nakambala product alignment and refinery project · project scope raw sugar refine sugar-raw house...
TRANSCRIPT
![Page 1: NAKAMBALA PRODUCT ALIGNMENT AND REFINERY PROJECT · PROJECT SCOPE RAW SUGAR REFINE SUGAR-RAW HOUSE UPGRADE 640 to 700TCH - BOILER UPGRADE MCR 160 to 185TPH - NEW REFINERY 90,000 t/year](https://reader034.vdocuments.us/reader034/viewer/2022051811/601e1f564ad5aa3d0e4a2d9e/html5/thumbnails/1.jpg)
NAKAMBALA PRODUCT ALIGNMENT AND REFINERY PROJECT
ZAMBIA 2016
![Page 2: NAKAMBALA PRODUCT ALIGNMENT AND REFINERY PROJECT · PROJECT SCOPE RAW SUGAR REFINE SUGAR-RAW HOUSE UPGRADE 640 to 700TCH - BOILER UPGRADE MCR 160 to 185TPH - NEW REFINERY 90,000 t/year](https://reader034.vdocuments.us/reader034/viewer/2022051811/601e1f564ad5aa3d0e4a2d9e/html5/thumbnails/2.jpg)
CLIENT ZAMBIA SUGAR PLC
EPCM BOSCH PROJECT
SITE NAKAMBALA,MAZABUKA, ZAMBIA
PROCESS
PROJECT SCOPE
RAW SUGARREFINE SUGAR
-RAW HOUSE UPGRADE 640to700TCH
- BOILER UPGRADE MCR160to185TPH
- NEW REFINERY 90,000t/year
- CONDITIONING SILO 200t
- PACKING STATION
INDUSTRIAL OPERATION
2016
PROJECT VALUES USD 90,000,000
FORGES TARDIEU CONTRACT VALUES
USD 17,400,000
PROJECT OVERVIEW
![Page 3: NAKAMBALA PRODUCT ALIGNMENT AND REFINERY PROJECT · PROJECT SCOPE RAW SUGAR REFINE SUGAR-RAW HOUSE UPGRADE 640 to 700TCH - BOILER UPGRADE MCR 160 to 185TPH - NEW REFINERY 90,000 t/year](https://reader034.vdocuments.us/reader034/viewer/2022051811/601e1f564ad5aa3d0e4a2d9e/html5/thumbnails/3.jpg)
STEEL, PIPING & MECHANICAL INSTALLATION:
• Raw House Upgrade• Bagasse Handling• Boiler Upgrade• Refinery• Conditioning Silo
STEEL & PIPING SUPPLY:
• Raw House Upgrade• Boiler Upgrade• Refinery Building
REFINERY EQUIPMENT DESIGN & SUPPLY:
• Batch Pans• Strike Receivers• Melters• Dryer Station
FORGES TARDIEU SCOPE
![Page 4: NAKAMBALA PRODUCT ALIGNMENT AND REFINERY PROJECT · PROJECT SCOPE RAW SUGAR REFINE SUGAR-RAW HOUSE UPGRADE 640 to 700TCH - BOILER UPGRADE MCR 160 to 185TPH - NEW REFINERY 90,000 t/year](https://reader034.vdocuments.us/reader034/viewer/2022051811/601e1f564ad5aa3d0e4a2d9e/html5/thumbnails/4.jpg)
Pan Capacity 42m³ x 2
Massecuite Flow Rate 24t/h
Material 3Cr12
REFINERY EQUIPMENT DESIGN & SUPPLYBATCH PANS
![Page 5: NAKAMBALA PRODUCT ALIGNMENT AND REFINERY PROJECT · PROJECT SCOPE RAW SUGAR REFINE SUGAR-RAW HOUSE UPGRADE 640 to 700TCH - BOILER UPGRADE MCR 160 to 185TPH - NEW REFINERY 90,000 t/year](https://reader034.vdocuments.us/reader034/viewer/2022051811/601e1f564ad5aa3d0e4a2d9e/html5/thumbnails/5.jpg)
Strike Capacity 50m³ x 3
Material 3Cr12
REFINERY EQUIPMENT DESIGN & SUPPLYSTRIKE RECEIVERS
