include capex + 5 years of

O&M).16 MLD of STP of SBR

Technology STP work is in progress under Ranchi

Smart City Mission

20 Cr.3348023

Please refer Annexure -1

NA

Please refer Annexure -1

NARanchi Municipal

Corporation1073427

3

SUBARNAREKHA

HATIA DAM TO

JAMSHEDP

UR

120

Serial No.

Name of the

River

River Stretch

Approx.

Length of the

Stretch (Kms)

No. of Villages/ Towns/ Cities along the river ( Approx. 10 Kms. from the

center of the identified river stretch length)

Population (as per Census 2011)

Approx Estimated Population

after 15 yrs. (for year

2035)

No. of Municipal

Drains falling into the main stream

Water Quality of

Each Darin

Quantity of

Sewage Discharged form

each drain

No. of Municipal

Drains divereted

or intercepted

before falling into the river

Existing Treatment

FacilityGap Analysis

Details on Current Method

adotped to prevent

discharge of

untreated sewage

prior to the completion

of proposed project

Propsed Treatment

Tentative

Budget Require

d

Funding Agency

Status

Timeline as per the order

of Hon'ble NGT

Curent Status Remarks

Details on Action Taken for Utilization of Treated Sewage

Quantity to minimise the abstraction of Ground

Water

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Details on Municipal Drains which are dischaging into the identified river stretches

TABLE -2

Adityapur Municipal Corporation

174355 326578

Please refer Annexure -1

NA

Please refer Annexure -1

NA NA 36 MLD NA

Total STP of 36 MLD capacity is under

construction with SBR Technology

255.15 Cr

AMRUTWork under progress. Till date 55 % of work completed at site.

31.03.2021

Work under progress. Till date 55 % of work completed at site.

Tentative timeline for completion of projct is December 2021

UD&HD, GoJ has already issued a policy for utilization of treated waste water from STPs called as Jharkhand Waste Water Policy 2017.The utilizaiton will be done as per the policy document.

Mango Municipal Corporation

223805 388730

Please refer Annexure -1

Please refer Annexure -1

Please refer Annexure -1

NA NA 33 MLD NA

Approx 30 Cr. of budget is proposed from State Fund

for adoption of insitu remediation at drains for

treatment of 33 MLD waste water as per NEERI Site

visit report. (Budget include capex + 5 years of

O&M)30 Cr.

State Fund

31.03.2021

-

Revised timeline of 31.03.2022 is proposed for adoption of insitu remediation at drains

UD&HD, GoJ has already issued a policy for utilization of treated waste water from STPs called as Jharkhand Waste Water Policy 2017.The utilizaiton will be done as per the policy document.

Please refer Annexure -1

1317852677350Jamshedpur NAC 35.20 Cr32 MLD

Around 50 MLD of STP is operational under JUSCO, STP for rest 32 MLD treatment required.

NA

Please refer Annexure -1

Please refer Annexure -1

NEERI site visit at drains was done from 03.03.2020 to 07.03.2020.Proposal to goahead for adoption of insitu remediation at drains is received from NEERI.

Regular consultantion with NEERI is in progress.

Approval for taking funds from TATA group under CSR fund for treatmaent of remaining 32 MLD is under progress.CSR

Fund

Approx 35.20 Cr. of budget is required for adoption of

insitu remediation at drains for treatment of 32 MLD as

per NEERI Site visit report. (Budget include

capex + 5 years of O&M)

Physiochemical

treatment and

Biological treatment

31.03.2021 -

Revised timeline of 31.03.2022 is proposed for adoption of insitu remediation at drains

UD&HD, GoJ has already issued a policy for utilization of treated waste water from STPs called as Jharkhand Waste Water Policy 2017.The utilizaiton will be done as per the policy document.

3

SUBARNAREKHA

HATIA DAM TO

JAMSHEDP

UR

120

Serial No.

Name of the

River

River Stretch

Approx.

Length of the

Stretch (Kms)

No. of Villages/ Towns/ Cities along the river ( Approx. 10 Kms. from the

center of the identified river stretch length)

Population (as per Census 2011)

Approx Estimated Population

after 15 yrs. (for year

2035)

No. of Municipal

Drains falling into the main stream

Water Quality of

Each Darin

Quantity of

Sewage Discharged form

each drain

No. of Municipal

Drains divereted

or intercepted

before falling into the river

Existing Treatment

FacilityGap Analysis

Details on Current Method

adotped to prevent

discharge of

untreated sewage

prior to the completion

of proposed project

Propsed Treatment

Tentative

Budget Require

d

Funding Agency

Status

Timeline as per the order

of Hon'ble NGT

Curent Status Remarks

Details on Action Taken for Utilization of Treated Sewage

Quantity to minimise the abstraction of Ground

Water

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Details on Municipal Drains which are dischaging into the identified river stretches

TABLE -2

Phusro Nagar Parisahd

89178 118350

Please refer Annexure -1

Please refer Annexure -1

Please refer Annexure -1

NA NA 15 MLD NA

STP of 15 MLD capacity proposed with SBR (14

MLD) and Phytorid Technology (1 MLD)

64 Cr. NMCG DPR to provide I&D structure and STP for drains is prepared and sent to National Mission for Clean Ganga (NMCG) New Delhi for approval on may 2019. NMCG send the DPR To IIT Roorkee for Third Party Appraisal on Jan 2020. DPR appraised by the IIT Roorkee on April 2020.

31.03.2021 29 Exective Committee (EC) of NMCG held on 28.08.2020 through Video Conferncing Executive Committee (EC) resolved to defer the Proposal and take up the same in the next EC meeting due to paucity of time.

18 months timeline is proposed for Tendering , construction of STP and I&D Scheme after aporoval from NMCG

UD&HD, GoJ has already issued a policy for utilization of treated waste water from STPs called as Jharkhand Waste Water Policy 2017.The utilizaiton will be done as per the policy document.

Dhanbad Municipal Corporation

1162472 1484520

Please refer Annexure -1

NA

Please refer Annexure -1

NA

50 KLD of treatment facility existing

143 MLD NASTP of 144 MLD capacity

required 381 Cr NMCG

DPR to provide I&D structure and STP for drains is prepared and sent to National Mission for Clean Ganga (NMCG) New Delhi for approval on July 2019. NMCG send the DPR To IIT Roorkee for Third Party Appraisal on Jan 2020. DPR appraised by the IIT Roorkee is under progress.

31.03.2021 Approval awaided from NMCG

26 months timeline is proposed for Tendering , construction of STP and I&D Scheme after aporoval from NMCG

UD&HD, GoJ has already issued a policy for utilization of treated waste water from STPs called as Jharkhand Waste Water Policy 2017.The utilizaiton will be done as per the policy document.

Ramgarh Nagar Parishad

123875 141886

Please refer Annexure -1

NA

Please refer Annexure -1

NA NA 40 MLD NASTP of 40 MLD capacity

required252 Cr NMCG

DPR to provide I&D structure and STP for drains is prepared and sent to National Mission for Clean Ganga (NMCG) New Delhi for approval on August 2020.

31.03.2020

Approval awaided from NMCG

26 months timeline is proposed for Tendering , construction of STP and I&D Scheme after aporoval from NMCG

UD&HD, GoJ has already issued a policy for utilization of treated waste water from STPs called as Jharkhand Waste Water Policy 2017.The utilizaiton will be done as per the policy document.

5 JUMAR

KANKE DAM

TO KADA

L

10Ranchi Municipal

Corporation1073427 3348023

1 no. of drains having negiligible discharge

NA NA NA NA

37 MLD capacity STP construction

work was under progress for Zone-1 (in which River Jumar falls)

and 42% of the work

completed

NA

37 MLD capacity STP construction work was

under progress for Zone-1 (in which River Juamr

falls) with SBR Technology

209.05 Cr.

State Fund

Sewerage Scheme for Zone-1 Ranchi, under Ranchi Municipal Corporation (in which river Jumar falls) was started but due to the poor performance of the executing agency the agreement has been terminated on dated 14.10.2019,

31.03.2021 Tender for the construction of remaining work has been floated by the RMC. Date of opening of Tender is 01.10.2020

24 months timeline is proposed for construction of STP and laying of sewer network under Zone-I

UD&HD, GoJ has already issued a policy for utilization of treated waste water from STPs called as Jharkhand Waste Water Policy 2017.The utilizaiton will be done as per the policy document.

4DAMODAR

PHUSRO

ROAD BDG TO

TURIO

12

Serial No.

Name of the

River

River Stretch

Approx.

