www.fonamperu.org PROJECT PORTFOLIO SUMMARY ENERGY CODE TECHNOLOGY PROJECT NAME AND DESCRIPTION EMISSION REDUCTION (TCO2E/YEAR) DNA APPROVAL (LOA) INVESTMENT IN MILLIONS US$ STATUS SALE SITUATION "Poechos I" Hydropower Project: Located in Piura, has an installed capacity of 15.4 MW and a projected installed capacity of 58.5 GWh. "Poechos II" Hydropower Project: Is the second phase of an existing Hydropower plant, and would have an installed capacity of 10 MW and an annual production of energy is 40,5 GWh. "Tarucani" Hydropower Project: Located in Arequipa, its installed capacity and estimated yearly energy generation is 49 MW and 282.5 GWh, respectively. "Carhuaquero IV" Hydroelectric Power Plant: Located in Cajamarca, its an small scale project with an installed capacity of 9.7 MW and projected generation of 42 GWh-year. "Caña Brava" Hydroelectric Power Plant: Located in Cajamarca, is a small scale project with an installed capacity of 5.6 MW and average generation of 38 GWh-year. “San Diego" Hydroelectric Power Plant: Is going to be located in Ancash. Its installed capacity and projected average energy generation is 3.8 MW and 21 GWh per year, respectively. "Chancay I" Hydroelectric Power Plant: It will be located in Cajamarca Peru with an installed capacity of 20 MW and a yearly average generation of 114 Gwh. "La Virgen" Hydropower Plant: The project would be located in Junin, and would have 64 MW of installed capacity and it will produce an average net annual generation of 386.8 Gwh. "La Joya" Hydroelectric Power Plant : located in Arequipa and it would have an install capacity of 14.96 MW and an annual average generation of 88.53 Gwh. “El Platanal” Hydropower Project: It will be located in Lima region , The project’s installed and firm capacity is 220 MW. The estimated yearly average generation is 1 063 GWh. “Centauro I-III” Hydroelectric Project: The purpose of this project is to build a new 30 MW Hydroelectric using run of water from two rivers. The estimated annual production of energy will be 223 GWh which will be delivered to the national grid (SEIN). “Chaglla” Hydropower Project: will be implemented in Huallaga River, in the central region of Peru. This project would consist in the construction of a new power plant with a power of 360 MW and the estimated annual production of energy would be 2 475 GWh. Rehabilitation of “Calca Hydropower Plant”: Compañía Electrica Calca S.A.C will rehabilitate the old Hydropower Plant of Calca, by using the same facilities of the old plant. The project will have an installed capacity of 2 MW an a yearly average generation of 14.6 Gwh. “San Gaban I" Hydroelectric Project: Located in Puno, consists of a seasonal regulated hydroelectric power plant of 150 MW capacity and it will produce an average net annual generation of 932 GWh. H-1 H-2 H-3 H-4 H-5 H-6 H-7 H-8 H-9 H-10 H-11 H-12 H-13 H-14 Hydropower Hydropower Hydropower Hydropower Hydropower Hydropower Hydropower Hydropower Hydropower Hydropower Hydropower Hydropower Hydropower Hydropower 31 878 23 055 153 958 23 909 21 632 11 954 64 897 220 194 42 848 501 810 126 947 1 408 943 8 311 530 559 16.5 10.5 55.7 6.4 9.5 4 27.3 75.4 11.5 186.3 14.0 283.8 2.4 221.7 YES YES YES YES YES NO NO YES YES NO NO NO NO NO Registered At Validation Registered At Validation Registered PIN PIN Registered At Validation At Validation PIN PIN PIN PIN ERPA with Prototype Carbon Fund of the World Bank CERs wil be sold in spot market Looking for CERs buyers Comercialization Contract with AHL Carbono Looking for CERs buyers Looking for CERs buyers Looking for CERs buyers Looking for CERs buyers Closed Contract with AHL Carbono Contract with CantorCO2e Looking for CERs buyers Looking for CERs buyers Looking for CERs buyers CDM in Peru NATIONAL ENVIRONMENTAL FUND - PERU