![Page 6: NAKAMBALA PRODUCT ALIGNMENT AND REFINERY PROJECT · PROJECT SCOPE RAW SUGAR REFINE SUGAR-RAW HOUSE UPGRADE 640 to 700TCH - BOILER UPGRADE MCR 160 to 185TPH - NEW REFINERY 90,000 t/year](https://reader034.vdocuments.us/reader034/viewer/2022051811/601e1f564ad5aa3d0e4a2d9e/html5/thumbnails/6.jpg)
REFINERY EQUIPMENT DESIGN & SUPPLYMELTERS
Refined Sugar Flow Rate 7.5 – 11.5 t/h
Material 3Cr12
![Page 7: NAKAMBALA PRODUCT ALIGNMENT AND REFINERY PROJECT · PROJECT SCOPE RAW SUGAR REFINE SUGAR-RAW HOUSE UPGRADE 640 to 700TCH - BOILER UPGRADE MCR 160 to 185TPH - NEW REFINERY 90,000 t/year](https://reader034.vdocuments.us/reader034/viewer/2022051811/601e1f564ad5aa3d0e4a2d9e/html5/thumbnails/7.jpg)
Rotary Louvre Type
Refined Sugar Output 25t/h
REFINERY EQUIPMENT DESIGN & SUPPLYDRYER STATION
![Page 8: NAKAMBALA PRODUCT ALIGNMENT AND REFINERY PROJECT · PROJECT SCOPE RAW SUGAR REFINE SUGAR-RAW HOUSE UPGRADE 640 to 700TCH - BOILER UPGRADE MCR 160 to 185TPH - NEW REFINERY 90,000 t/year](https://reader034.vdocuments.us/reader034/viewer/2022051811/601e1f564ad5aa3d0e4a2d9e/html5/thumbnails/8.jpg)
Steel Structures 1225 t
Piping 13 km
STEEL & PIPING SUPPLYRAW HOUSE UPGRADE
BOILER UPGRADE
REFINERY BUILDING
![Page 9: NAKAMBALA PRODUCT ALIGNMENT AND REFINERY PROJECT · PROJECT SCOPE RAW SUGAR REFINE SUGAR-RAW HOUSE UPGRADE 640 to 700TCH - BOILER UPGRADE MCR 160 to 185TPH - NEW REFINERY 90,000 t/year](https://reader034.vdocuments.us/reader034/viewer/2022051811/601e1f564ad5aa3d0e4a2d9e/html5/thumbnails/9.jpg)
Press Water ClarifierRotary Screens x 2
Juice Heaters BuildingJuice Heaters x 4
Reject Condensate Vessels
Juice Heater Condensate Receiver
Mill Intercarriers Refurbishment
Mud TankMud Mixer
Filtrate Receiving & Seal Tanks
Juice Splitter Box
STEEL, PIPING & MECHANICAL INSTALLATIONRAW HOUSE UPGRADE
![Page 10: NAKAMBALA PRODUCT ALIGNMENT AND REFINERY PROJECT · PROJECT SCOPE RAW SUGAR REFINE SUGAR-RAW HOUSE UPGRADE 640 to 700TCH - BOILER UPGRADE MCR 160 to 185TPH - NEW REFINERY 90,000 t/year](https://reader034.vdocuments.us/reader034/viewer/2022051811/601e1f564ad5aa3d0e4a2d9e/html5/thumbnails/10.jpg)
STEEL, PIPING & MECHANICAL INSTALLATIONRAW HOUSE UPGRADE
Mud Filters x 2 & AccessoriesJuice Clarifier
85m³ Continuous Vacuum PanCondenser
V3 & V4 Condensate Flash Vessel
Lime Prep Tank‘A’ Vacuum Seed Receiver
‘A’ Molasses Conditioning Tank
‘B’ Molasses Conditioning Tank
HSL 2 CVP ‘A’ Seal Tank
![Page 11: NAKAMBALA PRODUCT ALIGNMENT AND REFINERY PROJECT · PROJECT SCOPE RAW SUGAR REFINE SUGAR-RAW HOUSE UPGRADE 640 to 700TCH - BOILER UPGRADE MCR 160 to 185TPH - NEW REFINERY 90,000 t/year](https://reader034.vdocuments.us/reader034/viewer/2022051811/601e1f564ad5aa3d0e4a2d9e/html5/thumbnails/11.jpg)
Belt Conveyors x 3
Slat Conveyors.