Length of the

Stretch (Kms)

No. of Villages/ Towns/ Cities along the river ( Approx. 10 Kms. from the

center of the identified river stretch length)

Population (as per Census 2011)

Approx Estimated Population

after 15 yrs. (for year

2035)

No. of Municipal

Drains falling into the main stream

Water Quality of

Each Darin

Quantity of

Sewage Discharged form

each drain

No. of Municipal

Drains divereted

or intercepted

before falling into the river

Existing Treatment

FacilityGap Analysis

Details on Current Method

adotped to prevent

discharge of

untreated sewage

prior to the completion

of proposed project

Propsed Treatment

Tentative

Budget Require

d

Funding Agency

Status

Timeline as per the order

of Hon'ble NGT

Curent Status Remarks

Details on Action Taken for Utilization of Treated Sewage

Quantity to minimise the abstraction of Ground

Water

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Details on Municipal Drains which are dischaging into the identified river stretches

TABLE -2

6 KONAR

ALONG

TILAYA AND KONA

R

-No ULB falls under

the identified stretch of River

-

7NALKAR

I

ALONG

PATRATU

-No ULB falls under

the identified stretch of River

-

Serial No.

Name of the River

River Stretc

h

Approx.

Length of the

Stretch

(Kms)

No. of Villages/

Towns/ Cities along the

river ( Approx. 10 Kms. from

the center of the identified river stretch

length)

Population (as per Census 2011)

Estimated Population

after 15 yrs. (for

year 2035)

Approximate Quantity of

Sewage Generated

(City/Town/Village wise)

Propsed Treatment Facility based on

estimation of population after 15 yrs.

(Numbers and Capacity)

Tentative Budget Required

Funding Agency

Status

Timeline as per the order of Hon'ble

NGT

Curent Status

Current Status on

Networking/ Channelizatio

n including diversion of

sewage generated

from household/town ships/villages to sewer lines

Proposal for Networking/ Channelization including diversion of

sewage generated from household/town ships/villages to

sewer lines

Timeline required

1 2 3 4 5 6 7 8 15 16 17 18 19 20 21 22 23

1

2

Ranchi Municipal

Corporation1073427 3348023 36 MLD

26 MLD :- Phytorid Technology and

RENEU Technology of NEERI.

16 MLD:- 1 unit SBR technology '

20 Cr. for Phytorid Technology and RENEU Technology of NEERI.

16 MLD plant under construction under Ranchi Smart City

Mission

State Fund

Ranchi Smart city

Mission (State + Central)

NEERI site visit at drains was done from 03.03.2020 to 07.03.2020.Proposal to goahead for adoption of insitu remediation at drains is received from NEERI. Regular consultantion with NEERI is in progress.Allocation of state fund for this project and Approval on selection of CSIR-NEERI on nomination basis for preparation of DPR to adopt insitu remediation at drains at identified ULBs viz. Chas, Ranchi, Jamshedpur and involvement of CSIR – NEERI for complete

implementing including tendering is under process from competent authority.16 MLD plant is under construction, and to be completed by Dec 2021

31.03.2021

16 MLD of STP of SBR Technology is under construction under Ranchi Smart City Mission. Tentative timline of completion of project is December 2021.

Sewerage scheme under construction

Approx 20 Cr. of budget is proposed from State Fund for adoption of insitu remediation at drains for treatment of 36 MLD waste water as per NEERI Site visit report. (Budget include capex + 5 years of O&M).16 MLD of STP of SBR Technology STP work is in progress under Ranchi Smart City Mission NEERI site visit at drains was done from 03.03.2020 to 07.03.2020.Proposal to goahead for adoption of insitu remediation at drains is awaited from NEERI.

Regular consultantion with NEERI is in progress.

Revised timeline of 31.03.2022 is proposed for adoption of insitu remediation at drains

NA

Approx 41.50 Cr. of budget is proposed from State Fund for adoption of insitu remediation at drains for treatment of 29 MLD waste water as per NEERI Site visit report. (Budget include capex + 5 years of O&M)NEERI site visit at drains was done from 03.03.2020 to 07.03.2020.Proposal to goahead for adoption of insitu remediation at drains is awaited from NEERI.

Regular consultantion with NEERI is in progress.

Allocation of state fund for this project is in progress.

Revised timeline of 31.03.2022 is proposed for adoption of insitu remediation at drains

Chas Municipal Corporation

8 31.03.2021

At Present, under AMRUT Scheme, Septage Management scheme of Chas, in which septage treatment plant of 89 KLD is under construction and expected to be completed by Dec 2021

29 MLD243675156888

Action Plan for 7 Polluted River Stretches of Jharkhand under Hon'ble NGT order dated, 08.04.2019 in O.A. No. 673/2019TABLE -3

Deatials on Municipal Drains which are dischaging into the identified river stretches

3

SUBARNAREKHA

HATIA

DAM TO

JAMSHEDPU

R

120

NEERI site visit at drains was done from 03.03.2020 to 07.03.2020.Proposal to goahead for adoption of insitu remediation at drains is received from NEERI.

Regular consultantion with NEERI is in progress.

Allocation of state fund for this project and Approval on selection of CSIR-NEERI on nomination basis for preparation of DPR to adopt insitu remediation at drains at identified ULBs viz. Chas, Ranchi, Mango and involvement of CSIR – NEERI for

complete implementing including tendering is under process from competent authority.

State Fund

State+ Central

29 MLD

ALONG TALMUCHU

GARGA

41.50 Cr. for Phytorid Technology and RENEU Technology of NEERI.

89 KLD Septage treatment plant under

construction under AMRUT Scheme

Serial No.

Name of the River

River Stretc

h

Approx.

Length of the

Stretch

(Kms)

No. of Villages/

Towns/ Cities along the

river ( Approx. 10 Kms. from

the center of the identified river stretch

length)

Population (as per Census 2011)

Estimated Population

after 15 yrs. (for

year 2035)

Approximate Quantity of

Sewage Generated

(City/Town/Village wise)

Propsed Treatment Facility based on

estimation of population after 15 yrs.

(Numbers and Capacity)

Tentative Budget Required

Funding Agency

Status

Timeline as per the order of Hon'ble

NGT

Curent Status

Current Status on

Networking/ Channelizatio

n including diversion of

sewage generated

from household/town ships/villages to sewer lines

Proposal for Networking/ Channelization including diversion of

sewage generated from household/town ships/villages to

sewer lines

Timeline required

1 2 3 4 5 6 7 8 15 16 17 18 19 20 21 22 23

Action Plan for 7 Polluted River Stretches of Jharkhand under Hon'ble NGT order dated, 08.04.2019 in O.A. No. 673/2019TABLE -3

Deatials on Municipal Drains which are dischaging into the identified river stretches

Adityapur Municipal

Corporation174355 326578 36 MLD 4 units of 36 MLD

36 MLD STP under construction under AMRUT scheme

State + Central

Work under progress. Till date 55 % of work completed at site.

31.03.2021

Work under progress. Till date 55 % of work completed at site.

Sewerage scheme under construction

Sewerage scheme under construction

Tentative timeline for completion of projct is December 2021

Jamshedpur NAC

677350 1317852 82 MLD 32 MLD 35.20 CrCSR

FUND

NEERI site visit at drains was done from 03.03.2020 to 07.03.2020.Proposal to goahead for adoption of insitu remediation at drains is recived from NEERI.

Regular consultantion with NEERI is in progress.

Approval for taking funds from TATA group under CSR fund for treatmaent of remaining 32 MLD is under progress.

31.03.2021

50 MLD of waste water is currently treated.

Approx 35.20 Cr. of budget is required for adoption of insitu remediation at drains for treatment of 32 MLD as per NEERI Site visit report. (Budget include capex + 5 years of O&M)NEERI site visit at drains was done from 03.03.2020 to 07.03.2020.Proposal to goahead for adoption of insitu remediation at drains is awaited from NEERI.

Regular consultantion with NEERI is in progress.

Revised timeline of 31.03.2022 is proposed for adoption of insitu remediation at drains

Mango Municipal

Corporation223805 388730 33 MLD 33 MLD 30 Cr. State Fund

NEERI site visit at drains was done from 03.03.2020 to 07.03.2020.Proposal to goahead for adoption of insitu remediation at drains is received from NEERI.

Regular consultantion with NEERI is in progress.

Allocation of state fund for this project is in progress.

31.03.2021 NA

Approx 30 Cr. of budget is proposed from State Fund for adoption of insitu remediation at drains for treatment of 33 MLD waste water as per NEERI Site visit report. (Budget include capex + 5 years of O&M)NEERI site visit at drains was done from 03.03.2020 to 07.03.2020.Proposal to goahead for adoption of insitu remediation at drains is awaited from NEERI.

Regular consultantion with NEERI is in progress.

Revised timeline of 31.03.2022 is proposed for adoption of insitu remediation at drains

3

SUBARNAREKHA

HATIA

DAM TO

JAMSHEDPU

R

120

Serial No.

Name of the River

River Stretc

h

Approx.

