nafs - myskylightshop · astm f1642 / gsa ts01 test report report no.:d0074.01-119-12 rendered to:...
TRANSCRIPT
-
ASTM F1642 / GSA TS01
TEST REPORT
Report No.: D0074.01-119-12
Rendered to:
KINGSPAN LIGHT AND AIR LLC
Santa Ana, CA
PRODUCT TYPE:
Polycarbonate Aluminum Curb Mounted Skylight
SERIES: Tufflite
MODEL: HWHS
SPECIFICATIONS: ASTM F1642-04, Standard Test Method for Glazing and
Glazing Systems Subject to Airblast Loading
and
GSA-TS01-2003, US General Services Administration Standard Test Method for
Glazing and Window Systems Subject to Dynamic Overpressure Loadings
This report contains in its entirety:
Cover Page: 1 page
Report Body: 9 pages
Test Facility: 1 page
Pressure-Time Plots: 8 pages
Photographs: 7 pages
Drawings: 3 pages
Test Dates: 09/11/13
Through: 10/24/13
Report Date: 11/26/13
Test Record Retention Date: 11/26/17
Revision 2: 11/22/16
130 Derry CourtYork, PA 17406
p. 717.764.7700f. 717.764.4129
www.archtest.com www.intertek.com/building
-
Summary of Results
Title Summary of Results
Specimen Tufflite HWHS
ASTM Hazard Rating No Break
GSA Performance Condition 1
Average Peak Reflected Pressure 6.21 psi
Average Positive Phase Impulse 34 psi-msec
Average Positive Phase Duration 9.82 msec
Reference must be made to Report No. D0074.01-119-12-R2, dated 11/22/16 for complete test
specimen description and detailed test results.
130 Derry CourtYork, PA 17406
p. 717.764.7700f. 717.764.4129
www.archtest.com www.intertek.com/building
-
Report No.: D0074.01-119-12
Report Date: 11/26/13
Test Record Retention Date: 11/26/17
Revision 2: 11/22/16
Page 1 of 9
1.0 Report Issued To: Kingspan Light and Air LLC 401 E. Goetz Avenue
Santa Ana, California 92707
2.0 Test Laboratory: Intertek-Architectural Testing, Inc. ("Intertek-ATI") 130 Derry Court
York, Pennsylvania 17406
717-764-7700
3.0 Project Summary:
3.1 Product Type: Polycarbonate Aluminum Curb Mounted Skylight
3.2 Series: Tufflite
3.3 Model: HWHS
3.4 Compliance Statement: Results obtained are tested values and were secured by using the designated test methods. This report does not constitute certification of this product
nor an opinion or endorsement by this laboratory. It is the exclusive property of the client
so named herein and relates only to the specimens tested. This report may not be
reproduced, except in full, without the written approval of Architectural Testing, Inc., an
Intertek company ("Intertek-ATI").
3.5 Test Dates: 09/11/2013 - 10/24/2013
3.6 Test Facility: Intertek-ATI's shock tube is housed in a 10,000 square foot state-of-the-art test facility located in York, Pennsylvania. Blast loadings are produced on the
specimen to simulate the effects of a high explosive charge at a specified standoff
distance. Shock waves are generated by the sudden rupturing of a thin aluminum
membrane. The shock wave expands as it travels down the tube, and impacts the target
with a specific positive pressure and impulse. A photograph of the shock tube is provided
in Figure #1 of Appendix A.
3.7 Test Sample Source: The test specimens were provided by the client. Representative samples of the test specimen will be retained by Intertek-ATI for a minimum of four years
from the test completion date.
3.8 Drawing Reference: The test specimen drawings have been reviewed by Intertek-ATI and are representative of the test specimen reported herein. Test specimen construction
was verified by Intertek-ATI per the drawings located in Appendix D. Any deviations
are documented herein or on the drawings.
-
Report No.: D0074.01-119-12
Report Date: 11/26/13
Test Record Retention Date: 11/26/17
Revision 2: 11/22/16
Page 2 of 9
3.0 Project Summary: (Continued)
3.9 Data Acquisition: In accordance with ASTM F1642-04 and GSA TS01, four reflective pressure transducers are utilized to record data at a 1MHz sample rate. Two reflective
pressure transducers are located on the specimen holder at the top and right side (when
viewed from the interior). A third pressure transducer is located on the shell to the
exterior of the specimen, and a fourth is located in the witness chamber, directly to the
interior of the specimen holder. A sketch of the specimen holder and corresponding
reflective pressure sensor locations are provided in Figure #2 of Appendix A.
