Signature and Seal of Contractor 1 NABARD NEW DELHI REGIONAL OFFICE NABARD TOWER 24, RAJENDRA PLACE, NEW DELHI INVITES TENDER FOR CIVIL, INTERIOR FURNISHING, ELECTRICAL WORKS OF GROUND FLOOR OF NABARD TOWER AT 24, RAJENDRA PLACE, NEW DELHI (RENOVATION WORKS) Pre-bid meeting :- 11:00 AM on 01 March 2019 Last date of submission of sealed tender :- 08 March 2019 by 11.00 AM Opening of technical bid:- 08 March 2019 at 11.30 AM CLIENT: ARCHITECT: General Manager/Officer-In Charge Geotech Technical Associates Pvt. Ltd. NABARD, New Delhi Regional Office B-04, Amrapali Princely Estate, NABARD Tower, Sector 76, Noida-201301 24, Rajendra Place Phone: 9818938150, 910297218 New Delhi - 110125

Upload: others

Post on 14-Jun-2020

20 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: NABARD NEW DELHI REGIONAL OFFICE NABARD TOWER 24, …€¦ · signature and seal of contractor 1 nabard new delhi regional office nabard tower 24, rajendra place, new delhi invites

Signature and Seal of Contractor 1

NABARD NEW DELHI REGIONAL OFFICE

NABARD TOWER

24, RAJENDRA PLACE, NEW DELHI

INVITES

TENDER FOR CIVIL, INTERIOR FURNISHING, ELECTRICAL WORKS OF

GROUND FLOOR OF NABARD TOWER AT 24, RAJENDRA PLACE,

NEW DELHI

(RENOVATION WORKS)

Pre-bid meeting :- 11:00 AM on 01 March 2019

Last date of submission of sealed tender :- 08 March 2019 by 11.00 AM

Opening of technical bid:- 08 March 2019 at 11.30 AM

CLIENT: ARCHITECT:

General Manager/Officer-In Charge Geotech Technical Associates Pvt. Ltd.

NABARD, New Delhi Regional Office B-04, Amrapali Princely Estate,

NABARD Tower, Sector 76, Noida-201301

24, Rajendra Place Phone: 9818938150, 910297218

New Delhi - 110125

Page 2: NABARD NEW DELHI REGIONAL OFFICE NABARD TOWER 24, …€¦ · signature and seal of contractor 1 nabard new delhi regional office nabard tower 24, rajendra place, new delhi invites

Signature and Seal of Contractor 2

Table of Contents

Page No.

Notice inviting tender 3-4

Eligibility Criteria 5-9

Tender Document Issuing Letter 10

Letter for submitting tender 11

Instruction to tenderers 12-14

General conditions of contract 15-31

Special conditions of contract 32-35

Safety Code 36

Specifications 37

Agreement 38-40

Forwarding Letter 41-42

Annexures 43-48

List of Approved Make 49-50

Integrity Pact 51-56

Price Bid Summary 57

Price Bid 58-72

Drawings 73-74

Page 3: NABARD NEW DELHI REGIONAL OFFICE NABARD TOWER 24, …€¦ · signature and seal of contractor 1 nabard new delhi regional office nabard tower 24, rajendra place, new delhi invites

Signature and Seal of Contractor 3

NOTICE INVITING TENDER

1. NABARD invites sealed tenders in 2 bid Format for Civil, Interior Furnishing and Electrical Works for Renovation of Ground Floor at NABARD Tower, New Delhi from the eligible Empanelled contractors for above works.

2. The blank tender forms can be obtained from NABARD Tower, New Delhi Regional Office, 24, Rajendra Place, New Delhi- 110125 between 9:30 AM to 05.00 PM from 15/02/2019 to 08/03/2019 on payment of FRS. 500/- (Rs. Five hundred only) in cash or by pay order/ Demand Draft, non-refundable, payable at New Delhi, in favour of NABARD or can be down loaded from Bank's web site http://www.nabard.org and the said payment can be made along with tender submission.

3. The tenderer should study all the tender documents, specifications, drawings carefully and understand the same before quoting the rates. In case of any doubts he/ they should get it clarified AGM, 4th Floor, NABARD Tower, New Delhi Regional Office, 24, Rajendra Place, New Delhi110125 (Contact:- 9654503688,9643270383) but this shall not be a justification for late submission of tender or extension of opening date.

4. The tenderer should visit the site and get acquainted with the site conditions before quoting

5. The tenderer should quote his rates for all the items in the tender schedule. The incomplete tender can be summarily rejected at the discretion of the Bank's Management. If there is any discrepancy in rate and amount the unit rate shall be treated as correct.

6. The tenderer is requested to sign and put his seal on each page of the tender document in token of acceptance of the conditions.

7. The rates quoted shall be valid for a period of 90 days for acceptance from the last day of submission of tender. No upward revision in the rates will be accepted after opening of the tenders.

8. The time for completion of the work is 75 DAYS from the 1st day of issue of work order or handing over of site whichever is earlier.

9. The sealed tenders should be addressed & submitted to The General Manager/ Officer- In Charge, NABARD Tower, New Delhi Regional Office, 24, Rajendra Place, New Delhi- 110125 super scribed with 'Tender for Civil, Interior Furnishing and Electrical Works for Renovation of Ground Floor at NABARD tower, New Delhi' and should reach them not later than 11 AM on 08.03.2019. Tenders submitted late will not be accepted. Tenders shall be submitted in 2 bid format as below:

10. Pre-bid meeting will be held on 01.03.2019 at 11:00 AM to sought out any queries arising after going through Tender document thoroughly.

PART "A" ELIGIBILITY CRITERIA, EMD, TENDER FEE & TECHNICAL BID Shall contain Documents related to eligibility criteria duly signed and stamped and along with the

earnest money in required format.

Part "B" (In envelope marked) - FINANCIAL BID (A separate Document)

Financial Bids will be opened only of those firms which are found eligible in Part A

Page 4: NABARD NEW DELHI REGIONAL OFFICE NABARD TOWER 24, …€¦ · signature and seal of contractor 1 nabard new delhi regional office nabard tower 24, rajendra place, new delhi invites

Signature and Seal of Contractor 4

10. Earnest Money Deposit (EMD) of Rs. 66,000.00 (Rupees Sixty Six Thousand Only) for Civil, Interior Furnishing and Electrical Works for Renovation of Ground Floor at NABARD tower, New Delhi shall be deposited with the bank in the form of pay order/ Demand Draft payable at New Delhi in the

Signature and Seal of Contractor 3 name of 'NABARD' to be converted into Security Deposit for the successful Tenderer. EMD of the unsuccessful Tenderers shall be refunded immediately after the Bank's decision.

11. The tenders will be opened at 11:30 A.M. on 08.03.2019.

12. The Bank reserves the right to accept any tender or reject all tenders either in whole or in part without assigning any reason thereof. The Bank also reserves the right to split the various items amongst various Tenderers and any claim or correspondence of the Tenderer in this regard shall not be entertained.

(Naveen Dhingra)

Deputy General M

NABARD, New Delhi

NABARD Tower, 24,

New Delhi - 110125

Page 5: NABARD NEW DELHI REGIONAL OFFICE NABARD TOWER 24, …€¦ · signature and seal of contractor 1 nabard new delhi regional office nabard tower 24, rajendra place, new delhi invites

Signature and Seal of Contractor 5

ELIGIBILITY CRITERIA/ DOCUMENTS REQUIRED

The eligibility criteria/ documents required are as follows:

1. Work order and completion certificate of one work of Rs. 26.4 lacs or 2 works of 16.5 lacs or 3

works of 13.2 lacs each in last three years preferably for NABARD/ other PSUs or PSBs with cut off date as 30.11.2018 for works executed in NCR.

2. Tenderer should have GST registration No.

3. Valid PAN No.

4. Turnover of last 03 years i.e. upto March 2018(Minimum financial turnover of Rs. 50.0 lacs for

the past three financial years each) certified by Chartered Accountants.

5. Contractor/ firm should be empanelled with NABARD for category above 10.0 lacs and must have their well established office/ branch office in Delhi- NCR.

6. Tenderer should have sufficient workforce/ machinery/ equipments for carrying out the works.

7. Affidavit on Rs. 100/- stamp paper as per follows:

“Certified that the above information is correct to the best of our knowledge and no relevant information is concealed. If at any time during or after the appointment, it is proved that the information furnished by us is wrong, NABARD shall have the liberty to take necessary action against our firm as per applicable laws/ rules of the land.” 8. Contractors shall sign an Integrity Pact on non-Judicial Stamp paper of Rs.200.00 and

submit the same along with Technical Bid document to the bank

Page 6: NABARD NEW DELHI REGIONAL OFFICE NABARD TOWER 24, …€¦ · signature and seal of contractor 1 nabard new delhi regional office nabard tower 24, rajendra place, new delhi invites

Signature and Seal of Contractor 6

DETAILS OF APPLICANT

1. Name of the organization/ Contractor/ Firm and name of the person authorized.

:

2. Address for correspondence Phone No. (a) Landline with STD code (b) Mobile (c) Email-ID, (d) Fax No.

:

3. Year of establishment & in the line of activity since

:

4. Status of the firm whether company/firm/ proprietary/partnership

:

5. Name of Directors/ Partners/ Proprietor :

6. Whether registered with the Registrar of Companies/ Registrar of firms. If so, mention number and date.

:

7. Name and address of Bankers (enclose solvency certificate from Bankers).

:

8. Whether registered for GST. If so, mention number and date and copies of certificates.

:

9. Whether an assessee of Income Tax. If so, mention PAN number. (Furnish copy of PAN card)

:

10. If, you are registered in the panel of other organizations/ statutory bodies such as CPWD, PWD, MES, Banks, furnish their Names, category and date of registration

:

11. Detailed description and value of works done during the last 5 years, as per the criteria given as on 30.11.2018 (i.e. name of organization, value of work done and date of completion along with performance certificate from client)

:

12. Annual turnover for the last 3 years as on 30.11.2018. Attach certificate from the Chartered Accountant.

:

13. Declaration regarding near relatives working in the Bank: I hereby confirm that all information, particulars, copies of certificates and testimonials in connection with my empanelment are correct and genuine. I am, therefore, liable to face appropriate actions as deemed fit by the Bank in the event of any of the information, particulars, copies of certificates and testimonials are not found correct and genuine.

Special Note:- The firms not having valid GST number as on last date of submission of application will not be considered. Signature with Seal of the contractor Place: Name: Date: Note: Furnish Xerox certified copies of all relevant documents in support of the information furnished above.

Page 7: NABARD NEW DELHI REGIONAL OFFICE NABARD TOWER 24, …€¦ · signature and seal of contractor 1 nabard new delhi regional office nabard tower 24, rajendra place, new delhi invites

Signature and Seal of Contractor 7

ANNEXURE-1

PARTICULARS IN RESPECT OF WORKS EXECUTED FOR THE LAST 05 YEARS AS ON 30-03-2018

Sr.No.

Name of work/ Project with address

Contract Amount

Description of work executed

Name and address of the client with contact person and his details

Nature of work

Date of award of work

Period of completion

Actual time of completion

Name & address of Architect

Yearly turn-over

1 2 3 4 5 6 7 8 9 10 11

Please attach evidence like copy of letter for award of work given by the client/ Architect. Please also attach photographs, if any.

Page 8: NABARD NEW DELHI REGIONAL OFFICE NABARD TOWER 24, …€¦ · signature and seal of contractor 1 nabard new delhi regional office nabard tower 24, rajendra place, new delhi invites

Signature and Seal of Contractor 8

ANNEXURE-II PARTICULARS IN RESPECT OF WORKS IN HAND FOR THE LAST 5 YEARS

AS ON 31-03-2018

Sr.No.

Name of work/ project with address

Contract Amount

Description of work executed

Name and address of the client with contact person and his details

Nature of work

Date of award of work

Period of completion

Actual time of completion

Name & address of Architect

Yearly turn-over

1 2 3 4 5 6 7 8 9 10 11

Please attach evidence like copy of letter for award of work given by the client/ Architect. Please also attach photographs, if any.

Page 9: NABARD NEW DELHI REGIONAL OFFICE NABARD TOWER 24, …€¦ · signature and seal of contractor 1 nabard new delhi regional office nabard tower 24, rajendra place, new delhi invites

Signature and Seal of Contractor 9

ANNEXURE-III OTHER RELEVANT INFORMATION

Sr.No.

Particulars No. Year with the firm

Any other information

1 Work force/ technical personnel permanently employed with their qualification and experience etc.

2 List of major constructional equipment in possession of the firm including testing of material expertise/ facilities etc.

Page 10: NABARD NEW DELHI REGIONAL OFFICE NABARD TOWER 24, …€¦ · signature and seal of contractor 1 nabard new delhi regional office nabard tower 24, rajendra place, new delhi invites

Signature and Seal of Contractor

10

TENDER DOCUMENT ISSUING LETTER

LETTER ISSUING TENDER FOR CIVIL, INTERIOR FURNISHING, ELECTRICAL WORKS OF

GROUND FLOOR OF NABARD TOWER AT RAJENDRA PLACE, NEW DELHI

This tender document set for the Civil, Interior Furnishing and Electrical Works for Renovation of

Ground Floor at NABARD tower, New Delhi is issued.

Name of Tenderer:

Address of Tenderer:

The non refundable fee for this set of Tender Document is Rs. 500/-.

The Tender Document is issued on

For

NABARD

Page 11: NABARD NEW DELHI REGIONAL OFFICE NABARD TOWER 24, …€¦ · signature and seal of contractor 1 nabard new delhi regional office nabard tower 24, rajendra place, new delhi invites

Signature and Seal of Contractor

11

LETTER FOR SUBMITTING TENDER

To,

General Manager/Officer-In Charge

4th Floor, NABARD Tower,

New Delhi Regional Office,

24, Rajendra Place, New Delhi- 110125

Dear Sir,

This is in reference to the tender invited by you for the work. I/ We hereby offer to execute the work

under contract at the respective rates mentioned in the schedule of quantities.

I/ We have seen the site, understood the general conditions of contract, special conditions, additional

conditions.

I/ We agree to execute the work as per specifications, general conditions of contract, special conditions,

and additional conditions.

I/ We deposit earnest money Rs. 66,000.00 by demand draft/ pay order in favour of NABARD payable

at New Delhi which shall not carry any interest. I/ We do hereby agree that the sum shall be forfeited

by the bank in the event our tender is accepted & I/ We fail to execute the contract as per tender terms

and conditions.

I/ We understand that you are not bound to accept the lowest or any other tender that you receive.

Yours faithfully,

(Contractor)

Signature of Partner/ Propreitor of the firm

In the presence of our witness

Name:

Address: Place:

Page 12: NABARD NEW DELHI REGIONAL OFFICE NABARD TOWER 24, …€¦ · signature and seal of contractor 1 nabard new delhi regional office nabard tower 24, rajendra place, new delhi invites

Signature and Seal of Contractor 12

INSTRUCTIONS TO THE TENDERERS

1.0 Scope of work 1. Sealed tenders are invited by NABARD for the work of “Civil, Interior Furnishing and Electrical

Works for Renovation of Ground Floor at NABARD tower, New Delhi”.

1.1 Site and its location

The proposed work is to be carried out at Ground Floor, NABARD, New Delhi.

2.0 Tender documents 2.1 The work has to be carried out strictly according to the conditions stipulated in the tender

consisting the following documents in the most workman like manner. 2.2 The above documents shall be taken as complementary and mutually explanatory of one another but in case of ambiguities or discrepancies, shall take precedence in the order given below: a) Price Bid b) Specifications c) Drawings d) Special conditions of Contract e) General conditions of contract f) Instructions to Tenderers 2.3 The tender documents are not transferable.

3.0 Site Visit 3.1 The tenderer must obtain himself on his own responsibility and his own expenses all information and data which may be required for the purpose of filling this tender document and enter into a contract for the satisfactory performance of the work. The tenderer is requested to satisfy himself regarding the availability of water, power, transport and communication facilities, the character quality and quantity of the materials, labour, the law and order situation, climatic conditions local authorities requirement, traffic regulations etc. The tenderer will be fully responsible for considering the financial effect of any or all the factors while submitting his tender.

4.0 Earnest Money 4.1 The tenderers are requested to submit the Earnest Money of Rs. 66,000/- in the form of Demand

Draft or Banker's Cheque in favour of NABARD payable at New Delhi drawn on any Bank. 4.2 EMD in any other form other than as specified above will not be accepted. Tender not accompanied by the EMD in accordance with clause 4.1 above shall be rejected. 4.3 No interest will be paid on the EMD. 4.4 EMD of unsuccessful tenderers will be refunded after the award of Contract. EMD of successful

tenderer will be retained as a part of total security deposit.

5.0 Mobilisation Advance

Page 13: NABARD NEW DELHI REGIONAL OFFICE NABARD TOWER 24, …€¦ · signature and seal of contractor 1 nabard new delhi regional office nabard tower 24, rajendra place, new delhi invites

Signature and Seal of Contractor 13

5.1 No mobilisation advance shall be paid. Further, no amount shall be released against supply/ storage of material on site of NABARD without its execution/ installation and testing of the equipment.

5.2 Bills of all the items to be utilised in the project must be available in original and in duplicate for submitting to the bank for checking/ verification and record purpose.

6.0 Total Security Deposit 6.1 Total security deposit shall be 5 % of contract value which includes the EMD. The total security

deposit would be refunded back to the contractor after the defects liability period as specified in the contract.

6.2 No interest shall be paid on the amount retained by the Bank as Security Deposit.

7.0 Signing of contract Documents The successful tenderer shall be bound to implement the contract by signing an agreement and conditions of contract attached herewith within 10 days from the receipt of work order by the

Bank. However, the written acceptance of the tender by the Bank will constitute a binding agreement between the Bank and successful tenderer.

8.0 Completion Period

Time is essence of the contract. The work should be completed in all respects in accordance with the terms of contract within a period of 75 days from the date of handing over of site or from the date of receipt of letter of acceptance whichever is earlier.