Length of the

Stretch

(Kms)

No. of Villages/

Towns/ Cities along the

river ( Approx. 10 Kms. from

the center of the identified river stretch

length)

Population (as per Census 2011)

Estimated Population

after 15 yrs. (for

year 2035)

Approximate Quantity of

Sewage Generated

(City/Town/Village wise)

Propsed Treatment Facility based on

estimation of population after 15 yrs.

(Numbers and Capacity)

Tentative Budget Required

Funding Agency

Status

Timeline as per the order of Hon'ble

NGT

Curent Status

Current Status on

Networking/ Channelizatio

n including diversion of

sewage generated

from household/town ships/villages to sewer lines

Proposal for Networking/ Channelization including diversion of

sewage generated from household/town ships/villages to

sewer lines

Timeline required

1 2 3 4 5 6 7 8 15 16 17 18 19 20 21 22 23

Action Plan for 7 Polluted River Stretches of Jharkhand under Hon'ble NGT order dated, 08.04.2019 in O.A. No. 673/2019TABLE -3

Deatials on Municipal Drains which are dischaging into the identified river stretches

DPR to provide I&D structure and STP for drains is prepared and sent to National Mission for Clean Ganga (NMCG) New Delhi for approval on July 2019. NMCG send the DPR To IIT Roorkee for Third Party Appraisal on Jan 2020. DPR appraised by the IIT Roorkee is under progress.

26 months timeline is proposed for Tendering , construction of STP and I&D Scheme after aporoval from NMCG

Namami Gange

(Central fund)

DPR to provide I&D structure and STP for drains is prepared and sent to National Mission for Clean Ganga (NMCG) New Delhi for approval on July 2019. NMCG send the DPR To IIT Roorkee for Third Party Appraisal on Jan 2020. DPR appraised by the IIT Roorkee is under progress.

31.03.2021Approval awaided from NMCG

NA3 units of total 144

MLD 381 Cr for Dhanbad

I&D Scheme1484520 144 MLD

12

PHUSRO ROA

D BDG TO

TURIO

DAMODA

R

Dhanbad Municipal

Corporation1162472

29 Exective Committee (EC) of NMCG held on 28.08.2020 through Video Conferncing Executive Committee (EC) resolved to defer the Proposal and take up the same in the next EC meeting due to paucity of time.

NA

DPR to provide I&D structure and STP for drains is prepared and sent to National Mission for Clean Ganga (NMCG) New Delhi for approval on may 2019. NMCG send the DPR To IIT Roorkee for Third Party Appraisal on Jan 2020. DPR appraised by the IIT Roorkee on April 2020.

18 months timeline is proposed for Tendering , construction of STP and I&D Scheme after aporoval from NMCG

15 MLD11835089178Phusro Nagar

Parisahd 31.03.2021

DPR to provide I&D structure and STP for drains is prepared and sent to National Mission for Clean Ganga (NMCG) New Delhi for approval on may 2019. NMCG send the DPR To IIT Roorkee for Third Party Appraisal on Jan 2020. DPR appraised by the IIT Roorkee on April 2020.

Namami Gange

(Central fund)

64 Cr for Phusro I&D Scheme

2 Unit: SBR Technology 14 MLD

1 unit: Phytorid Technology 1 MLD

4

Serial No.

Name of the River

River Stretc

h

Approx.

Length of the

Stretch

(Kms)

No. of Villages/

Towns/ Cities along the

river ( Approx. 10 Kms. from

the center of the identified river stretch

length)

Population (as per Census 2011)

Estimated Population

after 15 yrs. (for

year 2035)

Approximate Quantity of

Sewage Generated

(City/Town/Village wise)

Propsed Treatment Facility based on

estimation of population after 15 yrs.

(Numbers and Capacity)

Tentative Budget Required

Funding Agency

Status

Timeline as per the order of Hon'ble

NGT

Curent Status

Current Status on

Networking/ Channelizatio

n including diversion of

sewage generated

from household/town ships/villages to sewer lines

Proposal for Networking/ Channelization including diversion of

sewage generated from household/town ships/villages to

sewer lines

Timeline required

1 2 3 4 5 6 7 8 15 16 17 18 19 20 21 22 23

Action Plan for 7 Polluted River Stretches of Jharkhand under Hon'ble NGT order dated, 08.04.2019 in O.A. No. 673/2019TABLE -3

Deatials on Municipal Drains which are dischaging into the identified river stretches

Approval awaided from NMCG

NA

DPR to provide I&D structure and STP for drains is prepared and sent to National Mission for Clean Ganga (NMCG) New Delhi for approval on August 2020.

26 months timeline is proposed for Tendering , construction of STP and I&D Scheme after aporoval from NMCG

2 units of total 40 MLD

252 Cr. for Ramgarh I&D Scheme

Namami Gange

(Central fund)

DPR to provide I&D structure and STP for drains is prepared and sent to National Mission for Clean Ganga (NMCG) New Delhi for approval on August 2020.

31.03.2021

DPR to provide I&D structure and STP for drains is prepared and sent to National Mission for Clean Ganga (NMCG) New Delhi for approval on July 2019. NMCG send the DPR To IIT Roorkee for Third Party Appraisal on Jan 2020. DPR appraised by the IIT Roorkee is under progress.

26 months timeline is proposed for Tendering , construction of STP and I&D Scheme after aporoval from NMCG

Ramgarh Nagar

Parishad123875 141886 40 MLD

Namami Gange

(Central fund)

DPR to provide I&D structure and STP for drains is prepared and sent to National Mission for Clean Ganga (NMCG) New Delhi for approval on July 2019. NMCG send the DPR To IIT Roorkee for Third Party Appraisal on Jan 2020. DPR appraised by the IIT Roorkee is under progress.

31.03.2021Approval awaided from NMCG

NA3 units of total 144

MLD 381 Cr for Dhanbad

I&D Scheme1484520 144 MLD

12

PHUSRO ROA

D BDG TO

TURIO

DAMODA

R

Dhanbad Municipal

Corporation1162472

Serial No.

Name of the River

River Stretc

h

Approx.

Length of the

Stretch

(Kms)

No. of Villages/

Towns/ Cities along the

river ( Approx. 10 Kms. from

the center of the identified river stretch

length)

Population (as per Census 2011)

Estimated Population

after 15 yrs. (for

year 2035)

Approximate Quantity of

Sewage Generated

(City/Town/Village wise)

Propsed Treatment Facility based on

estimation of population after 15 yrs.

(Numbers and Capacity)

Tentative Budget Required

Funding Agency

Status

Timeline as per the order of Hon'ble

NGT

Curent Status

Current Status on

Networking/ Channelizatio

n including diversion of

sewage generated

from household/town ships/villages to sewer lines

Proposal for Networking/ Channelization including diversion of

sewage generated from household/town ships/villages to

sewer lines

Timeline required

1 2 3 4 5 6 7 8 15 16 17 18 19 20 21 22 23

Action Plan for 7 Polluted River Stretches of Jharkhand under Hon'ble NGT order dated, 08.04.2019 in O.A. No. 673/2019TABLE -3

Deatials on Municipal Drains which are dischaging into the identified river stretches

5 JUMAR

KANKE

DAM TO

KADAL

10Ranchi

Municipal Corporation

1073427 3348023 37 MLD 1 unit of 37 MLD

209.05 Cr project cost for the Ranchi sewage

scheme under Zone -1 , Tender has been

floated. Date of opening of Tender is 01.10.2020

State Fund

Sewerage Scheme for Zone-1 Ranchi, under Ranchi Municipal Corporation (in which

river Jumar falls) was started but due to the poor performance of the executing agency

the agreement has been terminated on dated 14.10.2019.

209.05 Cr project cost for the Ranchi sewage scheme under Zone -1.

Tender has been floated. Date of opening of Tender is 01.10.2020

31.03.2021

Tender for the construction of remaining work

has been floated by the RMC. Date of opening of Tender

is 01.10.2020

NA

Sewerage Scheme for Zone-1 Ranchi, under Ranchi Municipal

Corporation (in which river Jumar falls) was started but due to

the poor performance of the executing agency the agreement

has been terminated on dated 14.10.2019.

209.05 Cr project cost for the Ranchi sewage scheme under Zone

-1.

Tender has been floated. Date of opening of Tender is 01.10.2020

24 months timeline is proposed for construction of STP and laying of sewer network under Zone-I from the date of agreement.

6 KONAR

ALONG

TILAYA

AND KONAR

-

No ULB falls under the identified stretch of

River

-

Serial No.

Name of the River

River Stretc

h

Approx.

Length of the

Stretch

(Kms)

No. of Villages/

Towns/ Cities along the

river ( Approx. 10 Kms. from

the center of the identified river stretch

length)

Population (as per Census 2011)

Estimated Population

after 15 yrs. (for

year 2035)

Approximate Quantity of

Sewage Generated

(City/Town/Village wise)

Propsed Treatment Facility based on

estimation of population after 15 yrs.

