GSFC Facilities Challenges
NASA - GODDARD SPACE FLIGHT CENTER
Agenda
GSFC Facilities at a Glance
Evolving Mission Requirements
Challenges
2
GSFC Facilities at a Glance
3
GSFC Facilities
IV&V
WSTF/TDRSS
GISS
GBLT
WFF
4
CSBF
GSFC Facilities
Facilities at a Glance
1,126
3,724
1,568
8,574
6,187
1,289
1,031
1,149
0% 20% 40% 60% 80% 100%
Site Area
Gross Building Area
Replacement Value
NASA Site Population
Greenbelt Wallops
Acres
kSF
$M
Employees
Established in 1959
50+ year-old infrastructure
Established in 1945
70+ year-old infrastructure
Miles
Miles
Miles
Miles
Miles
Miles
Miles
Acres
Acres
Miles
Miles
Facility Facts
5.7
11.2
140.5
25.0
1.2
5.1
8.2
20.0
20.5
3.0
1.0
290.0
155.0
35.0
22.0
14.0
10.0
4.0
14.0
0% 20% 40% 60% 80% 100%
Steam Distribution
Chilled Water Distribution
Total Paving
Airfield Paving
Electrical Distribution
Natrual Gas Distribution
Sanitary Sewer
Storm Drainage
Ductbank
Seawall
Fencing
Greenbelt Wallops
Evolving Mission Requirements
8
Funding levels and priorities for aging buildings and
infrastructure
9
Building “Suitable” facilities to support future GSFC mission is a challenge due to:
• Evolving Mission Set: Certain activities (such as launches at Wallops) have grown, others have
transformed (Mission Communication, Data Centers);
• Configuration: Like-functions and activities are not ideally distributed across a site, which impedes
their efficiency and effectiveness.
1960’s NASA Mission
1980’s NASA Mission
2010’s NASA Mission
Future NASA Mission
Technical Requirement Transformation:
The Challenge of Staying Ahead of the Mission
Explorer-1 (1958)
1st US made satellite
JWST (2018)Seeing the 1st light
60 Years Ago Present
Size of Satellite Tennis Racket Tennis Court
Temperature Control +/- 20F +/- 0.50F
Electrostatic Control 5,000V <250V
Molecular Control N/A Silicon material
Technical Requirement Transformation
Current clean rooms require tremendous amount of monitoring
and control to keep facilities within specification
Typical clean room monitoring system display in I&T Complex
12
GSFC Master Plan Neighborhoods
13
Facility Challenges
Facility Services
6
This is what people usually think of when you mention the word "Facilities“…
Traditional
View
•Custodial Services
•Refuse Handling
•Landscaping
•Grass Cutting
•Maintenance and Repair
•Mod and Rehab Program
•Construction Management
•Quality Assurance
•Snow Removal
•Central Plant Operations
•Outage Coordination
•Utilities
•Customer Requirements
•Building Management
Regulatory
Requirements
•Air Permitting & Emission Limitations
•Water Discharges & Monitoring
•Erosion & Sediment Control
•Wetlands Permitting
•Fire Protection & Detection
•Construction Safety
•Mishap Prevention & Investigation
•Contractor Safety
•Hazardous Material Management
•Asbestos / Lead Abatement
•Emergency Preparedness Response
•Land Management
•Reduce the Footprint
Federal
Requirements
•President’s Management Agenda
•Executive Orders
•Mission Criticality Assessment
•Mission Dependency Index
•Master Planning
•Deferred Maintenance
•Facilities Condition Index
•Sustainment Program
•Real Property Authorities
•Space Utilization
•Facility Utilization
•Energy Management Goals
•Pressure Systems Certification
15
Achieving Federal Sustainability Requirements
Growth of Environmental Requirements Applicable to Federal Agencies
RHAA AA MBTA
FWCA
HSBAA
FIFRA CAAFAHARSA SWDA
LWCFHUDA HBAWQA 4(f)NHPA FOIA
FAHAFAHAWSRA NEPACAA URAFAHA CWACZMA
MMPA ESASDWAAHPAFNWA TSCAMSFCMA
RCRA SWDACAA EO 11990
EO 11998CWA CRAARPA CERCLA
ANILCA LAAFPPA RRA
CBRA HSWAEPCRAEWRA
STURRA CWACAAA
NAGPRA ADACZARA OPASNARTA ISTEA
EO 12898MMPA EO 13007
SDWA EO 13061EO 13101 TEA-21EO 13089 EO 13112EO 13148 EO 13186
EO 13212EO 13211EO 13221 EO 13302
EO 13327 EISA
EO 13423EO 13514
0
10
20
30
40
50
60
70
80
90
1890 1900 1910 1920 1930 1940 1950 1960 1970 1980 1990 2000 2010 2020 2030 2040 2050
S
WA
L L
AN
TE
NM
IRO
RD
ER
SN
V O E
E IVFR
OC
UT
BE E
XN
UM E
ND
AE
IVT
AU
LC
UM
YEAR
Apollo Future ProgramsShuttle
Facilities Challenges
Funding levels and priorities for aging buildings and infrastructure
Staying ahead of mission
Achieving Federal Sustainability Requirements
Adapt to climate change (not only environmental but also policies)
16
Funding levels and priorities for aging buildings and
infrastructure
17
• Approximately 75 percent of GSFC facilities are more than 50 years old and need