9.0 Validity of tender Tenders shall remain valid and open for acceptance for a period of three months from the date of opening of price bid. lf the tenderer withdraws his/ her offer during the validity period or makes modifications in his/ her original offer which are not acceptable to the Bank without prejudice to any other right-or remedy the Bank shall be at liberty to forfeit the EMD.

10.0 Liquidated Damages The liquidated damages shall be 0.25% per week subject to a maximum of 5% of total contract value.

11.0 Rate and prices: 11.1 In case of item rate tender 11.1.1 The tenderers shall quote their rates for individual items both in words and figures in case of

discrepancy between the rates quoted in words and figures the unit rate quoted in words will prevail. If no rate is quoted for a particular item then for arriving at the total quoted sum by the tenderer, the highest quoted rate for the particular item amongst all tenderers shall be considered. In such case, if the tenderer still becomes lowest then he shall be awarded the work and shall not be paid for that item when it is executed.

The amount of each item shall be calculated and the requisite total is given. In case of discrepancy between the unit rate and the total amount calculated from multiplication of unit rate and the quantity the unit rate quoted-will govern and the amount will be corrected. In case, only amount is quoted then unit rate shall be derived by dividing the quoted amount by quantity.

Page 14: NABARD NEW DELHI REGIONAL OFFICE NABARD TOWER 24, …€¦ · signature and seal of contractor 1 nabard new delhi regional office nabard tower 24, rajendra place, new delhi invites

Signature and Seal of Contractor 14

11.1.2 The tenderers need not quote their rates for which no quantities have been given. In case the tenderers quote their rates for such items those rates will be ignored and will not be considered during execution. 11.1.3 The tenderers should not change the units as specified in the tender. If any unit is changed the tenders would be evaluated as per the original unit and the contractor would be paid accordingly. The tenderer should not change or modify or delete the description of the item. If any discrepancy is observed he should immediately bring to the knowledge of the Architect/ Bank. 11.1.4 Each page of the BOQ shall be signed by the authorised person and cutting or overwriting shall be duly attested by him. 11.1.5 Each page shall be totalled and the grand total shall be given. 11.1.6 The rate quoted shall be firm and shall include all costs, allowances, taxes, levies, Royalties etc. as

applicable. GST shall be payable extra. Taxes like TDS etc. shall be deducted from the bills of the contractor as per prevailing rates. In case of any exemption, the contractor shall submit requisite certificates from the respective department in advance.

11.1.7 GST shall be payable over and above the quoted rates (as applicable from time to time). The

contractor must have registration No. with GST and will provide copy of Registration to NABARD before release of any payment by the Bank. The contractor will submit regular Challans/ Invoices fulfilling all conditions of GST Rules amended from time to time. In case of any failure in timely submission of the same, the bank shall have without prejudice to any other rights or remedy available under any of the clauses of contract, full powers to deduct/ recover the sum(s) found fit from any amount due/ payable or any security deposit available at his disposal.

Page 15: NABARD NEW DELHI REGIONAL OFFICE NABARD TOWER 24, …€¦ · signature and seal of contractor 1 nabard new delhi regional office nabard tower 24, rajendra place, new delhi invites

Signature and Seal of Contractor 15

GENERAL CONDITIONS OF CONTRACT

1.0 Definitions: Contract means the documents forming the tender and the acceptance thereof and the formal agreement executed between NABARD (client) and the contractor, together with the documents referred therein including these conditions, the specifications, designs, drawings and instructions issued from time to time by the architects/ Bank and all these documents taken together shall be deemed to form one contract and shall be complementary to one another. 1.1 In the contract the following expressions shall, unless the context otherwise requires, have the meaning hereby respectively assigned to them.

1.1.1 'NABARD' shall mean NABARD (client) having its Head Office at B.K.C. Bandra (East), Mumbai

and Regional Office at New Delhi and any of it’s employees representatives authorized on their

behalf.

'Architects/ Consultants' shall mean M/s Geotech Technical Associates Pvt. Ltd. having its registered office at 7, Mahamanapuri Colony, ITI Road, Varanasi- 221005.

1.1.2 'The Contractor' shall mean the individual or firm or company whether incorporated or not, undertaking the works and shall include legal personal representative of such individual or those comprising the firm or company and the permitted assignees of such individual or firms or company. The expression works or 'work' shall mean the permanent or temporary work described in the "Scope of work” and/ or to be executed in accordance with the contract and includes materials, apparatus, equipment, temporary supports, fittings and things of all kinds to be provided, the obligations of the contractor hereunder and work to be done by the contractor under the contract. 1.1.3 'Engineer' shall mean the Engineer appointed by the Bank. 1.1.4 'Drawings' shall mean the drawings prepared by the Architects and issued by the Engineer and referred to in the specifications and any modifications of such drawings as may be issued by the Engineer from time to time. Contract value shall mean the value of the entire work as stipulated in the letter of acceptance of tender subject to such additions thereto or deductions there from as may be made under the provision herein after contained. 1.1.5 'Specifications' shall mean the specifications referred to in the tender and any modifications thereof as may time to time be furnished or approved by the architect/ consultant. 1.1.6 'Month' means calendar month. 1.1.7 'Week' means seven consecutive days. 1.1.8 'Day' means a calendar day beginning and ending at 00 Hrs and 24 Hrs respectively.

CLAUSE 1.0 Total Security Deposit Total Security deposit comprises of

Page 16: NABARD NEW DELHI REGIONAL OFFICE NABARD TOWER 24, …€¦ · signature and seal of contractor 1 nabard new delhi regional office nabard tower 24, rajendra place, new delhi invites

Signature and Seal of Contractor 16

Earnest Money Deposit and Retention Money

a) Earnest Money Deposit

The tenderer shall furnish EMD of Rs. 66,000/- in the form of Demand draft drawn in favour of NABARD, payable at New Delhi on any Scheduled Bank. No tender shall be considered unless the EMD is so deposited in the required form. No interest shall be paid on this EMD. The EMD of the unsuccessful tenderer shall be refunded soon after the decision to award the contract is taken without interest. The EMD shall stand absolutely forfeited if the tenderer revokes his tender at any time the period when he is required to keep his tender open acceptance by the NABARD or after it is accepted by the NABARD the contractor fails to enter into a formal agreement or fails to pay the initial security deposit as stipulated or fails to commence the commence the work within the stipulated time.

b) Retention Money

Besides the EMD as deposited by the contractor in the above said manner the remaining Security Deposit which will be 5% of Contract amount. The successful bidder has to submit balance amount of Security Deposit within 10 days of issue of work order. The EMD plus Retention Money shall both together not exceed 5 % of the contract value. The total security deposit shall be refunded to the contractors without interest after the end of defects liability period provided the contractor has satisfactorily attended to all defects in accordance with the conditions of contract including site clearance.

2.0 Language The language in which the contract documents shall be drawn shall be in English.

3.0 Errors, omissions and discrepancies In case of errors, omissions and/ or disagreement between written and scaled dimensions on the drawings or between the drawings and specifications etc., the following order shall apply.

i. Between scaled and written dimension (or description) on a drawing, the latter shall be adopted.

ii. Between the written or shown description or dimensions in the drawings and the corresponding one in the specification the former shall be taken as correct.

iii. Between written description of the item in the specifications and descriptions in bills of

quantities of the same item, the former shall be adopted. a) In case of difference between rates written in figures and words, the rate in words shall prevail. b) Between the duplicate/ subsequent copies of the tender, the original tender shall be taken as correct.

4.0 Scope of work

The contractor shall completely carry out and maintain the said work in every respect in strict accordance with this contract and with the directions of and to the satisfaction of the Bank to be communicated through the architect/ consultant. The architect/ consultant at the directions of the

Page 17: NABARD NEW DELHI REGIONAL OFFICE NABARD TOWER 24, …€¦ · signature and seal of contractor 1 nabard new delhi regional office nabard tower 24, rajendra place, new delhi invites

Signature and Seal of Contractor 17

Bank from time to time issue further drawings and/ or written instructions, details directions and explanations which are hereafter collectively referred to as Architect's/ consultant's instructions in regard to the variation or modification of the design, quality or quantity of work or the addition or omission or substitution of any work. Any discrepancy in the drawings or between the BOQ and/ or drawings and/ or specifications shall be brought in notice of the architect/ consultant. The removal from the site of any material brought thereon by the Contractor and any substitution of any other materials therefore the removal and/ or re-execution of any work executed by him. The dismissal from the work of any person employed/ engaged thereupon.

5.0 i) Letter of Acceptance Within the validity period of the tender the Bank shall issue a letter of acceptance either directly or otherwise depositing at the address of the contractor as given in the tender to enter into a Contract for the execution of the work as per the terms of the tender. The letter of acceptance shall constitute a binding contract between the NABARD and the contractor.

ii) Contract Agreement On receipt of intimation of the acceptance/ work order of tender from the NABARD, the successful tenderer shall be bound to implement the contract and within 10 days thereof he shall sign an agreement in a non-judicial stamp paper of appropriate value.

6.0 Ownership of drawings

All drawings, specifications and copies thereof furnished by the NABARD through its architects/ consultants are the properties of the NABARD. They are not to be used on other work.

7.0 Detailed drawings and instructions The NABARD through its architects/ consultants shall furnish with reasonable promptness additional instructions by means of drawings or otherwise necessary for the proper execution of the work. All such drawings and instructions shall be consistent with the contract documents, true developments thereof and reasonably inferable there from. The work shall be executed in conformity therewith and the contractor prepare a detailed programme schedule indicating therein the date of start and completion of various activities on receipt of the work order and submit the same to the NABARD through the architect/ consultant.

8.0 Copies of agreement One copy of agreement duly signed by both the parties with the drawings shall be handed over to the contractors.

9.0 Liquidated damages

lf the contractor fails to maintain the required progress in terms of Detailed drawings and instructions as stipulated in clause 7.0 of General Conditions of Contract or to complete the work and clear the site including vacating their office on or before the contracted or extended date or completion without justification in support of the cause of delay, he may be called upon without prejudice to any other right of remedy available under the law to the NABARD on account of such breach to pay a liquidated damages at the rate of 0.25% of the contract value per week subject to a maximum of 5% of the contract value as stipulated in Clause no. 10 under Instructions to the tenderers.

10.0 Materials, Appliances and Employees

Page 18: NABARD NEW DELHI REGIONAL OFFICE NABARD TOWER 24, …€¦ · signature and seal of contractor 1 nabard new delhi regional office nabard tower 24, rajendra place, new delhi invites

Signature and Seal of Contractor 18

Unless or otherwise specified the contractor shall provide and pay for all materials, labour, tools; equipment transportation and any other facilities that are required for the satisfactory execution and completion of the work. Unless or otherwise specified all materials shall be new and both workmanship and materials shall be of best quality. The contractor shall at all times enforce strict discipline and good order among his employees and shall not employ on the work any unfit person or anyone not skilled in the work assigned to him. Workman whose work or behaviour is found to be unsatisfactory by the NABARD/ architect/ consultant he shall be removed from the site immediately.

11.0 Permits, Laws and Regulations

Permits and licences required for the execution of the work shall be obtained by the contractor at his own expense. The contractor shall give notices and comply with the regulations, laws, ordinances, rules, applicable to the contract. If the contractor observes any discrepancy between the drawings and specifications, he shall promptly notify the NABARD in writing under intimation of the Architect/ Consultant. If the contractor performs any act which is against the law, rules and regulations he shall meet all the costs arising there from and shall indemnify the NABARD any legal actions arising there from.

12.0 Setting out Work The contractor shall set out the work and shall be responsible for the true and perfect setting out of the same and for the correctness of the positions, levels, dimensions, and alignment of all parts thereof and get it approved by the architect/ consultant before proceeding with the work. lf at any time any error in this respect shall appear during the progress of the works, irrespective of the fact that the layout had been approved by the architect/ consultant the contractor shall be responsible for the same and shall at his own expenses rectify such error, if so, required to the satisfaction of the NABARD.

13.0 Protection of works and property The contractor shall continuously maintain adequate protection of all his work from damage and shall protect the NABARD's properties from injury or loss arising in connection with contract. He shall make good any such damage, injury loss, except due to causes beyond his control and due to his fault or negligence.

He shall take adequate care and steps for protection of the adjacent properties. The contractor shall take all precautions for safety and protections of his employees on the works and shall comply with all applicable provisions of Govt. and local bodies safety laws and building codes to prevent accidents, or injuries to persons or property on, about or adjacent to his place of work. The contractor shall take insurance covers as per clause 26.0 at his own cost. The policy may be taken in joint names of the contractor and the NABARD and the original policy may be lodged with the NABARD.

14.0 Inspection of work

The NABARD/ Architect/ Consultant or their representatives shall at all reasonable times have free access to the work site and/ or to the workshop, factories, or other places where materials are lying or from where they are obtained and the contractor shall give every facility to the NABARD, Architect/ consultant and their representatives necessary for inspection and examination and test of the materials and workmanship. No person unless authorised by the NABARD/ Architect/ Consultant except the representative of Public authorities shall be allowed on the work at any time. The proposed work either during its construction stage or its completion can also be inspected by the Chief Technical Examiner's organisation a wing of Central Vigilance commission.

Page 19: NABARD NEW DELHI REGIONAL OFFICE NABARD TOWER 24, …€¦ · signature and seal of contractor 1 nabard new delhi regional office nabard tower 24, rajendra place, new delhi invites

Signature and Seal of Contractor 19

15.0 Assignment and subletting The whole of work included in the contract shall be executed by the contractor and he shall not directly entrust and engage or indirectly transfer, assign or underlet the contract or any part or share thereof or interest therein without the written consent of the NABARD through the architect and no undertaking shall relieve the contractor from the responsibility of the contractor from active superintendence of the work during its progress.

16.0 Quality of materials, Workmanship & Test All materials and workmanship shall be best of the respective kinds described in the contract and in accordance with Architect/ consultant instructions and shall be subject from time to time to such tests as the architect/ consultant may direct at the place of manufacture or fabrication or on the site or an approved testing laboratory. The contractor shall provide such assistance, instruments, machinery labour, and materials as are normally required for examining measuring sampling and testing any material or part of work before incorporation in the work for testing as may be selected and required by the architect/ consultant.

ii) Samples All samples of adequate numbers, size, shades & pattern as per specifications shall be supplied by the contractor without any extra charges. If certain items proposed to be used are of such nature that samples cannot be presented or prepared at the site detailed literature/ test certificate of the same shall be provided to the satisfaction of the Architect/ consultant. Before submitting the sample/ literature the contractor shall satisfy himself that the material/ equipment for which he is submitting the sample/ literature meet with the requirement of tender specification. Only when the samples are approved in writing by the architect/ consultant the contractor shall proceed with the procurement and installation of the particular material/ equipment. The approved samples shall be signed by the Architect/ Consultant for identification and shall be kept on record at site office until the completion of the work for inspection/ comparison at any time. The Architect/ Consultant shall take reasonable time to approve the sample. Any delay that might occur in approving the samples for reasons of its not meeting the specifications or other discrepancies inadequacy in furnishing samples of best qualities from various manufacturers and such other aspects causing delay on the approval of the materials/ equipment etc. shall be to the account of the contractor.

iii) Cost of tests The cost of making any test shall be borne by the contractor if such test is intended by or provided for in the specification or BOQ.

iv) Costs of tests not provided for: lf any test is ordered by the Architect/ Consultant which is either a) lf so intended by or provided for or (in the cases above mentioned) is not so particularised, or though so intended or provided for but ordered by the Architect/ Consultant to be carried out by an independent person at any place other than the site or the place of manufacture or fabrication of the materials tested or any Government/ approved laboratory, then the cost of such test shall be borne by the contractor.

17.0 Obtaining information related to execution of work

Page 20: NABARD NEW DELHI REGIONAL OFFICE NABARD TOWER 24, …€¦ · signature and seal of contractor 1 nabard new delhi regional office nabard tower 24, rajendra place, new delhi invites

Signature and Seal of Contractor 20

No claim by the contractor for additional payment shall be entertained which is consequent upon failure on his part to obtain correct information as to any matter affecting the execution of the work nor any misunderstanding or the obtaining incorrect information or the failure to obtain correct information relieve him from any risks or from the entire responsibility for the fulfilment of contract.

18.0 Contractor's superintendence The contractor shall give necessary personal superintendence during the execution of the works and as long, thereafter, as the Architect/ consultant may consider necessary until the expiry of the defects liability period, stated hereto.

19.0 Quantities

The Schedule of Quantities unless otherwise stated shall be deemed to have been prepared in accordance with the Standard Procedure of the Architects shall be considered to be approximate and subject to variation. The Employer reserves the right to execute

only a part or the whole or any excess thereof without assigning any reason thereof. The Contractor shall be deemed to have satisfied himself before tendering to the correctness and sufficiency of his tender for the works and of the prices stated in the Schedule of Quantities and/or the Schedule of Rates and Prices, which rates and prices shall cover all things necessary for the completion of the works.

20.0 Works to be measured The Architect/ Consultant may from time to time intimate to the contractor that he requires the work to be measured and the contractor shall forthwith attend or send a qualified representative to assist the Architect in taking such measurements and calculations and to furnish all particulars or to give all assistance required by any of them. Such measurements shall be taken in accordance with the Mode of measurements detailed in the specifications. The representative of the Architect/ Consultant shall take joint measurements with the contractor's representative and the measurements shall be entered in the measurement book. The contractor or his authorised representative shall sign all the pages of the measurement book in which the measurements have been recorded in token of his acceptance. All the corrections shall be duly attested by both representatives. No over writings shall be made in the M book should the contractor not attend or neglect or omit to depute his representative to take measurements then the measurements recorded by the representative of the Architect/ consultant shall be final. All authorised extra work, omissions and all variations made shall be included in such measurement.

