nasa global hawk aircraft status, integration, op’s, schedule 8may’12
DESCRIPTION
NASA Global Hawk Aircraft Status, Integration, Op’s, Schedule 8May’12. Hurricane and Severe Storm Sentinel (HS3) Science Campaign 2012. 36-months of GH Science Flights:. 30 Instruments, 7 Science Missions, 833 Flt-Hrs, 433,000 Km’s. EAFB. GH Hurricane Overflights. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: NASA Global Hawk Aircraft Status, Integration, Op’s, Schedule 8May’12](https://reader035.vdocuments.us/reader035/viewer/2022062410/56815c3c550346895dca34dd/html5/thumbnails/1.jpg)
NASA Global HawkAircraft Status, Integration, Op’s, Schedule
8May’12
Hurricane and Severe Storm Sentinel (HS3) Science Campaign 2012
![Page 2: NASA Global Hawk Aircraft Status, Integration, Op’s, Schedule 8May’12](https://reader035.vdocuments.us/reader035/viewer/2022062410/56815c3c550346895dca34dd/html5/thumbnails/2.jpg)
36-months of GH Science Flights:
EAFB
30 Instruments, 7 Science Missions, 833 Flt-Hrs, 433,000 Km’s
![Page 3: NASA Global Hawk Aircraft Status, Integration, Op’s, Schedule 8May’12](https://reader035.vdocuments.us/reader035/viewer/2022062410/56815c3c550346895dca34dd/html5/thumbnails/3.jpg)
3
GH over the eye of
Hurricane Karl
Sept 16-17, 2010
(15 hours, 20 Eye
Passes)
GH Hurricane Overflights
![Page 4: NASA Global Hawk Aircraft Status, Integration, Op’s, Schedule 8May’12](https://reader035.vdocuments.us/reader035/viewer/2022062410/56815c3c550346895dca34dd/html5/thumbnails/4.jpg)
HS3 Payload on AV-1
4
HAMSR
HIWRAP
AV-1 “Over Storm” Instrument Configuration871
(AV-1)
HIRAD
![Page 5: NASA Global Hawk Aircraft Status, Integration, Op’s, Schedule 8May’12](https://reader035.vdocuments.us/reader035/viewer/2022062410/56815c3c550346895dca34dd/html5/thumbnails/5.jpg)
5
HAMSR
Issues / Status :Ready
![Page 6: NASA Global Hawk Aircraft Status, Integration, Op’s, Schedule 8May’12](https://reader035.vdocuments.us/reader035/viewer/2022062410/56815c3c550346895dca34dd/html5/thumbnails/6.jpg)
6
HIWRAP
6
Issues / Status :- Battery Backup remote Command Circuit being installed on GH.
- Zone-12/16 Heat issue being worked by GSFC/DFRC
![Page 7: NASA Global Hawk Aircraft Status, Integration, Op’s, Schedule 8May’12](https://reader035.vdocuments.us/reader035/viewer/2022062410/56815c3c550346895dca34dd/html5/thumbnails/7.jpg)
7
HIRAD
Issues / Status:RF issue being worked
![Page 8: NASA Global Hawk Aircraft Status, Integration, Op’s, Schedule 8May’12](https://reader035.vdocuments.us/reader035/viewer/2022062410/56815c3c550346895dca34dd/html5/thumbnails/8.jpg)
HS3 Payload on AV-6
8
![Page 9: NASA Global Hawk Aircraft Status, Integration, Op’s, Schedule 8May’12](https://reader035.vdocuments.us/reader035/viewer/2022062410/56815c3c550346895dca34dd/html5/thumbnails/9.jpg)
CPL
9
Issues / Status:None
![Page 10: NASA Global Hawk Aircraft Status, Integration, Op’s, Schedule 8May’12](https://reader035.vdocuments.us/reader035/viewer/2022062410/56815c3c550346895dca34dd/html5/thumbnails/10.jpg)
S-HIS
10
Issues / Status:None
![Page 11: NASA Global Hawk Aircraft Status, Integration, Op’s, Schedule 8May’12](https://reader035.vdocuments.us/reader035/viewer/2022062410/56815c3c550346895dca34dd/html5/thumbnails/11.jpg)
S-HIS (Pods in 2014)
11
![Page 12: NASA Global Hawk Aircraft Status, Integration, Op’s, Schedule 8May’12](https://reader035.vdocuments.us/reader035/viewer/2022062410/56815c3c550346895dca34dd/html5/thumbnails/12.jpg)
AVAPS
12
Issues / Status:None