significant maintenance and upgrades to preserve the safety and continuity of
operations for critical missions;
In FY15 GSFC spent $22.7M (58%) out of $39M of Facilities funding on annual
maintenance, yet still retained a maintenance backlog of $18.8M. This includes
$3.4M in major repairs (<$25K), and $15.4M in routine maintenance;
• At these current maintenance funding levels, facilities will continue to
degrade – leading to a “run to failure” philosophy;
• Even if current risk is considered acceptable, failures will increase over time
without an increase in maintenance funding.
Obsolescence of facilities and supporting infrastructure makes it difficult to
support latest technology flight systems and maintain state of the art technical
capabilities;
Current Agency policy to ‘Reduce the Footprint’ requires a greater than 1:1 ratio
on new construction.
•
•
•
Staying ahead of the Mission
18
Achieving Federal Sustainability Requirements
19
New Executive Orders such as 13693, Planning for Federal Sustainability in the Next Decade, shape the metrics of the Federal government sustainability goals, which in turn has required GSFC to:
Update Master Plans and Capital Improvement Plans to inform construction and demolition investments;
Recognize operational and mission risks, such as: direct mission risks (schedule, cost, technical); safety, security and health; legal requirements; and climate risks (short term, long term, and extreme events) in all facility designs;
Assess climate change vulnerabilities with partners in the local community and state and federal neighbors; and
Design NET Zero buildings for all new construction
A building that is design, constructed, and operated to require a greatly reduced quantity of energy to operate, meet the balance of energy needs from sources of energy that do not produce greenhouse gases and be economically viable. (Executive Order 13514 definition of zero-net-energy building).
Achieving Federal Sustainability Requirements, con’t
Adaptability: decisions at the inception of project design to incorporate elements and concepts that will assist with future adaptations to a building can facilitate change in the future;
Building to readily facilitate horizontal and vertical expansion;Analyzing the building structural concept, i.e. structural grid, dimensions, and floor-to-
floor heights that allow for flexibility in internal layouts; demountable walls;Functional Quality: decisions to incorporate the use of hard walls for offices and workspaces vs. flexible 'furniture' systems have a significant impact on functionality of a building;
Buildings support multiple functions: office/laboratory/server rooms;
Existing buildings are not optimized for energy efficiency; Older buildings with HVAC systems designed in 1960’s;
Laboratories or server rooms adjacent to office areas;Offices that used to be laboratories or server rooms.
Adapt to climate change – Challenges
21
Energy Climate change has the potential to create new and unaccounted energy demands on an already
challenged facilities system;
Bringing climate change into facility capital investment discussions provides a potential catalyst for empowering decision makers on Center to engage the problem and solutions.
Water Goddard needs to develop a strategic vision for water management and sustainable site design for
the next 20 years and utilize it to leverage resources to implement the Center vision – Chesapeake Bay.
Sea Level Rise Models predict sea level rise poses a real risk to Wallops Island infrastructure and assets within the
next 100 years;Structures and equipment will be elevated, as practicable, to as much as 13 feet above sea level.
Wallops Island Shoreline Before and After Restoration
Wallops Island Shoreline Restoration In Action
Adapt to climate change - Challenges
24
Other Climate Change Effects
Communication, appreciation, and cooperation of operational and cultural changes to Center personnel are critical to meet the facilities demands for future missions; End users needs sometimes are in conflict with the need to find ways to reduce
energy load, increase efficiency, and maximize the use of renewable energy sources in federal facilities;
The strategic vision must include providing resources for maintenance of structures once they have been installed. These costs are expected to have significant impacts on the CM&O budget.
25
GSFC Facilities Challenges
QUESTIONS?