ASTM F1642 / GSA TS01 TEST REPORT Report No.: D0074.01-119-12 Rendered to: KINGSPAN LIGHT AND AIR LLC Santa Ana, CA PRODUCT TYPE: Polycarbonate Aluminum Curb Mounted Skylight SERIES: Tufflite MODEL: HWHS SPECIFICATIONS: ASTM F1642-04, Standard Test Method for Glazing and Glazing Systems Subject to Airblast Loading and GSA-TS01-2003, US General Services Administration Standard Test Method for Glazing and Window Systems Subject to Dynamic Overpressure Loadings This report contains in its entirety: Cover Page: 1 page Report Body: 9 pages Test Facility: 1 page Pressure-Time Plots: 8 pages Photographs: 7 pages Drawings: 3 pages Test Dates: 09/11/13 Through: 10/24/13 Report Date: 11/26/13 Test Record Retention Date: 11/26/17 Revision 2: 11/22/16 130 Derry Court York, PA 17406 p. 717.764.7700 f. 717.764.4129 www.archtest.com www.intertek.com/building

Upload: others

Post on 20-Oct-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

  • ASTM F1642 / GSA TS01

    TEST REPORT

    Report No.: D0074.01-119-12

    Rendered to:

    KINGSPAN LIGHT AND AIR LLC

    Santa Ana, CA

    PRODUCT TYPE:

    Polycarbonate Aluminum Curb Mounted Skylight

    SERIES: Tufflite

    MODEL: HWHS

    SPECIFICATIONS: ASTM F1642-04, Standard Test Method for Glazing and

    Glazing Systems Subject to Airblast Loading

    and

    GSA-TS01-2003, US General Services Administration Standard Test Method for

    Glazing and Window Systems Subject to Dynamic Overpressure Loadings

    This report contains in its entirety:

    Cover Page: 1 page

    Report Body: 9 pages

    Test Facility: 1 page

    Pressure-Time Plots: 8 pages

    Photographs: 7 pages

    Drawings: 3 pages

    Test Dates: 09/11/13

    Through: 10/24/13

    Report Date: 11/26/13

    Test Record Retention Date: 11/26/17

    Revision 2: 11/22/16

    130 Derry CourtYork, PA 17406

    p. 717.764.7700f. 717.764.4129

    www.archtest.com www.intertek.com/building

  • Summary of Results

    Title Summary of Results

    Specimen Tufflite HWHS

    ASTM Hazard Rating No Break

    GSA Performance Condition 1

    Average Peak Reflected Pressure 6.21 psi

    Average Positive Phase Impulse 34 psi-msec

    Average Positive Phase Duration 9.82 msec

    Reference must be made to Report No. D0074.01-119-12-R2, dated 11/22/16 for complete test

    specimen description and detailed test results.

    130 Derry CourtYork, PA 17406

    p. 717.764.7700f. 717.764.4129

    www.archtest.com www.intertek.com/building

  • Report No.: D0074.01-119-12

    Report Date: 11/26/13

    Test Record Retention Date: 11/26/17

    Revision 2: 11/22/16

    Page 1 of 9

    1.0 Report Issued To: Kingspan Light and Air LLC 401 E. Goetz Avenue

    Santa Ana, California 92707

    2.0 Test Laboratory: Intertek-Architectural Testing, Inc. ("Intertek-ATI") 130 Derry Court

    York, Pennsylvania 17406

    717-764-7700

    3.0 Project Summary:

    3.1 Product Type: Polycarbonate Aluminum Curb Mounted Skylight

    3.2 Series: Tufflite

    3.3 Model: HWHS

    3.4 Compliance Statement: Results obtained are tested values and were secured by using the designated test methods. This report does not constitute certification of this product

    nor an opinion or endorsement by this laboratory. It is the exclusive property of the client

    so named herein and relates only to the specimens tested. This report may not be

    reproduced, except in full, without the written approval of Architectural Testing, Inc., an

    Intertek company ("Intertek-ATI").