21.0 Variations

No alteration, omission or variation ordered in writing by the Architect/ consultant shall vitiate the contract. In case the NABARD/ Architect/ Consultant thinks proper at any time during the progress of works to make any alteration in, or additions to or omissions from the works or any alteration in the kind or quality of the materials to be used therein, the Architect/ Consultant shall give notice thereof in writing to the contractor or shall confirm in writing within seven days of giving such oral instructions the contractor shall alter to, add to, or omit from as the case may be in accordance with such notice, but the contractor shall not do any work extra to or make any alterations or additions to or omissions from the works or any deviation from any of the provisions of the contract, stipulations, specifications or contract drawings without previous consent in writing of the Architect/ Consultant and the value of such extras, alterations, additions or omissions shall in all cases be

Page 21: NABARD NEW DELHI REGIONAL OFFICE NABARD TOWER 24, …€¦ · signature and seal of contractor 1 nabard new delhi regional office nabard tower 24, rajendra place, new delhi invites

Signature and Seal of Contractor 21

determined by the Architect/ Consultant and the same shall be added to or deducted from the contract value, as the case may be.

22.0 Valuation of Variations No claim for an extra shall be allowed unless it shall have been executed under the authority of the Architect/ Consultant with the concurrence of the NABARD as herein mentioned. Any such extra is herein referred to as authorised extra and shall be made in accordance with the following provisions. a) (i) The net rates or prices in the contract shall determine the valuation of the extra work where such extra work is of similar character and executed under similar conditions as the work priced herein. (ii) Rates for all items, wherever possible should be derived out of the rates given in the priced BOQ. b) The net prices of the original tender shall determine the value of the items omitted, provided if omissions do not vary the conditions under which any remaining items of works are carried out, otherwise the prices for the same shall be valued under sub-clause (c) hereunder. c) Where the extra works are not of similar character and/ or executed under similar conditions as aforesaid or where the omissions vary the conditions under which any remaining items or works are carried out, then the contractor shall within 7 days of the receipt of the letter of acceptance inform the Architect/ consultant of the rate which he intends to charge for such items of work, duly supported by analysis of the rate or rates claimed and the Architect/ consultant shall fix such rate or prices as in the circumstances in his opinion are reasonable and proper, based on the market rate. d) Where extra work cannot be properly measured or valued the contractor shall be allowed day work prices at the net rates stated in the tender of the BOQ or, if not, so stated then. In accordance with the local day work rates and wages for the district; provided that in either case, vouchers specifying the daily time (and if required by the Architect/ Consultant) the workman's name and materials employed be delivered for verifications to the Architect/ consultant at or before the end of the week following that in which the work has been executed. e) It is further clarified that for all such authorised extra items where rates cannot be derived from the tender, the Contractor shall submit rates duly supported by rate analysis worked on the "market rate" basis for material, labour, hire/ running charges of equipment and wastages etc. plus 15% towards establishment charges, contractor's overheads and profit. Such items shall not be eligible for escalation.

23.0 Final measurement The measurement and valuation in respect of the contract shall be completed within one months of the virtual completion of the work.

24.0 Virtual completion certificate (VCC) On successful completion of entire works covered by the contract to the full satisfaction of the NABARD, the contractor shall ensure that the following works have been completed to satisfaction of the NABARD: a) Clear the site of all scaffolding, wiring, pipes, surplus materials, contractor's labour, equipment and machinery.

Page 22: NABARD NEW DELHI REGIONAL OFFICE NABARD TOWER 24, …€¦ · signature and seal of contractor 1 nabard new delhi regional office nabard tower 24, rajendra place, new delhi invites

Signature and Seal of Contractor 22

b) Demolish, dismantle and remove the contractor's site office, temporary works, structures including labour sheds/ camps and construction and other items and things whatsoever brought upon or erected at the site or any land allotted to the contractor by the NABARD and not incorporated in the permanent works. c) Remove all rubbish, debris etc. from the site and the land allotted to the contractor, if any by the

NABARD and shall clear, level and dress, compact the site as required by the NABARD. d) Shall put the NABARD in undisputed custody and possession of the site and all land allotted by the NABARD. e) Shall hand over the work in a peaceful manner to the NABARD. f) All defects/ imperfections have been attended and rectified as pointed out by the NABARD to the full satisfaction of NABARD. Upon the satisfactory fulfilment by the contractor as stated above, the contractor shall be entitled to apply to the Architect/ consultant once he is satisfied of the completion of the work. Relative to which the completion certificate has been sought, the Architect/ consultant shall within fourteen (14) days of the receipt of the application for virtual completion certificate, issue a VCC in respect of the work for which the VCC has been applied. This issuance of a VCC shall be without prejudice to the NABARD's rights and contractor liabilities under the contract including the contractor's liability for defects liability period nor shall the issuance of VCC in respect of the works or work at any site be construed as a waiver of any right or claim of the NABARD against the contractor in respect of works or work at the site and in respect of which the VCC has been issued.

25.0 Work by other agencies

The NABARD/ Architect/ consultant reserves the rights to use premises and any portion of the site for execution of any work not included in the scope of this contract which it may desire to have carried out by other persons simultaneously and the contractor shall not only allow but also extend reasonable facilities for the execution of such work. The contractor however shall not be required to provide any plant or material for the execution of such work except by special arrangement with the NABARD. Such work shall be carried out in such manner as not to impede the progress of the works included in the contract.

26.0 Insurance of works

26.1 Without limiting his obligations and responsibilities under the contract the contractor shall insure in

the joint names of the NABARD and the contractor against all loss of damages from whatever cause arising other than the excepted risks, for which he is responsible under the terms of contract and in such a manner that the NABARD and contractor are covered for the period stipulated in clause of GCC and are also covered during the period of maintenance for loss or damage arising from a cause, occurring prior to the commencement of the period of maintenance and for any loss or damage occasioned by the contractor in the course of any operations carried out by him for the purpose of complying with his obligations under clause.

a) The works for the time being executed to the estimated current Contract value thereof, or such additional sum as may be specified together with the materials for incorporation in the works at their replacement value. b) The constructional plant and other things brought on to the site by the contractor to the replacement value of such constructional plant and other things.

Page 23: NABARD NEW DELHI REGIONAL OFFICE NABARD TOWER 24, …€¦ · signature and seal of contractor 1 nabard new delhi regional office nabard tower 24, rajendra place, new delhi invites

Signature and Seal of Contractor 23

c) Such insurance shall be effected with an insurer and in terms approved by the NABARD which approval shall not be unreasonably withheld and the contractor shall whenever required produce to the Architect/ consultant the policy if insurance and the receipts for payment of the current premiums. 26.2 Damage to persons and property

The contractor shall be responsible for all injury to the work or workmen, animals or things and for all damages to the structural and/or decorative part of property which may arise from the operations or neglect of himself or of any sub-contractor or of any of his or a sub-contractor’s employees, whether such injury or damage arise from carelessness, accident or any other cause whatsoever in any way connected with the carrying out of this contract. The clause shall be held to include inter-alias, any damage to building whether immediately adjacent or otherwise, and any damage to roads, streets foot paths or ways as well as damages caused to the buildings and the works forming the subject of this contract by rain, wind or other inclemency of the weather. The contractor shall indemnify the employer and hold harmless in respect of all and also in respect of any expenses arising from any such injury of damage under any acts on compensation or damage consequent upon such claim. The contractor shall reinstate all damages of every sort mentioned in this clause so as to deliver the whole of the contract works complete and perfect in every respect and so as to make good or otherwise satisfy all claims for damages to the property of third parties. The contractor shall affect the insurance necessary and indemnify the Employer entirely from all the responsibility in this respect. The original insurance policy will be with NABARD which will be jointly in the name of Employer and Contractor and the duplicate will be with the contractor. The scope of insurance is to include damage or loss to the contract itself till this is made over in a complete state, so contractor will take the CAR (Contractors all Risk Policy) for insurance equal to the amount of issued work order for this work, Insurance is compulsory and must be affected from the very initial stage. The contractor shall also be responsible for anything, which may be excluded from damage to any property arising out of incidents, negligence or defective carrying out of this contract. The Employer shall be at liberty and is hereby empowered the deduct the amount of any damages, compensations, costs, charges and expenses arising or accruing from or in respect of any such claim or damages from any sums due to or to become due to the contractor.

26.3 Contractor to indemnify NABARD

The contractor shall indemnify the NABARD against all claims, proceedings, damages, costs, charges and expenses in respect of the matters referred to in the provision sub-clause 26.2 of this clause.

26.4 Contractor's superintendence

The contractor shall fully indemnify and keep indemnified the NABARD against any action, claim, or proceeding relating to infringement or use of any patent or design or any alleged patent or design rights and shall pay any royalties which may be payable in respect of any article or part thereof included in the contract. In the event of any claim made under or action brought against NABARD in respect of such matters as aforesaid the contractor shall be immediately notified thereof and the contractor shall be at liberty, at his own expenses to settle any dispute or to conduct any litigation that may arise there from, provided that the contractor shall not be liable to indemnify the

Page 24: NABARD NEW DELHI REGIONAL OFFICE NABARD TOWER 24, …€¦ · signature and seal of contractor 1 nabard new delhi regional office nabard tower 24, rajendra place, new delhi invites

Signature and Seal of Contractor 24

NABARD if the infringement of the patent or design or any alleged patent or design right is the direct result of an order passed by the Architect/ consultant in this behalf.

26.5 Third Party Insurance 26.5.1 Before commencing the execution of the work the contractor but without limiting his obligations and

responsibilities under clause 26.0 of General Conditions of Contract shall insure against his liability for any material or physical damage, loss, or injury which may occur to any property including that of NABARD, or to any person, including any employee of the NABARD, by or arising out of the execution of the works or in the carrying out of the contract, otherwise than due to the matters referred to in the provision to clause 25.0 thereof.

26.5.2 Minimum amount of Third Party Insurance

Such insurance shall be effected with an insurer and in terms approved by the NABARD which approval shall not be reasonably withheld and for at least the amount stated below. The contractor shall, whenever required, produce to the Architect/ consultant the policy or policies of insurance cover and receipts for payment of the current premiums. 26.6 The minimum insurance cover for physical property, injury and death is Rs. 5 lacs per occurrence with the number of occurrences limited to four. After each occurrence contractor will pay additional premium necessary to make insurance valid for four occurrences always. 25.7 Accident or injury to workman 26.7.1 The NABARD shall not be liable for or in respect of any damages or compensation payable at law

in respect or in consequence of any accident or injury to any workmen or other person in the employment of the contractor or any sub-contractor, save and except an accident or injury resulting from any act or default of the NABARD or their agents, or employees. The contractor shall indemnify and keep indemnified NABARD against all such damages and compensation, save and except as aforesaid, and against all claims, proceedings, costs, charges and expenses whatsoever in respect thereof or in relation thereto.

26.7.2 Insurance against accidents etc. to workmen The contractor shall insure against such liability with an insurer approved by the NABARD during the whole of the time that any persons are employed by him on the works and shall, when required, produce to the architect/ consultant such policy of insurance and receipt for payment of the current premium. Provided always that, in respect of any persons employed by any sub- contractor the contractor's obligation to insure as aforesaid under this sub-clause shall be satisfied if the sub-contractor shall have insured against the liability in respect of such persons in such manner that NABARD is indemnified under the policy but the contractor shall require such sub- contractor to produce to the Architect/ consultant when such policy of insurance and the receipt for the payment of the current premium. 26.7.3 Remedy on contractor's failure to insure

If the contractor fails to effect and keep in force the insurance referred to above or any other insurance which he may be required to effect under the terms of contract, then and in any such case the NABARD may effect and keep in force any such insurance and pay such premium or premiums as may be necessary for that purpose and from time to time deduct the amount so paid by the NABARD as aforesaid from any amount due or which may become due to the contractor, or recover the same as debt from the contractor.

Page 25: NABARD NEW DELHI REGIONAL OFFICE NABARD TOWER 24, …€¦ · signature and seal of contractor 1 nabard new delhi regional office nabard tower 24, rajendra place, new delhi invites

Signature and Seal of Contractor 25

Without prejudice to the others rights of the NABARD against contractors in respect of such default, the employer shall be entitled to deduct from any sums payable to the contractor the amount of any damages costs, charges, and other expenses paid by the NABARD and which are payable by the contractors under this clause. The contractor shall upon settlement by the insurer of any claim made against the insurer pursuant to a policy taken under this clause, proceed with due diligence to rebuild or repair the works destroyed or damaged. In this event all the monies received from the insurer in respect of such damage shall be paid to the contractor and the Contractor shall not be entitled to any further payment in respect of the expenditure incurred for rebuilding or repairing of the materials or goods destroyed or damaged.

27.0 Commencement of Works

The date of the work will be reckoned as the date of handing over site or from the date of issue of letter of acceptance of the tender by the NABARD whichever is earlier.

28.0 Time for completion

Time is essence of the contract and shall be strictly observed by the contractor. The entire work shall be completed within a period of 75 days from the date of commencement, if required in the contract or as directed by the Architect/ consultant.

29.0 Extension of time

lf in the opinion of the Architect/ consultant, the work be delayed for reasons beyond the control of the contractor, the Architect/ consultant may submit a recommendation to the NABARD to grant a fair and reasonable extension of time for completion of work as per the terms of contract. lf the contractor needs an extension of time for the completion of work or if the completion of work is likely to be delayed for any reasons beyond the due date of completion as stipulated in the contract, the contractor shall apply to the NABARD through the Architect/ Consultant in writing at least 30 Days before the expiry of the scheduled time and while applying for extension of time he shall furnish the reasons in detail and his justification if any, for the delays. The architect/ consultant shall submit their recommendations to the NABARD in the prescribed format for granting extension of time. While granting extension of time the contractor shall be informed the period extended time which will qualify for levy of liquidated damages. For the balance period in excess of original stipulated period and duly sanctioned extension of time by the NABARD the provision of liquidated damages as stated under clause shall become applicable. Further the contract shall remain in force even for the period beyond the due date of completion irrespective whether the extension is granted or not.

30.0 Rate of progress Whole of the materials, plant and labour to be provided by the contractor and the mode, manner and speed of execution and maintenance of the works are to be of a kind and conducted in a manner to the satisfaction of the Architect/ consultant should the rate of progress of the work or any part thereof be at any time be in the opinion of the Architect/ consultant too slow to ensure the completion of the whole of the work by the prescribed time or extended time for completion the Architect/ consultant shall thereupon take such steps as considered necessary by the Architect/ consultant to expedite progress so as to complete the works by the prescribed time or extended time. Such communications from the Architect/ consultant neither shall relieve the contractor from fulfilling obligations under the contract nor will he be entitled to raise any claims arising out of such directions.

31.0 Work during nights and holidays

Subject to any provision to the contrary contained in the contract no permanent work shall save as herein provided be carried on during the night or on holidays without the permission in writing of the

Page 26: NABARD NEW DELHI REGIONAL OFFICE NABARD TOWER 24, …€¦ · signature and seal of contractor 1 nabard new delhi regional office nabard tower 24, rajendra place, new delhi invites

Signature and Seal of Contractor 26

Architect/ consultant, save when the work is unavoidable or absolutely necessary for the saving of life or property or for the safety of the work in which case the contractor shall immediately advise the Architect/ consultant. However the provisions of the clause shall not be applicable in the case of any work which becomes essential to carry by rotary or double shifts in order to achieve the progress and quality of the part of the works being technically required/ continued with the prior approval of the Architect/ consultant at no extra cost to the NABARD. All work at night after obtaining approval from competent authorities shall be carried out without unreasonable noise and disturbance. Further, nothing extra shall be payable in this regard.

32.0 No compensation or restrictions of work

If at any time after acceptance of the tender NABARD shall decide to abandon or reduce the scope of work for any reason whatsoever and hence not required the whole or any part of the works to be carried out. The Architect/ consultant shall give notice in writing to that effect to the contractor and the contractor shall act accordingly in the matter. The contractor shall have no claim to any payment of compensation or otherwise whatsoever on account of any profit or advantage which he might have derived from the execution of the Work fully but which he did not derive in consequence of the foreclosure of the whole or part of the work.

33.0 Suspension of work i) The contractor shall on receipt of the order in writing of the NABARD (whose decision shall be final

and binding on the contractor) suspend the progress of works or any part thereof for such time and in such manner as NABARD may consider necessary so as not to cause any damage or injury to the work already done or endanger the safety thereof for any of following reasons.

33.1 On account any default on the part of the contractor, or 33.2 For proper execution of the works or part thereof for reasons other than the default of the contractor, or 33.3 For safety of the works or part thereof. The contractor shall, during such suspension, properly protect and secure the works to the extent necessary and carry out the instructions given in that behalf by the Architect/ consultant. 33.4 The contractor shall be entitled to an extension of time equal to the period of every such suspension. No compensation whatsoever shall be paid on this account.

34.0 Action when the whole security deposit is forfeited

In any case in which under any clause or clauses of this contract, the Contractor shall have rendered himself liable to pay compensation amounting to the whole of his security deposit the NABARD shall have the power to adopt any of the following course as they may deem best suited to the interest of the bank.

a) To rescind the contract (of which rescission notice in writing to the contractor by the NABARD shall

be conclusive evidence) and in which case the security deposit of the contractor shall be forfeited and be absolutely at the disposal of NABARD.

b) To employ labour paid by the NABARD and to supply materials to carry out the work, or any part of

the work, debiting the contractor with the cost of the labour and materials (the cost of such labour and materials as worked out by the Architect/ consultant shall be final and conclusive against the contractor) and crediting him with the value of the work done, in all respects in the same manner and at the same manner and at the same rates as if it had been carried

Page 27: NABARD NEW DELHI REGIONAL OFFICE NABARD TOWER 24, …€¦ · signature and seal of contractor 1 nabard new delhi regional office nabard tower 24, rajendra place, new delhi invites

Signature and Seal of Contractor 27

out by the contractor under the terms of this contract the certificate of architect/ consultant as to the value of work done shall be final and conclusive against the contractor.

To measure up the work of the contractor and to take such part thereof as shall be unexecuted, out of his hands, and to give it to another contractor to complete in which case any expenses which may be incurred in excess of the sum which would have been paid to the original contractor, if the whole work had been executed by him (of the amount of which excess the certificates in writing of the Architects/ consultant shall be final and conclusive) shall be borne by original contractor and may be deducted from any money due to him by NABARD under the contract or otherwise, or from his security deposit or the proceeds of sale thereof, or sufficient part thereof. In the event of any of above courses being adopted by the NABARD the contractor shall have no claim to compensation for any loss sustained by him by reasons of his having purchased or procured any material or entered into any engagements or make any advances on account of, or with a view to the execution of the work or the performance of the contract and in case the contract shall be rescind under the provision aforesaid, the contractor shall not be entitled to recover or to be paid any sum or any work thereto for actually performed under this contract, unless, and until the Architect/ consultant will have certified in writing the performance of such work and the value payable in respect thereof, and he shall only be entitled to be paid the value so certified.