![Page 13: NASA Global Hawk Aircraft Status, Integration, Op’s, Schedule 8May’12](https://reader035.vdocuments.us/reader035/viewer/2022062410/56815c3c550346895dca34dd/html5/thumbnails/13.jpg)
Sonde Launch Safety Mitigation
AVAPS Deploy System & Mech. Latch Controlled by
EIP Safety Interlock Circuit -- Controlled by GH
Mission Director
13
![Page 14: NASA Global Hawk Aircraft Status, Integration, Op’s, Schedule 8May’12](https://reader035.vdocuments.us/reader035/viewer/2022062410/56815c3c550346895dca34dd/html5/thumbnails/14.jpg)
14
Integration, Testing, Safety
![Page 15: NASA Global Hawk Aircraft Status, Integration, Op’s, Schedule 8May’12](https://reader035.vdocuments.us/reader035/viewer/2022062410/56815c3c550346895dca34dd/html5/thumbnails/15.jpg)
• Preflight Instrument Testing at DFRC– SIL-Bench Power, Safety, and Data Comm’s Checkout
• Be sure to Contact Caitlin Barnes, Don Sullivan with
Changes
– Integration and Instrument Testing on aircraft
– Outdoor SatCom Testing with PI’s in PMOF (Pre-CST)
– Formal Combined System Test (CST)
– Functional Tests during Range Flight w/Cold Soak
• All Payload Op’s shall take place from WFF
15
HS3 2013 Payload Integration
![Page 16: NASA Global Hawk Aircraft Status, Integration, Op’s, Schedule 8May’12](https://reader035.vdocuments.us/reader035/viewer/2022062410/56815c3c550346895dca34dd/html5/thumbnails/16.jpg)
Hangar Operations
16
![Page 17: NASA Global Hawk Aircraft Status, Integration, Op’s, Schedule 8May’12](https://reader035.vdocuments.us/reader035/viewer/2022062410/56815c3c550346895dca34dd/html5/thumbnails/17.jpg)
“New” GH Hangar (B-4840)
17
![Page 18: NASA Global Hawk Aircraft Status, Integration, Op’s, Schedule 8May’12](https://reader035.vdocuments.us/reader035/viewer/2022062410/56815c3c550346895dca34dd/html5/thumbnails/18.jpg)
GH Payload Area (B-4840)
18
![Page 19: NASA Global Hawk Aircraft Status, Integration, Op’s, Schedule 8May’12](https://reader035.vdocuments.us/reader035/viewer/2022062410/56815c3c550346895dca34dd/html5/thumbnails/19.jpg)
Pre-Ferry Flight DFRC Op’s
“CST”:Formal Aircraft EMI Test, Preflight Op. with Engine Run
“Pre-CST”:Payload System Satcom, PMOF
Op., and Instrument C3 Test
![Page 20: NASA Global Hawk Aircraft Status, Integration, Op’s, Schedule 8May’12](https://reader035.vdocuments.us/reader035/viewer/2022062410/56815c3c550346895dca34dd/html5/thumbnails/20.jpg)
Flight Operation – Timeline• T-2 Day
– Flight route determined by science– Mission Route transmitted to FAA by COB
• T-1 Day– NOTAM for CPL and Dropsondes transmitted– Aviation weather briefing– ‘T-1’ Crew Briefing– Aircraft and GHOC-E preflights
• T-3 hrs– Aviation weather briefing– File DD1801 flight plan– Aircraft / GHOC-E final preparation
• T-2 hrs– ‘T-0’ Crew Briefing– 1st Shift Personnel man GHOC-E
• T-1 hr - Engine start
20
![Page 21: NASA Global Hawk Aircraft Status, Integration, Op’s, Schedule 8May’12](https://reader035.vdocuments.us/reader035/viewer/2022062410/56815c3c550346895dca34dd/html5/thumbnails/21.jpg)
Flight Operations Summary
21
Emergencies:
• If an emergency RTB back to WFF is declared by the PIC, ATC will provide emergency handling. (Non-emergency RTB’s will loiter in Atlantic until after dawn.)
• If required, an emergency landing could occur at night and/or during IMC conditions.
• Control tower is required for emergency RTB (activate Class D airspace)
• Other Emergency landing fields: Pax River, KSC, Cherry Point MAS, MAS Station Beaufort, Mayport, Caribbean site (possibly Puerto Rico)
• DFRC pilots from GHOC will conduct an emergency landing at WFF in the event that WFF pilots are in crew rest.