    3.5 Test Dates: 09/11/2013 - 10/24/2013

    3.6 Test Facility: Intertek-ATI's shock tube is housed in a 10,000 square foot state-of-the-art test facility located in York, Pennsylvania. Blast loadings are produced on the

    specimen to simulate the effects of a high explosive charge at a specified standoff

    distance. Shock waves are generated by the sudden rupturing of a thin aluminum

    membrane. The shock wave expands as it travels down the tube, and impacts the target

    with a specific positive pressure and impulse. A photograph of the shock tube is provided

    in Figure #1 of Appendix A.

    3.7 Test Sample Source: The test specimens were provided by the client. Representative samples of the test specimen will be retained by Intertek-ATI for a minimum of four years

    from the test completion date.

    3.8 Drawing Reference: The test specimen drawings have been reviewed by Intertek-ATI and are representative of the test specimen reported herein. Test specimen construction

    was verified by Intertek-ATI per the drawings located in Appendix D. Any deviations

    are documented herein or on the drawings.

  • Report No.: D0074.01-119-12

    Report Date: 11/26/13

    Test Record Retention Date: 11/26/17

    Revision 2: 11/22/16

    Page 2 of 9

    3.0 Project Summary: (Continued)

    3.9 Data Acquisition: In accordance with ASTM F1642-04 and GSA TS01, four reflective pressure transducers are utilized to record data at a 1MHz sample rate. Two reflective

    pressure transducers are located on the specimen holder at the top and right side (when

    viewed from the interior). A third pressure transducer is located on the shell to the

    exterior of the specimen, and a fourth is located in the witness chamber, directly to the

    interior of the specimen holder. A sketch of the specimen holder and corresponding

    reflective pressure sensor locations are provided in Figure #2 of Appendix A.

    3.10 List of Official Observers:

    Name Company

    Emily C. Riley Intertek-ATI

    Joshua I. Scott Intertek-ATI

    Joseph A. Reed, P.E. Intertek-ATI

    Steven A. Neff Intertek-ATI

    4.0 Test Specifications:

    ASTM F1642-04, Standard Test Method for Glazing and Glazing Systems Subject to Airblast

    Loading

    ASTM F2912-11, Standard Specification for Glazing and Glazing Systems Subject to Airblast

    Loading

    GSA-TS01-2003, US General Services Administration Standard Test Method for Glazing and

    Window Systems Subject to Dynamic Overpressure Loadings

  • Report No.: D0074.01-119-12

    Report Date: 11/26/13

    Test Record Retention Date: 11/26/17

    Revision 2: 11/22/16

    Page 3 of 9

    5.0 Test Specimen Description

    5.1 Product Sizes:

    Measured Dimensions Width

    (inches)

    Height

    (inches)

    Overall size 65-1/2 77-1/2

    Fixed Day Lite Opening 63-3/4 73-3/4

    5.2 Glazing:

    Glass Type Interior

    Lite

    Exterior

    Lite

    Glazing

    Bite

    Polycarbonate Dome 0.090" thick white

    polycarbonate

    0.115" thick clear

    polycarbonate 1-1/2"

    Spacer: No spacer system was utilized

    Glazing Method: Glazing was set onto a santoprene rubber gasket and secured in place

    using an extruded aluminum retainer cap. The retainer cap was set onto a bed of silicone

    and secured through the glazing using #10-14 x 1" long self-tapping hex head screws

    with neoprene-backed washers located 3" from corners and spaced 6"on center.

    5.3 Frame Construction:

    Frame Member Material Description

    Curb frame Aluminum Extruded

    Retainer cap Aluminum

    Extruded, secured to frame members using

    #10-20 x 3/8" long self-tapping hex head screws

    located 6" from corners and spaced 6" on center.

