Gas Separation system Name: Hussain Abbas Qassim Ashoor

ID: 20090222Supervisor: David Krause

Senior Project 2014

Page 2: Name: Hussain Abbas Qassim Ashoor ID: 20090222 Supervisor: David Krause Senior Project 2014

Index

• Project objectives

• Introduction

• Tasks reviews

• Gantt Chart

• Difficulties and recommendations

Page 3: Name: Hussain Abbas Qassim Ashoor ID: 20090222 Supervisor: David Krause Senior Project 2014

Project objectives

Making a prototype to demonstrate a separation

system plant.

Implementing what was learned

Designing a PCB circuit

Write a PLC code program and Mbed

Page 4: Name: Hussain Abbas Qassim Ashoor ID: 20090222 Supervisor: David Krause Senior Project 2014

Introduction

• The project idea

• Company conflicts

• Improving the project idea

Page 5: Name: Hussain Abbas Qassim Ashoor ID: 20090222 Supervisor: David Krause Senior Project 2014

The project idea

Page 6: Name: Hussain Abbas Qassim Ashoor ID: 20090222 Supervisor: David Krause Senior Project 2014

PFD (Process Flow Diagram)

Page 7: Name: Hussain Abbas Qassim Ashoor ID: 20090222 Supervisor: David Krause Senior Project 2014

Oil Well Pump

Oil Well Pump is a part of the gas separation system and operated by Tatweer Petroleum.

Page 8: Name: Hussain Abbas Qassim Ashoor ID: 20090222 Supervisor: David Krause Senior Project 2014

Separation system plant

Where the gas separates from oil and sent to stores.

Page 9: Name: Hussain Abbas Qassim Ashoor ID: 20090222 Supervisor: David Krause Senior Project 2014

Stores Here were stores the oil and gas to be deliver to the Companies

Banagas StoreBapco

Store

Page 10: Name: Hussain Abbas Qassim Ashoor ID: 20090222 Supervisor: David Krause Senior Project 2014

Boiler

Boiling the un wanted water

Page 11: Name: Hussain Abbas Qassim Ashoor ID: 20090222 Supervisor: David Krause Senior Project 2014

Company conflicts

PLC used in the Company is Rslogix 500

There are no budget

Limited equipment

No workshop in the Company for students

Page 12: Name: Hussain Abbas Qassim Ashoor ID: 20090222 Supervisor: David Krause Senior Project 2014

Improving the project idea

• Simulation

• Mbed program

• Ultrasonic sensor, Temperature sensor, Level sensors and

Gas sensor

• Control panel and SCADA program.

Page 13: Name: Hussain Abbas Qassim Ashoor ID: 20090222 Supervisor: David Krause Senior Project 2014

Tasks Reviews

Page 14: Name: Hussain Abbas Qassim Ashoor ID: 20090222 Supervisor: David Krause Senior Project 2014

Planning• Solid worksDesigning any mechanical part

•Ms VisioDesigning the PFD process flow diagram

• MS projectDoing the Gantt chart (what to do)

•Ms Power PointDesigning the Control Panel

Page 15: Name: Hussain Abbas Qassim Ashoor ID: 20090222 Supervisor: David Krause Senior Project 2014

Boiler TankDesigned at Solid Works

Built in Building 34

Page 16: Name: Hussain Abbas Qassim Ashoor ID: 20090222 Supervisor: David Krause Senior Project 2014

Ventilation 3D Concept

Page 17: Name: Hussain Abbas Qassim Ashoor ID: 20090222 Supervisor: David Krause Senior Project 2014

Control Panel

25 %

Page 18: Name: Hussain Abbas Qassim Ashoor ID: 20090222 Supervisor: David Krause Senior Project 2014

Building (Fabrication)

Page 19: Name: Hussain Abbas Qassim Ashoor ID: 20090222 Supervisor: David Krause Senior Project 2014

Building (Fabrication)

Page 20: Name: Hussain Abbas Qassim Ashoor ID: 20090222 Supervisor: David Krause Senior Project 2014

Building (Fabrication)

Page 21: Name: Hussain Abbas Qassim Ashoor ID: 20090222 Supervisor: David Krause Senior Project 2014

7-segment circuit

Page 22: Name: Hussain Abbas Qassim Ashoor ID: 20090222 Supervisor: David Krause Senior Project 2014

Mbed, Comparator and switch regulator Circuit

Page 23: Name: Hussain Abbas Qassim Ashoor ID: 20090222 Supervisor: David Krause Senior Project 2014

PCB

Page 24: Name: Hussain Abbas Qassim Ashoor ID: 20090222 Supervisor: David Krause Senior Project 2014

Relay Circuit and PCB

Page 25: Name: Hussain Abbas Qassim Ashoor ID: 20090222 Supervisor: David Krause Senior Project 2014

PCB before soldering

Page 26: Name: Hussain Abbas Qassim Ashoor ID: 20090222 Supervisor: David Krause Senior Project 2014

PCB soldered

Page 27: Name: Hussain Abbas Qassim Ashoor ID: 20090222 Supervisor: David Krause Senior Project 2014

Relay PCB in the project

Page 28: Name: Hussain Abbas Qassim Ashoor ID: 20090222 Supervisor: David Krause Senior Project 2014

Ultrasonic SensorConnection and teaching mode

Page 29: Name: Hussain Abbas Qassim Ashoor ID: 20090222 Supervisor: David Krause Senior Project 2014

ProgrammingPLC Program (RSlogix5000)

Mbed Program (Micro Controller)

Factory Talk View (SCADA)

Page 30: Name: Hussain Abbas Qassim Ashoor ID: 20090222 Supervisor: David Krause Senior Project 2014

Separation System Block Diagram

Control Panel

SCADA

Fans

Pumps

LCD

Level Sensor

Ultrasonic Sensor

Temperature Sensor

7-segment

Buzzer

PLC

Mbed

Page 31: Name: Hussain Abbas Qassim Ashoor ID: 20090222 Supervisor: David Krause Senior Project 2014

Mbed

Page 32: Name: Hussain Abbas Qassim Ashoor ID: 20090222 Supervisor: David Krause Senior Project 2014

SCADA   Stands for (Supervisory Control and Data Acquisition) 

Page 33: Name: Hussain Abbas Qassim Ashoor ID: 20090222 Supervisor: David Krause Senior Project 2014

Gantt Chart MS Project

Page 34: Name: Hussain Abbas Qassim Ashoor ID: 20090222 Supervisor: David Krause Senior Project 2014

Old Gantt Chart

Page 35: Name: Hussain Abbas Qassim Ashoor ID: 20090222 Supervisor: David Krause Senior Project 2014

New Gantt Chart

Page 36: Name: Hussain Abbas Qassim Ashoor ID: 20090222 Supervisor: David Krause Senior Project 2014

Difficulties

Recommendation

•The company conflicts

•Building the project on my own budget

•Ultrasonic sensor

•Using better PLC module which could produce more than 205mA

•Adding various sensors such as (pressure sensor and flow meter),

also use better equipment to make the project with high quality