Upload: others

Post on 04-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: NATIONAL ENVIRONMENTAL FUND - PERU · “Aobamba Hydroelectric Project”: Will be Located in Cusco, its installed capacity and projected average generation is 10 MW and 130 GWh per

www.fonamperu.org

PROJECT PORTFOLIOSUMMARY

ENERGY

CODE TECHNOLOGY PROJECT NAME AND DESCRIPTIONEMISSION

REDUCTION (TCO2E/YEAR)

DNA APPROVAL

(LOA)

INVESTMENTIN MILLIONS

US$STATUS SALE SITUATION

"Poechos I" Hydropower Project: Located in Piura, has an installed capacity of 15.4 MW and a projected installed capacity of 58.5 GWh.

"Poechos II" Hydropower Project: Is the second phase of an existing Hydropower plant, and would have an installed capacity of 10 MW and an annual production of energy is 40,5 GWh.

"Tarucani" Hydropower Project: Located in Arequipa, its installed capacity and estimated yearly energy generation is 49 MW and 282.5 GWh, respectively.

"Carhuaquero IV" Hydroelectric Power Plant: Located in Cajamarca, its an small scale project with an installed capacity of 9.7 MW and projected generation of 42 GWh-year.

"Caña Brava" Hydroelectric Power Plant: Located in Cajamarca, is a small scale project with an installed capacity of 5.6 MW and average generation of 38 GWh-year.

“San Diego" Hydroelectric Power Plant: Is going to be located in Ancash. Its installed capacity and projected average energy generation is 3.8 MW and 21 GWh per year, respectively.

"Chancay I" Hydroelectric Power Plant: It will be located in Cajamarca Peru with an installed capacity of 20 MW and a yearly average generation of 114 Gwh.

"La Virgen" Hydropower Plant: The project would be located in Junin, and would have 64 MW of installed capacity and it will produce an average net annual generation of 386.8 Gwh.

"La Joya" Hydroelectric Power Plant : located in Arequipa and it would have an install capacity of 14.96 MW and an annual average generation of 88.53 Gwh.

“El Platanal” Hydropower Project: It will be located in Lima region , The project’s installed and firm capacity is 220 MW. The estimated yearly average generation is 1 063 GWh.

“Centauro I-III” Hydroelectric Project: The purpose of this project is to build a new 30 MW Hydroelectric using run of water from two rivers. The estimated annual production of energy will be 223 GWh which will be delivered to the national grid (SEIN).

“Chaglla” Hydropower Project: will be implemented in Huallaga River, in the central region of Peru. This project would consist in the construction of a new power plant with a power of 360 MW and the estimated annual production of energy would be 2 475 GWh.

Rehabilitation of “Calca Hydropower Plant”: Compañía Electrica Calca S.A.C will rehabilitate the old Hydropower Plant of Calca, by using the same facilities of the old plant. The project will have an installed capacity of 2 MW an a yearly average generation of 14.6 Gwh.

“San Gaban I" Hydroelectric Project: Located in Puno, consists of a seasonal regulated hydroelectric power plant of 150 MW capacity and it will produce an average net annual generation of 932 GWh.