35.0 Owner's right to terminate the contract lf the contractor being an individual or a firm commit any 'Act of insolvency' or shall be adjusted an insolvent or being an incorporated company shall have an order for compulsory winding up voluntarily or subject to the supervision of Govt. and of the Official Assignee of the liquidator in such acts of insolvency or winding up shall be unable within seven days after notice to him to do so, to show to the reasonable satisfaction of the Architect/ Consultant that he is able to carry out and fulfil the contract, and to give security therefore if so required by the Architect/ consultant. Or if the contractor (whether an individual firm or incorporated Company) shall suffer execution to be issued or shall suffer any payment under this contract to be attached by or on behalf of any of the creditors of the contractor.

Or shall assign or sublet this contract without the consent in writing of the NABARD or shall charge or encumber this contract or any payment due to which may become due to the contractor there under:

a) Has abandoned the contract; or b) has failed to commence the works, or has without any lawful excuse under these conditions

suspended the progress of the works for 07 days after receiving from the NABARD written notice to proceed, or

c) has failed to proceed with the works with such diligence and failed to make such due progress as

would enable the works to be completed within the time agreed upon, or has failed to remove the materials from the site or to pull down and replace work within seven days after written notice from the NABARD that the said materials were condemned and rejected under these conditions; or has neglected or failed persistently to observe and perform all or any of the acts, matters or things by this contract to be observed and performed by the contractor for seven days after written notice shall have been given to the contractor to observe or perform the same or has to the detriment of good workmanship or in defiance of the NABARD’s or Architect's/ consultant's instructions to the contrary subject any part of the contract. Then and in any of said cases the NABARD and or the Architect/ consultant, may not withstanding any previous waiver, after giving seven days’ notice in writing to the contractor, determine the contract, but without thereby affecting the powers of the NABARD or the Architect/ consultant or the obligation and liabilities of the contractor the whole of which shall continue in force as fully as if the contract had not been so determined and as if the works subsequently had been executed by or on behalf of the contractor. And, further the NABARD

Page 28: NABARD NEW DELHI REGIONAL OFFICE NABARD TOWER 24, …€¦ · signature and seal of contractor 1 nabard new delhi regional office nabard tower 24, rajendra place, new delhi invites

Signature and Seal of Contractor 28

through the Architect/ consultant their agents or employees may enter upon and take possession of the work and all plants, tools, scaffoldings, materials, sheds, machineries lying upon the premises or on the adjoining lands or roads use the same by means of their own employees or workmen in carrying on and completing the work or by engaging any other contractors or persons to complete the work and the contractor shall not in any was interrupt or do any act, matter or thing to prevent or hinder such other contractor or other persons employed for completing and finishing or using the materials and plant for the works.

When the works shall be completed or as soon thereafter as convenient the NABARD or the architect/ consultant shall give a notice in writing to the contractor to remove his surplus materials and plants and should the contractor fail to do so within 07 days after receipt thereof by him the NABARD sell the same by public auction after due publication and shall adjust the amount realised by such auction. The contractor shall have no right to question any of the acts of the NABARD incidental to the sale of the materials etc.

36.0 Certificate of payment

All bills shall be prepared by the contractor in the form prescribed by the Employer’s /Architects. The bill in proper forms must be accompanied by detailed measurements in support of the qualities of work done and must show deductions for all previous payments, retention money etc. The Architect shall issue a certificate after due scrutiny of the contractor’s bill stating the amount due to the contractor to the Employer and the contractor shall be entitled to payment thereof, within the period of honouring certificates named in these documents. The employer will deduct retention money. The refund of Retention money will be released after expiry of Defect Liability Period taken as 12 months for the Project. The Architect/ consultant shall have power to withhold the payment if the work or any part thereof is not carried out to their satisfaction.

The Architect/ consultant may by any certificate make any corrections required in previous certificate.

The NABARD shall modify the certificate of payment as issued by the architect/ consultant from time to time while making the payment.

The contractor shall submit interim bills only after taking actual measurements and properly recorded in the M books.

The contractor shall submit maximum one R/A bill after minimum value of 18.0 lacs executed works.

The final bill may be submitted by contractor within a period of one month from the date of virtual completion and Architect/ consultant shall issue the certificate of payment within a period of thirty days. The NABARD shall pay the amount within a period of three months from the date of issue of certificate provided there is no dispute in respect of rates and quantities.

The contractor shall submit the interim bills in the prescribed format with all details. 37.0 Settlement of disputes and arbitration

All disputes or differences of any kind whatsoever which at any time arise between parties touching or concerning the works or the execution or maintenance thereof this contract or effect thereof or to the rights or liabilities of the parties arising out of or in relation thereto whether during or after determination for closure or breach of the contract (other than those in respect of which the decision

Page 29: NABARD NEW DELHI REGIONAL OFFICE NABARD TOWER 24, …€¦ · signature and seal of contractor 1 nabard new delhi regional office nabard tower 24, rajendra place, new delhi invites

Signature and Seal of Contractor 29

of any person is by the contract expressed to be final and binding) shall after written notice by either party to the contract to the other of them and to the Employer hereinafter mentioned be referred for adjudication to a sole Arbitrator to be appointed as hereinafter provided. For the purpose of appointing sole Arbitrator referred to above, the Employer will send within thirty days of receipt of the notice, to the contractor a panel of three names of persons who shall be presently unconnected with the organization for which the work is executed from following categories of Arbitrators: a. Retired High Court/Supreme Court judge who have experienced in handling Arbitration cases. b. Member of Council of arbitrators. c. Fellow of the Institution of Engineers. d. Eminent Retired Chief Engineer from State/Central PWD/ Public Sector undertaking of good

reputation and integrity. e. Fellow of Indian Institution of Architects.

The contractor shall on receipt of the names as aforesaid, select any one of the persons name to be appointed as a sole Arbitrator and communicate his name to the Employer within thirty days of receipt of the names. The Employer shall thereupon without any delay appoint the said person as Sole Arbitrator. If the contractor fails to communicate such selection as provided above within specified period, the Competent Authority should make the decision and appoint the selected person as sole Arbitrator. If the Employer fails to send to the Contractor panel of three names as aforesaid within specified period, the contractor shall send to the Employer a panel of three names of persons who shall be unconnected with either party. The Employer shall on receipt appoint the said person as Sole Arbitrator. If the Employer fails to select the person and appoint him as sole Arbitrator within 30 days of receipt of panel and inform the contractor accordingly, the contractor shall be entitled to appoint one of the persons from the panel as sole Arbitrator and communicate his name to the Employer. If the Arbitrator so appointed is unwilling or unable to act or vacates his office due to any reason whatsoever another sole Arbitrator shall be appointed as aforesaid. The work under the contract shall, however, continue during the arbitration proceedings and no payment due or payable to the contractor shall be withheld on account of such proceedings. The deemed to have entered on the reference on the date he issued notice to both the partied fixing date of the first hearing. The Arbitrator may from time to time, with the consent of the parties, enlarge the time for making and publishing the award. The arbitrator shall give a separate award in respect of each dispute or difference referred to him. The Arbitrator shall decide each dispute in accordance with the terms of the contract and give a reasoned award. The venue of Arbitration shall be such place as may be fixed by the Arbitrator in his sole discretion. The award of the Arbitrator shall be final and binding on the both the parties. Subject to aforesaid the provisions to the Arbitration act,1992 or any statutory modification or re-enactment thereof and the rules made thereunder, and for the time being in force shall apply to the arbitration proceeding under this clause. The employer and the contractor hereby also agree that arbitration under clause shall be condition precedent to any right to action under the contract with regard to the matters hereby expressly agreed to be so referred to arbitration.

Page 30: NABARD NEW DELHI REGIONAL OFFICE NABARD TOWER 24, …€¦ · signature and seal of contractor 1 nabard new delhi regional office nabard tower 24, rajendra place, new delhi invites

Signature and Seal of Contractor 30

38.0 Electricity and Water supply Electricity and water supply will be provided by NABARD free of cost.

39.0 Treasure trove etc. Any treasure trove, coin or object antique which may be found on the site shall be the property of NABARD and shall be handed over to the bank immediately.

40.0 Method of measurement Unless otherwise mentioned in the schedule of quantities or in mode of measurement, the measurement will be on the net quantities or work produced in accordance with up to date rules laid down by the Bureau of Indian Standards. In the event any dispute/ disagreement the decision of the Architect/ consultant shall be final and binding on the contractor.

41.0 Maintenance of registers The contractor shall maintain the following registers as per the enclosed proforma at site of work and should produce the same for inspection of NABARD/ architect/ consultant whenever desired by them. The contractor shall also maintain the records/ registers as required by the local authorities/ Govt. from time to time.

i) Register for secured advance

ii) Register for hindrance to work

iii) Register for running account bill

iv) Register for labour

42.0 Rates quoted shall remain fixed for the entire period of contract and no price escalation on

any account shall be considered.

43.0 Immediately on award of contract, the contractor shall produce the details thereof to the Bank of registration to tax authorities.

44.0 The successful tenderers may also note that the Bank reserves the right to deduct any Tax on works contract applicable and to be levied under relevant Act, from the bills and amount due to them from Bank and remit the same directly to the Government in case they are not submitting the proof/ evidence of having paid the Tax on work executed under this contract.

46.0 Force majeure 46.1 Neither contractor nor NABARD shall be considered in default in performance of their obligations if

such performance is prevented or delayed by events such as but not to war, hostilities revolution, riots, civil commotion, strikes, lockout, conflagrations, epidemics, accidents, fire, storm, droughts, earthquakes or ordinances or any act of god or for any other cause beyond the reasonable control of the party affected or prevented or delayed shall not be regarded as a breach of the provision of this Agreement.

Page 31: NABARD NEW DELHI REGIONAL OFFICE NABARD TOWER 24, …€¦ · signature and seal of contractor 1 nabard new delhi regional office nabard tower 24, rajendra place, new delhi invites

Signature and Seal of Contractor 31

47.0 Local laws, Acts, Regulations: The contractor shall strictly adhere to all prevailing labour laws inclusive of contract labour (regulation and abolition act of 1970) and other safety regulations. The contractor shall comply with the provision of all labour legislation including the latest requirements of all the Acts, laws, any other regulations that are applicable to the execution of the project. i) Minimum wages Act 1948 (Amended) ii) Payment of wages Act 1936 (Amended) iii) Workmen's compensation Act 1923 (Amended) iv) Contract labour regulation and abolition act 1970 and central rules 1971 (Amended) v) Apprentice act 1961 (amended) vi) Industrial employment (standing order) Act 1946 (Amended) vii) Personal injuries (Compensation insurance) act 1963 and any other modifications viii) Provident fund and miscellaneous provisions Act 1952 and amendment ix) Shop and establishment act x) Any other act or enactment relating thereto and rules framed there under from time to time.

48.0 Accidents The contractor shall immediately on occurrence of any accident at or about the site or in connection with the execution of the work report such accident to the architect/ consultant. The contractor shall also such report immediately to the competent authority whenever such report is required to be lodged by the law and take appropriate actions thereof.

Page 32: NABARD NEW DELHI REGIONAL OFFICE NABARD TOWER 24, …€¦ · signature and seal of contractor 1 nabard new delhi regional office nabard tower 24, rajendra place, new delhi invites

Signature and Seal of Contractor 32

SPECIAL CONDITIONS OF CONTRACT

Scope of work

1.0 The scope of work is to carry out the “Civil, Interior Furnishing and Electrical Works for Renovation

of Ground Floor at NABARD tower, New Delhi”.

2.0 Address of site

The site is located at 24, Rajendra Place, New Delhi.

3.0 Dimensions and levels All dimensions and levels shown on the drawings shall be verified by the contractor on the site and he will be held responsible for the accuracy and maintenance of all the dimensions and the levels. Figured dimensions are in all cases to be accepted and no dimension shall be scaled. Large scale details shall take precedence over small-scale drawings. In case of discrepancy the contractor shall ask for clarification from the Architect/ consultant before proceeding with the work.

4.0 Notice of operation The contractor shall not carry out any important operation without the consent in writing from the Architect/ consultant. 5.0 Construction records

The contractor shall keep and provide to the Architect/ consultant full and accurate records of the dimensions and positions of all new work and any other information necessary to prepare complete drawings recording details of the work as constructed.

6.0 Safety of adjacent structures and trees The contractor shall provide and erect to the approval of the Architect/ consultant such supports as may be required to protect effectively all structures and protective guards to trees which may be endangered by the execution of the works or otherwise take such permanent measures as may be required by the Architect to protect the trees and structures.

7.0 Temporary works Before any temporary works are commenced the contractor shall submit at least 7 days in advance to the architect/ consultant for approval complete drawings of all temporary works he may require for the execution of the works. The contractor shall carry out the modifications relating to strength, if required by the architect/ consultant may require in accordance with the conditions of contract at his own cost. The contractor shall be solely responsible for the stability and safety of all temporary works and unfinished works and for the quality of the permanent works resulting from the arrangement eventually adopted for their execution. b) Permission from the various authorities, but the responsibility for obtaining the same in time shall be of the contractor.

The contractor shall also make the arrangements at his own cost for transport where necessary for his staff and workmen to and from site of work at his own cost.

Page 33: NABARD NEW DELHI REGIONAL OFFICE NABARD TOWER 24, …€¦ · signature and seal of contractor 1 nabard new delhi regional office nabard tower 24, rajendra place, new delhi invites

Signature and Seal of Contractor 33

8.0 Lighting of works

The contractor shall at all times provide adequate and approved lighting as required for the proper execution and supervision and inspection of work. The contractor shall make his own arrangement for the housing and welfare of his staff and

workmen. The contractor shall also make arrangements at his own cost for transport where necessary for his staff and workmen to and from site of work at his own cost.

9.0 Fire Fighting arrangements i) The contractor shall provide suitable arrangement for fire fighting at his own cost. For this purpose he shall provide requisite number of fire extinguishers and adequate number of buckets, some of which are to be always kept filled with sand and some with water. These equipments shall be provided at suitable prominent and easily accessible places and shall be properly maintained. ii) Any deficiency in the fire safety or unsafe conditions shall be corrected by the contractor at his own cost and to the approval of the relevant authorities. The contractor shall make the following arrangements at his own cost but not limited to the following. . a) Proper handling, storage and disposal of combustible materials and waste. b) Work operations which can create fire hazards. c) Access for fire fighting equipments. d) Type, number and location of containers for the removal of surplus materials and rubbish. e) Type, size, number and location of fire extinguishers or other fire fighting equipment, general housekeeping.

10.0 Site order book

A site order book shall be maintained at site for the purpose of quick communication between the architect/ consultant. Any communication relating to the works may be conveyed through records in the site order book. Such a communication from one party to the other shall be deemed to have been adequately served in terms of contract. Each site order book shall have machine numbered pages in triplicate and shall carefully maintained and preserved by the contractor and shall be made available to the architect/ consultant as and when demanded. Any instruction which the architect/ consultant may like to issue to the contractor or the contractor may like to bring to the architect/ consultant two copies of such instructions shall be taken from the site order book and one copy will be handed over to the party against proper acknowledgment and the second copy will be retained for their record.

11.0 Temporary fencing/ barricading

The contractor shall provide and maintain a suitable temporary fencing/ barricading and gates at his cost to adequately enclose all boundaries of the site for the protection of the public and for the proper execution and security of the work and in accordance with the requirement of the architect/ consultant and regulations of local authorities. These shall be altered, relocated and adopted from time to time as necessary and removed on completion of the work.

12.0 Site meetings Site meetings will be held to review the progress and quality evaluation. The contractor shall depute a senior representative along with the site representative and other staff of approved sub-

Commented [IK1]:

Commented [IK2R1]:

Commented [IK3R1]:

Page 34: NABARD NEW DELHI REGIONAL OFFICE NABARD TOWER 24, …€¦ · signature and seal of contractor 1 nabard new delhi regional office nabard tower 24, rajendra place, new delhi invites

Signature and Seal of Contractor 34

contractors and suppliers as required to the site meetings and ensure all follow up actions. Any additional review meetings shall he held if required by the architect/ consultant.

13.0 Disposal of refuse The contractor shall cart away all debris, refuse etc. arising from the work from the site and deposit the same as directed by the architect/ consultant at his own cost. It is the responsibility of the contractor to obtain from the local authorities concerned to the effect that all rubbish arising out of contractor's activities at the construction site or any other off-site activities borrow pits has been properly disposed off.

14.0 Contractor to verify site measurement

The contractor shall check and verify all site measurements whenever requested by other specialist contractors or other sub-contractors to enable them to prepare their own shop drawings and pass on the information with sufficient promptness as will not in any way delay the works.

15.0 Bar bending schedule The contractor shall prepare a detailed bar bending schedule for all reinforced concrete works and get them approved by the architect/ consultant well in advance.

16.0 As built drawings i) The architect/ consultant will issue two sets of drawings to the Contractor, for the items where some

modification is sought, the contractor will make the changes made on these copies and return these copies to the architect/ consultant for their approval. The architect/ consultant will return one copy duly approved by him

ii) For the drawings prepared by the contractor. The contractor will modify the drawing prepared by him wherever the changes are made by the NABARD/ architect/ consultant and submit two copies of such modified drawings to the architect/ consultant for approval. The architect/ consultant will return one copy of the approved drawing to the contractor. iii) One set of as built drawing to be submitted to the Bank after completion of project which

incorporates all changes made by Contractor/Architect/NABARD. 17.0 Approved make

The contractor shall provide all materials from the list of approved makes at his own cost and also appoint the specialised agency for the waterproofing, anti-termite treatment, aluminium doors and windows and any other item as specified in the tender. The architect/ consultant may approve any make/ agency within the approved list as given in the tender after inspection of the sample/ mock up.

18.0 Procurement of materials The contractor shall make his own arrangements to procure all the required materials for the work. All wastages and losses in weight shall be to the contractor's account.