(Numbers and Capacity)

Tentative Budget Required

Funding Agency

Status

Timeline as per the order of Hon'ble

NGT

Curent Status

Current Status on

Networking/ Channelizatio

n including diversion of

sewage generated

from household/town ships/villages to sewer lines

Proposal for Networking/ Channelization including diversion of

sewage generated from household/town ships/villages to

sewer lines

Timeline required

1 2 3 4 5 6 7 8 15 16 17 18 19 20 21 22 23

Action Plan for 7 Polluted River Stretches of Jharkhand under Hon'ble NGT order dated, 08.04.2019 in O.A. No. 673/2019TABLE -3

Deatials on Municipal Drains which are dischaging into the identified river stretches

7NALKAR

I

ALONG

PATRAT

U

-

No ULB falls under the identified stretch of

River

-

Serial No.

Name of the River

River Stretch

Approx.

Length of the

Stretch (Kms)

No. of Villages/ Towns/ Cities

along the river ( Approx. 10 Kms. from the center of the identified river

stretch length)

Population (as per

Census 2011)

Estimated Population

after 15 yrs.

Total Quantity of MSW Waste

Generated in the town

/city/village(in TPD)

Total Quantity of MSW Waste

Treated (In TPD)(

City/Town/Village Wise)

Gap Analysi

s

Details on Current Method adotped to prevent improper

disposal of untreated waste prior to the

completion of proposed project

Approx. Budget

Funding Agency Current Status

door to door collection

Segerated OthersRecyled/ Rused/

RDF Quantity and Numbers

Composting/Biomining Quantity and Numbers

Landfilable Quantity and

NumbersOthers Number Capacity Technology Other

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 26

1 GARGA

ALONG

TALMUCHU

8Chas

Municipal Corporation

156888 243675 47 p100% D2D collection at all 35 wards

91.4% - 18.8 TPD

Material recovery facility (MRF) for

segregation of waste 1 nos.Wet Waste:

Windrow composting : 2 nos.

Dry waste: recycled through

recycler

28.2 28.2

Material recovery facility (MRF) for

segregation of waste 1 nos.Wet Waste:

Windrow composting : 2

nos.Dry waste:

recycled through recycler

1 no waste to compost

50 MT

With intrgrated MSW solutions (Processing technology - waste to compost)

Further processing facility of the waste will be increased through concessionaire.

Capex: 21.26 Crore

PPP+State+Central + ULB Share

Concessionaire has been selected. Agreement has been done.

2 SANKH

KONGSERABASAR TO BOLBA

10

No ULB falls under the identified stretch of

River

- -

Ranchi Municipal

Corporation1073427 3348023 536 270

100% D2D collection at all 53 wards

100% - 110 TPD

Material recovery facility (MRF) for

segregation of waste: 9 nos.

Wet Waste: Pit Compost: 40 nos.

Dry waste: recycled through

recyclerC&D Recycle : 1

nos.

266 266

Material recovery facility (MRF) for

segregation of waste: 9 nos.

Wet Waste: Pit Compost: 40 nos.

Dry waste: recycled through

recyclerC&D Recycle : 1

nos.

Biomethanation Plant is under approval.

-

Separate Collection, Transportation & Processing (Waste to Biomethanation Technology) solution

Further processing facility of the waste will be increased through PSU/CSR

Capex: 64 Crore

State+Central +ULB+PSU Share

Under approval Stage

Action Plan for 7 Polluted River Stretches of Jharkhand under Hon'ble NGT order dated, 08.04.2019 in O.A. No. 673/2019TABLE - 4

Deatials on Municipal Solid Waste Dumped along the identified river stretches

Type of the treatment facility Present Quantity of MSW Treated Proposed Project for remaining untreated waste

3

SUBARNAREKHA

HATIA

DAM TO

JAMSHEDPU

R

Serial No.

Name of the River

River Stretch

Approx.

Length of the

Stretch (Kms)

No. of Villages/ Towns/ Cities

along the river ( Approx. 10 Kms. from the center of the identified river

stretch length)

Population (as per

Census 2011)

Estimated Population

after 15 yrs.

Total Quantity of MSW Waste

Generated in the town

/city/village(in TPD)

Total Quantity of MSW Waste

Treated (In TPD)(

City/Town/Village Wise)

Gap Analysi

s

Details on Current Method adotped to prevent improper

disposal of untreated waste prior to the

completion of proposed project

Approx. Budget

Funding Agency Current Status

door to door collection

Segerated OthersRecyled/ Rused/

RDF Quantity and Numbers

Composting/Biomining Quantity and Numbers

Landfilable Quantity and

NumbersOthers Number Capacity Technology Other

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 26

TABLE - 4Deatials on Municipal Solid Waste Dumped along the identified river stretches

Type of the treatment facility Present Quantity of MSW Treated Proposed Project for remaining untreated waste

Adityapur Municipal

Corporation174355 326578 59.95 34

100% D2D collection at all 35 wards

100% - 6

Material recovery facility (MRF) for segregation of waste: 1 nosWet Waste: Pit composting - 11 nos.Dry waste: recycled through recycler

25.95 25.95

Material recovery facility (MRF) for segregation of waste: 1 nosWet Waste: Pit composting - 11 nos.Dry waste: recycled through recycler

Jamshedpur NAC

677350 1317852 214 48100% D2D collection at all 4 zones

100% - 6

Material recovery facility (MRF) for segregation of waste: 4 nosWet Waste: Pit composting - 8 nos.Dry waste: recycled through recycler Biomethaneation Plant - 9 nos.

166 166

Material recovery facility (MRF) for segregation of waste: 4 nosWet Waste: Pit composting - 8 nos.Dry waste: recycled through recycler Biomethaneation Plant - 9 nos.

120Mango

Municipal Corporation

223805 388730 77.81 33.1100% D2D collection at all 3 wards

100% - 22.5

Material recovery facility (MRF) for segregation of waste: 1 nosWet Waste: Pit composting - 20 nos.Dry waste: recycled through recycler C&D Recycling unit -1 nos.

44.71 44.71

Material recovery facility (MRF) for segregation of waste: 1 nosWet Waste: Pit composting - 20 nos.Dry waste: recycled through recycler C&D Recycling unit -1 nos.

Further processing

facility of the waste will be

increased through

concessionaire

Capex: 78.63

Crore In cluster

(Adityapur+Jamshedpur+Mango+jugsalai+kapali)

PPP+State+Central + ULB

Share

DPR under

Revision

1 no waste to compost

300 MT

With intrgrated MSW solutions

(Processing technology -

waste to compost)

3

SUBARNAREKHA

HATIA

DAM TO

JAMSHEDPU

R

Serial No.

Name of the River

River Stretch

Approx.

Length of the

Stretch (Kms)

No. of Villages/ Towns/ Cities

along the river ( Approx. 10 Kms. from the center of the identified river

stretch length)

Population (as per

Census 2011)

Estimated Population

after 15 yrs.

Total Quantity of MSW Waste

Generated in the town

/city/village(in TPD)

Total Quantity of MSW Waste

Treated (In TPD)(

City/Town/Village Wise)

Gap Analysi

s

Details on Current Method adotped to prevent improper

disposal of untreated waste prior to the

completion of proposed project

Approx. Budget

Funding Agency Current Status

door to door collection

Segerated OthersRecyled/ Rused/

RDF Quantity and Numbers

Composting/Biomining Quantity and Numbers

Landfilable Quantity and

NumbersOthers Number Capacity Technology Other

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 26

TABLE - 4Deatials on Municipal Solid Waste Dumped along the identified river stretches

Type of the treatment facility Present Quantity of MSW Treated Proposed Project for remaining untreated waste

Phusro Nagar Parisahd

89178 118350 41.89 17.5 (16.5+1)100% D2D collection at all 28 wards

100% - 0

Wet Waste: Pit composting - 2 nos.

24.39 24.39

Wet Waste: Pit composting - 2 nos.

1 no waste to compost

50 MT

With intrgrated MSW solutions (Processing technology - waste to compost)

Further processing facility of the waste will be increased through concessionaire

Capex: 13.45 Crore

PPP+State+Central+ULB Share

Concessionaire has been selected. Agreement has been done.

Dhanbad Municipal

Corporation1162472 1484520 540 290

100% D2D collection at all 55 wards

100% 110

Material recovery facility (MRF) for segregation of waste: 55 nosWet Waste: Pit composting - 143 nos.Dry waste: recycled through recycler C&D Recycling unit -5 nos.

250 250

Material recovery facility (MRF) for segregation of waste: 55 nosWet Waste: Pit composting - 143 nos.Dry waste: recycled through recycler C&D Recycling unit -5 nos.

1 no waste to compost

500 MT

With intrgrated MSW solutions (Processing technology - waste to compost)

Further processing facility of the waste will be increased through concessionaire

Capex: 84 Crore

PPP+State+Central+ULB Share

Concessionaire has been selected. Agreement has been done.