H-1

H-2

H-3

H-4

H-5

H-6

H-7

H-8

H-9

H-10

H-11

H-12

H-13

H-14

Hydropower

Hydropower

Hydropower

Hydropower

Hydropower

Hydropower

Hydropower

Hydropower

Hydropower

Hydropower

Hydropower

Hydropower

Hydropower

Hydropower

31 878

23 055

153 958

23 909

21 632

11 954

64 897

220 194

42 848

501 810

126 947

1 408 943

8 311

530 559

16.5

10.5

55.7

6.4

9.5

4

27.3

75.4

11.5

186.3

14.0

283.8

2.4

221.7

YES

YES

YES

YES

YES

NO

NO

YES

YES

NO

NO

NO

NO

NO

Registered

At Validation

Registered

AtValidation

Registered

PIN

PIN

Registered

AtValidation

AtValidation

PIN

PIN

PIN

PIN

ERPA with Prototype Carbon Fund of the World Bank

CERs wil be sold in spot market

Looking for CERs buyers

Comercialization Contract with AHL Carbono

Looking for CERs buyers

Looking for CERs buyers

Looking for CERs buyers

Looking for CERs buyers

Closed

Contract withAHL Carbono

Contract with CantorCO2e

Looking for CERs buyers

Looking for CERs buyers

Looking for CERs buyers

CDM in Peru

NATIONAL ENVIRONMENTAL FUND - PERU

Page 2: NATIONAL ENVIRONMENTAL FUND - PERU · “Aobamba Hydroelectric Project”: Will be Located in Cusco, its installed capacity and projected average generation is 10 MW and 130 GWh per

CODE TECHNOLOGY PROJECT NAME AND DESCRIPTIONEMISSION

REDUCTION (TCO2E/YEAR)

DNA APPROVAL

(LOA)

INVESTMENTIN MILLIONS

US$STATUS SALE SITUATION

“San Gaban II” Retrofitting Project: This project is part of the initiative of San Gaban to ensure the maximum power of 110 MW f. The project consists of two parts, the regulation of Putumayo River that will generate an increment of 42.26 GWh per year and the use of water form Tupuri that will generate an increment of 26 GWh per year

“San Gaban III Hydroelectric Power Station”: The Project is located in Puno Region , its installed capacity is estimated in 174 MW, and annual electric energy production of 1 189 GWh.

“San Gabán IV” Hydroelectric Power Plant: located in Macusani District, Carabaya Province, Puno Region. The proposed project will have an installed capacity of 130 MW and a yearly average generation of 850 GWh.

"Mancahuara" Hydropower Project :Located in Apurimac, its a small project that consists in a rehabilitation of an old abandoned hydropower plant. The installed capacity will be 2.5MW with a yearly average generation of 15.2 GWh.

"Hercca" Hydropower Project : Is located in the city of Sicuani in Cusco. The hydropower plant will have 6.7 MW of installed capacity and an estimated annual generation of 38.77 Gwh

"Santa Rosa" Hydroelectric Power Plant : Is a bundle of 3 small run-of-river hydroelectric power plants, located in Lima, in the Santa Rosa Irrigation, Sayan District. The installed capacity and projected average generation are 4.1 MW and 30.1 GWh per year.

“Santa Cruz I” Hydroelectric Power Plant:The is a run-of-river hydropower plant, located in the north east of Lima, Department of Ancash, Perú. The plant will have an installed Capacity of 5.9 MW and a yearly average generation of 35.8GWh.

Rehabilitation of Callahuanca hydroelectric power station: Is located in Lima, the plant has a total capacity of 72.7 MW. This refurbishment will increase the plant’s capacity up to 82.5 MW without dam enlargements nor new water inlets are necessary. The generation would be 40.47 GWh.

“Gera II” Hydroelectric Power Plant: is a small project activity, located in San Martin Region. Gera II Hydropower project takes advantage of the water from Gera I project, generating 2 MW.

“Pucara” Hydroelectric power plant: This hydropower project is located in San Pablo district, Cusco Region. The proposed project will have an installed capacity of 191.4 MW and a yearly average generation of 975.9 Gwh.

“Pías I” Hydroelectric Power Plant : Is located in La Libertad Region. The Project installed capacity would be 12.6 MW, from a 245 meters jump.

"Huanza" Hydroelectric Project : The proposed project is located 130 kilometres north east of Lima. It consists of a 90.6 MW run-of-river hydroelectric power plant. The annual average generation is estimated at 369.8 Gwh.

“Marañon” Hydropower Project: This project, a run-of-the-river hydroelectric, will have an installed capacity of 96 MW (two vertical axis Francis turbines and two electrical generator of 48 MW each one) with an average annual energy generation of 415 GWh/year.

“PARIAC CH 2-3” Hydropower Optimization Project : will optimize the operation of four small hydro power plants, concentrating the facilities in only two hydro power plants and increasing the effective power output in 0.7 MW.

