nakambala product alignment and refinery project · project scope raw sugar refine sugar-raw house...

20
NAKAMBALA PRODUCT ALIGNMENT AND REFINERY PROJECT ZAMBIA 2016

Upload: others

Post on 30-Sep-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: NAKAMBALA PRODUCT ALIGNMENT AND REFINERY PROJECT · PROJECT SCOPE RAW SUGAR REFINE SUGAR-RAW HOUSE UPGRADE 640 to 700TCH - BOILER UPGRADE MCR 160 to 185TPH - NEW REFINERY 90,000 t/year

NAKAMBALA PRODUCT ALIGNMENT AND REFINERY PROJECT

ZAMBIA 2016

Page 2: NAKAMBALA PRODUCT ALIGNMENT AND REFINERY PROJECT · PROJECT SCOPE RAW SUGAR REFINE SUGAR-RAW HOUSE UPGRADE 640 to 700TCH - BOILER UPGRADE MCR 160 to 185TPH - NEW REFINERY 90,000 t/year

CLIENT ZAMBIA SUGAR PLC

EPCM BOSCH PROJECT

SITE NAKAMBALA,MAZABUKA, ZAMBIA

PROCESS

PROJECT SCOPE

RAW SUGARREFINE SUGAR

-RAW HOUSE UPGRADE 640to700TCH

- BOILER UPGRADE MCR160to185TPH

- NEW REFINERY 90,000t/year

- CONDITIONING SILO 200t

- PACKING STATION

INDUSTRIAL OPERATION

2016

PROJECT VALUES USD 90,000,000

FORGES TARDIEU CONTRACT VALUES

USD 17,400,000

PROJECT OVERVIEW

Page 3: NAKAMBALA PRODUCT ALIGNMENT AND REFINERY PROJECT · PROJECT SCOPE RAW SUGAR REFINE SUGAR-RAW HOUSE UPGRADE 640 to 700TCH - BOILER UPGRADE MCR 160 to 185TPH - NEW REFINERY 90,000 t/year

STEEL, PIPING & MECHANICAL INSTALLATION:

• Raw House Upgrade• Bagasse Handling• Boiler Upgrade• Refinery• Conditioning Silo

STEEL & PIPING SUPPLY:

• Raw House Upgrade• Boiler Upgrade• Refinery Building

REFINERY EQUIPMENT DESIGN & SUPPLY:

• Batch Pans• Strike Receivers• Melters• Dryer Station

FORGES TARDIEU SCOPE

Page 4: NAKAMBALA PRODUCT ALIGNMENT AND REFINERY PROJECT · PROJECT SCOPE RAW SUGAR REFINE SUGAR-RAW HOUSE UPGRADE 640 to 700TCH - BOILER UPGRADE MCR 160 to 185TPH - NEW REFINERY 90,000 t/year

Pan Capacity 42m³ x 2

Massecuite Flow Rate 24t/h

Material 3Cr12

REFINERY EQUIPMENT DESIGN & SUPPLYBATCH PANS

Page 5: NAKAMBALA PRODUCT ALIGNMENT AND REFINERY PROJECT · PROJECT SCOPE RAW SUGAR REFINE SUGAR-RAW HOUSE UPGRADE 640 to 700TCH - BOILER UPGRADE MCR 160 to 185TPH - NEW REFINERY 90,000 t/year

Strike Capacity 50m³ x 3

Material 3Cr12

REFINERY EQUIPMENT DESIGN & SUPPLYSTRIKE RECEIVERS

Page 6: NAKAMBALA PRODUCT ALIGNMENT AND REFINERY PROJECT · PROJECT SCOPE RAW SUGAR REFINE SUGAR-RAW HOUSE UPGRADE 640 to 700TCH - BOILER UPGRADE MCR 160 to 185TPH - NEW REFINERY 90,000 t/year

REFINERY EQUIPMENT DESIGN & SUPPLYMELTERS

Refined Sugar Flow Rate 7.5 – 11.5 t/h

Material 3Cr12

Page 7: NAKAMBALA PRODUCT ALIGNMENT AND REFINERY PROJECT · PROJECT SCOPE RAW SUGAR REFINE SUGAR-RAW HOUSE UPGRADE 640 to 700TCH - BOILER UPGRADE MCR 160 to 185TPH - NEW REFINERY 90,000 t/year