3.10 List of Official Observers:
Name Company
Emily C. Riley Intertek-ATI
Joshua I. Scott Intertek-ATI
Joseph A. Reed, P.E. Intertek-ATI
Steven A. Neff Intertek-ATI
4.0 Test Specifications:
ASTM F1642-04, Standard Test Method for Glazing and Glazing Systems Subject to Airblast
Loading
ASTM F2912-11, Standard Specification for Glazing and Glazing Systems Subject to Airblast
Loading
GSA-TS01-2003, US General Services Administration Standard Test Method for Glazing and
Window Systems Subject to Dynamic Overpressure Loadings
-
Report No.: D0074.01-119-12
Report Date: 11/26/13
Test Record Retention Date: 11/26/17
Revision 2: 11/22/16
Page 3 of 9
5.0 Test Specimen Description
5.1 Product Sizes:
Measured Dimensions Width
(inches)
Height
(inches)
Overall size 65-1/2 77-1/2
Fixed Day Lite Opening 63-3/4 73-3/4
5.2 Glazing:
Glass Type Interior
Lite
Exterior
Lite
Glazing
Bite
Polycarbonate Dome 0.090" thick white
polycarbonate
0.115" thick clear
polycarbonate 1-1/2"
Spacer: No spacer system was utilized
Glazing Method: Glazing was set onto a santoprene rubber gasket and secured in place
using an extruded aluminum retainer cap. The retainer cap was set onto a bed of silicone
and secured through the glazing using #10-14 x 1" long self-tapping hex head screws
with neoprene-backed washers located 3" from corners and spaced 6"on center.
5.3 Frame Construction:
Frame Member Material Description
Curb frame Aluminum Extruded
Retainer cap Aluminum
Extruded, secured to frame members using
#10-20 x 3/8" long self-tapping hex head screws
located 6" from corners and spaced 6" on center.
Joinery Type Detail
All corners Mitered Welded
6.0 Installation: The specimen was installed into a Spruce-Pine-Fir wood buck.
Location Anchor Description Anchor Location
Aluminum
curb frame
#10 x 1-1/4" Phillips
flat head screws
Located 3" from corners and spaced 6"
on center through aluminum curb frame
into wood test buck
-
Report No.: D0074.01-119-12
Report Date: 11/26/13
Test Record Retention Date: 11/26/17
Revision 2: 11/22/16
Page 4 of 9
7.0 Test Results: The results are tabulated as follows.
Test Specimen #1:
Description Results
Ambient Temperature 90 °F
Glazing Temperature 91 °F
ASTM Hazard Rating Very Low Hazard
GSA Performance Condition 5
Peak Positive Pressure
Top Pressure 6.64 psi
Right Pressure 6.66 psi
Shell Pressure 6.58 psi
Average Pressure 6.62 psi
Witness Chamber Pressure 0.93 psi
Peak Positive Phase Duration
Top Duration 10.62 msec
Right Duration 10.64 msec
Shell Duration 9.24 msec
Average Duration 10.16 msec
Peak Positive Phase Impulse
Top Impulse 37 psi*msec
Right Impulse 36 psi*msec
Shell Impulse 36 psi*msec
Average Impulse 36 psi*msec
Glazing Response
Exterior Lite Unbroken
Interior Lite Unbroken
Glazing Pullout
Length and Location
Top: 29 in
Side: 73-3/4 in
Bottom: 40 in
Glazing Tearing None
Witness Chamber Results
There were three perforations on the witness panel located at heights of
50-1/4 in, 66 in and 67 in. The floor of the witness chamber had pieces of the
skylight glazing located at 24 in, 53 in, 69-1/4 in, 72 in, 86 in and 118 in.
Pressure-time plots are presented in Appendix B. Pre-test and post-test photographs are
provided in Appendix C.
-
Report No.: D0074.01-119-12
Report Date: 11/26/13
Test Record Retention Date: 11/26/17
Revision 2: 11/22/16
Page 5 of 9
7.0 Test Results: (Continued)
Test Specimen #2:
Description Results
Ambient Temperature 65 °F
Glazing Temperature 65 °F
ASTM Hazard Rating No Break
GSA Performance Condition 1
Peak Positive Pressure
Top Pressure 6.15 psi
Right Pressure 6.70 psi
Shell Pressure 5.96 psi
Average Pressure 6.27 psi
Witness Chamber Pressure 0.64 psi
Peak Positive Phase Duration
Top Duration 9.95 msec
Right Duration 10.10 msec
Shell Duration 9.27 msec
Average Duration 9.77 msec
Peak Positive Phase Impulse
Top Impulse 33 psi*msec
Right Impulse 33 psi*msec
Shell Impulse 33 psi*msec
Average Impulse 33 psi*msec
Glazing Response
Exterior Lite Unbroken
Interior Lite Unbroken
Glazing Pullout
Length and Location None
Glazing Tearing None
Witness Chamber Results
No debris was observed.