“PARIAC CH 5-6” Hydropower Project : Will be built in Ancash, upstream of the existing PARIAC mini hydro facilities The project would have an installed capacity of 7.7 MW and an estimated energy annual production of 53.4 Gwh.

H-15

H-16

H-17

H-18

H-19

H-20

H-21

H-22

H-23

H-24

H-25

H-26

H-27

H-28

H-29

Hydropower

Hydropower

Hydropower

Hydropower

Hydropower

Hydropower

Hydropower

Hydropower

Hydropower

Hydropower

Hydropower

Hydropower

Hydropower

Hydropower

Hydropower

38 801

676 862

483 879

8 666

22 070

17 393

20 602

18 213

9 973

555 550

45 611

210 629

236 247

2 846

30 399

8.2

182.1

183.0

2.4

NA

3.7

7.2

13.8

2.0

273.0

16.5

132.5

147.0

0.1

12.0

NO

NO

NO

File under elaboration

NO

YES

YES

YES

NO

File under elaboration

File under elaboration

YES

File under elaboration

NO

NO

PIN

PIN

PIN

PDD under elaboration

PIN

Registered

AtValidation

Registered

PIN

PDD

PIN

PDD under elaboration

PDD under elaboration

PDD underelaboration

PDD underelaboration

Looking for CERs buyers

Looking forCERs buyers

Looking for CERs buyers

Looking for CERs buyers

Looking for CERs buyers

ERPA with Community Development Carbon Fund

Contract with AHL Carbono

CERs will be sold to ENDESA

Looking for CERs buyers

Contractwith AHL

Looking for CERs buyers

Looking for CERs buyers

Looking for CERs buyers

Looking for CERs buyers

Looking for CERs buyers

Page 3: NATIONAL ENVIRONMENTAL FUND - PERU · “Aobamba Hydroelectric Project”: Will be Located in Cusco, its installed capacity and projected average generation is 10 MW and 130 GWh per

Hydropower

Hydropower

Hydropower

Hydropower

Hydropower

Hydropower

Hydropower

Hydropower

Hydropower

Hydropower

Hydropower

Transmission Line

Transmission Line

Transmission Line

Transmission Line

Wind Power

H-30

H-31

H-32

H-33

H-34

H-35

H-36

H-37

H-38

H-39

H-40

TL-1

TL-2

TL-3

TL-4

W-1

“COPA” Hydropower Project: Located in Lima, will be built downstream of the RAPAY Project. Is expected to have an installed capacity of 77 MW and an estimated annual energy production of 411 GWh.

“RAPAY” Hydropower Project :The project plans to have an installed capacity of 89 MW and an estimated annual energy production of 428 Gwh.

“Aobamba Hydroelectric Project”: Will be Located in Cusco, its installed capacity and projected average generation is 10 MW and 130 GWh per year, respectively.

Rehabilitation of the Hydroelectric of Machupicchu : The project is located in Cusco and would have an installed capacity of 75 MW with 518 GWh of annually energy production.

"Santa Teresa" Hydropower Project : will be located in Cusco, its installed capacity would be 87.57 MW that will deliver 679 GWh per year to the National Interconnected Grid (SEIN).

"Yuncan" Hydropower Project: Located in Pasco, it has an installed capacity of 136 MW, and the estimated electric generation is 901 GWh per year.

“Chirhuain” Hydropower Project : Will be located in Cerro de Pasco. The installed capacity is planned to be around 5 MW and is estimated an average of 33 GWh of electric generation.

"Santa Rita" Hydropower Project : Located in La Libertad and would have an installed capacity of 173 MW and will have 1 100 GWh of annual energy production.

"Central Graton" Hydropower Project : Located in Lima, is a small scale project with an installed capacity and projected average generation of 5 MW and 34.6 GWh, respectively.

“Yaupi” Hydropower Expansion Project : Located in Junin, the project would increase the plant’s generating capacity by approximately 35 MW and the production is set to increase by 189 GWh per year.