19.0 Duties, taxes, levies etc.

Page 35: NABARD NEW DELHI REGIONAL OFFICE NABARD TOWER 24, …€¦ · signature and seal of contractor 1 nabard new delhi regional office nabard tower 24, rajendra place, new delhi invites

Signature and Seal of Contractor 35

The contractor shall pay and be responsible for payment of all taxes, duties, levies, royalties, fees, cess or charges in respect of the works including but not limited to GST, tax in respect of materials, equipment plant and other things required for the contract. All of the aforesaid taxes, duties, levies, fees and charges shall be to the contractor's account and the NABARD shall not be required to pay any additional or extra amount on this account. Variation of taxes, duties, fees, levies etc if any, till completion of work shall be deemed to be included in the quoted rates and no extra amount on this account. lf a new tax or duty or levy or cess or royalty or octroi is imposed under as statue or law during the currency of contract the same shall be borne by the contractor.

20.0 Acceptance of tender

The NABARD shall have the right to reject any or all tenders without assigning any reason. They are not bound to accept the lowest or any tender and the tenderer or tenderers shall have no right to question the acts of the NABARD. However adequate transparency would be maintained by the NABARD.

Signature of the Contractor and Seal

Page 36: NABARD NEW DELHI REGIONAL OFFICE NABARD TOWER 24, …€¦ · signature and seal of contractor 1 nabard new delhi regional office nabard tower 24, rajendra place, new delhi invites

Signature and Seal of Contractor 36

SAFETY CODE

1. First aid appliances including adequate supply of sterilised dressing and cotton wool shall be kept in a readily accessible place.

2. An injured person shall be taken to a public hospital without loss of time, in cases where the injury

necessitates hospitalisation.

3. Suitable and strong scaffolds should be provided for workmen for all works that cannot safely be done from the ground.

4. No portable single ladder shall be over 8 meters in length. The width between the side rails shall

not be less than 30 cm. (clear) and the distance between two adjacent rungs shall not be more than 30 cm. When a ladder is used an extra mazdoor shall be engaged for holding ladder.

5. The excavated material shall not be placed within 1.5 meters of the edge of the trench or half of the

depth of trench whichever is more. All trenches and excavations shall be provided with necessary fencing and lighting.

6. Every opening in the floor of a building or in a working platform be provided with suitable means to

prevent the fall of persons or materials by providing suitable fencing or railing whose minimum height shall be one metre.

7. No floor, roof or other part of the structure shall be so overloaded with debris or materials as to

render it unsafe.

8. Workers employed on mixing and handling material such as asphalt, cement mortar or concrete and lime mortar shall be provided with protective footwear and rubber hand-gloves.

9. Those engaged in welding works shall be provided with welder's protective eye shields and gloves

10. (i) No paint containing lead or lead products shall be used except in the form of paste or readymade

paint.

(ii) Suitable facemasks should be supplied for use by the workers when the paint is applied in the form of spray or surface having lead paint dry rubbed and scrapped.

11. Overalls shall be supplied by the Contractor to the painters and adequate facilities shall be provided to enable the working painters to wash during the periods of cessation of work.

12. Hoisting machines and tackle used in the works, including their attachments, anchorage and

supports shall be in perfect condition.

13. The ropes used in hoisting or lowering material or as a means of suspension shall be of durable quality and adequate strength and free form defects.

Page 37: NABARD NEW DELHI REGIONAL OFFICE NABARD TOWER 24, …€¦ · signature and seal of contractor 1 nabard new delhi regional office nabard tower 24, rajendra place, new delhi invites

Signature and Seal of Contractor 37

SPECIFICATIONS

1. All the works specified and provided for in the schedule and drawing or which may be required to be done in order to perform and complete any part there of shall be executed in accordance with the technical specification, workmanship, quality control, as prescribed (though not enclosed in this document) in the specification & codes, with up to date amendments, in the following order:-

a) CPWD/ DSR

b) ISI (BIS) Codes

2. All works under this contract (wherever grey cement is used) have to be executed in OPC.

3. The quantities given in the tender are approximate. However the payment shall be made on the basis of actual measurements taken on site and in conformity with C.P.W.D. Specification and B.I.S Codes. It is clarified that all quantities are subject to change and no claims whatsoever on this behalf shall be entertained.

4. All materials used in the works shall be of their respective kind and quality specified in the tender document or approved by the NABARD and/ or Architect and shall comply strictly with the requirements of the latest specifications of CPWD and Indian Standard Codes.

5. The work shall be executed and measured as per metric dimensions given in the Schedule of

Quantities, drawings etc. (FPS units wherever indicated are for guidance only).

Page 38: NABARD NEW DELHI REGIONAL OFFICE NABARD TOWER 24, …€¦ · signature and seal of contractor 1 nabard new delhi regional office nabard tower 24, rajendra place, new delhi invites

Signature and Seal of Contractor 38

A G R E E M E N T

1. This agreement made on the ------------- day of ------------ 2019 between -----------------------(herein

referred to as "the Contractor" which expression shall unless repugnant to the context of meaning thereof be deemed to include its/ his legal heirs, executors, administrators and assigns of the one part and the NABARD, a corporation having its Head office at, C-24, G-Block, Bandra Kurla Complex, bandra E, Mumbai-400051 hereinafter referred to as "the Employer or NABARD" which expression shall unless repugnant to the context or meaning thereof be deemed to include its successors and assigns of the other part.

2. WHEREAS the said employer requires execution of certain works to be carried out for the “Civil,

Interior Furnishing and Electrical Works for Renovation of Ground Floor at NABARD tower, New Delhi”. (Hereinafter the aforesaid works are collectively referred to as "the works").

3. WHEREAS the said works are more particularly described in contract documents consisting of

agreement, the set of conditions of contract to be complied with by the contractor, schedule of Quantities and drawings are annexed herewith as part and parcel of this agreement. The parties to the contract agree to abide by the same.

4. WHEREAS the employer has invited the tenders from the contractors as per the eligibility criteria.

The contractor has also given his tender which was opened on ---------------------and it has been accepted by the Bank vide letter No.-------------------------- Dated -------------------------.

Now it is hereby agreed as follows:

5. WHEREAS in consideration of the payments to be made to the contractors as hereinafter

provided, the contractor shall upon and subject to the set of said conditions described in the contractual documents, execute and complete the works as shown in the said plans, drawings, complete specifications, schedule of quantities of the various classes of works to be done and such further detailed drawings plans and specification as may be furnished/ provided to him by the said employer and described in the said specifications and on the said price of schedule of quantities.

6. The Officer In charge/General Manager, NABARD Tower, New Delhi Regional Office, 24,

Rajendra Place, New Delhi- 110125 shall exercise powers on behalf of the said employer for the purpose of the Contract Agreement.

7. WHEREAS both the parties agree to sign the following annexure annexed to this agreement in

token of their acceptance:- i.General Conditions of Contract ii.Special Conditions of Contract iii.Safety Code iv.Specifications v. List of Approved Makes vi.Priced Bill of Quantities vii.Drawings

8. The Bank shall pay the contractor such sum as shall become payable hereunder at the times and

in the manner specified in the said conditions mentioned in the General Conditions of contract.

9. WHEREAS the contractor hereby undertakes and agrees to carry out and complete the works

Page 39: NABARD NEW DELHI REGIONAL OFFICE NABARD TOWER 24, …€¦ · signature and seal of contractor 1 nabard new delhi regional office nabard tower 24, rajendra place, new delhi invites

Signature and Seal of Contractor 39

within 75 days from the 1st day after the date of work order to commence the works are given to the contractor. The contractor agrees and has deposited the sum of Rs.------------------------------ by way of Earnest money deposit for due fulfilment of this contract for the works. It is agreed that the security deposit shall be deducted from each running bills as per clause-1 and refunded to the contractor as per clause-1 of the General Conditions of the contract annexed herewith.

10. WHEREAS it is agreed that the earnest money amounting to Rs.------------------deposited by the

contractor in the form of demand draft along with the tender shall be forfeited in full in case the contractor does adhere to the conditions of the tender.

11. WHEREAS Shri ---------------------- is the accredited representative(s) of the contractor who would

be responsible for taking instructions from the employer in relation to the works. The contractor agrees to pay taxes on material or finished works in respect of this contract of the works and the employer will not entertain any claim whatsoever in this report nor the employer shall be responsible to pay any tax as mentioned above. If due to non-payment of any of the taxes connected with the works, the contractor suffers any loss or damages or delays in completing the works, the employer will not be responsible for such loss or damages occurred to the contractor and the employer will be entitled to claim damages from the contractor for non-completion of the work within 75 days as stipulated in Para -9 above.

12. WHEREAS the contractor hereby declares the list of all the relative working with the employer

which is annexed herewith and marked C-1.

OR

WHEREAS the contractor declares that none of his relative is working with the employers.

13. WHEREAS the contractor declares that he has associated himself with the agencies of the

appropriate classes of person for (i) electrical (ii) sanitary and water supply installation etc. or any other specialized job to complete the works.

14. The plans, drawings, specifications, contract documents and the documents above mentioned

shall form basis of this contract and the decision of General Manager/Officer-In Charge, NABARD Tower, New Delhi Regional Office, 24, Rajendra Place, New Delhi- 110125 for the time being as mentioned in the conditions of contract in reference to all matters of dispute as to material, workmanship or account and as to the intended interpretation of the clauses of the agreement or any of the document attached hereto shall be final and binding on both parties and may be made rule of the court.

15. The work comprises of the “Civil, Interior Furnishing and Electrical Works for Renovation of

Ground Floor at NABARD tower, New Delhi” as mentioned above and all subsidiary and other works connected therewith on the same site as may be ordered to be done from time to time by the said General Manager/Officer-In Charge, NABARD Tower, New Delhi Regional Office, 24, Rajendra Place, New Delhi- 110125 for the time being even though such works may not have been shown on the drawings plans or described in the said specifications or schedule of quantities of various classes of work to be done.

Page 40: NABARD NEW DELHI REGIONAL OFFICE NABARD TOWER 24, …€¦ · signature and seal of contractor 1 nabard new delhi regional office nabard tower 24, rajendra place, new delhi invites

Signature and Seal of Contractor 40

16. The employer through the General Manager/Officer-In Charge, NABARD Tower, New Delhi

Regional Office, 24, Rajendra Place, New Delhi- 110125 reserves himself the right of altering the plans, drawings and nature of work and of adding to or omitting any items of work or having portions of the same carried out departmentally or otherwise and such alterations or variations shall be carried out without prejudice to this contract.

17. All disputes arising out of or in any way connected with this agreement shall be deemed to have

arisen in New Delhi and only the courts of Delhi shall have jurisdiction to determine the same.

18. The several parts of this contract have been read to us and fully understood by us.

IN WITNESS whereof the parties above-named have executed these presents today and year first hereinabove written.

Signed, sealed and delivered by:

Authorised representative Authorised representatives

of Employer of Contractor

(i) Witness 1. Witness

(ii) Witness 2. Witness

Page 41: NABARD NEW DELHI REGIONAL OFFICE NABARD TOWER 24, …€¦ · signature and seal of contractor 1 nabard new delhi regional office nabard tower 24, rajendra place, new delhi invites

Signature and Seal of Contractor 41

FORWARDING LETTER

FROM: …………………………………. …………………………………. …………………………………. …………………………………. TO: General Manager/Officer-In Charge

NABARD Tower, New Delhi Regional Office, 24, Rajendra Place, New Delhi- 110125 REF: Civil, Interior Furnishing and Electrical Works for Renovation of Ground Floor at NABARD Tower, New Delhi

Dear Sir, 1. With reference to the tender invited by you, I/we hereby offer to perform, provide, execute and complete the works in conformity with conditions of contract, drawings and specifications for the respective items of schedule of quantities attached hereto. 2. I/ We have satisfied myself/ ourselves as to the location and prevailing conditions of the site and have read carefully the articles of agreement, conditions of contract, specification, general and special conditions, technical specifications etc. and I/we understand that the works are to be completed within 75 days from the 1st day of award of works and fully understand that the time will be the essence of the contract. 3. I/We have enclosed a demand draft for Rs. 66,000/- drawn on …………payable at New Delhi in

favour of NABARD as earnest money and fully understand that this amount will not bear any interest.

4. I/We agree to keep the offer for 90 days from the date of opening the tender. 5. Should this tender be accepted in whole or in Part, I/we hereby agree to abide by and fulfil all the terms and conditions annexed hereto. If I/we fail to commence the work specified in tender documents, I/we agree that my/our earnest money shall stand forfeited. I/We also agree to the balance Retention money being deducted from my/our bills in accordance with the Conditions of contract. 6. All the terms and conditions contained in the notice Inviting Tenders, Conditions of Tender, Special specifications/ General specifications for execution of the work and additional conditions and the agreement etc. constituting the tender documents have been fully read by me/us and explained to me/us and I/we hereby accept the same and sign hereunder in token of their acceptance. 7. We are further enclosing herewith the following documents: i) Partnership Deed, Article of Association and Power of Attorney. We agree that no change will be made in these documents without prior approval of the Employer.

Page 42: NABARD NEW DELHI REGIONAL OFFICE NABARD TOWER 24, …€¦ · signature and seal of contractor 1 nabard new delhi regional office nabard tower 24, rajendra place, new delhi invites

Signature and Seal of Contractor 42

ii) Tender documents duly signed along with detailed programme and targets of completion of each item/ work. iii) Details of deployment of manpower/ machinery, plant and equipment. iv) Latest I.T. C. C. V) Demand draft No:....................dated.........................drawn. Name of the Partners/ Directors of the firm 1) 2) Yours faithfully, Date: Name & Sign of Tenderers (s) Office stamp & seal of the Tenderer (s) Address:………………………. ……………………….. ……………………….. Occupation:……………………

Page 43: NABARD NEW DELHI REGIONAL OFFICE NABARD TOWER 24, …€¦ · signature and seal of contractor 1 nabard new delhi regional office nabard tower 24, rajendra place, new delhi invites

Signature and Seal of Contractor 43

PROFORMA FOR APPLICATION BY CONTRACTOR FOR EXTENTION OF TIME

1. Name of the contractor

2. Name of the work as given in the agreement

3. Agreement WO 4. Tender amount 5. Date of commencement of work 6. Period allowed for completion as per agreement 7. Date of completion as per agreement 8. Period for which extension of time has been given

Dated Month Year

a) 1st extension vide Bank's letter no.

b) 2nd extension vide Bank's letter no.

c) 3rd extension vide Bank's letter no.

9. Reasons for which extensions have been previously given (copies of the previous applications

should be attached)

10. Period for which extension is applied for and the reasons thereof including hindrances, time for extra

work assigned, if any etc.

Signature of Contractor

Page 44: NABARD NEW DELHI REGIONAL OFFICE NABARD TOWER 24, …€¦ · signature and seal of contractor 1 nabard new delhi regional office nabard tower 24, rajendra place, new delhi invites

Signature and Seal of Contractor 44

PROFORMA OF SITE ORDER BOOK

Name of the work:

Date of Commencement:

Sr. No.

Remarks/ Instructions of Bank’s Engineer/ Architect

Dated initials of Bank’s Engineer/ Architect

lnitials of the Contractor for having received the instructions

Action taken with the date

Dated initials of the Bank’s Engineer

Remarks of the Architects/ Bank’s Officials

1. 2. 3 . 4. 5. 6.

Page 45: NABARD NEW DELHI REGIONAL OFFICE NABARD TOWER 24, …€¦ · signature and seal of contractor 1 nabard new delhi regional office nabard tower 24, rajendra place, new delhi invites

Signature and Seal of Contractor 45

I – RUNNING A/C BILL

i) Name of Contractor/ Agency

ii) Name of work

iii) Sr. No. of this bill

iv) No. and date of Previous

v) Reference to Agreement No.

vi) Date of written order to commence

vii) Date of completion as per agreement

S.

No. ltem Description Unit Rate (Rs.) As per tender

Qty. Amount (Rs.)

1. 2. 3. 4. 5.

Upto previous R/A Bill Upto date (Gross) Present Bill Remark

Qty. Amount (Rs.)

Qty. Amount (Rs.)

Qty. Amount (Rs.)

6. 7. 8. 9.

Note: 1) lf part rate is allowed for any item, it should be ---------------------

indicated with reasons for allowing such a rate. Net Value since previous bill

2) If adhoc payment is made, it should be mentioned specifically.

Page 46: NABARD NEW DELHI REGIONAL OFFICE NABARD TOWER 24, …€¦ · signature and seal of contractor 1 nabard new delhi regional office nabard tower 24, rajendra place, new delhi invites

Signature and Seal of Contractor 46

II _ ACCOUNT OF SECURED ADVANCE, IF ADMISSIBLE ON MATERIALS HELD AT SITE BY THE CONTRACTOR

No. ltem Quantity Unit Amount Remarks

1. 2. 3. 4. 5. 6.

Total Value of materials at site

Secured Advance @ .........% of above value

CERTIFIED (i) that the materials mentioned above have actually been brought by the contractor to the

site of the work and no advance on any quantity of any of this item is outstanding on their security, (ii) that

the materials are of imperishable nature and are all required by the contractor for use in the work in

connection with the items for which rates of finished work have been agreed upon. ____________________________________________________________________________

Dated signature of Site Engineer

preparing the bill

Designation ______________

Dated signature ________________________ of Bank’s Architects

Dated signature of Contractor

(Name of Architects)

Page 47: NABARD NEW DELHI REGIONAL OFFICE NABARD TOWER 24, …€¦ · signature and seal of contractor 1 nabard new delhi regional office nabard tower 24, rajendra place, new delhi invites

Signature and Seal of Contractor 47

C E R T I F I C A T E

The measurements on the basis of which the above entries for the Running Bill No. __________________ were made have been taken jointly on ___________________ and are recorded at pages ___________ to ____________ of measurement book No._________________. ____________ ________________ ___________ Signature and Signature and Signature and Date of contractor date of Architect’s date of Bank’s

Representative (seal) Engineer

The work recorded in the above mentioned measurements has been done at the site satisfactorily as per tender drawings, conditions and specifications.

