Name/Office Symbol/(703) XXX-XXX (DSN XXX) / email address Date-Time-Group
19 September 2008
Fort Monroe ClosureEnvironmental
Planning
Robert Edwards/IMNE-MNR-RMO (757) 788-3571 (DSN 680) / [email protected] 1 July 2008
NEPAPA SECTION 106
Fort Monroe Transition to Closure
ContinuingInteraction
and Impacts
20052005 20112011
BRACDECISION
FMCLOSURE
REUSE
CONCEPT
TENANT RELOCATION
ENVIRONMENTAL REMEDIATION
Gov’t Rqmts Property Reuse
2
Robert Edwards/IMNE-MNR-RMO (757) 788-3571 (DSN 680) / [email protected] 1 July 20083
National Environmental Policy Act (NEPA)
• Army has determined an Environmental Impact Statement (EIS) is required based upon the Reuse Plan and the potential to exceed threshold levels for significant impacts.Notice of Intent in Federal Register – 19 Sep 08Public Scoping meeting – 28 Oct 08– Time: 7:00PM - 9:00 PM Place: Northampton Community Center– http://www.hampton.gov/parks/north_hampton_cc.html, 1435 Todds
Lane, Hampton, VA 23666
Robert Edwards/IMNE-MNR-RMO (757) 788-3571 (DSN 680) / [email protected] 1 July 2008
National Environmental Policy Act (NEPA)
Environmental Impact Statement (EIS)Major Milestones
• Notice of Intent in Federal Register -19 Sept 08• Public Scoping Meeting - 28 Oct 08• Description of Proposed Action and Alternatives - 29 Sep 08• Preliminary Draft EIS for Army Review - 08 Dec-05 Jan 09• Draft EIS 45-Day Public Review - 17 Apr-3 Jun 09• Public Meeting Draft EIS - 8 May 09• Final EIS Published - 9 Oct 09• Final EIS 30-Day Waiting Period - 20 Oct-19 Nov 09• Record of Decision Signed - 28 Dec 09
Robert Edwards/IMNE-MNR-RMO (757) 788-3571 (DSN 680) / [email protected] 1 July 20085
• Apr 06: Historical Records Review (HRR)
• Nov 06: Environmental Condition of Property (ECP) Report
• Aug - Oct 07: Initial sampling at potential Hazardous Toxic &
Radiological Waste (HTRW) Sites
• Jan 08: Draft Site Inspection Report for HTRW
• Mar – Apr 08: Updated Army Environmental Database - 16
Munitions Response Sites (MRS), 14 HTRW Sites and 3
Closure-related Compliance Sites
• Apr – Jun 08: Draft BRAC Installation Action Plan
Environmental Cleanup
Events to Date
Robert Edwards/IMNE-MNR-RMO (757) 788-3571 (DSN 680) / [email protected] 1 July 2008
Environmental CleanupWay Ahead
IRP :Contract awarded Aug 08 to conduct
Expanded Site Inspection work at 6 Sites:
anticipate award to conduct Remedial
Investigation at 8 sites by 3rd Qtr FY09
MMRP: Contract award pending to conduct
Remedial Investigation at 16 MR sites
Robert Edwards/IMNE-MNR-RMO (757) 788-3571 (DSN 680) / [email protected] 1 July 20087
• Established RAB 19 Sept 06
• Purpose – Citizens’ Advisory Board on environmental remediation; meet quarterly
• Completed Training - Environmental Cleanup Process (Feb 07) and Munitions (May 07)
• Visited HTRW sampling sites (open to the public), Aug 07
• Documents reviewed: • Historical Records Review • Environmental Condition of Property
• Documents provided for comment:• Draft Field Sampling Plan for HTRW, Jun - Jul 07• Draft Site Inspection Report for HTRW, Jan - Feb 08• Draft BRAC Installation Action Plan, May – Jun 08
• Meet quarterly – next meeting 6 Nov 08
Restoration Advisory Board (RAB)
Robert Edwards/IMNE-MNR-RMO (757) 788-3571 (DSN 680) / [email protected] 1 July 20088
FY06 FY07 FY08 FY09 FY11FY10
NEPA
PA
Army Timeline for Fort Monroe
TRADOC HQ
NHPA Section 106 Compliance
IMCOM NE
NETCOM-N Region
ACA-N Region
JTFCS
Accessions Cmd
Cadet Command
Construction
Movement
Env Remediation
Implementation