“Substitution of fuel generators by small scale 0.8 MW hydropower in Pasto Bueno”: The main objective of the project is the production of hydroelectric energy to replace the diesel fuel-generated energy. The power plant will generate 800 kW, which will be fed to the Pasto Bueno mine “Huaura” belonging to Minera Dynacor del Perú S.A.C.

"Grid Connection of isolated electricity systems San Gabán - Puerto Maldonado": The project consist in the implementation of a Transmission Line named “San Gaban Puerto – Maldonado”, that would bring energy from the interconnected grid to Puerto Maldonado City, contributing in rural electrification.

"138 kV Transmission Line Majes – Camana”: The project extends 65.83 km of the 138 KV transmission line, from Majes to Camana, constructs 1 substation, and supplies electrical energy to the Camana province.

“138 kV Transmission Line Tayabamba – Llacuabamba”: The project prolongs 31.5 km, the government 138 KV transmission line from Tayabamba to Llacuabamba, and constructs 5 substations and 11.5 km of primary 22.9 kV lines towards Retamas and San Andrés.

60 kV Transmission Line “Constante – Bayovar” Project: The project consists of the construction of 35 km of the 60 kV transmission line from Constante to Bayovar, a new 7 MVA substation in Bayovar and a new line bay in substation of Constante.

“Los Perros / Bayovar” Wind Energy Project: Located in Sechura - Piura, this wind energy project of 20 MW of installed capacity will replace energy generated by the oil fired thermo-electrical power plants, mainly operating in the northern part of Peru’s national grid system.

233 969

243 647

74 005

294 881

386 534

497 009

18 785

626 197

20 272

107 592

5 326

14 346

2 482

18 000

3 502

95 000

76.6

100.0

17.3

57.5

77.9

127.8

NA

183.0

5.8

33.5

2.7

20.1

3.5

9.3

4.1

95.3

NO

NO

NO

YES

NO

NO

NO

YES

YES

NO

YES

YES

NO

NO

NO

NO

PDD underelaboration

PDD underelaboration

PIN

PDD underelaboration

PIN

At validation

PIN

PDD

PDD under elaboration

PDD under elaboration

Atvalidation

Atvalidation

PIN

PIN

PIN

PIN

Looking for CERs buyers

Looking for CERs buyers

Looking for CERs buyers

Looking forCERs buyers

Looking forCERs buyers

Contract withAHL Carbono

Looking forCERs buyers

ERPA withEEA Fund

Looking forCERS buyers

Looking forCERS buyers

Looking forCERs buyers

Looking forCERs buyers

Looking forCERs buyers

Looking for CERs buyers

Looking for CERs buyers

Looking for CERs buyers

CODE TECHNOLOGY PROJECT NAME AND DESCRIPTIONEMISSION

REDUCTION (TCO2E/YEAR)

DNA APPROVAL

(LOA)

INVESTMENTIN MILLIONS

US$STATUS SALE SITUATION

Page 4: NATIONAL ENVIRONMENTAL FUND - PERU · “Aobamba Hydroelectric Project”: Will be Located in Cusco, its installed capacity and projected average generation is 10 MW and 130 GWh per

Wind Power

Wind Power

Solid Waste Management

Solid WasteManagement

Solid WasteManagement

Solid Waste Management

Solid WasteManagement

Solid Waste Management}

Solid Waste Management

WastewaterManagement

Transportation

Transportation

Transportation

Transportation

W-2

W-3

SWM-1

SWM-2

SWM-3

SWM-4

SWM-5

SWM-6

SWM-7

WM-1

T-1

T-2

T-3

T-4

"Nordwind" Wind Farm Project : The project will be located in Paita - Piura, and would have an installed power capacity of 105 MW comprised of either 70 wind turbines of 1.5 MW each or 42 wind turbines of 2.5 MW each.

“Malabrigo" Wind Energy Project : The project will be located at the northern coast of Peru, District of Razuri, Province of Ascope, at La Libertad Region, and would have an installed power capacity of 60MW.

“Portillo Grande" Landfill Gas Recovery Project : Is located in the south part of Lima City. This landfill is 15 years old and has accumulated 4.2 million tons of MSW. This landfill has the capacity to receive 2000 tons for the next 30 years.