Pressure-time plots are presented in Appendix B. Pre-test and post-test photographs are
provided in Appendix C.
-
Report No.: D0074.01-119-12
Report Date: 11/26/13
Test Record Retention Date: 11/26/17
Revision 2: 11/22/16
Page 6 of 9
7.0 Test Results: (Continued)
Test Specimen #3:
Description Results
Ambient Temperature 66 °F
Glazing Temperature 66 °F
ASTM Hazard Rating No Break
GSA Performance Condition 1
Peak Positive Pressure
Top Pressure 6.53 psi
Right Pressure 6.47 psi
Shell Pressure 6.32 psi
Average Pressure 6.44 psi
Witness Chamber Pressure 0.72 psi
Peak Positive Phase Duration
Top Duration 10.24 msec
Right Duration 9.82 msec
Shell Duration 8.90 msec
Average Duration 9.65 msec
Peak Positive Phase Impulse
Top Impulse 35 psi*msec
Right Impulse 34 psi*msec
Shell Impulse 34 psi*msec
Average Impulse 35 psi*msec
Glazing Response
Exterior Lite Unbroken
Interior Lite Unbroken
Glazing Pullout
Length and Location None
Glazing Tearing None
Witness Chamber Results
No debris was observed.
Pressure-time plots are presented in Appendix B. Pre-test and post-test photographs are
provided in Appendix C.
-
Report No.: D0074.01-119-12
Report Date: 11/26/13
Test Record Retention Date: 11/26/17
Revision 2: 11/22/16
Page 7 of 9
7.0 Test Results: (Continued)
Test Specimen #4:
Description Results
Ambient Temperature 62 °F
Glazing Temperature 60 °F
ASTM Hazard Rating No Break
GSA Performance Condition 1
Peak Positive Pressure
Top Pressure 5.46 psi
Right Pressure 5.62 psi
Shell Pressure 5.44 psi
Average Pressure 5.51 psi
Witness Chamber Pressure 0.62 psi
Peak Positive Phase Duration
Top Duration 9.81 msec
Right Duration 9.83 msec
Shell Duration 9.39 msec
Average Duration 9.68 msec
Peak Positive Phase Impulse
Top Impulse 32 psi*msec
Right Impulse 31 psi*msec
Shell Impulse 32 psi*msec
Average Impulse 32 psi*msec
Glazing Response
Exterior Lite Unbroken
Interior Lite Unbroken
Glazing Pullout
Length and Location None
Glazing Tearing None
Witness Chamber Results
No debris was observed.
Pressure-time plots are presented in Appendix B. Pre-test and post-test photographs are
provided in Appendix C.
-
Report No.: D0074.01-119-12
Report Date: 11/26/13
Test Record Retention Date: 11/26/17
Revision 2: 11/22/16
Page 8 of 9
Intertek-ATI will service this report for the entire test record retention period. Test records that
are retained such as detailed drawings, datasheets, representative samples of test specimens, or
other pertinent project documentation will be retained by Intertek-ATI for the entire test record
retention period.
Results obtained are tested values and were secured using the designated test methods. This report
does not constitute certification of this product nor an opinion or endorsement by this laboratory.
It is the exclusive property of the client so named herein and relates only to the specimens tested.
This report may not be reproduced, except in full, without the written approval of Intertek-ATI.
For ARCHITECTURAL TESTING, INC.:
Steven A. Neff Joseph A. Reed, P.E.
Technician Director - Engineering
SAN:cmd:jar/jas
Attachments (pages): This report is complete only when all attachments listed are included.
Appendix A: Test Facility (1)
Appendix B: Pressure-Time Plots (8)
Appendix C: Photographs (7)
Appendix D: Drawings (3)
-
Report No.: D0074.01-119-12
Report Date: 11/26/13
Test Record Retention Date: 11/26/17
Revision 2: 11/22/16
Page 9 of 9
Revision Log
Rev. # Date Page(s) Revision(s)
0 11/26/13 N/A Original report issue
1 11/10/16 Cover, 1 Changed company name per client's
request
2 11/22/16 1 Updated company address per client's
request
This report produced from controlled document template ATI 00368, issued 06/08/12.
