Republic of the Philippines DEPARTMENT OF TRANSPORTATION AND COMMUNICATIONS
PRE-QUALIFICATION, BIDS AND AWARDS COMMITTEE
General Bid Bulletin No. 02-2015
Subject: ROAD TRANSPORT IT INFRASTRUCTURE PROJECT- PHASE II
TO ALL PROSPECTIVE BIDDERS:
Please find attached as Annex "A" the Presentation del ivered during the Pre-qualification Conference held last 24 August 20 15.
Issued this 2i11 day of August 2015.
-~ ATTY. RPETUO M. LOTILLA Chairma , Q alifi cation, Bids and Awards Committee and Undersecretary for Legal Affairs
n
THE COLUMBIA TOWER - 2 :J OZ. BRGY. WACK-WACK, ORTIGAS AVENUE 1555 MANDALUYONG CITY, PHILIPPINES
TELEFAX: (63 2) 72 3-49- 25 TRUNKLINE (632) 727-79-60 TO 79
DOTC ACTION CENTER HOTLINE: 7890
![Page 2: n Undersecretary for Legal Affairs - PPP Center€¦ · - Reduction in physical appearance Updated To-Be Process 9 1.1.1 1.1.2 Pre-Evaluation of Application Filing Assessment of Fees](https://reader036.vdocuments.us/reader036/viewer/2022070900/5f3701beb2a2bd04fb7d7293/html5/thumbnails/2.jpg)
Road Transport IT Infrastructure Project Phase II
Pre Qualification Conference August 24, 2015
![Page 3: n Undersecretary for Legal Affairs - PPP Center€¦ · - Reduction in physical appearance Updated To-Be Process 9 1.1.1 1.1.2 Pre-Evaluation of Application Filing Assessment of Fees](https://reader036.vdocuments.us/reader036/viewer/2022070900/5f3701beb2a2bd04fb7d7293/html5/thumbnails/3.jpg)
Project Background
Project Objectives
Proposed PPP Structure
Bidding Process & Pre Qualification Criteria
Agenda
2
![Page 4: n Undersecretary for Legal Affairs - PPP Center€¦ · - Reduction in physical appearance Updated To-Be Process 9 1.1.1 1.1.2 Pre-Evaluation of Application Filing Assessment of Fees](https://reader036.vdocuments.us/reader036/viewer/2022070900/5f3701beb2a2bd04fb7d7293/html5/thumbnails/4.jpg)
Land Transportation Franchising and Regulatory Board (LTFRB)
- Frontline agency of the Department of Transportation and Communications
(DOTC) entrusted with the powers of issuing Certificates of Public
Convenience (Franchises) for public land transport services in the Philippines.
1
2
3
4
Obtaining CPC is a mandatory requirement for operating any public land
transportation services within the Philippines except for some government agencies such as the Philippine National Railways (PNR)
Spread across 16 Regional Offices along with a Central Office at Quezon
City in Metro Manila
Central Office has issued Citizen’s Charter covering all transactions /
processes required between the Operator and LTFRB
Regional Offices have developed their own Citizen’s Charters, which need
to be synced with the Central Office
About LTFRB
3
![Page 5: n Undersecretary for Legal Affairs - PPP Center€¦ · - Reduction in physical appearance Updated To-Be Process 9 1.1.1 1.1.2 Pre-Evaluation of Application Filing Assessment of Fees](https://reader036.vdocuments.us/reader036/viewer/2022070900/5f3701beb2a2bd04fb7d7293/html5/thumbnails/5.jpg)
Certificate of Public Convenience (CPC)
Around 1,000,000 transactions in the year 2014
Functions of LTFRB
4
CPC + 8 transactions
• Amendment in CPC
• Extension of validity
• Changes – name, grants
• Sale & Transfers
etc.
11 transactions
• Advertisements on units
• Dropping & Substitution
• Special Permit
• Upgrade/ Downgrade
Units
• Correction typo in
decisions
etc.
7 transactions
• Annual Confirmations
• Sticker
• Inspections
• Special Trips
• Franchisee Verification
• Clearance of Accounts
• Certified true copies
12% 11% 77%
With Hearing (Complex) Without Hearing (Complex) Simple Transactions
![Page 6: n Undersecretary for Legal Affairs - PPP Center€¦ · - Reduction in physical appearance Updated To-Be Process 9 1.1.1 1.1.2 Pre-Evaluation of Application Filing Assessment of Fees](https://reader036.vdocuments.us/reader036/viewer/2022070900/5f3701beb2a2bd04fb7d7293/html5/thumbnails/6.jpg)
As an example, to obtain a valid CPC, the Operator is required to
undergo a number of activities & sub-processes.