“El Zapallal” Landfill Gas Recovery Project : located in the north zone of Lima City. This landfill is 17 years old, has accumulated 3 million tons of MSW and has the capacity to receive 2000 tons per day for the next years.

“Ancon – EcoMethane Landfill Gas Project” : Located in the north part of Lima, the objective is to replace the existing ineffective passive venting system by an active gas collection and flaring system in order to destroy the methane contained in the LFG.

“Huaycoloro” Landfill Gas Recovery Project: The project is located in Huarochiri - Lima and it consists of the active capture of the biogas generated in 160 vertical extraction wells connected via a HDPE pipeline of more than 10 km. with the blower and the flaring station.

“Calca”– Reduce Methane Emissions through Compost Plant and Manual Landfill Project : The project is located in Calca province, Cusco and it consists of reduced the methane gas at atmosphere and controlled the leachate.

"Sechura" - Compost Plant and Mechanized Landfill Project : The project is located in Sechura Province to 54 km2 of Piura’s center. The Project includes a composting and recovery of recyclable waste and a landfill.

CDM Program for the Integrated Solid Waste Management in Municipalities of Peru: The Program is based on the implementation of integrated systems for solid waste management, which can be made of Segregation and Composting plant to reduce the waste that go to landfills and clandestine dumps.

Biogas Recovery at Carapongo Wastewater Treatment Plant: The project consists of implementing the biogas recovery through Aerobic-anaerobic system for the wastewater treatment from East Zone of Lima; Chosica, Chaclacayo and towns on the banks of the Rimac river.

Rapid Bus Transport System based on High Capacity Buses using Exclusive Roads : The project aims to develop a massive public transportation system in the city of Lima, which will be more economic, faster, and more ordered than the current system.

Electric Mass Transit System Project for Lima and Callao : The project aims to endow an electric mass transit system, for peripheral zones in the Cities of Lima and Callao with high population density.

Integrated Transport System in Lima /GTU : The project aims to develop a massive public transportation system, for low income population, which will be more economic, faster, and more orderly than the current system.

“Renewal Program of Automotive Fleet to Promote Change of Energy Matrix”: This Activities Program is established by means of the Presidential Decree. 213-2007-EF "Temporary Regime for the Change of Automotive Fleet of diesel vehicles," which consists in promoting renewal of the automotive fleet to new light vehicles that consume gasoline and/or vehicular natural gas (VNG).

209 445

83 683

151 64

54 213

69 012

298 996

360

2 101

369 359

78 840

199 743

725 585

436 543

73 563

218.3

102.0

1.6

1.6

3.6

2.0

0.2

4.9

520.0

1.6

214.5

408.0

333.1

50.2

NO

NO

File underelaboration

NO

YES

YES

NO

NO

File underelaboration

NO

NO

NO

NO

File underelaboration

PIN

PIN

PIN

PIN

At validation

Registered

PIN

PIN

PIN

PIN

PIN

PIN

PIN

PIN

Looking for CERs buyers

Looking for CERs buyers

Looking for CERs buyers

Looking for CERs buyers

Contract with Ecosecurities

ERPA with NetherlandsClean DevelopmentMechanism Facility

Looking for CERs buyers

Looking forCERs buyers

Looking for CERs buyers

Looking forCERs buyers

Looking forCERs buyers

Looking forCERs buyers

Looking forCERs buyers

Looking forCERs buyers

CODE TECHNOLOGY PROJECT NAME AND DESCRIPTIONEMISSION

REDUCTION (TCO2E/YEAR)

DNA APPROVAL

(LOA)

INVESTMENTIN MILLIONS

US$STATUS SALE SITUATION

Page 5: NATIONAL ENVIRONMENTAL FUND - PERU · “Aobamba Hydroelectric Project”: Will be Located in Cusco, its installed capacity and projected average generation is 10 MW and 130 GWh per