Ramgarh Nagar

Parishad123875 141886 30 24

100% D2D collection at all 32 wards

100% 0

Wet Waste: Pit composting - 32 nos.Dry waste: recycled through recycler C&D collection unit -1 nos.

6 6

Wet Waste: Pit composting - 32 nos.Dry waste: recycled through recycler C&D unit -1 nos.

Tentative Capex: 31 Crore

PPP+State+Central+ULB+ Cantonment Board Share

DPR under

preparation

5 JUMAR

KANKE

DAM TO

KADAL

10Ranchi

Municipal Corporation

1073427 3348023 536 270100% D2D collection at all 53 wards

100% 110 TPD

Material recovery facility (MRF) for

segregation of waste: 9 nos.

Wet Waste: Pit Compost: 40 nos.

Dry waste: recycled through

recyclerC&D Recycle : 1

nos.

266 266

Material recovery facility (MRF) for

segregation of waste: 9 nos.

Wet Waste: Pit Compost: 40 nos.

Dry waste: recycled through

recyclerC&D Recycle : 1

nos.

Biomethanation Plant is under approval.

-

Separate Collection, Transportation & Processing (Waste to Biomethanation Technology) solution

Further processing facility of the waste will be increased through PSU/CSR

Capex: 64 Crore

State+Central +ULB+PSU Share

Under approval Stage

4DAMODA

R

PHUSRO ROA

D BDG TO

TURIO

12

Serial No.

Name of the River

River Stretch

Approx.

Length of the

Stretch (Kms)

No. of Villages/ Towns/ Cities

along the river ( Approx. 10 Kms. from the center of the identified river

stretch length)

Population (as per

Census 2011)

Estimated Population

after 15 yrs.

Total Quantity of MSW Waste

Generated in the town

/city/village(in TPD)

Total Quantity of MSW Waste

Treated (In TPD)(

City/Town/Village Wise)

Gap Analysi

s

Details on Current Method adotped to prevent improper

disposal of untreated waste prior to the

completion of proposed project

Approx. Budget

Funding Agency Current Status

door to door collection

Segerated OthersRecyled/ Rused/

RDF Quantity and Numbers

Composting/Biomining Quantity and Numbers

Landfilable Quantity and

NumbersOthers Number Capacity Technology Other

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 26

TABLE - 4Deatials on Municipal Solid Waste Dumped along the identified river stretches

Type of the treatment facility Present Quantity of MSW Treated Proposed Project for remaining untreated waste

6 KONAR

ALONG

TILAYA

AND KONAR

-

No ULB falls under the identified stretch of

River

-

7 NALKARI

ALONG

PATRAT

U

-

No ULB falls under the identified stretch of

River

-

Serial No.

Name of the

River

River Stretch

Approx.

Length of the

Stretch

(Kms)

No. of Villages/ Towns/ Cities

along the river ( Approx. 10

Kms. from the center of the

identified river stretch length)

Population (as per Census 2011)

Estimated Population after 15 yrs.

Total Quantity of

Plastic Waste Generated in

the town/cily/village (in TPD)

Total Quantity of

Plastic Waste Treated (In

TPD)( City/Town/Vil

lage Wise)

Gap Analy

sis

Details on Current Method adotped to prevent improper

disposal of untreated waste prior to the

completion of proposed project

Recyled/ Rused Quantity and

Numbers

RDF Quantity and Numbers

Landfilable Quantity and Numbers

Others Number Capacity Technology Other

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

1 GARGA

ALONG

TALMUCHU

8 Chas Municipal

Corporation

156888 243675 3.46 0 3.46 0 0 Through local Scrap vendors it is send to recycler

0 All the Plastic waste is recycled through local scrap dealer

- - - Further, Treatment Plant for plastic waste will be installed

through concessionaire

2 SANKH

KONGSERABAS

AR TO

BOLB

10 No ULB falls under the identified stretch of

River

- -

Ranchi Municipal

Corporation

1073427 3348023 70 0 70 0 0 Through local Scrap vendors it

is send to recycler

0 All the Plastic waste is recycled through local scrap dealer

- - - -

Adityapur Municipal

Corporation

174355 326578 5 0 4 0 1 Through local Scrap vendors it

is send to recycler

1 All the Plastic waste is recycled through local scrap dealer

- - - -

Deatials on Plastic Waste Dumped along the identified river stretches

Type of the treatment facility Present Proposed Project for remaining untreated waste

TABLE - 4

3 SUBARNAREKHA

HATIA

DAM TO

JAMSHEDP

UR

120

Serial No.

Name of the

River

River Stretch

Approx.

Length of the

Stretch

(Kms)

No. of Villages/ Towns/ Cities

along the river ( Approx. 10

Kms. from the center of the

identified river stretch length)

Population (as per Census 2011)

Estimated Population after 15 yrs.

Total Quantity of

Plastic Waste Generated in

the town/cily/village (in TPD)

Total Quantity of

Plastic Waste Treated (In

TPD)( City/Town/Vil

lage Wise)

Gap Analy

sis

Details on Current Method adotped to prevent improper

disposal of untreated waste prior to the

completion of proposed project

Recyled/ Rused Quantity and

Numbers

RDF Quantity and Numbers

Landfilable Quantity and Numbers

Others Number Capacity Technology Other

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

Deatials on Plastic Waste Dumped along the identified river stretches

Type of the treatment facility Present Proposed Project for remaining untreated waste

TABLE - 4

Jamshedpur NAC

677350 1317852 17.12 0 6 0 11.12 ( Through the local Scrap vendors it is

send to recycler and also used for

road construction)

11.12 All the Plastic waste is recycled through local scrap dealer

- - - -

Mango Municipal

Corporation

223805 388730 2 0 2 0 0 Through local Scrap vendors it

is send to recycler

0 All the Plastic waste is recycled through local scrap dealer

- - - -

Phusro Nagar Parisahd

89178 118350 4.6 0 1.2 0 4.6 Through local Scrap vendors it

is send to recycler

3.4 All the Plastic waste is recycled through local scrap dealer

- - - -

Dhanbad Municipal

Corporation

1162472 1484520 43.2 0 43.2 0 0 Through local Scrap vendors it

is send to recycler

0 All the Plastic waste is recycled through local scrap dealer

- - - -

Ramgarh Nagar

Parishad

123875 141886 0.8 0 0.8 0 0 Through local Scrap vendors it

is send to recycler

0 All the Plastic waste is recycled through local scrap dealer

- - - -

4 DAMODAR

PHUSRO

ROAD

BDG TO

TURIO

12

3 SUBARNAREKHA

HATIA

DAM TO

JAMSHEDP

UR

120

Serial No.

Name of the

River

River Stretch

Approx.

Length of the

Stretch

(Kms)

No. of Villages/ Towns/ Cities

along the river ( Approx. 10

Kms. from the center of the

identified river stretch length)

Population (as per Census 2011)

Estimated Population after 15 yrs.

Total Quantity of

Plastic Waste Generated in

the town/cily/village (in TPD)

Total Quantity of

Plastic Waste Treated (In

TPD)( City/Town/Vil

lage Wise)

Gap Analy

sis

Details on Current Method adotped to prevent improper

disposal of untreated waste prior to the

completion of proposed project

Recyled/ Rused Quantity and

Numbers

RDF Quantity and Numbers

Landfilable Quantity and Numbers

Others Number Capacity Technology Other

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

Deatials on Plastic Waste Dumped along the identified river stretches

Type of the treatment facility Present Proposed Project for remaining untreated waste

TABLE - 4

5 JUMAR

KANKE

DAM TO

KAD

10 Ranchi Municipal

Corporation

1073427 3348023 70 0 70 0 0 Through local Scrap vendors it

is send to recycler

0 All the Plastic waste is recycled through local scrap dealer

-

6 KONAR

ALONG

TILAYA

AND KONAR

- No ULB falls under the identified stretch of

River

-

7 NALKARI

ALONG

PATRATU

- No ULB falls under the identified stretch of

River

-

Serial No.

Name of the River

River Stretch

Approx. Length of the

Stretch (Kms)

No. of Villages/ Towns/ Cities

along the river ( Approx. 10

Kms. from the center of the

identified river stretch length)

Population (as per Census 2011)

Estimated Population

after 15 yrs.