STEEL, PIPING & MECHANICAL INSTALLATIONBAGASSE HANDLING
![Page 12: NAKAMBALA PRODUCT ALIGNMENT AND REFINERY PROJECT · PROJECT SCOPE RAW SUGAR REFINE SUGAR-RAW HOUSE UPGRADE 640 to 700TCH - BOILER UPGRADE MCR 160 to 185TPH - NEW REFINERY 90,000 t/year](https://reader034.vdocuments.us/reader034/viewer/2022051811/601e1f564ad5aa3d0e4a2d9e/html5/thumbnails/12.jpg)
Venturi Scrubber
Swirl Tank
ID Fans
STEEL, PIPING & MECHANICAL INSTALLATIONBOILER UPGRADE
![Page 13: NAKAMBALA PRODUCT ALIGNMENT AND REFINERY PROJECT · PROJECT SCOPE RAW SUGAR REFINE SUGAR-RAW HOUSE UPGRADE 640 to 700TCH - BOILER UPGRADE MCR 160 to 185TPH - NEW REFINERY 90,000 t/year](https://reader034.vdocuments.us/reader034/viewer/2022051811/601e1f564ad5aa3d0e4a2d9e/html5/thumbnails/13.jpg)
Melting, Carbonatation & Sulphitation
Flue Gas CompressorsSeparator Vessel
Vacuum Batch Pan x 2New Strike Receivers x 3
CentrifugalReject MelterSugar Dryer
Bucket ElevatorsScrew ConveyorsLump & Oversize Vibrating Screens
Lump BreakerPacking Machines x 2
STEEL, PIPING & MECHANICAL INSTALLATIONREFINERY
![Page 14: NAKAMBALA PRODUCT ALIGNMENT AND REFINERY PROJECT · PROJECT SCOPE RAW SUGAR REFINE SUGAR-RAW HOUSE UPGRADE 640 to 700TCH - BOILER UPGRADE MCR 160 to 185TPH - NEW REFINERY 90,000 t/year](https://reader034.vdocuments.us/reader034/viewer/2022051811/601e1f564ad5aa3d0e4a2d9e/html5/thumbnails/14.jpg)
Shell StrakesPenthouse Floor
ComponentsAir Distribution Cone
Silo OutfeedSugar Distributer
Vibrating Conveyor
STEEL, PIPING & MECHANICAL INSTALLATIONCONDITIONING SILO
![Page 15: NAKAMBALA PRODUCT ALIGNMENT AND REFINERY PROJECT · PROJECT SCOPE RAW SUGAR REFINE SUGAR-RAW HOUSE UPGRADE 640 to 700TCH - BOILER UPGRADE MCR 160 to 185TPH - NEW REFINERY 90,000 t/year](https://reader034.vdocuments.us/reader034/viewer/2022051811/601e1f564ad5aa3d0e4a2d9e/html5/thumbnails/15.jpg)
SITE AMENITIES
WELLFARE FACILITIES
Site CampSite Office & StoresLaydown & Site Buffer Area
Birthday CelebrationCulture & Nature TripFestivalsCelebrating AchievementsSports CompetitionCricket, Volley Ball & Football
MANPOWER 335 Expatriate Skills Labour250 Local Labour50 Management Staff
PLANT & MACHINERY
MOBILISATION
SITE TEAM MANAGEMENT STRUCTURE
Imported from Mauritius