Biomass

Biomass

Biomass

Biomass

Biomass

Biomass

Biomass

Biomass

Biomass

Biomass

Biomass

Biomass

Fuel Switching

Fuel Switching

Fuel Switching

CODE TECHNOLOGY PROJECT NAME AND DESCRIPTIONEMISSION

REDUCTION (TCO2E/YEAR)

DNA APPROVAL

(LOA)

INVESTMENTIN MILLIONS

US$STATUS SALE SITUATION

B-1

B-2

B-3

B-4

B-5

B-6

B-7

B-8

B-9

B-10

B-11

B-12

FS-1

FS-2

FS-3

Cogeneration with Biomass at "Complejo Agroindustrial Cartavio SAA” : Is located in La Libertad. The Project consist in replace the current energy generation system to another modern system with more efficient combustion that will use bagasse instead of residual oil.

Avoid methane emissions using biodigester for Vinasse Treatment at Cartavio S.A.A. :Consists in a vinasse treatment facility as well as a cogenerating facility, it involves the design, construction, installation, start-up and operation of biodigesters and co-generating facility. It’s expected to generate 6 400 MWh per year.

“Paramonga” CDM Bagasse Boiler Project : It will replace the existing boilers with a new bagasse one, displacing the use of residual fuel oil with renewable energy and zero net greenhouse gas emissions.

"HEAVEN" Biodiesel Production and Distribution for Automobile Transportation : This project will take place in Lurín - Lima; it consists in the construction of a plant for a production of 120 000 gallons of biodiesel per day.

"Garodi" Biodiesel Plant : Located in Lima, the project consists in the construction of a Biodiesel plant for a production of 10 000 000 liters per year.

“COMISA” Sugar cane ethanol project : The project is going to be located in Sullana Province, Piura Region and consists in the implementation of 12 000 hectares of sugar cane crops with the propose to generate ethanol.

“Palmas del Espino – Biogas recovery and heat generation from Palm Oil Mill Effluent” : The project involves a biogas recovery system which covers lagoons with floating plastic membranes. .

“Boiler Optimization in Agroindustrial Laredo” : The project is located in La Libertad, consists in the optimization and repotentiation of an old boiler, displacing the use of residual fuel oil through the use of bagasse to feed this boiler.

Chiclayo Rice Hull Power Plant : The objective of the Chiclayo Rice-Hull Fired Cogeneration Project is to generate electricity by burning rice hulls, a biomass fuel. The initial stated aggregate power output from the plant will be 9.2 MW.

Sugar Cane Foliage for Steam and Green Power Generation : Based on Swedish technology, whole cane harvesting and subsequent separation and use of cane foliage will facilitate a fossil fuel free production of sugar, paper (from bagasse), ethanol (from molasses) and other products.

Rice-Hull Energy Generation Project in San Martin : The purpose of the Project is to use the rice-hull as input for the electric power generation, with capacity of 1.84 MW, and to avoid the generation risks of CH4 (methane), and N2O (nitrous oxide) emissions.

“Chira’s” Bioenergy Project : Electricity cogeneration Project (20 MW) with the use of biomass residues from the sugarcane harvesting process of the ethanol project “Caña Brava”, in the north coast of Peru (Piura)

Fuel Switching at Atocongo Cement Plant and Natural Gas Pipeline Extension - Cementos Lima : The project considers the construction of a 3.5 km natural gas pipeline and the installation of new natural gas burners.

"REX S.A." Fuel Switching Project : contemplates fuel switching from coal to natural gas in brickworks furnaces through the installation of new burners for natural gas.

“Peruvian Fuel-Switching Project” : the project is located in Lima, and consists in the substitution of fuel that consists in investment in order to replace the use of liquid fuels of petroleum for natural gas.