Total Quantity of C&DWaste Generated in

the town/cily/village (in TPD)

Total Quantity of C&D Waste Treated (In

TPD)( City/Town/Vil

lage Wise)

Gap Analysis

Details on Current Method adotped to prevent improper

disposal of untreated waste prior to the

completion of proposed project

Recyled/ Rused Quantity and

NumbersLandfilable Quantity and NumbersOthers Number Capacity Technology Other

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 181 GARGA ALONG

TALMUCHU

8 Chas Municipal Corporation

156888 243675 5 - 5 0 - 0 Land filling of low lying area

Construction sitefor Construction of

PCC road

- ` - -

2 SANKH KONGSERABASA

R TO

10 No ULB falls under the

identified stretch

- -

Ranchi Municipal

Corporation

1073427 3348023 20 - 20 0 For treatment of C&D waste, Tender was floated but due

to single bidder found responsive in 1st call, tender was

cancelled and retendering is under

0 Land filling of low lying area

Construction sitefor Construction of

PCC road

1 50 TPD (Projected as per next 15 years)

C&D waste Recycling Plant

For treatment of C&D waste, Tender was

floated but due to single bidder

found responsive in 1st call, tender was cancelled and Adityapur

Municipal Corporation

174355 326578 1.75 1.75 0 - Land filling of low lying area

Construction sitefor Construction of

PCC road

- ` - -

Jamshedpur NAC

677350 1317852 17.5 - 17.5 0 - Land filling of low lying area

Construction site

- ` - -

Mango Municipal

Corporation

223805 388730 2 - 2 0 - Land filling of low lying area

- ` - -

Phusro Nagar Parisahd

89178 118350 7 - 7 0 - Land filling of low lying area

- ` - -

Dhanbad Municipal

Corporation

1162472 1484520 24 - 24 0 - Land filling of low lying area

Construction sitefor Construction of

- ` - -

Ramgarh Nagar Parishad

123875 141886 0.5 - 0.5 0 - Land filling of low lying area

Construction sitefor Construction of

PCC road

- ` - -

5 JUMAR KANKE DAM TO KADAL

10 Ranchi Municipal

Corporation

1073427 3348023 20 - 20 0 For treatment of C&D waste, Tender was floated but due

to single bidder found responsive in 1st call, tender was

cancelled and retendering is under

process.

0 Land filling of low lying area

Construction sitefor Construction of

PCC road

1 50 TPD (Projected as per next 15 years)

C&D waste Recycling Plant

For treatment of C&D waste, Tender was

floated but due to single bidder

found responsive in 1st call, tender was cancelled and

retendering is under process.

6 KONAR ALONG TILAYA

AND KONAR

-

7 NALKARI

ALONG PATRAT

U

-

4 DAMODAR

PHUSRO ROAD

BDG TO TURIO

12

TABLE - 4Deatials on Construction & Demoliation (C&D) Waste Dumped along the identified river stretches

Type of the treatment facility Present Proposed Project for remaining untreated waste

3 SUBARNAREKHA

HATIA DAM TO JAMSHE

DPUR

120

List of Industries present along Subarnarekha river stretch with their Name, Type/Category and Status of E.T.P. installed.

Sl. no.

Name of Industries present along the

catchment basin of the defined stretches

Type/Category of Industries

Status of E.T.P. with respect to the industries present

along the river stretches

Treatment Capacity of ETP

01 M/s. Heavy Engineering Corporation Ltd., Foundry Forge Plant, Dhurwa, Ranchi.

Red/ Foundry Forge Plant

E.T.P. Installed Adequate

02 M/s. Hindalco Industries Ltd, Muri works. Po-Chhotamuri, Dist.-Ranchi.

Red/Alumina Plant without

smelter

E.T.P. Installed Adequate

03 M/s. Usha Martin Ltd., Wire rope and specialty Division, Captive Power Plant, At.-Tatisilway, Dist.-Ranchi.

Red/Wire & Wire Rope

E.T.P. Installed Adequate

04 M/s Samridhi Rice Mill Pvt. LTD. At.- Malar, Bero, Ranchi

Orange/ Rice Mill

E.T.P. Installed Adequate

05 M/s Hemraj Rice Products Pvt. Ltd., At.- At-Saher, Po-Nagari, Dist.-Ranchi

Orange/ Rice Mill

E.T.P. Installed Adequate

06 M/s Sri Krishna Metcom, At. -Nagari, Dist.-Ranchi

Orange/ Rice Mill

E.T.P. Installed Adequate

07 M/s Prateek Agro Experts (P) Ltd., Futkaltoli Simalia Ratu, Kanke Ranchi

Orange/ Rice Mill

E.T.P. Installed Unit is not operational

08 M/s Narmada Agro Foods (P) Ltd. At.-Bandhtoli, Piska Nagari, Ranchi

Orange/ Rice Mill

E.T.P. Installed Adequate

09 M/s Bihariji Rice Mill, At.-Tikratoli, Nagari, Ranchi.

Orange/ Rice Mill

E.T.P. Installed Adequate

10 M/s Sri Krishna Rice Mill, At. Bandhtoli, Piska Nagari, Dist.-Ranchi

Orange/ Rice Mill

E.T.P. Installed Adequate

11 M/s Baba rice mill, At.-Bandhtoli, Piska Nagari, Ranchi

Orange/ Rice Mill

E.T.P. Installed Adequate

12 M/s Sharvi Rice Mill (P) Ltd., At.-Nagri, Po-Piska Nagri, Dist.-Ranchi

Orange/ Rice Mill

E.T.P. Installed Adequate

13 M/s Satnarayan Agro Pvt. Ltd. At-Agrawal, At-Bandhtoli, Nagri, Ranchi

Orange/ Rice Mill

E.T.P. Installed Unit is not operational

14 M/s Balajee Agrotech Industries, At-Tikratoli, Po-Piska, Nagari, Dist.-Ranchi

Orange/ Rice Mill

E.T.P. Installed Adequate

15 M/S Chorus Agro Pvt. Ltd., At.-Tupudana Industrial Area, Dist.-Ranchi

Orange/ Rice Mill

E.T.P. Installed Adequate

16 M/S Shree Shakambari Rice Mill Pvt. Ltd., At.-Industrial Area Tupudana, Dist.-Ranchi

Orange/ Rice Mill

E.T.P. Installed Adequate

17 M/s Bihar State Milk Co-Operative Federation Ltd., (Ranchi Dairy) At+Mauza-Sector-2, HEC, Po-Dhurwa, Ranchi

Red/ Dairy E.T.P. Installed Adequate

18 M/s Hotel Raddison Blu, Kadru, Bypass Road, Ranchi

Red/ Hotel E.T.P. Installed Adequate

19 M/s Hotel BNR Chanakya, Railway Station Road, Ranchi

Red/ Hotel E.T.P. Installed Adequate

20 M/s S.M.V. Agro Products Pvt. Ltd., At.- Ara Gate, Mahilong, Angara, Ranchi

Orange/ Rice Mill

E.T.P. Installed Adequate

21 M/s Tulsyan Rice Mill Pvt.Ltd., Tatisilway, I/A, Phase-II, Ranchi

Orange/ Rice Mill

E.T.P. Installed Adequate

22 M/s KGVK Agro Limited (Dairy Unit), At+ Mauza- Hutup & Rukka, Dist.-Ranchi

Red/ Dairy E.T.P. Installed Adequate

23 M/s. Balaji food & Grains (P) Ltd. At.- Lotwa, Po- Sandi, Dist- Ranchi

Orange/ Rice Mill

E.T.P. Installed Adequate

24 M/s Rani Sati Food Grains, Rukka,Ormanjhi, Dist- Ranchi

Orange/ Rice Mill

E.T.P. Installed Adequate

(R.N. Kashyap) Regional Officer

Ranchi

List of Industries present along Jumar river stretch with their Name, Type/Category and Status of E.T.P. installed.

Sl. no.

Name of Industries present along the

catchment basin of the defined stretches

Type/Category of Industries

Status of E.T.P. with respect to the industries present

along the river stretches

Treatment Capacity of ETP

01 M/s KGVK Agro Limited (Dairy Unit), At+ Mauza- Hutup & Rukka, Dist.-Ranchi

Red/ Dairy E.T.P. Installed Adequate

02 M/s. Balaji food & Grains (P) Ltd. At.- Lotwa, Po- Sandi, Dist- Ranchi

Orange/ Rice Mill

E.T.P. Installed Adequate

03 M/s Rani Sati Food Grains, Rukka,Ormanjhi, Dist- Ranchi

Orange/ Rice Mill

E.T.P. Installed Adequate

(R.N. Kashyap) Regional Officer Ranchi

List of Industries present along Jumar river stretch with their Name, Type/Category and Status of E.T.P. installed.

Sl. no.