Architect Bank’s Engineer

Page 48: NABARD NEW DELHI REGIONAL OFFICE NABARD TOWER 24, …€¦ · signature and seal of contractor 1 nabard new delhi regional office nabard tower 24, rajendra place, new delhi invites

Signature and Seal of Contractor 48

PROFORMA OF DAILY WORK LOG BOOK

Name of Work : Date of Start of Work :

Name of Contractor : Period of completion :

Agreement No. : Date of completion :

Sl

No.

Date Name of

Work in

progress

Nature of

Hindrance

Date by

occurrence

of

Hindrance

Date of

which

Hindrance

was

removed

Period of

Hindrance

Signature

of

Contractor/

Bank’s

Officer

Remarks

1 2 3 4 5 6 7 8 9

Page 49: NABARD NEW DELHI REGIONAL OFFICE NABARD TOWER 24, …€¦ · signature and seal of contractor 1 nabard new delhi regional office nabard tower 24, rajendra place, new delhi invites

Signature and Seal of Contractor 49

LIST OF APPROVED MAKES

No. Item Approved Make

1. a) L.T. Cable, 1.1 KV grade XLPE Insulated AL/ Cu Conductor Armoured Cable

b) PVC insulated, 1100V Grade, FR/FRLS multi-stranded copper conductor wires

Skytone, Finolex, Polycab, Havells, RR Kabel Grandlay, Skytone, Bonton, National (FRLS), Havells, RR Kabel

2. Termination Kits (Heat shrinkable type)

Raychem, Denson

3. MCCB, RCCB, MCB DBs, MCB, Distribution Board (Double door type)

Legrand, L & T- Hager, ABB

4. Switch Disconnector Fuses Unit Legrand, L & T, Siemens

5. Contactors, Timers, HRC Fuses Fuse Fitting & Indicating Lamps

L & T, Siemens, Legrand

6. Lamps

Philips/ Wipro/ CG/ Osram

7. Voltmeter & Ammeter, Selector Switch, Current Transformer & Indicating Lights

AE, Neptune, Ducati, MECO, Rishline (L & T)

8. Cable Gland & Lugs Dowells, Multit, Jainsons

9. Modular Type Light and Power Accessories (Switches, Sockets), Ceiling Roses, Call Bell

Anchor Woods, Legrand Mosaic, Crabtree Athena, Philips Elite, North West Stylus

10. MS Conduit (ISI Marked)

AKG, Precision, BEC, SETIA

11. MS Conduit Accessories

AKG, Precision, BEC, SETIA

12. Exhaust Fan

Crompton Greaves, Bajaj, Orient, Usha, Havells

13. Ceiling Fan

Crompton Greaves, Havells, Usha

14. Wall Bracket Fan Crompton Greaves, Bajaj, Orient, Usha, Havells

15. PVC Conduits AKG, SETIA, BEC

16. Time Switches

Legrand, L & T

17.

Light Fittings Philips/ Wipro/ CG/ Osram

18.

Metal Clad Socket Outlets ABB, Legrand, Northwest, L&T

19.

Telephone Cable Delton, Amp, D-Link

Page 50: NABARD NEW DELHI REGIONAL OFFICE NABARD TOWER 24, …€¦ · signature and seal of contractor 1 nabard new delhi regional office nabard tower 24, rajendra place, new delhi invites

Signature and Seal of Contractor 50

20.

Solderless lugs/ Ferrule Dowell

21.

Cable Glands Dowell, Gripwel, Comet

22.

Tag Block (Telephone) Krone

23.

Fire Alarm System/ CCTV/ door Access

Vintage, Crompton

24.

Jointing Kits, Connectors Screwless Wago and Controls (I) Ltd.

25.

Metering Equipments Rishabh, AE, Conzerv

26.

ASS/ VSS Kayacee/ L&T

27.

LAN & Voice AMP, D-Link

28.

Sensors (PIA) IRTEC, Philips, Honeywell

29. Other items not stipulated As directed by the Bank

Page 51: NABARD NEW DELHI REGIONAL OFFICE NABARD TOWER 24, …€¦ · signature and seal of contractor 1 nabard new delhi regional office nabard tower 24, rajendra place, new delhi invites

Signature and Seal of Contractor 51

Pre Contract Integrity Pact

(to be executed on non judicial stamp paper of Rs. 200)

General

This pre-bid pre-contract Agreement (hereinafter called the Integrity Pact) is made on _______day of the month of ________ __ between, on one hand, National Bank for Agriculture and Rural Development (NABARD), represented by Shri ________________________________ (hereinafter called the “BUYER”, which expression shall mean and include, unless the context otherwise requires, his successors in office and assigns) of the First Part and M/s _______________________ represented by Shri _______________________, Chief Executive Officer (hereinafter called “BIDDER/Seller” which expression shall mean and include, unless the context otherwise requires, his successors and permitted assigns) of the Second Part.

WHEREAS the BUYER proposes to getting executed the work of Civil, Interior Furnishing and Electrical works of Ground Floor at NABARD Tower and the BIDDER is willing to offer/ has offered the work and

WHEREAS THE BIDDER is a private company/ public company/ Government undertaking/ partnership/ registered export agency, constituted in accordance with the relevant law in the matter and the BUYER is a body corporate established under NABARD Act, 1981 having its Head Office at Plot No. C-24, Block ‘G’, Bandra-Kurla Complex, Bandra (East), Mumbai.

NOW, THEREFORE,

To avoid all forms of corruption by following a system that is fair, transparent and free from any influence/ prejudiced dealings prior to, during and subsequent to the currency of the contract to be entered into with a view to:-

Enabling the BUYER to obtain the desired said work at a competitive price in conformity with the defined specifications by avoiding the high cost and the distortionary impact of corruption on public procurement and

Enabling BIDDERs to abstain from bribing or indulging in any corrupt practice in order to secure the contract by providing assurance to them that their competitors will also abstain from bribing and other corrupt practices and the BUYER will commit to prevent corruption, in any form, by its officials by following transparent procedures.

The parties hereto hereby agree to enter into this Integrity Pact and agree as follows:

Commitments of the BUYER

1.1 The BUYER undertakes that no official of the BUYER, connected directly or indirectly with the contract, will demand, take a promise for or accept, directly or through intermediaries, any bribe, consideration, gift, reward, favour or any material or immaterial benefit of any other advantage from the BIDDER, either for themselves or for any person, organization or third party related to the contract in exchange for an advantage in the bidding process, bid evaluation, contracting or implementation process related to the contract.

1.2 The BUYER will, during the pre-contract stage, treat all BIDDERs alike and will provide to all BIDDERs the same information and will not provide any such information to any particular BIDDER which could afford an advantage to that particular BIDDER in comparison to other BIDDERs.

Page 52: NABARD NEW DELHI REGIONAL OFFICE NABARD TOWER 24, …€¦ · signature and seal of contractor 1 nabard new delhi regional office nabard tower 24, rajendra place, new delhi invites

Signature and Seal of Contractor 52

1.3 All the officials of the BUYER will report to the appropriate Government office any attempted or completed breaches of the above commitments as well as any substantial suspicion of such a breach.

2 In case any such preceding misconduct on the part of such official(s) is reported by the BIDDER to the BUYER with full and verifiable facts and the same is prima facie found to the correct by the BUYER, necessary disciplinary proceedings, or any other action as deemed fit including criminal proceedings may be initiated by the BUYER and such a person shall be debarred from further dealings related to the contract process. In such a case while an enquiry in being conducted by the BUYER the proceedings under the contract would not be stalled.

Commitments of BIDDERs

3 The BIDDER commits itself to take all measures to prevent corrupt practices, unfair means and illegal activities during any stage of its bid or during an pre-contract or post-contract stage in order to secure the contract or in furtherance to secure it and in particular commit itself to the following:-

3.1 The BIDDER will not offer, directly or through intermediaries, any bribe, gift, consideration, reward, favour, any material immaterial benefit or other advantage, commission, fees, brokerage or inducement to any official of the BUYER, connected directly or indirectly with the bidding process, or to any person, organization or third party related to the contract in exchange for any advantage in the bidding, evaluation, contracting and implementation of the contract.

3.2 The BIDDER further undertakes that it has not given, offered or promised to give, directly or indirectly any bribe, gift, consideration, reward, favour, any material or immaterial benefit or other advantage, commission, fees, brokerage or inducement to any official of the BUYER or otherwise in procuring the Contract or forbearing to do or having done any act in relation to the obtaining or execution of the contract or any other contract with the Bank for showing or forbearing to show favour or disfavor to any person in relation to the contract or any other contract with the Bank.

3.3 BIDDERs shall disclose the name and address of agents and representatives and Indian BIDDERs shall disclose their foreign principles or associates.

3.4 BIDDERs shall disclose the payments to be made by them to agents/ brokers or any other intermediary, in connection with this bid/ contract.

3.5 The BIDDER further confirms and declares to the BUYER that the BIDDER is the original manufacturer/ integrator/ authorized government sponsored export entity of the defence stores and has not engaged any individual or firm or company whether Indian or foreign to intercede, facilitate or in any way to recommend to the BUYER or any of its functionaries, whether officially or unofficially to the award of the contract to the BIDDER, nor has any amount been paid, promised or intended to be paid to any such individual, firm or company in respect of any such intercession, facilitation or recommendation.

3.6 The BIDDER, either while presenting the bid or during pre-contract negotiations or before signing the contract, shall disclose any payments he has made, is committed to or intends to make to officials of the BUYER or their family members, agents, brokers or any other intermediaries in connection with the contract and the details of services agreed upon for such payments.

3.7 The BIDDER will not collude with other parties interested in the contract to impair the transparency, fairness and progress of the bidding process, bid evaluation, contracting and implementation of the contract.

3.8 The BIDDER will not accept any advantage in exchange for any corrupt practice, unfair means and illegal activities.

3.9 The BIDDER shall not use improperly for purposes of competition or personal gain or pass on to others, any information provided by the BUYER as part of the business relationship regarding plans,

Page 53: NABARD NEW DELHI REGIONAL OFFICE NABARD TOWER 24, …€¦ · signature and seal of contractor 1 nabard new delhi regional office nabard tower 24, rajendra place, new delhi invites

Signature and Seal of Contractor 53

technical proposals and business details, including information contained in any electronic data carrier. The BIDDER also undertakes to exercise due and adequate care lest any such information is divulged.

3.10 The BIDDER commits to refrain from giving any complaint directly or through any other manner without supporting it with full and verifiable facts.

3.11 The BIDDER shall not instigate or cause to instigate any third person to commit any of the actions mentioned above.

3.12 If the BIDDER or any employee of the BIDDER or any person acting on behalf of the BIDDER either directly or indirectly is a relative of any of the officers of the BUYER, or alternatively if any relative of an officer of the BUYER has financial interest/ stake in the BIDDER’s firm, the same shall be disclosed by the BIDDER at the time of filling of tender. The term ‘relative’ for this purpose would be as defined in Section 6 of the Companies Act 1986.

3.13 The BIDDER shall not lend to or borrow any money from or enter into any monetary dealings or transactions, directly or indirectly, with any employee of the BUYER.

4. Previous Transgression

4.1 The BIDDER declares that no previous transgression occurred in the last three years immediately before signing of this Integrity Pact, with any other company in any country in respect of any corrupt practices envisaged hereunder or with any Public Sector Enterprises in India or any Government Department in India that could justify BIDDER’s exclusion from the tender process.

4.2 The BIDDER agrees that if it makes incorrect statement on this subject, BIDDER can be disqualified from the tender process or the contract, if already awarded, can be terminated for such reason.

5. Earnest Money (Security Deposit)

5.1 While submitting commercial bid, the BIDDER shall deposit an amount Rs.66,000.00 as Earnest Money/ Security Deposit, with the BUYER through any of the following instruments.

i. Bank Draft or a Pay Order in favour of NABARD

ii. A confirmed guarantee by an Indian Nationalised Bank, promising payment of the guaranteed sum to the BUYER on demand within three working days without any demur whatsoever and without any reasons whatsoever. The demand for payment by the BUYER shall be treated as conclusive proof of payment.

iii. Any other mode or through any other instrument (as specified in the tender document)

5.2 The Earnest Money/ Security Deposit shall be valid upto a period of five years or the complete conclusion of the contractual obligations to the complete satisfaction of both the BIDDER and the BUYER, including warranty period, whichever is later.

5.3 In case of the successful BIDDER a clause would also be incorporated in the Article pertaining to Performance Bond in the Purchase Contract that the provisions of Sanctions for Violation shall be applicable for forfeiture of Performance Bond in case of a decision by the BUYER to forfeit the same without assigning any reason for imposing sanction for violation of this Pact.

5.4 No interest shall be payable by the BUYER to the BIDDER on Earnest Money/ Security Deposit for the period of its currency.

Page 54: NABARD NEW DELHI REGIONAL OFFICE NABARD TOWER 24, …€¦ · signature and seal of contractor 1 nabard new delhi regional office nabard tower 24, rajendra place, new delhi invites

Signature and Seal of Contractor 54

6. Sanctions for Violations

6.1 Any breach of the aforesaid provisions by the BIDDER or any one employed by it or acting on its behalf (whether with or without the knowledge of the BIDDER) shall entitle the BUYER to take all or any one of the following actions, wherever required :-

i. To immediately call off the pre-contract negotiations without assigning any reason or giving any compensation to the BIDDER. However, the proceedings with the other BIDDER(s) would continue.

ii. The Earnest Money Deposit (in pre-contract stage) and/ or Security Deposit/ Performance Bond (after the contract is signed) shall stand forfeited either fully or partially as decided by the BUYER and the BUYER shall not be required to assign any reason therefore.

iii. To immediately cancel the contract, if already signed, without giving any compensation to the BIDDER.

iv. To recover all sums already paid by the BUYER, and in case of an Indian BIDDER with interest thereon at 2% higher than the prevailing Prime Lending Rate of State Bank of India, while in case of a BIDDER from a country other than India with interest thereon at 2%, higher than the LIBOR. If any outstanding payment is due to the BIDDER from the BUYER in connection with another contract for any other stores, such outstanding payment could also be utilized to recover the aforesaid sum and interest.

v. To encash the advance bank guarantee and performance bond/ warranty bond, if furnished by the BIDDER, in order to recover the payments, already made by the BUYER, along with interest.

vi. To cancel all or any other contracts with BIDDER. The BIDDER shall be liable to pay compensation for any loss or damage to the BUYER resulting from such cancellation/ rescission and the BUYER shall be entitled to deduct the amount so payable from the money(s) due to the BIDDER.

vii. To debar the BIDDER from participating in future bidding processes of the Government of India for a minimum period of five years, which may be further extended at the discretion of the BUYER.

viii. To recover all sums paid in violation of this Pact by BIDDER(S) to any middleman or agent or broker with a view to securing the contract.

ix. In cases where irrevocable Letters of Credit have been received in respect of any contract signed by the BUYER with the BIDDER, the same shall not be opened.

x. Forfeiture of Performance Bond in case of a decision by the BUYER to forfeit the same without assigning any reason for imposing sanction for violation of this Pact.

6.2 The BUYER will be entitled to take all or any of the actions mentioned at para 6.1(i) to (x) of this Pact also on the Commission by the BIDDER or any one employed by it or acting on its behalf (whether with or without the knowledge of the BIDDER), of an offence as defined in Chapter IX of the Indian Penal code, 1860 or Prevention of Corruption Act, 1988 or any other statute enacted for prevention of corruption.

6.3 The decision of the BUYER to the effect that a breach of the provisions of the Pact has been committed by the BIDDER shall be final and conclusive on the BIDDER. However, the BIDDER can approach the Independent Monitor(s) appointed for the purposes of this Pact.

7 Fall Clause

7.1 The BIDDER undertakes that it has not supplied/s not supplying similar product/ systems or subsystems at a price lower than that offered in the present bid in respect of any other Ministry/ Department of the Government of India or PSU and it is found at any stage that similar product/

Page 55: NABARD NEW DELHI REGIONAL OFFICE NABARD TOWER 24, …€¦ · signature and seal of contractor 1 nabard new delhi regional office nabard tower 24, rajendra place, new delhi invites

Signature and Seal of Contractor 55

systems or sub systems was supplied by the BIDDER to any other Ministry/ Department of the Government of India or a PSU at a lower price, then that very price, with due allowance for elapsed time, will be applicable to the present case and the difference in the cost would be refunded by the BIDDER to the BUYER, if the contract has already been concluded.

8. Independent Monitors

8.1 The BUYER has appointed Independent Monitor Shri Debabrata Sarkar (hereinafter referred to as Monitor) for this Pact in consultation with the Central Vigilance Commission.

8.2 The task of the Monitor shall be to review independently and objectively, whether and to what extent the parties comply with the obligations under this Pact.

8.3 The Monitor shall not be subject to instructions by the representatives of the parties and perform their functions neutrally and independently.

8.4 Both the parties accept that the Monitors have the right to access all the documents relating to the project/ procurement, including minutes of meetings.

8.5 As soon as the Monitor notices or has reason to believe, a violation of this Pact, he will so inform the Authority designated by the BUYER.

8.6 The BIDDER(s) accepts that the Monitor has the right to access without restriction to all Project documentation of the BUYER including that provided by the BIDDER. The BIDDER will also grant the Monitor, upon his request and demonstration of a valid interest, unrestricted and unconditional access to his project documentation. The same is applicable to Subcontractors. The Monitor shall be under contractual obligation to treat the information and documents of the BIDDER/ Subcontractor(s) with confidentiality.

8.7 The BUYER will provide to the Monitor sufficient information about all meetings among the parties related to the Project provided such meetings could have an impact on the contractual relations between the parties. The parties will offer to the Monitor the option to participate in such meetings.

8.8 The Monitor will submit a written report to the designated Authority of BUYER within 8 to 10 weeks from the date of reference or intimation to him by the BUYER/ BIDDER and should the occasion arise submit proposals for correcting problematic situations.

9. Facilitation of Investigation

In case of any allegation of violation of any provisions of this Pact or payment of commission, the BUYER or its agencies shall be entitled to examine all the documents including the Books of Accounts of the BIDDER and the BIDDER shall provide necessary information and documents in English and shall extend all possible help for the purpose of such examination.