Manual Processes within the LTFRB
5
1.1.1
Pre-Evaluation of
Application
1.1.2
Assessment of
Filing Fees
1.1.3
Payment of Filing
fees
1.1.4
Official Receipt of
Application
Start
End
1.1.5
Pre Docketing
1.1.10
Preparation of
Draft Decision
1.1.9
Conduct of
Regular Hearing
1.1.8
Publication of
NOH in the newspaper
1.1.7
Receipt of NOH
1.1.11
Signing of
Decision
1.1.12
Docketing
1.1.13
Recording of
Signed Decisions
1.1.14
Release of
Decisions
1.1.6
Preparation of
NOH
Issuance of New CPC
![Page 7: n Undersecretary for Legal Affairs - PPP Center€¦ · - Reduction in physical appearance Updated To-Be Process 9 1.1.1 1.1.2 Pre-Evaluation of Application Filing Assessment of Fees](https://reader036.vdocuments.us/reader036/viewer/2022070900/5f3701beb2a2bd04fb7d7293/html5/thumbnails/7.jpg)
The IT Infrastructure consists of following applications
• Franchise Processing System(FPS) – Franchise Verification
• Franchisee Information System (FIS) – Fees Receipt and Payment
Analysis of Present Infrastructure
6
![Page 8: n Undersecretary for Legal Affairs - PPP Center€¦ · - Reduction in physical appearance Updated To-Be Process 9 1.1.1 1.1.2 Pre-Evaluation of Application Filing Assessment of Fees](https://reader036.vdocuments.us/reader036/viewer/2022070900/5f3701beb2a2bd04fb7d7293/html5/thumbnails/8.jpg)
Project Background
Project Objectives
Proposed PPP Structure
Bidding Process & Pre Qualification Criteria
Agenda
7
![Page 9: n Undersecretary for Legal Affairs - PPP Center€¦ · - Reduction in physical appearance Updated To-Be Process 9 1.1.1 1.1.2 Pre-Evaluation of Application Filing Assessment of Fees](https://reader036.vdocuments.us/reader036/viewer/2022070900/5f3701beb2a2bd04fb7d7293/html5/thumbnails/9.jpg)
The LTFRB Road Transport IT Infrastructure Project Phase II aims to
deliver a transparent and efficient franchising system through
streamlining of LTFRB’s current processes and automation and is
expected to do the following-
Data verification,
migration, and
conversion of
existing records
1
2
3
4 Enhance data
collection,
processing,
and integration
Improve
access to
public
information
and
channels
Promote
transparency
and ease of
use
Aim of the Project
8
![Page 10: n Undersecretary for Legal Affairs - PPP Center€¦ · - Reduction in physical appearance Updated To-Be Process 9 1.1.1 1.1.2 Pre-Evaluation of Application Filing Assessment of Fees](https://reader036.vdocuments.us/reader036/viewer/2022070900/5f3701beb2a2bd04fb7d7293/html5/thumbnails/10.jpg)
- Online application submission, payments, and documents upload
- Reduction in physical appearance
Updated To-Be Process
9
1.1.1
Pre-Evaluation of
Application
1.1.2
Assessment of
Filing Fees
1.1.3
Payment of Filing
fees
1.1.4
Official Receipt of
Application
Start
End
1.1.5
Pre Docketing
1.1.10
Preparation of
Draft Decision
1.1.9
Conduct of
Regular Hearing
1.1.8
Publication of
NOH in the newspaper
1.1.7
Receipt of NOH
1.1.11
Signing of
Decision
1.1.12
Docketing
1.1.13
Recording of
Signed Decisions
1.1.14
Release of
Decisions
1.1.6
Preparation of
NOH
Issuance of New CPC
![Page 11: n Undersecretary for Legal Affairs - PPP Center€¦ · - Reduction in physical appearance Updated To-Be Process 9 1.1.1 1.1.2 Pre-Evaluation of Application Filing Assessment of Fees](https://reader036.vdocuments.us/reader036/viewer/2022070900/5f3701beb2a2bd04fb7d7293/html5/thumbnails/11.jpg)
The IT Infrastructure consists of a centralized web based application with
following architecture
Proposed IT Infrastructure
10
![Page 12: n Undersecretary for Legal Affairs - PPP Center€¦ · - Reduction in physical appearance Updated To-Be Process 9 1.1.1 1.1.2 Pre-Evaluation of Application Filing Assessment of Fees](https://reader036.vdocuments.us/reader036/viewer/2022070900/5f3701beb2a2bd04fb7d7293/html5/thumbnails/12.jpg)
The IT Infrastructure consists of a centralized web based application with