6.1

5.0

5.4

15.0

0.6

81.0

1.3

2.0

16.6

20.0

1.9

11.3

6.6

0.6

0.7

32 887

30 859

85 300

412 759

24 897

192 000

26 719

75 979

14 717

296 000

11 712

87 000

243 882

32 000

25 577

YES

NO

YES

NO

NO

NO

YES

YES

NO

NO

NO

NO

YES

YES

NO

PDD underelaboration

PIN

At Validation

PDD underelaboration

PDD underelaboration

PIN

Registered

PIN

PIN

PIN

PIN

PIN

At Validation

PDD underelaboration

Registered

Looking forCERs buyers

Looking for CERs buyers

Contract withCAEMA

ComercializationContract with AHL Carbono

Comercialization Contract with AHL Carbono

Looking for CERs buyers

Contract with Ecofys

Looking for CERs buyers

Looking for CERs buyers

Looking for CERs buyers

Looking for CERs buyers

Working with One Carboncompany

Contract with DEUMAN

Contract with A2G

Contract with MGM Int.

Page 6: NATIONAL ENVIRONMENTAL FUND - PERU · “Aobamba Hydroelectric Project”: Will be Located in Cusco, its installed capacity and projected average generation is 10 MW and 130 GWh per

Cogeneration

Cogeneration

Cogeneration

Cogeneratio

EnergyEfficiency

EnergyEfficiency

EnergyEfficiency

GeothermalPower

GeothermalPower

14 289 069TOTAL

CODE TECHNOLOGY PROJECT NAME AND DESCRIPTIONEMISSION

REDUCTION (TCO2E/YEAR)

DNA APPROVAL

(LOA)

INVESTMENTIN MILLIONS

US$STATUS SALE SITUATION

5 820.0

C-1

C-2

C-3

C-4

EE-1

EE-2

EE-3

G-1

G-2

Natural Gas Cogeneration Plant in Nuevo Mundo Industrial Company : The project will implement a cogeneration plant, which consists of a 6.34 MW turbine, covering much of the thermal energy supply, all the electric power demand from the two plants and the sale of excess of electric power to the National Grid.

Natural Gas Cogeneration at San Miguel Industrial Company : The Project will totally cover the demand of steam and part of electric power demand, which will be completed by purchasing electricity from the National Grid.

590 MW Natural gas based grid connected Combined cycle power plant – Electroperu S.A. : The project will be located in the District of Chilca, province of Cañete, region of Lima. The plant is based on efficient combined cycle technology and can use natural gas from Camisea field as fuel.

Ventanilla Conversion from Single-cycle to Combined-cycle Power Generation Project : The project activity converts two open-cycle gas turbine of 160 MW each into a combined-cycle facility that adds approximately 179 MW of generating capacity to Peru’s electric power grid.

CDM Program to replace incandescent lamps with compact fluorescent lamps-CFL : The objective project is to replace one million of incandescent lamps of 60 W and 500 000 incandescent lamps of 100 W with CFL for compacts fluorescent lamps in two years 2008-2009.

CDM Program to replace fluorescent lamps T12 with fluorescent lamps T8 at Public and Private Buildings : The objective project is to replace one million of fluorescent lamps T12 for fluorescent lamps T8 at Government buildings; and to achieve by multiplying effect the replacement of 4 millions of fluorescent lamps T12 for T8 in the Private sector.

Electricity production from waste heat gases in sponge iron production: the project involves the generation of electrical power through the installation of 4 waste heat recovery boilers and a 35 MW steam turbine generator.

“Aguas Calientes” Geothermal Project : The project consists in the construction of a 50 MW geothermal power plant in the field of Aguas Calientes Candarave and in the south of the country in the department of Tacna.

“Borateras” Geothermal Project : The project consists in the construction of a 50 MW geothermal power plant in the field of Aguas Calientes Candarave and in the south of the country in the department of Tacna.

13 361

4 348

730 791

375 051

34 800

2 784

143 562

224 406

224 406

4.2

1.5

570.0

156.0

0.1

0.1

45.0

140.0

140.0

NO

NO

NO

File under elaboration

NO

NO

NO

NO

NO

PIN

NO

PIN

At Validation

PIN

PIN

PIN

PIN

PIN

Looking for CERSs buyers

Looking for CERSs buyers

Looking for CERSs buyers

CERs will besold to ENDESA

Looking for CERSs buyers

Looking for CERSs buyers

Looking for CERSs buyers

Looking for CERSs buyers

Looking for CERSs buyers