    Joinery Type Detail

    All corners Mitered Welded

    6.0 Installation: The specimen was installed into a Spruce-Pine-Fir wood buck.

    Location Anchor Description Anchor Location

    Aluminum

    curb frame

    #10 x 1-1/4" Phillips

    flat head screws

    Located 3" from corners and spaced 6"

    on center through aluminum curb frame

    into wood test buck

  • Report No.: D0074.01-119-12

    Report Date: 11/26/13

    Test Record Retention Date: 11/26/17

    Revision 2: 11/22/16

    Page 4 of 9

    7.0 Test Results: The results are tabulated as follows.

    Test Specimen #1:

    Description Results

    Ambient Temperature 90 °F

    Glazing Temperature 91 °F

    ASTM Hazard Rating Very Low Hazard

    GSA Performance Condition 5

    Peak Positive Pressure

    Top Pressure 6.64 psi

    Right Pressure 6.66 psi

    Shell Pressure 6.58 psi

    Average Pressure 6.62 psi

    Witness Chamber Pressure 0.93 psi

    Peak Positive Phase Duration

    Top Duration 10.62 msec

    Right Duration 10.64 msec

    Shell Duration 9.24 msec

    Average Duration 10.16 msec

    Peak Positive Phase Impulse

    Top Impulse 37 psi*msec

    Right Impulse 36 psi*msec

    Shell Impulse 36 psi*msec

    Average Impulse 36 psi*msec

    Glazing Response

    Exterior Lite Unbroken

    Interior Lite Unbroken

    Glazing Pullout

    Length and Location

    Top: 29 in

    Side: 73-3/4 in

    Bottom: 40 in

    Glazing Tearing None

    Witness Chamber Results

    There were three perforations on the witness panel located at heights of

    50-1/4 in, 66 in and 67 in. The floor of the witness chamber had pieces of the

    skylight glazing located at 24 in, 53 in, 69-1/4 in, 72 in, 86 in and 118 in.

    Pressure-time plots are presented in Appendix B. Pre-test and post-test photographs are

    provided in Appendix C.

  • Report No.: D0074.01-119-12

    Report Date: 11/26/13

    Test Record Retention Date: 11/26/17

    Revision 2: 11/22/16

    Page 5 of 9

    7.0 Test Results: (Continued)

    Test Specimen #2:

    Description Results

    Ambient Temperature 65 °F

    Glazing Temperature 65 °F

    ASTM Hazard Rating No Break

    GSA Performance Condition 1

    Peak Positive Pressure

    Top Pressure 6.15 psi

    Right Pressure 6.70 psi

    Shell Pressure 5.96 psi

    Average Pressure 6.27 psi

    Witness Chamber Pressure 0.64 psi

    Peak Positive Phase Duration

    Top Duration 9.95 msec

    Right Duration 10.10 msec

    Shell Duration 9.27 msec

    Average Duration 9.77 msec

    Peak Positive Phase Impulse

    Top Impulse 33 psi*msec

    Right Impulse 33 psi*msec

    Shell Impulse 33 psi*msec

    Average Impulse 33 psi*msec

    Glazing Response

    Exterior Lite Unbroken

    Interior Lite Unbroken

    Glazing Pullout

    Length and Location None

    Glazing Tearing None

    Witness Chamber Results

    No debris was observed.

    Pressure-time plots are presented in Appendix B. Pre-test and post-test photographs are

    provided in Appendix C.

  • Report No.: D0074.01-119-12

    Report Date: 11/26/13

    Test Record Retention Date: 11/26/17

    Revision 2: 11/22/16

    Page 6 of 9

    7.0 Test Results: (Continued)

    Test Specimen #3:

    Description Results

    Ambient Temperature 66 °F

    Glazing Temperature 66 °F

    ASTM Hazard Rating No Break

    GSA Performance Condition 1

    Peak Positive Pressure

    Top Pressure 6.53 psi

    Right Pressure 6.47 psi

    Shell Pressure 6.32 psi

    Average Pressure 6.44 psi

    Witness Chamber Pressure 0.72 psi

    Peak Positive Phase Duration

    Top Duration 10.24 msec

    Right Duration 9.82 msec

    Shell Duration 8.90 msec

    Average Duration 9.65 msec

    Peak Positive Phase Impulse

    Top Impulse 35 psi*msec

    Right Impulse 34 psi*msec

    Shell Impulse 34 psi*msec

    Average Impulse 35 psi*msec

    Glazing Response

    Exterior Lite Unbroken

    Interior Lite Unbroken

    Glazing Pullout

    Length and Location None

    Glazing Tearing None

    Witness Chamber Results

    No debris was observed.