Rotary Louvre Type

Refined Sugar Output 25t/h

REFINERY EQUIPMENT DESIGN & SUPPLYDRYER STATION

Page 8: NAKAMBALA PRODUCT ALIGNMENT AND REFINERY PROJECT · PROJECT SCOPE RAW SUGAR REFINE SUGAR-RAW HOUSE UPGRADE 640 to 700TCH - BOILER UPGRADE MCR 160 to 185TPH - NEW REFINERY 90,000 t/year

Steel Structures 1225 t

Piping 13 km

STEEL & PIPING SUPPLYRAW HOUSE UPGRADE

BOILER UPGRADE

REFINERY BUILDING

Page 9: NAKAMBALA PRODUCT ALIGNMENT AND REFINERY PROJECT · PROJECT SCOPE RAW SUGAR REFINE SUGAR-RAW HOUSE UPGRADE 640 to 700TCH - BOILER UPGRADE MCR 160 to 185TPH - NEW REFINERY 90,000 t/year

Press Water ClarifierRotary Screens x 2

Juice Heaters BuildingJuice Heaters x 4

Reject Condensate Vessels

Juice Heater Condensate Receiver

Mill Intercarriers Refurbishment

Mud TankMud Mixer

Filtrate Receiving & Seal Tanks

Juice Splitter Box

STEEL, PIPING & MECHANICAL INSTALLATIONRAW HOUSE UPGRADE

Page 10: NAKAMBALA PRODUCT ALIGNMENT AND REFINERY PROJECT · PROJECT SCOPE RAW SUGAR REFINE SUGAR-RAW HOUSE UPGRADE 640 to 700TCH - BOILER UPGRADE MCR 160 to 185TPH - NEW REFINERY 90,000 t/year

STEEL, PIPING & MECHANICAL INSTALLATIONRAW HOUSE UPGRADE

Mud Filters x 2 & AccessoriesJuice Clarifier

85m³ Continuous Vacuum PanCondenser

V3 & V4 Condensate Flash Vessel

Lime Prep Tank‘A’ Vacuum Seed Receiver

‘A’ Molasses Conditioning Tank

‘B’ Molasses Conditioning Tank

HSL 2 CVP ‘A’ Seal Tank

Page 11: NAKAMBALA PRODUCT ALIGNMENT AND REFINERY PROJECT · PROJECT SCOPE RAW SUGAR REFINE SUGAR-RAW HOUSE UPGRADE 640 to 700TCH - BOILER UPGRADE MCR 160 to 185TPH - NEW REFINERY 90,000 t/year

Belt Conveyors x 3

Slat Conveyors.

STEEL, PIPING & MECHANICAL INSTALLATIONBAGASSE HANDLING

Page 12: NAKAMBALA PRODUCT ALIGNMENT AND REFINERY PROJECT · PROJECT SCOPE RAW SUGAR REFINE SUGAR-RAW HOUSE UPGRADE 640 to 700TCH - BOILER UPGRADE MCR 160 to 185TPH - NEW REFINERY 90,000 t/year

Venturi Scrubber

Swirl Tank

ID Fans

STEEL, PIPING & MECHANICAL INSTALLATIONBOILER UPGRADE

Page 13: NAKAMBALA PRODUCT ALIGNMENT AND REFINERY PROJECT · PROJECT SCOPE RAW SUGAR REFINE SUGAR-RAW HOUSE UPGRADE 640 to 700TCH - BOILER UPGRADE MCR 160 to 185TPH - NEW REFINERY 90,000 t/year

Melting, Carbonatation & Sulphitation

Flue Gas CompressorsSeparator Vessel

Vacuum Batch Pan x 2New Strike Receivers x 3

CentrifugalReject MelterSugar Dryer

Bucket ElevatorsScrew ConveyorsLump & Oversize Vibrating Screens

Lump BreakerPacking Machines x 2

STEEL, PIPING & MECHANICAL INSTALLATIONREFINERY

Page 14: NAKAMBALA PRODUCT ALIGNMENT AND REFINERY PROJECT · PROJECT SCOPE RAW SUGAR REFINE SUGAR-RAW HOUSE UPGRADE 640 to 700TCH - BOILER UPGRADE MCR 160 to 185TPH - NEW REFINERY 90,000 t/year