-
Report No.: D0074.01-119-12
Report Date: 11/26/13
Test Record Retention Date: 11/26/17
Revision 1: 11/22/16
APPENDIX A
Test Facility
-
Report No.: D0074.01-119-12
Report Date: 11/26/13
Test Record Retention Date: 11/26/17
Revision 1: 11/22/16
Figure #1
Shock Tube and Test Facility
Figure #2
Pressure Sensor Locations
-
Report No.: D0074.01-119-12
Report Date: 11/26/13
Test Record Retention Date: 11/26/17
Revision 1: 11/22/16
APPENDIX B
Pressure-Time Plots
-
Report No.: D0074.01-119-12
Report Date: 11/26/13
Test Record Retention Date: 11/26/17
Revision 1: 11/22/16
Specimen #1
-
Report No.: D0074.01-119-12
Report Date: 11/26/13
Test Record Retention Date: 11/26/17
Revision 1: 11/22/16
Specimen #1: (Continued)
-
Report No.: D0074.01-119-12
Report Date: 11/26/13
Test Record Retention Date: 11/26/17
Revision 1: 11/22/16
Specimen #2
-
Report No.: D0074.01-119-12
Report Date: 11/26/13
Test Record Retention Date: 11/26/17
Revision 1: 11/22/16
Specimen #2: (Continued)
-
Report No.: D0074.01-119-12
Report Date: 11/26/13
Test Record Retention Date: 11/26/17
Revision 1: 11/22/16
Specimen #3
-
Report No.: D0074.01-119-12
Report Date: 11/26/13
Test Record Retention Date: 11/26/17
Revision 1: 11/22/16
Specimen #3: (Continued)
-
Report No.: D0074.01-119-12
Report Date: 11/26/13
Test Record Retention Date: 11/26/17
Revision 1: 11/22/16
Specimen #4
-
Report No.: D0074.01-119-12
Report Date: 11/26/13
Test Record Retention Date: 11/26/17
Revision 1: 11/22/16
Specimen #4: (Continued)
-
Report No.: D0074.01-119-12
Report Date: 11/26/13
Test Record Retention Date: 11/26/17
Revision 1: 11/22/16
APPENDIX C
Photographs
-
Report No.: D0074.01-119-12
Report Date: 11/26/13
Test Record Retention Date: 11/26/17
Revision 1: 11/22/16
Photo No. 1
Pre-Test Specimen #1, Interior
Photo No. 2
Post-Test Specimen #1, Witness Chamber
-
Report No.: D0074.01-119-12
Report Date: 11/26/13
Test Record Retention Date: 11/26/17
Revision 1: 11/22/16
Photo No. 3
Post-Test Specimen #1, Interior
-
Report No.: D0074.01-119-12
Report Date: 11/26/13
Test Record Retention Date: 11/26/17
Revision 1: 11/22/16
Photo No. 4
Pre-Test Specimen #2, Interior
Photo No. 5
Post-Test Specimen #2, Interior
-
Report No.: D0074.01-119-12
Report Date: 11/26/13
Test Record Retention Date: 11/26/17
Revision 1: 11/22/16
Photo No. 6
Post-Test Specimen #2, Witness Chamber
Photo No. 7
Pre-Test Specimen #3, Interior
-
Report No.: D0074.01-119-12
Report Date: 11/26/13
Test Record Retention Date: 11/26/17
Revision 1: 11/22/16
Photo No. 8
Post-Test Specimen #3, Interior
Photo No. 9
Post-Test Specimen #3, Witness Chamber
-
Report No.: D0074.01-119-12
Report Date: 11/26/13
Test Record Retention Date: 11/26/17
Revision 1: 11/22/16
Photo No. 10
Pre-Test Specimen #4, Interior
Photo No. 11
Post-Test Specimen #4, Interior
-
Report No.: D0074.01-119-12
Report Date: 11/26/13
Test Record Retention Date: 11/26/17
Revision 1: 11/22/16
Photo No. 12
Post-Test Specimen #4, Witness Chamber
-
Report No.: D0074.01-119-12
Report Date: 11/26/13
Test Record Retention Date: 11/26/17
Revision 1: 11/22/16
APPENDIX D
Drawings
-
2016-11-22T12:11:52-0500Steven Neff
2016-11-22T15:14:37-0500Joseph Reed
2016-11-22T15:16:02-0500Joseph Reed
2016-11-22T15:15:19-0500Joseph Reed
2016-11-22T15:15:51-0500Joseph Reed
2016-11-22T10:41:06-0500Julie Shilke