    Pressure-time plots are presented in Appendix B. Pre-test and post-test photographs are

    provided in Appendix C.

  • Report No.: D0074.01-119-12

    Report Date: 11/26/13

    Test Record Retention Date: 11/26/17

    Revision 2: 11/22/16

    Page 7 of 9

    7.0 Test Results: (Continued)

    Test Specimen #4:

    Description Results

    Ambient Temperature 62 °F

    Glazing Temperature 60 °F

    ASTM Hazard Rating No Break

    GSA Performance Condition 1

    Peak Positive Pressure

    Top Pressure 5.46 psi

    Right Pressure 5.62 psi

    Shell Pressure 5.44 psi

    Average Pressure 5.51 psi

    Witness Chamber Pressure 0.62 psi

    Peak Positive Phase Duration

    Top Duration 9.81 msec

    Right Duration 9.83 msec

    Shell Duration 9.39 msec

    Average Duration 9.68 msec

    Peak Positive Phase Impulse

    Top Impulse 32 psi*msec

    Right Impulse 31 psi*msec

    Shell Impulse 32 psi*msec

    Average Impulse 32 psi*msec

    Glazing Response

    Exterior Lite Unbroken

    Interior Lite Unbroken

    Glazing Pullout

    Length and Location None

    Glazing Tearing None

    Witness Chamber Results

    No debris was observed.

    Pressure-time plots are presented in Appendix B. Pre-test and post-test photographs are

    provided in Appendix C.

  • Report No.: D0074.01-119-12

    Report Date: 11/26/13

    Test Record Retention Date: 11/26/17

    Revision 2: 11/22/16

    Page 8 of 9

    Intertek-ATI will service this report for the entire test record retention period. Test records that

    are retained such as detailed drawings, datasheets, representative samples of test specimens, or

    other pertinent project documentation will be retained by Intertek-ATI for the entire test record

    retention period.

    Results obtained are tested values and were secured using the designated test methods. This report

    does not constitute certification of this product nor an opinion or endorsement by this laboratory.

    It is the exclusive property of the client so named herein and relates only to the specimens tested.

    This report may not be reproduced, except in full, without the written approval of Intertek-ATI.

    For ARCHITECTURAL TESTING, INC.:

    Steven A. Neff Joseph A. Reed, P.E.

    Technician Director - Engineering

    SAN:cmd:jar/jas

    Attachments (pages): This report is complete only when all attachments listed are included.

    Appendix A: Test Facility (1)

    Appendix B: Pressure-Time Plots (8)

    Appendix C: Photographs (7)

    Appendix D: Drawings (3)

  • Report No.: D0074.01-119-12

    Report Date: 11/26/13

    Test Record Retention Date: 11/26/17

    Revision 2: 11/22/16

    Page 9 of 9

    Revision Log

    Rev. # Date Page(s) Revision(s)

    0 11/26/13 N/A Original report issue

    1 11/10/16 Cover, 1 Changed company name per client's

    request

    2 11/22/16 1 Updated company address per client's

    request

    This report produced from controlled document template ATI 00368, issued 06/08/12.

  • Report No.: D0074.01-119-12

    Report Date: 11/26/13

    Test Record Retention Date: 11/26/17

    Revision 1: 11/22/16

    APPENDIX A

    Test Facility

  • Report No.: D0074.01-119-12

    Report Date: 11/26/13

    Test Record Retention Date: 11/26/17

    Revision 1: 11/22/16

    Figure #1

    Shock Tube and Test Facility

    Figure #2

    Pressure Sensor Locations

  • Report No.: D0074.01-119-12

    Report Date: 11/26/13

    Test Record Retention Date: 11/26/17

    Revision 1: 11/22/16

    APPENDIX B

    Pressure-Time Plots

  • Report No.: D0074.01-119-12

    Report Date: 11/26/13

    Test Record Retention Date: 11/26/17

    Revision 1: 11/22/16

    Specimen #1

  • Report No.: D0074.01-119-12

    Report Date: 11/26/13

    Test Record Retention Date: 11/26/17

    Revision 1: 11/22/16

    Specimen #1: (Continued)