![Page 16: NAKAMBALA PRODUCT ALIGNMENT AND REFINERY PROJECT · PROJECT SCOPE RAW SUGAR REFINE SUGAR-RAW HOUSE UPGRADE 640 to 700TCH - BOILER UPGRADE MCR 160 to 185TPH - NEW REFINERY 90,000 t/year](https://reader034.vdocuments.us/reader034/viewer/2022051811/601e1f564ad5aa3d0e4a2d9e/html5/thumbnails/16.jpg)
MOBILISATIONMANPOWER :335 Expatriate Skills Labour250 Local Labour50 Management Staff
![Page 17: NAKAMBALA PRODUCT ALIGNMENT AND REFINERY PROJECT · PROJECT SCOPE RAW SUGAR REFINE SUGAR-RAW HOUSE UPGRADE 640 to 700TCH - BOILER UPGRADE MCR 160 to 185TPH - NEW REFINERY 90,000 t/year](https://reader034.vdocuments.us/reader034/viewer/2022051811/601e1f564ad5aa3d0e4a2d9e/html5/thumbnails/17.jpg)
MOBILISATIONSITE AMNITIES :Laydown & Site Buffer AreaSite CampSite Office & Stores
![Page 18: NAKAMBALA PRODUCT ALIGNMENT AND REFINERY PROJECT · PROJECT SCOPE RAW SUGAR REFINE SUGAR-RAW HOUSE UPGRADE 640 to 700TCH - BOILER UPGRADE MCR 160 to 185TPH - NEW REFINERY 90,000 t/year](https://reader034.vdocuments.us/reader034/viewer/2022051811/601e1f564ad5aa3d0e4a2d9e/html5/thumbnails/18.jpg)
MOBILISATIONWELLFARE FACILITIES :Birthday CelebrationCulture & Nature TripFestivalsCelebrating AchievementsSports CompetitionCricket, Volley Ball & Football
![Page 19: NAKAMBALA PRODUCT ALIGNMENT AND REFINERY PROJECT · PROJECT SCOPE RAW SUGAR REFINE SUGAR-RAW HOUSE UPGRADE 640 to 700TCH - BOILER UPGRADE MCR 160 to 185TPH - NEW REFINERY 90,000 t/year](https://reader034.vdocuments.us/reader034/viewer/2022051811/601e1f564ad5aa3d0e4a2d9e/html5/thumbnails/19.jpg)
HEALTH,SAFETY &PERFORMANCEACCOMPLISHMENTS
TOOLBOX TALKSPPE
MEDICAL FACILITYEFFECTIVE H&SMANAGEMENT
CERTIFICATE OF ACHIEVEMENT:
1.1 MILLION MAN HOURS
PERFORMANCE APPRAISAL FROM
CLIENT :
“ Very Good leaning to excellent ”
![Page 20: NAKAMBALA PRODUCT ALIGNMENT AND REFINERY PROJECT · PROJECT SCOPE RAW SUGAR REFINE SUGAR-RAW HOUSE UPGRADE 640 to 700TCH - BOILER UPGRADE MCR 160 to 185TPH - NEW REFINERY 90,000 t/year](https://reader034.vdocuments.us/reader034/viewer/2022051811/601e1f564ad5aa3d0e4a2d9e/html5/thumbnails/20.jpg)
FORGES TARDIEU LtdPO Box 20, 31 Nicolay Road, Port Louis, Republic of MauritiusTel +230 206 52 00Fax +230 240 71 59Email [email protected] www.forgestardieu.com
Phot
os a
nd il
lust
rati
ons
cont
aine
d in
thi
s do
cum
ent
are
info
rmat
ive
& n
on-c
ontr
actu
al.
MO
RE
INFO
RM
ATI
ON
ON
WW
W.F
OR
GES
TAR
DIE
U.C
OM
ART
DIR
ECTI
ON
& D
ESIG
NTH
EIDEA
SSTO
RE.M
U