10 Law and Place of Jurisdiction

This Pact is subject to Indian Law. The place of performance and jurisdiction is the seat of the BUYER.

11. Other Legal Actions

The actions stipulated in this Integrity Pact are without prejudice to any other legal action that may follow in accordance with the provisions of the extant law in force relating to any civil or criminal proceedings.

Page 56: NABARD NEW DELHI REGIONAL OFFICE NABARD TOWER 24, …€¦ · signature and seal of contractor 1 nabard new delhi regional office nabard tower 24, rajendra place, new delhi invites

Signature and Seal of Contractor 56

12. Validity

12.1 The validity of this Integrity Pact shall be from date of its signing and extend up to 5 years or the complete execution of the contract to the satisfaction of both the BUYER and the BIDDER/ Seller, including warranty period, whichever is later in case BIDDER is unsuccessful, this Integrity Pact shall expire after six months from the date of the signing of the contract.

12.2 Should one or several provisions of this Pact turn out to be invalid, the remainder of this Pact shall remain valid. In this case, the parties will strive to come to an agreement to their original intentions.

13 The parties hereby sign this Integrity Pact at _____________________ on -____________________.

BUYER BIDDER

Name of the Officer Chief Executive Officer

Designation

NABARD

Witness Witness

1. _______________________ 1. _______________________

2. _______________________ 2._______________________

Page 57: NABARD NEW DELHI REGIONAL OFFICE NABARD TOWER 24, …€¦ · signature and seal of contractor 1 nabard new delhi regional office nabard tower 24, rajendra place, new delhi invites

Signature and Seal of Contractor 57

CIVIL, INTERIOR FURNISHING AND ELECTRICAL WORKS OF GROUND FLOOR AT NABARD TOWER

PART A:- INTERIOR FURNISHING WORKS

S No Description AMOUNT (`)

1 Partitions and Panelling =

2 Storage =

3 Doors =

4 Finishing and Ceiling Works =

5 Counters and Tables =

6 Miscellaneous =

TOTAL COST =

PART B:- ELECTRICAL WORKS

TOTAL COST =

PART C:- PHE WORKS

S No Description AMOUNT (`)

1 Sanitary Installation =

2 Water Supply Pipes =

3 Soil, Waste & Vent Pipes =

TOTAL COST =

PART D:- CIVIL WORKS

S No Description AMOUNT (`)

1 Flooring and brickworks =

TOTAL COST =

PART E:- MISCELLANEOUS WORKS

TOTAL COST =

GRAND TOTAL =

Page 58: NABARD NEW DELHI REGIONAL OFFICE NABARD TOWER 24, …€¦ · signature and seal of contractor 1 nabard new delhi regional office nabard tower 24, rajendra place, new delhi invites

Signature and Seal of Contractor 58

CIVIL, INTERIOR FURNISHING AND ELECTRICAL WORKS OF GROUND FLOOR AT NABARD TOWER

PART A:- INTERIOR FURNISHING WORKS

S. No. Description Unit Qty. Rate Amount

I. PARTITIONS AND PANELLING:-

1.(i) Full/ Low Height Partition: Providing and fixing in

position Full Height partition in framework of 600 X 600 mm grid (horizontally and vertically) comprising of 50 mm X 50 mm heavy duty Aluminium Box Sections with 12 mm thick MDF on both sides finished with 4 mm thick decorative teak veneer of make Green Decowood/ Century veneers/ Archidply including grooves as/ Architect. Item to include 65 X 65 mm teakwood member for door frame and additional framework and teakwood beading required for providing glazing. All exposed teakwood surfaces, grooves and the like to be finished in melamine polish of matching laminate colour including all necessary fittings and SS hardware of make hettich/ hafele/ dorma. The rate to include provision of extra frame work as necessary for skirting and making cut-outs for electrical switches, switch boxes, conduiting, door/ glazing as per drawings.

Sqm 21.00

Note:- a) In case of false ceiling, the vertical Aluminium members to be fixed to RCC ceiling but the area of partition payable will be below the false ceiling only. b) Measurement of height shall be taken from finished floor only, in case of varying heights on either side of partition, average height shall be considered. c) Openings/ door/ glass shall not be measured for payment.

(ii) Extra for same as above but in circular profile. Sqm 17.00

(iii) Same as above but only one side of partition to be finished

with 12 mm thick MDF finished with 4 mm thick decorative

teak veneer of make Green Decowood/ Century veneers/

Archidply including grooves as/ Architect.

Sqm 35.00

(iv) Extra for same as above but for lvl. Difference Sqm 11.00

Page 59: NABARD NEW DELHI REGIONAL OFFICE NABARD TOWER 24, …€¦ · signature and seal of contractor 1 nabard new delhi regional office nabard tower 24, rajendra place, new delhi invites

Signature and Seal of Contractor 59

2.(i) Wall Panelling: Providing and fixing in position wall

panelling in 600 X 600 mm grid (horizontally and vertically) comprising of 25 mm X 50 mm heavy duty Aluminium Box Sections with 12 mm thick MDF finished with with 4 mm thick decorative teak veneer of make Green Decowood/ Century veneers/ Archidply including grooves as/ Architect. The rate to include for provision of extra frame work as necessary for skirting and making cut outs for electrical switches, switch boxes, conduiting, receiving A.C.'s etc. as per drawings. All exposed teakwood surfaces, grooves and the like to be finished in melamine polish of matching laminate colour or as directed.

-

Sqm 73.00

Contractor to use proper masking tapes while polishing grooves etc. to prevent any damage to laminate. [Note:Incase of wall not being true to plumb extra shims of aluminium section shall be provided. Nothing extra shall be payable in this regard.]

(ii) Same as above but panelling to be finished with Laquered

glass of make Saint Gobain or approved equivalent with

adhesive of approved brand and manufacture all complete

as per the directions of Architect/ Engineer-in-charge.

Sqm 5.00

(iii) Same as above but panelling to be finished with

Travertino Beige Italian Marble (sample to be approved before installation) with aeraldite all complete as per the directions of Architect/ Engineer-in-charge.

Sqm 30.00

3. Providing and fixing glazed door and fixed glazing (full/ low

height glass partition) with 12 mm thick toughened glass of approved make with all SS patch fittings (Hettich/ Haffele/ Dorma) and frosting as per drawing. Item to include floor springs, lock, 300 mm long D- handles and other necessary hardware of Stainless Steel of make Ozone/ Haffele/ Dorma all complete as per the directions of Architect/ Engineer-in-charge.

a Fixed Glazing Sqm 67.00 b Same as above but for Automatic Sensor door with remote

control system Sqm 11.00

Total of S.H. (I) of Partitions and Panelling

II. STORAGE:-

Page 60: NABARD NEW DELHI REGIONAL OFFICE NABARD TOWER 24, …€¦ · signature and seal of contractor 1 nabard new delhi regional office nabard tower 24, rajendra place, new delhi invites

Signature and Seal of Contractor 60

4. Providing and fixing full/ low height storage and 450 mm deep as shown in details/ drawing with all sides, shelves to be 19 mm blockboard with 12 mm thick commercial plywood to be fixed at the back. The top shall be finished with 1 mm thick laminate over 19 mm thick blockboard all complete. The shutters to be 19 mm thick blockboard with 1 mm thick laminate 'UGM' Frosty White/ 'E-1761' Bleached Teak of make Formica/ equivalent shade in approved make on all exposed outside surfaces and 0.8 mm thick laminate on all the inside surfaces. The sides/ bottom of the drawer shall be made out of 12 mm thick commercial plyboard. All edges/ shutters to be finished with 0.8 mm thick PVC Edge banding. all complete including S.S. long handles, self closing hinges/ telescopic hinges of Hettich/ Hafele/ Ebco etc.

Sqm 3.00

All outside surfaces to be finished in laminate and providing of 8 mm thick clear toughened glass with bevelled edges at the top of storage all complete to the

satisfaction of Architect/ Engineer-in-charge. [Front elevation shall be measured for payment.]

(ii) Same as above but finished with 4 mm thick decorative

teak veneer of make Green Decowood/ Century veneers/ Archidply including grooves as/ Architect. All exposed teakwood surfaces, grooves and the like to be finished in melamine polish of matching colour including all necessary fittings and SS hardware of make hettich/ hafele/ dorma.

Sqm 2.00

5. Providing, fabricating and fixing in position as per layout

plan overhead cabinets (400 mm deep). The specifications for the framework/ carcass and shutters of the cabinets are same as given for the cabinets above [Front visible surface area of the cabinets shall be measured for payment].

Sqm 3.00

Total of S.H. (II) of Storage

III. DOORS:-

6.(i) Solid Flush door : Providing and fixing 30 mm thick flush

door with 10 mm thick teakwood lipping on all sides finished in 4 mm thick decorative teak veneer of make Green Decowood/ Century veneers/ Archidply including grooves as/ Architect. All exposed teakwood surfaces, grooves and the like to be finished in melamine polish of matching colour including SS door handle, SS stopper, lock, door closer, SS butt hinges etc. of make Dorma/ Hettich/ Hafele all complete as per directions of Architect/ Bank.

Sqm 4.00

Page 61: NABARD NEW DELHI REGIONAL OFFICE NABARD TOWER 24, …€¦ · signature and seal of contractor 1 nabard new delhi regional office nabard tower 24, rajendra place, new delhi invites

Signature and Seal of Contractor 61

6.(ii) Solid Flush door with vision panel: Providing and fixing

30 mm thick flush door (with vision panel of size 150 mm

X 1500 mm having float glass of thickness 5 mm) with 10

mm thick teakwood lipping on all sides finished in 4 mm

thick decorative teak veneer of make Green Decowood/

Century veneers/ Archidply including grooves as/

Architect. All exposed teakwood surfaces, grooves and

the like to be finished in melamine polish of matching

colour including SS door handle, SS stopper, lock, door

closer, SS butt hinges etc. of make Dorma/ Hettich/ Hafele all complete as per directions of Architect/ Bank.

Sqm 4.00

7. Electrical panel door with louvres: Providing and fixing

30 mm thick flush door with louvres with 10 mm thick teakwood lipping on all sides finished 4 mm thick decorative teak veneer of make Green Decowood/ Century veneers/ Archidply including grooves as/ Architect. All exposed teakwood surfaces, grooves and the like to be finished in melamine polish of matching colour including SS door handle, SS stopper, lock, door closer, SS butt hinges etc. of make Dorma/ Hettich/ Hafele. The item to include White powder coated Aluminium louvres in the shutters of the door all complete as per directions of Architect/ Bank.

Sqm 10.00

8. Sliding Folding door: Providing and fixing 50 mm thick

Sliding folding door system with 10 mm thick teakwood lipping on all sides finished 4 mm thick decorative teak veneer on both sides of make Green Decowood/ Century veneers/ Archidply including grooves as/ Architect. All exposed teakwood surfaces, grooves and the like to be finished in melamine polish of matching colour including SS door handle, SS stopper, lock, door closer, SS butt hinges etc. of make Dorma/ Hettich/ Hafele all complete as per directions of Architect/ Bank.

Sqm 35.00

Total of S.H. (III) of Doors

IV. CEILING AND FINISHING WORKS:-

Page 62: NABARD NEW DELHI REGIONAL OFFICE NABARD TOWER 24, …€¦ · signature and seal of contractor 1 nabard new delhi regional office nabard tower 24, rajendra place, new delhi invites

Signature and Seal of Contractor 62

9. Providing and fixing at all height false ceiling and making coves including providing and fixing of framework made of special sections power pressed from M.S. sheet and galvanised in accordance with zinc coating of grade 350 as per IS : 277 and consisting of angle cleats. The perimeter of ceiling fixed to wall/partition with the help of rawl plugs at 450 mm centre to centre with 25 mm long drive-all screws @ 230 mm interval including jointing and fixing to a flush finish of tapered and square edges of the board with recommended filler, jointing tapes, finisher and one coat of primer suitable for board as per manufactures specification and also including the cost of making openings for light fittings, grills, diffusers, cut-outs made with frame of perimeter channels suitably fixed all complete as per drawing and specification and direction of the Engineer in Charge with: 12.5 mm thick tapered edge gypsum board conforming to IS:2095- Part-I of India Gypsum/ approved make for both framework and the board.

Sqm 175.00

Item to include painting with plastic emulsion paint with 'Velvet Touch' of approved brand and manufacture to

give an even shade: Two or more coats on new work with rollers/ spray of make Asian/ Berger/ Dulux paint. Note:Measurement shall be taken of the plan area only. Suspending system and frame work shall match layout of Electrical/ fire protection wiring/ fixtures etc. Rate to include provision of extra frame work needed due to above and to include necessary scaffolding etc. all complete.

10. Providing and fixing false ceiling base with 12 mm thick

commercial ply over wooden framework of 50 mm X 50

mm heavy duty Aluminium Box Sections all complete as

per the directions of Engineer-in-charge/ Architect/

drawings. The ceiling to be finished using 4 mm thick teak

veneer of make Green Decowood/ Century veneers/

Archidply over base as above and including making

grooves and finishing the grooves in melamine polish etc.

Note:- a) Contractor to use proper masking tapes while

polishing grooves etc. to prevent any damage to veneer. b)The direction of grains in veneer shall be as per Architect. Nothing extra shall be payable in this regard.

Sqm 75.00

11. Providing and applying Birla putty over plastered surface

to prepare the surface even and smooth all complete as per the directions of Engineer-in-charge.

Sqm 55.00

12. Finishing walls with textured interior paint of required

shade: New work (Two or more coats applied @ 3.28 ltr/10 sqm) over and including base coat of water proofing cement paint applied @ 2.20 kg/10 sqm with rollers/ spray of make ACRO/ approved make.

Sqm

55.00

Total of S.H. (IV) of Ceiling and Finishing Works

V. COUNTERS AND TABLES:-

Page 63: NABARD NEW DELHI REGIONAL OFFICE NABARD TOWER 24, …€¦ · signature and seal of contractor 1 nabard new delhi regional office nabard tower 24, rajendra place, new delhi invites

Signature and Seal of Contractor 63

13. Providing and fixing in position Reception table 3500 X

600 mm wide (as per design) comprising of the following complete in all respects (REFER DRAWING):

Nos. 1.00

(i) Work top to be made with 19 mm thick blockboard and

finished with 1 mm thick laminate. 8 mm thick clear toghened glass with bevelled edges to be provided on top. Inside facia of the blockboard shall be finished with 4 mm thick teak veneer of make Green Decowood/ Century veneers/ Archidply over base as above and including making grooves.

(ii) Vertical facia (apron) to be made with 19 mm thick

blockboard and finished with 4 mm thick teak veneer of

make Green Decowood/ Century veneers/ Archidply over

base as above and including making grooves. The

grooves to be finished with melamine polish all complete.

[Note:- Contractor to use masking tapes etc. to prevent any polishing from affecting the laminate.]

(iii) Vertical drop box (horizontal box) shall be provided on the facia with 19 mm thick blockboard finished with 4 mm thick teak veneer of make Green Decowood/ Century veneers/ Archidply over base as above and including making grooves.

(iv) Vertical supports made with 19 mm thick blockboard finished with 4 mm thick teak veneer of make Green Decowood/ Century veneers/ Archidply over base as above and including making grooves.

(v) Telescopic CPU stand and readymade keyboard tray shall be provided of approved model and make.

(vi) Boxing as per drawing made with 12 mm thick plywood finished with synthetic enamel paint shall be provided below the table top for electrical conduiting and at the bottom for the LAN cabling/ telephone wire conduiting.

(vii) The item to include all necessary hardware and fittings in

SS finish, 0.8 mm thick PVC edge banding to all edges,

providing SS wire manager etc. Necessary SS D-brackets

required for fixing the glass are to be provided.

[Note:Contractor to use masking tapes etc. to prevent any polishing from affecting the laminate.]

14. Providing & fixing Running Counter/ Table with 19 mm

thk. BWR ply top with 1.0mm thk. decorative texture laminate finish. Table supported on drawer unit and other side with gable end finished with laminate from outside and 0.8mm thk. white laminate from inside. Counter to have one drawer unit per occupant (approx. 1200mm running length per occupant) with specifications for drawer units etc. as per main specifications mentioned above etc. complete as per design/drawing. The width of running counter/ table to be 600 mm.

R.Mt. 4.0

Total of S.H. (V) of Counters and Tables

VI. MISCELLANEOUS:-

Page 64: NABARD NEW DELHI REGIONAL OFFICE NABARD TOWER 24, …€¦ · signature and seal of contractor 1 nabard new delhi regional office nabard tower 24, rajendra place, new delhi invites

Signature and Seal of Contractor 64

15. Providing and fixing of satin brush finish stainless steel lettering in 18 gauge sheet (SS-304 grade) of required size and shape including fixing with necessary stainless steel nuts and bolts/ araldite including stainless steel welding as per approved architectural drawing etc. all complete as per direction of Engineer-in-charge.

per sq inch

150.00

16. Supply & fixing of Aluminium Composite Panel (ACP), 3

mm thick in required colours for exteriors consisting of two layers of aluminium skins of 0.5 mm thick sandwiching a thermo plastic core in continuous lamination process with PVDF coating for exterior grades ensuring long colour and no fungal attacks of make Alukobond/ Eurobond or approved equivalent. Base frame work with aluminium sections shall be fixed over finished plaster and the above aluminium panels shall be fixed to the frame work as cladding including cost of labour, materials, accessories, adhesives, scaffolding, wastages, transportation, taxes, fixing in to a neat finish with FOLDING SYSTEM and

without any undulations in facias all complete as per drawing and instruction of Engineer-in-charge.

Sqm 16.00

17. Providing and placing SS perforated dustbin with square

holes of Euronics/ approved make (Cat No. AFBR 3FP) of size 8" X 12" all complete as per directions of Engineerin-charge.

Nos. 2.00

18. Supply, Installation, Testing and Commissioning on

Cascade water fountain comprising of LED changing lights, pump, plumbing works and of minimum working dimensions 2800 mm X 2400 mm all complete as per the directions of Architect/ Engineer-in-Charge.