Name of Industries present along the

catchment basin of the defined stretches

Type/Category of Industries

Status of E.T.P. with respect to the industries present

along the river stretches

Treatment Capacity of ETP

01 M/s KGVK Agro Limited (Dairy Unit), At+ Mauza- Hutup & Rukka, Dist.-Ranchi

Red/ Dairy E.T.P. Installed Adequate

02 M/s. Balaji food & Grains (P) Ltd. At.- Lotwa, Po- Sandi, Dist- Ranchi

Orange/ Rice Mill

E.T.P. Installed Adequate

03 M/s Rani Sati Food Grains, Rukka,Ormanjhi, Dist- Ranchi

Orange/ Rice Mill

E.T.P. Installed Adequate

(R.N. Kashyap) Regional Officer Ranchi

$11'<~O\S ~I\iiI >t~ol Pt li?t 01 m,~ ¢1<:jlC'1<:j-W-q<T'PI~lTcqT. -Qloilo'<:no ::ctfcp, TJGClI~ m, ~~~\Ji.......JI~'-+-IGl~I~JII

Ref . Datc .

Details of the drain meeting in the river in R.O. Hazaribag area in the respect of writpetition(s)(Civil) no(s) 13029/1985, in the matter of M.C. Mehta Vrs. Union of India&Ors.

SL. No.

1

Name of Unit & AddressMis Urimari Project, CCL,At+PO- Urimari, Hazaribag

_\J~jv~!__\ Damodar

Damodar River

River

I

j~~~TOvaliditY __ 1 Treated/UntreatedI Till 15.02.2021 I Treated through1 i. settling tank &

, discharge.TiI130.06.2023 : Treated through

! settling tank &I discharge.

Tilj-jT:Oi20io-~j l~~~ated Ih~;~gI~i settling tank &! discharge.-~--------------- --1 ---- ----~~: Treated through, settling tank &

discharue.---.- -_'-' .

Zero liquid discharge

2 Mis Birsa Project, CCL,.At+PO- Urimari, Hazaribag

11

,

i -! :Viis Central Coal field Ltd.

Kedla Washery, CCL,At- Basantpur, PO-kedla, Dist- Ramgarh

Damodar River1-- ------~--- --------~-- - -----~----- -- ------ ---II 3 Mis Giddi A, Colliery. CCL,

At+PO- Giddi. Hazaribag

'1-- ---~---------~~------------ ----~~-~-----~---------4 ! Mis New Giddi C, Colliery, CCL,

I AtWO- Giddi, HazaribagI

Damodar

r- ---5~---1-M/s Giddi Co~I\Vashery, CCL,

~. ._~ __l_I~_t2f(~_C_Jiddi,!?~t::~<I;>:<lrib<l_gI 6 i Mis Rajrappa OCP, CCL,I I At+-PO- Rajrappa, Dist-Ramgarh

\--------7--f MI, I{,j"PP'W"hory;-CC'J .:- ----

i- 8 ---1 ~t/~~i~~~:~~~P~:~{:~~~~~~I?;rh, I At-Bongabar, 1'0- Bharechnagar,

! Dist- Rarngarh

Treated throughsettling rank &

___ ~ discharge.Till 31.03.2020 Zero liquid discharge

-Till 30.06.2020 J TP Installed.

j rca ted effluent Keptin katchha pond ()WI~

land.

-- -9-----1' M/s-kun] Bihari Food Processing (p) Ltd .•At- Sukrigarha, PO-Lari, Ramgarh

I I

I !

I·----\-~---------------------~-~---1 10 Mis Karma Open Cast Project,: ! At;-PO- Karma, Dist-Rarngarh

Till 31.12.2020- -

[TP Installed.lrcatcd effluent keptin katchha pond ownland.

Till 31.12.2022 Treated throughsettling tank &discharge.

Chutuwa "allah-

rill 30.06.202 J . Zero liquid discharge

------~-- ._ .._-- _._- - __ .-_---_- ..--_"

Till 31. J 2.2006 Treated throughsettling tank &discharge .

12 Mis Argadda Colliery, CCL,At+PO- Argadda, Ramgarh

Mis Sirka Colliery(Sirka U/G & SirkaOep) CCLAt-Sirka. PO- Argadda, Distk.amgarh

14 Mis Religarha Colliery. CCLAt- Rei igarha, Dis- I!azari bag

..._.---__ ..- -

rill 3 J .03.20 19 Treated throughsettling lank &discharge.

Damodar River I rill 31.03.2022 Treated throughsettling tank &discharge., ,

I--~- I__- ~ - _

r 15 1 Mis Purnadih Open Cast Project, CCLI I At-Purnadih, Dist- Chatrai :~ I

-Damodar River Till 3 J .12.2020 lrcatcd through

settling tank &discharge.

OmlOffice Worklpage no. - 1266

I 1~~~M/S Ashoka Project, CCL, III Damodar RiverPO-Bachra, Dist- Chatra

--17 Mi,Pip,';';"-O';;;; C,;; Project, CCL, I Damcdar River

118----j-:;:::;;~;;;~~h'"'D'''-Chatra -1-f:5am;;-d-arRiver

i I At-Piparwar, PO-Bachra, Dist- Chatra

! I I

II 19 I Mis Pali Hills Breweries(p) I:td,~--~- -1-Nafk:;i River! At- Industrial Area, PO-Patratu, Ramgarh I

i- 20 - -\ Mis i-i.R. r:·ood-Proeessi·l~g(p) Ltd., \1\lalkari Ri~~~i At- Industrial Area, PO-Patratu, Ramgarh

1---21- MTsS~u-n-daDCOlii~~y,(:(=1., -hNalkari River

I At-Sounda, Dist-Ramgarh

1--22 ~/~tS:y:~a~i~e~lliery, C-C-L~---··~----·-· --i-)-a-m-o-d~~I{i~;-~1-·-I'-ill-jJ:03-.-20-04--1-N(rtope;a-tl-·v-e--.

At-+ po- Sayal, Dist-Ramgarh I!

; 23 T~:;~:~:'~~~~::~~;:::'i;~~~;;hNalkari Ri~;;--I,ITJj U22004 -i-:~oi;;p,~~tiv<--. __._.I(~.~~~)?_el:atiVe) .

, 24 i Mis Bhurkunda Colliery, CCL,I I At·, PO- Bhurkunda, RamgarhL- "-- ---

Nalkari Rivcr

}

OmlOffice Worklpage no. - 1267

Till 31.03.2020 Treated throughsettling tank &disc_~,!rge. _

Till 31.03.2020 Treated throughsettling tank &

. _. ~_!. _~~0arg':.: ...Till 31. I2.2007 1 Zero liquid discharge

t,··;· ~-. -" --)' .._-_.._--\ -~;;-;-- ..---- lL, --., nu _,1.03._017 ,L I P Installed,i ' Treated effluent goesI out side thc....E!_cmises.

--1 .. ---- E·Tp-II~stalled,- .-

Treated effluent goes_________ I OL~l~idethy premises.

Till 31.12.2006 I Not operative

Till 31.12.2019 Treated throughsettiing tank &discharge ...

(A.K. Yadav)

Regional Officer

List of Industries present along GARGA river stretch with their Name, Type/Category and Status of E.T.P. installed.

Sl. no.

Name of Industries present along the

catchment basin of the defined stretches

Type/Category of Industries

Status of E.T.P. with respect to the industries present

along the river stretches

Treatment Capacity of ETP

1 M/s. Bokaro Steel Ltd., Bokaro

Red/Integrated Steel

E.T.P. Installed Adequate

2 M/s. Bokaro Dairy, BIHAR STATE MILK COOPERATIVE FEDERATION LTD,At- SECTOR12F BOKARO STEEL CITY, PO-Chas, Dist- Bokaro

Red/ Dairy Product

E.T.P. Installed ( Not functioning)

Adequate

3 M/s. Bokaro Power Supply Co. Ltd.At- B.S. City. Bokaro

Red/Thermal Power Plant

E.T.P. Installed Adequate

STN CodeSampling

DateSampling

Time

Name Of Monitoring

Location

Name Of WaterBody

Sub Basin DistrictTemperature

©

Dissolved O2 (mg/l)

pHBOD

(mg/l)Turbidity

(mg/l)

Total Alkalinity

(mg/l)

Chlorides (mg/l)

COD (mg/l)

Total Hardness

(mg/l)

Calcium (mg/l)

Magnesium (mg/l)

Sulphate (mg/l)

Total Dissolved

Solids (mg/l)

Total Fixed Solids (mg/l)

Total Suspended

Solids (mg/l)