Shell StrakesPenthouse Floor

ComponentsAir Distribution Cone

Silo OutfeedSugar Distributer

Vibrating Conveyor

STEEL, PIPING & MECHANICAL INSTALLATIONCONDITIONING SILO

Page 15: NAKAMBALA PRODUCT ALIGNMENT AND REFINERY PROJECT · PROJECT SCOPE RAW SUGAR REFINE SUGAR-RAW HOUSE UPGRADE 640 to 700TCH - BOILER UPGRADE MCR 160 to 185TPH - NEW REFINERY 90,000 t/year

SITE AMENITIES

WELLFARE FACILITIES

Site CampSite Office & StoresLaydown & Site Buffer Area

Birthday CelebrationCulture & Nature TripFestivalsCelebrating AchievementsSports CompetitionCricket, Volley Ball & Football

MANPOWER 335 Expatriate Skills Labour250 Local Labour50 Management Staff

PLANT & MACHINERY

MOBILISATION

SITE TEAM MANAGEMENT STRUCTURE

Imported from Mauritius

Page 16: NAKAMBALA PRODUCT ALIGNMENT AND REFINERY PROJECT · PROJECT SCOPE RAW SUGAR REFINE SUGAR-RAW HOUSE UPGRADE 640 to 700TCH - BOILER UPGRADE MCR 160 to 185TPH - NEW REFINERY 90,000 t/year

MOBILISATIONMANPOWER :335 Expatriate Skills Labour250 Local Labour50 Management Staff

Page 17: NAKAMBALA PRODUCT ALIGNMENT AND REFINERY PROJECT · PROJECT SCOPE RAW SUGAR REFINE SUGAR-RAW HOUSE UPGRADE 640 to 700TCH - BOILER UPGRADE MCR 160 to 185TPH - NEW REFINERY 90,000 t/year

MOBILISATIONSITE AMNITIES :Laydown & Site Buffer AreaSite CampSite Office & Stores

Page 18: NAKAMBALA PRODUCT ALIGNMENT AND REFINERY PROJECT · PROJECT SCOPE RAW SUGAR REFINE SUGAR-RAW HOUSE UPGRADE 640 to 700TCH - BOILER UPGRADE MCR 160 to 185TPH - NEW REFINERY 90,000 t/year

MOBILISATIONWELLFARE FACILITIES :Birthday CelebrationCulture & Nature TripFestivalsCelebrating AchievementsSports CompetitionCricket, Volley Ball & Football

Page 19: NAKAMBALA PRODUCT ALIGNMENT AND REFINERY PROJECT · PROJECT SCOPE RAW SUGAR REFINE SUGAR-RAW HOUSE UPGRADE 640 to 700TCH - BOILER UPGRADE MCR 160 to 185TPH - NEW REFINERY 90,000 t/year

HEALTH,SAFETY &PERFORMANCEACCOMPLISHMENTS

TOOLBOX TALKSPPE

MEDICAL FACILITYEFFECTIVE H&SMANAGEMENT

CERTIFICATE OF ACHIEVEMENT:

1.1 MILLION MAN HOURS

PERFORMANCE APPRAISAL FROM

CLIENT :

“ Very Good leaning to excellent ”

Page 20: NAKAMBALA PRODUCT ALIGNMENT AND REFINERY PROJECT · PROJECT SCOPE RAW SUGAR REFINE SUGAR-RAW HOUSE UPGRADE 640 to 700TCH - BOILER UPGRADE MCR 160 to 185TPH - NEW REFINERY 90,000 t/year

FORGES TARDIEU LtdPO Box 20, 31 Nicolay Road, Port Louis, Republic of MauritiusTel +230 206 52 00Fax +230 240 71 59Email [email protected] www.forgestardieu.com

Phot

os a

nd il

lust

rati

ons

cont

aine

d in

thi

s do

cum

ent

are

info

rmat

ive

& n

on-c

ontr

actu

al.

MO

RE

INFO

RM

ATI

ON

ON

WW

W.F

OR

GES

TAR

DIE

U.C

OM

ART

DIR

ECTI

ON

& D

ESIG

NTH

EIDEA

SSTO

RE.M

U