  • Report No.: D0074.01-119-12

    Report Date: 11/26/13

    Test Record Retention Date: 11/26/17

    Revision 1: 11/22/16

    Specimen #2

  • Report No.: D0074.01-119-12

    Report Date: 11/26/13

    Test Record Retention Date: 11/26/17

    Revision 1: 11/22/16

    Specimen #2: (Continued)

  • Report No.: D0074.01-119-12

    Report Date: 11/26/13

    Test Record Retention Date: 11/26/17

    Revision 1: 11/22/16

    Specimen #3

  • Report No.: D0074.01-119-12

    Report Date: 11/26/13

    Test Record Retention Date: 11/26/17

    Revision 1: 11/22/16

    Specimen #3: (Continued)

  • Report No.: D0074.01-119-12

    Report Date: 11/26/13

    Test Record Retention Date: 11/26/17

    Revision 1: 11/22/16

    Specimen #4

  • Report No.: D0074.01-119-12

    Report Date: 11/26/13

    Test Record Retention Date: 11/26/17

    Revision 1: 11/22/16

    Specimen #4: (Continued)

  • Report No.: D0074.01-119-12

    Report Date: 11/26/13

    Test Record Retention Date: 11/26/17

    Revision 1: 11/22/16

    APPENDIX C

    Photographs

  • Report No.: D0074.01-119-12

    Report Date: 11/26/13

    Test Record Retention Date: 11/26/17

    Revision 1: 11/22/16

    Photo No. 1

    Pre-Test Specimen #1, Interior

    Photo No. 2

    Post-Test Specimen #1, Witness Chamber

  • Report No.: D0074.01-119-12

    Report Date: 11/26/13

    Test Record Retention Date: 11/26/17

    Revision 1: 11/22/16

    Photo No. 3

    Post-Test Specimen #1, Interior

  • Report No.: D0074.01-119-12

    Report Date: 11/26/13

    Test Record Retention Date: 11/26/17

    Revision 1: 11/22/16

    Photo No. 4

    Pre-Test Specimen #2, Interior

    Photo No. 5

    Post-Test Specimen #2, Interior

  • Report No.: D0074.01-119-12

    Report Date: 11/26/13

    Test Record Retention Date: 11/26/17

    Revision 1: 11/22/16

    Photo No. 6

    Post-Test Specimen #2, Witness Chamber

    Photo No. 7

    Pre-Test Specimen #3, Interior

  • Report No.: D0074.01-119-12

    Report Date: 11/26/13

    Test Record Retention Date: 11/26/17

    Revision 1: 11/22/16

    Photo No. 8

    Post-Test Specimen #3, Interior

    Photo No. 9

    Post-Test Specimen #3, Witness Chamber

  • Report No.: D0074.01-119-12

    Report Date: 11/26/13

    Test Record Retention Date: 11/26/17

    Revision 1: 11/22/16

    Photo No. 10

    Pre-Test Specimen #4, Interior

    Photo No. 11

    Post-Test Specimen #4, Interior

  • Report No.: D0074.01-119-12

    Report Date: 11/26/13

    Test Record Retention Date: 11/26/17

    Revision 1: 11/22/16

    Photo No. 12

    Post-Test Specimen #4, Witness Chamber

  • Report No.: D0074.01-119-12

    Report Date: 11/26/13

    Test Record Retention Date: 11/26/17

    Revision 1: 11/22/16

    APPENDIX D

    Drawings

  • 2016-11-22T12:11:52-0500Steven Neff

    2016-11-22T15:14:37-0500Joseph Reed

    2016-11-22T15:16:02-0500Joseph Reed

    2016-11-22T15:15:19-0500Joseph Reed

    2016-11-22T15:15:51-0500Joseph Reed

    2016-11-22T10:41:06-0500Julie Shilke