Nos. 1.00

19. Supply, Fabrication and Installation of Corian Dupont/

Luxor Durlax/ approved equivalent of 'Salt (Translucent series), Azure & Diamond Blue' 12 mm thk. applied on

Table top, Sides, Wall, Logo and the like. The edges to be joined should be straight, smooth and clean. Joints should only be made with joint adhesive for Dupont Corian. All corners of a cutout must be rounded to 5mm radius and the edges smoothed, both on top & bottom, all around a cutout. "L" & "U" shaped corners need smooth 5 mm radius inside corner all complete as per the the directions of the Architect/ Bank's Engineer. Note:Finished area

shall only be measured for payment.

Sqm

8.00

Total of S.H. (VI) of Miscellaneous

PART B:- ELECTRICAL WORKS

S.

No. Description Unit Qty. Rate Amount

Page 65: NABARD NEW DELHI REGIONAL OFFICE NABARD TOWER 24, …€¦ · signature and seal of contractor 1 nabard new delhi regional office nabard tower 24, rajendra place, new delhi invites

Signature and Seal of Contractor 65

I Wiring for light point/ fan point/ wall fan point/ exhaust fan/ light sockets etc. with 3 X 1.5 sq.mm. PVC insulated 1100 V Grade copper conductor (FRLS) wire in concealed/ surface using 16 SWG MS conduits, accessories such as bends, tees, saddles, draw boxes, mounting boxes, inner plates, cover plates, ceiling rose etc (whereever required) and chromium plates brass screws/ rowel plug etc. The circuit wiring starting from DB to point control box/ switch box using 2x2.5 sq.mm PVC insulated 1100 V grade multi stranded copper conductor wire & 1.5 sq.mm. PVC insulated earth wire (color code to be used). (Flexible conduit/ elbow not allowed). The conduit to be laid in ceiling with proper clamps/ wall/ floor and filling the chase with cement mortar and finishing the same in original form/ wooden partition/ above false ceiling with proper clamps etc. all complete.

-

(Wherever required as per standard specifications).

i) Each circuit shall have independent earth wire.

ii) Each point shall be earthed.

iii) Circuit wiring is to be included in point wiring rates. (i) Primary light points controlled by one 6 amp. Modular

switch. Nos. 20.00

(ii) Secondary light points controlled by one 6 amp. Modular switch.

Nos. 30.00

(iii) One call bell point with ceiling rose/ 6 amp. 3 pin socket controlled by one 6 amp. Push Modular switch. Item to include call bell of make Anchor.

Nos. 1.00

(iv) One wall fan/ exhaust fan point with 6 amp 3-pin socket controlled by one 6 amp. Modular switch. The switch should be at switchboard level.

Nos. 5.00

(v) One light 5 pin socket controlled by one 6 amp. Modular switch.

a Dependent Nos. 2.00 b Independent Nos. 5.00

II POWER POINTS (i) Same as serial no.1, but wiring for 6/16 Amp, 6-pin

sockets by using 2 X 4 sq.mm. PVC insulated 1100 V

grade copper conductor wire with independent 2 X 2.5

sq.mm earth wire from D.B. to first point 1st socket and 1st

to 2nd, socket with 2.5 sq.mm. and 1.5 earth wire including

providing and fixing of 16 Amp, 6 –pin socket with 16 Amp. Switch (Maximum two points in a circuit).

a) Primary Point Nos. 5.00 b) Secondary Point C Looped Point Nos. 5.00

III LIGHT FITTINGS

Supplying, installation, testing and commissioning of following light fixtures with minimum 3 years replacement warranty and including electronic Ballasts, electronic transformer, Tubes, lamps, all fixing materials including connecting wires etc. all complete as per the directions of Engineer-in-charge.

Page 66: NABARD NEW DELHI REGIONAL OFFICE NABARD TOWER 24, …€¦ · signature and seal of contractor 1 nabard new delhi regional office nabard tower 24, rajendra place, new delhi invites

Signature and Seal of Contractor 66

(i) BBS170 X 1 X DLED 5000PSU CW complete as required 15 W (noiminal) of make Philips/ Wipro/ CG (Contractor to take approval before installation).

Nos. 42.00

(ii) LED flexi strip light of 5 mtrs. Length Cat. No.

LHKDO1005674 and driver Cat. No. LHBDO5160074 in 20 - 25 W of make Havells/ Osram/ Wipro.

Nos. 6.00

(iii) Box type 16 - 20 W LED tube with only 27 mm width for

mounting of make CG/ C & S/ HPL/ Halonix. Nos. 4.00

IV Supply, installation, testing and commissioning of

following fans with all fixing materials like white Polycarbonate 2 mm Hylem sheet cover, down rods, fan box as required etc. all complete as per the directions of Engineer-in-charge.

(i) Wall mounted fans 400 mm dia. Bajaj Midea/ Crompton

Hiflo. Nos. 3.00

(ii) Supply & fixing of inline exhaust fan with all accessories

etc. complete of make Havells/ Crompton/ Orient/ approved equivalent.

Nos. 2.00

(iii) Supply & fixing of Pendant ligts/ Chandeliers (Basic Cost

Rs. 75,000.00 P) all complete. Nos. 2.00

V a) Wiring with 2 X 2.5 sq.mm. + 1 X 1.5 sq.mm. FRLS PVC

insulated 1100 V Grade multi stranded copper conductor wires in 2 mm thick PVC conduit from UPS DB to computer point. Each point to have 3 Nos. 6 Amp 5 pin modular type sockets, one 6 Amp indicator at below the top of the table/ counter and controlled by one 6 Amp modular switch at above the table top in wooden partition with all accessories, inner/ outer plates, metal box etc. and to be fixed on wooden partitions/ by grouting on wall etc. as per the requirement at site.

Nos. 2.00

b) Same as above but looped from the above 1st Point to 2nd point and 2nd point to 3rd point (Maximum 3 points in a circuit).

Nos. 3.00

VI DISTRIBUTION BOARDS

All MCBs are of 'C' Series. a) Supplying, fixing, on wall, interconnection, factory

fabricated for LIGHTING DB 4 way TPN with double door (metal) for having three phase 40 Amp TPN ELMCB as incomer controlling 12 Nos. 10 Amp/ 16 Amp SP MCB.

Nos. 1.00

VII (i) Supplying and laying of aluminium armoured XLPE cable

of following size:

ii) 4 core X 16 sq.mm. RM 25.00

Page 67: NABARD NEW DELHI REGIONAL OFFICE NABARD TOWER 24, …€¦ · signature and seal of contractor 1 nabard new delhi regional office nabard tower 24, rajendra place, new delhi invites

Signature and Seal of Contractor 67

iii) 4 core X 10 sq.mm. RM 15.00 iv) 4 core X 6 sq.mm. RM 25.00

VII (ii)

Termination with aluminium lugs with properly crimped and cable glands of required size:

b 4 core 16 sq.mm. Nos. 2.00 c 4 core 10 sq.mm. Nos. 2.00 d 4 core 6 sq.mm. Nos. 2.00

Total of Electrical Works

PART C:- PHE WORKS

S.

No. Description Unit Qty. Rate Amount

S. H. : I - SANITARY INSTALLATIONS

1. Providing and fixing white vitreous china extended body

wall mounted water closet of size 'Enigma' of make Hindware or approved equivalent with white vitreous china cistern with dual flush fitting of flushing capacity 3 litre/ 6 litre (adjustable to 4 litre/ 8 litres), including seat cover, and cistern fittings, nuts, bolts and gasket etc. all complete as per directions of Architect/ Engineer.

Each 2.00

2. Providing and fixing Wash basin '510 X 400 mm' of make

Hindware/ Approved equivalent with C.I. brackets, 15 mm C.P. brass spatula lever taps, 32 mm C.P. brass waste of standard pattern, including painting of fittings and brackets, cutting and making good the walls wherever required: White Vitreous China Wash basin with a single 15 mm C.P. brass spatula lever tap.

Each 1.00

3. Providing and fixing Half Pedestal wash basin 'Studio' of

make Hindware/ Approved equivalent with C.I. brackets, 15 mm C.P. brass pillar taps, 32 mm C.P. brass waste of standard pattern, including painting of fittings and brackets, cutting and making good the walls wherever required: White Vitreous China Wash basin with a single 15 mm C.P. brass pillar tap.

Each 1.00

4. Providing and fixing Stainless Steel 304 grab bar 600 mm

long including painting of fittings and brackets, cutting and making good the walls wherever required: Grab Bar 600 mm long.

Each 3.00

Page 68: NABARD NEW DELHI REGIONAL OFFICE NABARD TOWER 24, …€¦ · signature and seal of contractor 1 nabard new delhi regional office nabard tower 24, rajendra place, new delhi invites

Signature and Seal of Contractor 68

5. Providing and fixing Stainless Steel 304 Wall Mounted Hinged Rail 750 mm long including painting of fittings and brackets, cutting and making good the walls wherever required: Hinged Rail 750 mm long.

Each 1.00

6. Providing and fixing CP Brass 32 mm size Bottle Trap of

approved quality & make and as per the direction of Engineer-in-charge.

Each 2.00

7. Providing and fixing C.P. brass angle valve for basin mixer

and geyser points of approved quality conforming to IS:8931: 15 mm nominal bore.

Each 6.00

8. Providing and fixing Health faucet with 8 mm dia, 1 meter

long Flexible tube with wall hook (Cat. No. ALD-573) of make Jaquar or approved equivalent with SS screws etc. all complete as per directions of Engineer-in-charge.

Each 2.00

9. Providing and Fixing Glass shelf 22" (ACN- 1171N)

including cutting and making good the walls wherever required of make Jaquar or approved equivalent.

Each 1.00

10. Providing & fixing C.P. 450 mm long copper connecting

pipe and brass nuts of approved make with washers etc. all complete including cutting and making good the walls wherever required.

Each 4.00

11. Providing and fixing grating in C.P. brass all complete as

per the instructions of Engineer-in-charge. Each 2.00

Total of S.H. I of Sanitary Installations

S. H. : II - WATER SUPPLY PIPES

12. Providing and fixing Chlorinated Polyvinyl Chloride

(CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, i/c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and the cost of cutting chases and making good the same including testing of joints complete as per direction of Engineer in Charge. Concealed work, including cutting chases and making good the walls etc.:

a 15 mm nominal outer dia Pipes. Mtr 35.00 b 20 mm nominal outer dia Pipes. Mtr 10.00 c 32 mm nominal outer dia Pipes. Mtr 20.00

Page 69: NABARD NEW DELHI REGIONAL OFFICE NABARD TOWER 24, …€¦ · signature and seal of contractor 1 nabard new delhi regional office nabard tower 24, rajendra place, new delhi invites

Signature and Seal of Contractor 69

13. Providing and fixing Gun Metal Ball valve with SS 304 ball, SS stem, renewable PTFE seat, teflon gland packing, stanmdard bore, lever operated, screwed female threads, body and seat test pressure 500 Psig. Complete in all respects.

a 32 mm dia. Nominal bore. Each 2.00

Total of S.H. II of Water Supply Pipes

S. H. : III - SOIL, WASTE & VENT PIPES

14. Providing and fixing soil, waste and vent pipes :100 mm

dia Centrifugally cast (spun) iron socket & spigot (S&S) pipe as per IS: 3989.

Mtr 15.00

15. Providing and fixing plain bend of required degree. 100

mm dia Sand cast iron S&S as per IS - 3989. Each 4.00

16. Providing and fixing M.S. stays and clamps for sand cast

iron/ centrifugally cast (spun) iron pipes of diameter: 100 mm.

Each 3.00

17. Providing and fixing trap of self cleansing design with

screwed down or hinged grating with or without vent arm complete, including cost of cutting and making good the walls and floors: 100 mm inlet and 100 mm outlet. Sand cast iron S&S as per IS: 3989.

Each 2.00

18. Painting sand cast iron/ centrifugally cast (spun) iron soil,

waste vent pipes and fittings with two coats of synthetic

enamel paint of any colour such as chocolate grey, or buff

etc. over a coat of primer (of approved quality) for new work: 100 mm diameter pipe.

Mtr 15.00

Total of S.H. III of Soil, Waste & Vent Pipes

PART D:- CIVIL WORKS

S.

No. Description Unit Qty. Rate Amount

S. H. : I - FLOORING AND BRICKWORK

1.(i) Providing and fixing Ist quality Glazed Vitrified Wall tiles of

size 400 X 1200 of Eternity Series make Kajaria or approved equivalent (thickness to be specified by the manufacturer) in all colours, shades as approved by Architect/ Engineer-in-Charge in dado, skirting, risers of steps etc. over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3kg per sqm, including pointing in white cement mixed with pigment of matching shade complete.

Sqm 24.00

Page 70: NABARD NEW DELHI REGIONAL OFFICE NABARD TOWER 24, …€¦ · signature and seal of contractor 1 nabard new delhi regional office nabard tower 24, rajendra place, new delhi invites

Signature and Seal of Contractor 70

1.(ii) same as above but with Hand made Tiles as per approval Sqm 7.00

2. Providing and laying Glazed Vitrified Floor tiles of size 400

X 1200 of Eternity Series make Kajaria or approved equivalent (thickness to be specified by the manufacturer) in all colours, shades as approved by Architect/ Engineerin-Charge laid on 20 mm thick cement mortar 1:4 (1 Cement : 4 Coarse sand), jointing with grey cement slurry @ 3.3kg/ sqm including pointing the joints with white cement and matching pigment etc. complete.

Sqm 7.00

3. Half Brick Masonry with F.P.S. bricks of class designation

75 in superstructure above plinth level up to floor III level.

Cement mortar 1:3 (1 cement : 3 coarse sand). Item to

include providing and placing in position 2 Nos. 6 mm dia. M.S. bars at every third course of half brick masonry (with

F.P.S. bricks) etc. all complete as per directions of Architect/ Bank's Engineer.

Sqm 2.00

4. 12 mm cement plaster on brick wall of mix: 1 : 6 (1 cement:

6 coarse sand). Sqm 5.00

5. Granite flooring/ cladding (upto 3 metres in height)

including all designs/ patterns/ combinations/ motifs as per architect with 18 mm thick stone (sample of Granite shall be approved by Engineer-in-charge) over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with grey cement slurry including rubbing and polishing the same.

Sqm 12.00

Total of S.H. I of Flooring & Brickwork

PART E:- MISCELLANEOUS WORKS

S.

No. Description Unit Qty. Rate Amount

1. Providing and fixing C.P. brass robe hook (Cat. No. AQN

7791) of Jaquar/ approved make with SS screws etc. all complete as per directions of Engineer-in-charge.

- Each 2.00

2. Supplying & installation of powder coated aluminium

venetian blinds for windows of Vista/ approved make all complete and inclusive of taxes etc. as per the directions of the Architect.

Sqm 5.00

3. Providing and fixing toilet paper holder recessed type

(Cat. No. AHS-1551) of Jaquar/ approved make with SS screws etc. all complete as per directions of Architect/ Engineer-in-charge.

Each 2.00

Page 71: NABARD NEW DELHI REGIONAL OFFICE NABARD TOWER 24, …€¦ · signature and seal of contractor 1 nabard new delhi regional office nabard tower 24, rajendra place, new delhi invites

Signature and Seal of Contractor 71

4. Providing and fixing Hand dryer (Cat No. EH-07S) of

Euronics/ approved make in SS finish all complete as per the directions of the Architect/ Engineer-in-charge.

Nos. 2.00

5. Providing and fixing Paper dispensers (Cat No. 09992) of

Kimberley Clarke/ approved make in white colour all complete as per the directions of the Architect/ Engineerin-charge.

Nos. 2.00

6. Providing and fixing liquid soap dispensers (Cat No.

ES09) of Euronics/ approved make all complete as per the directions of the Architect/ Engineer-in-charge.

Nos. 2.00

7. Providing and fixing Mirror with frosted border (shape and

size as per architect) fixed on 6 mm ply backing and mounted with SS spacers etc. all complete as per the directions of Architect/ Engineer-in-charge.

Sqm 4.00

8. Polishing on existing woodwork with melamine polish of

matching shade all complete as per the Architect/ Engineer-in-charge.

Sqm 25.00

9. Relevelling of MS water tank manhole frame and cover

after removal of the same and recasting with required MS

bars, welding and the like as needed including concreting

as per requirement. Item to also include providing a new

set of cover of same weight and size as the existing cover

but top finished with granite matching with adjoining floor

and finished all complete as per the instructions of Architect/ Engineer-in-charge.

Nos. 1.00

10. Providing & setting on site sofa as follows (one seat shall

be measured as 600 mm (Avg.) wide): Seat 3.00

i) Fully Upholstered back and seat in 125 mm (100 mm

rubber + 25 mm foam) cushion with coilsprings and block

board/ hardwood frame of approved quality size & colour.

Item to also include quilting as per selected pattern and foam/ filling as required for the same.

ii) Upholstry fabric leatherite as per client (material shall be

paid separately as per selection as per Invoice raised.

Nothing extra shall be payable on the invoice and shall be assumed to be included in quoted price already.)

iii) Armrest forming supports and back rest in angular shape shall be made out of boxing with 18 mm thick plyboard of approved make.

iv) The bottom opening shall be fixed with galvanised mesh. PVC buffers shall be provided to avoid direct contact of the upholstry with floor. Item to include all necessary paint, polish, lipping, patti, piping, buttons etc. as per the Architect/ Bank's Engineer.

Page 72: NABARD NEW DELHI REGIONAL OFFICE NABARD TOWER 24, …€¦ · signature and seal of contractor 1 nabard new delhi regional office nabard tower 24, rajendra place, new delhi invites

Signature and Seal of Contractor 72

11. Disposal of rubbish/ mulba after dismantling/ demolition including clearing building waste of all types, rank vegetation etc. outside municipal limits and spreading of available good earth all complete as per the directions of Engineer-in-charge.

No. 1.00

12. Demolishing brick work in cement mortar manually or by

mechanical means including stacking of serviceable material and disposal of unserviceable material all leads included as per the directions of the Architect/ Bank's Engineer.

Cum 1.00

Total of Miscellaneous Works

Page 73: NABARD NEW DELHI REGIONAL OFFICE NABARD TOWER 24, …€¦ · signature and seal of contractor 1 nabard new delhi regional office nabard tower 24, rajendra place, new delhi invites

Signature and Seal of Contractor 73