2382 10/08/20 11:30 AM DAMODAR AT PHUSRO ROAD BRIDGE

DAMODAR DAMODAR BOKARO 34 7.6 7.5 1.6 Not Analysed

98 48 92 70 13.6 8.78 Not Analysed

536 Not Analysed

102

3557 10/08/20 12:05 PM DAMODAR RIVER NEAR BERMO RAILWAY STATION, BOKARO

DAMODAR DAMODAR BOKARO 35.5 7.7 7.5 1.4 Not Analysed

112 54 88 66 12 8.74 Not Analysed

534 Not Analysed

88

3555 10/08/20 1:20 AM DAMODAR RIVER NEAR ZARANGDIH BRIDGE, BOKARO

DAMODAR DAMODAR BOKARO 36 7.9 7.6 1.3 Not Analysed

100 54 80 86 13.6 11.95 Not Analysed

532 Not Analysed

84

3556 10/08/20 2:00 AM CONFLUENCE OF BOKARO & DAMODAR RIVER NEAR ZARANGDIH BRIDGE, BOKARO

DAMODAR DAMODAR BOKARO 35.5 7.8 7.5 1.8 Not Analysed

112 64 96 90 15.2 12.68 Not Analysed

514 Not Analysed

112

3554 10/08/20 2:50 AM KONAR RIVER NEAR SWANG COAL WASHERY, BOKARO

KONAR DAMODAR BOKARO 35 7.6 7.5 1.5 Not Analysed

122 66 100 88 14.4 12.68 Not Analysed

544 Not Analysed

104

2390 10/08/20 5:15 AM KONAR AT TENUGHAT DAM

KONAR DAMODAR BOKARO 25 7.4 7.6 1.1 Not Analysed

94 38 76 70 14.4 8.29 Not Analysed

454 Not Analysed

74

23 18/08/20 2:30 AM SUBARNAREKHA AT RANCHI, (TATISILWAI)

SUBARNAREKHA

SUBARNAREKHA

RANCHI 21 6.8 7.5 2.6 Not Analysed

86 16 44 110 28.8 9.27 Not Analysed

388 430 42

2385 18/08/20 12:40 PM SUBARNAREKHA AT NAMKUM ROAD BRIDGE

SUBARNAREKHA

SUBARNAREKHA

RANCHI 22 6.4 6.5 2.4 Not Analysed

82 16 32 122 33.6 9.27 Not Analysed

Not Analysed

398 472

2386 19/08/20 11:30 AM SUBARNAREKHA AT MURI ROAD BRIDGE

SUBARNAREKHA

SUBARNAREKHA

RANCHI 22 7.8 7.5 2.4 Not Analysed

86 22 28 124 36.8 7.8 Not Analysed

388 428 40

2395 18/08/20 8:40 AM SUBARNAREKHA AT HATIA DAM

SUBARNAREKHA

SUBARNAREKHA

RANCHI 18 8.5 7.3 1.1 Not Analysed

84 18 24 118 32.4 9.03 Not Analysed

404 456 52

2396 18/08/20 10:35 AM JUMAR AT KANKE DAM

JUMAR DAMODAR RANCHI 20 6.9 7.5 2.1 Not Analysed

74 16 28 122 33.6 9.27 Not Analysed

384 424 40

2397 18/08/20 4:30 AM SUBARNAREKHA AT GATALSUD DAM

SUBARNAREKHA

SUBARNAREKHA

RANCHI 20 8.4 7.4 2 Not Analysed

82 22 32 120 30.4 10.74 Not Analysed

334 384 50

48 29/08/20 10:15 AM SUBARNAREKHA AT CHANDIL BRIDGE

SUBARNAREKHA

SUBARNAREKHA

EAST SINGHBHUM

25.5 7.8 7.4 0.7 5 16 12 4 18 4.8 1.46 4.64 111 Not Analysed

18

4744 29/08/20 7:30 AM ON SWARNREKHA BEFORE MEETING KHARKAI RIVER

SWARNREKHA

SUBARNAREKHA

EAST SINGHBHUM

24 7.5 7.4 1 5 18 14 4 20 4.8 1.95 6.3 112 Not Analysed

24

4746 29/08/20 7:45 AM ON SWARNREKHA RIVER AFTER CONFLUENCE OF KHARKAI RIVER

SWARNREKHA

SUBARNAREKHA

EAST SINGHBHUM

24 6.8 7.4 2.3 7 28 18 8 38 9.6 3.41 8.63 114 Not Analysed

34

49 29/08/20 8:30 AM SUBARNAREKHA AT D/S JAMSHEDPUR, (TATA NAGAR)

SUBARNAREKHA

SUBARNAREKHA

EAST SINGHBHUM

24.5 5.8 7.6 4 17 52 42 16 76 18.4 7.32 15.05 143 Not Analysed

76

4743 29/08/20 1:20 AM SWARNREKHA U/S HCL GHATSHILA, E.S

SWARNREKHA

SUBARNAREKHA

EAST SINGHBHUM

28.2 7.2 7.4 1.1 6 20 14 4 30 7.2 2.92 5.64 110 Not Analysed

24

24 29/08/20 3:40 AM SUBARNAREKHA AT JAMSHEDPUR

SUBARNAREKHA

SUBARNAREKHA

EAST SINGHBHUM

27.3 6 7.4 3.2 13 38 32 12 56 13.6 5.36 11.73 128 Not Analysed

64

4748 29/08/20 5:30 AM SWARNKEKHA RIVER AT BAHARAGORA ROAD BRIDGE, P.O- BAHARAGORA, E.S

SWARNREKHA

SUBARNAREKHA

EAST SINGHBHUM

26.2 7 7.4 1.2 6 28 18 8 36 8.8 3.41 5.86 116 Not Analysed

36

2399 29/08/20 9:45 AM SUBARNAREKHA AT CHANDIL DAM

SUBARNAREKHA

SUBARNAREKHA

SERAIKELA KHARSAWAN

25 7.6 7.5 0.8 5 14 10 4 16 4 1.46 3.98 107 Not Analysed

19

2387 29/08/20 1:40 AM SUBAREKHA AT GHATISLA ROAD BRIDGE

SUBARNAREKHA

SUBARNAREKHA

RANCHI 28 7.3 7.4 1 6 20 12 4 28 7.2 2.44 5.42 106 Not Analysed

24

4749 13/08/20 2:00 AM ON SWARNREKHA RIVER , NEAR RING ROAD BRIDGE SEMBO, NAGRI, RANCHI

SWARNREKHA

SUBARNAREKHA

RANCHI 23 8 7.5 2.8 Not Analysed

80 16 44 110 28.8 9.27 Not Analysed

424 506 82

4750 13/08/20 11:00 AM ON SWARNREKHA RIVER NEAR INTAKE WELL HATIA RAILWAY

SWARNREKHA

SUBARNAREKHA

RANCHI 23 7.8 7.4 2.2 Not Analysed

84 18 40 112 24.8 12.2 Not Analysed

30.2 362 60

4752 13/08/20 10:05 AM SWARNREKHA RIVER, NEAR OBERIA ROAD BRIDGE, HATIA RANCH

SWARNREKHA

SUBARNAREKHA

RANCHI 22 6 6.6 2.8 Not Analysed

88 24 44 124 36.8 7.8 Not Analysed

318 370 52

4084 18/08/20 8:00 AM SURBARNREKHA RIVER AT HATIA ROAD BRIDGE, RANCHI

DAMODAR DAMODAR RANCHI 17 5.8 6.5 2.5 Not Analysed

72 22 48 116 32.4 9.03 Not Analysed

342 382 40

4085 18/08/20 3:20 AM JUMAR RIVER AT BIT MESRA, RANCHI

DAMODAR DAMODAR RANCHI 20 5.6 6.6 2.6 Not Analysed

Not Analysed

Not Analysed

44 120 30.4 10.74 Not Analysed

400 452 52

2391 08/08/20 1:55 AM DAMODAR AT PANCHET DAM

DAMODAR DAMODAR DHANBAD 36 7.5 7.7 1.1 Not Analysed

102 48 76 82 14.4 11.22 Not Analysed

538 Not Analysed

90

4086 19/08/20 12:40 PM SWARNREKHA RIVER U/S HINDALCO IND LTD, MURLI WORKS, CHHOTAMURI, RANCHI

DAMODAR DAMODAR RANCHI 23 8.4 7.4 2.2 Not Analysed

70 24 28 122 33.6 9.27 Not Analysed

328 378 50

2384 08/08/20 1:30 AM DAMODAR AT DOMGARH WATER WORKS D/S SINDRI

DAMODAR DAMODAR DHANBAD 32 7.6 7.4 1.3 Not Analysed

106 48 80 92 15.2 13.17 Not Analysed

530 Not Analysed

88

2383 08/08/20 3:00 AM DAMODAR U/S JAMADOBA WATER WORKS

DAMODAR DAMODAR DHANBAD 30 7.5 7.6 1.4 Not Analysed

106 46 84 80 12.6 11.83 Not Analysed

530 Not Analysed

94

4000 08/08/20 5:05 AM GARGA RIVER NEAR TELMUCHO BRIDGE

GARGA DAMODAR DHANBAD 24 6.8 6.7 4.6 Not Analysed

136 86 92 120 20.8 16.59 Not Analysed

526 Not Analysed

98

3553 08/08/20 5:35 AM DAMODAR RIVER NEAR TELMUCHO BRIDGE

DAMODAR DAMODAR DHANBAD 23 7.5 7.4 1.7 Not Analysed

116 52 88 118 18.4 17.56 Not Analysed

536 Not Analysed

104