following applications:
Key
Applications
Workflow Management System
Document Management System
Revenue Management System
Basic Business Intelligence System
Online Payment System
Application Submission System
User Registration System
Proposed Key Applications
11
![Page 13: n Undersecretary for Legal Affairs - PPP Center€¦ · - Reduction in physical appearance Updated To-Be Process 9 1.1.1 1.1.2 Pre-Evaluation of Application Filing Assessment of Fees](https://reader036.vdocuments.us/reader036/viewer/2022070900/5f3701beb2a2bd04fb7d7293/html5/thumbnails/13.jpg)
Project Background
Project Objectives
Proposed PPP Structure
Bidding Process & Pre Qualification Criteria
Agenda
12
![Page 14: n Undersecretary for Legal Affairs - PPP Center€¦ · - Reduction in physical appearance Updated To-Be Process 9 1.1.1 1.1.2 Pre-Evaluation of Application Filing Assessment of Fees](https://reader036.vdocuments.us/reader036/viewer/2022070900/5f3701beb2a2bd04fb7d7293/html5/thumbnails/14.jpg)
Type of Agreement Build-Transfer-Operate (BTO)
Implementing
Agency
DOTC/LTFRB
Terms of payment
• Monthly Availability Based Payments (ABP)
• During Operations Period of 10 years, begin after the
application development and installation period
Concession Period • 11.5 years, including 1.5 years for the application
development and installation period.
Transfer of Assets to
the Implementing
Agency
Post installation period, the Concessionaire will
• Transfer legal ownership of all IT Hardware
Infrastructure, IT Software, Application Database after the
installation period
• Transfer physical ownership of a part of IT hardware
infrastructure after the concession period
Proposed Project Structure
13
![Page 15: n Undersecretary for Legal Affairs - PPP Center€¦ · - Reduction in physical appearance Updated To-Be Process 9 1.1.1 1.1.2 Pre-Evaluation of Application Filing Assessment of Fees](https://reader036.vdocuments.us/reader036/viewer/2022070900/5f3701beb2a2bd04fb7d7293/html5/thumbnails/15.jpg)
Responsibility of the Concessionaire
14
1. Design, development and installation of a robust, secured and re-
engineered automated business process work for LTFRB’s core
processes specified in its Citizen’s Charter;
2. Development of an on-line database of franchise information;
3. Data verification, data migration and conversion of existing records
into an online database with scanned copies of all relevant records;
4. Procurement, installation, operations and management of the
following:
IT hardware equipment including requisite replacements and
IT software and IT network development and enablement
(including firewall and security);
![Page 16: n Undersecretary for Legal Affairs - PPP Center€¦ · - Reduction in physical appearance Updated To-Be Process 9 1.1.1 1.1.2 Pre-Evaluation of Application Filing Assessment of Fees](https://reader036.vdocuments.us/reader036/viewer/2022070900/5f3701beb2a2bd04fb7d7293/html5/thumbnails/16.jpg)
Responsibilities of the Concessionaire
15
contd…
5. Ensuring availability and security of entire IT infrastructure and all
other related activities related to core processes of LTFRB
6. Training and knowledge transfer to LTFRB with regard to the
system architecture and applications;
7. Refresh of IT infrastructure at the sixth (6) year of operations;
8. Ensuring that system design includes:
adequate redundancy and
adequate Business Continuity Planning and Disaster
Recovery Planning
9. One half of the cost of Project Management/ Independent
Consultant (PMC/ IC).
![Page 17: n Undersecretary for Legal Affairs - PPP Center€¦ · - Reduction in physical appearance Updated To-Be Process 9 1.1.1 1.1.2 Pre-Evaluation of Application Filing Assessment of Fees](https://reader036.vdocuments.us/reader036/viewer/2022070900/5f3701beb2a2bd04fb7d7293/html5/thumbnails/17.jpg)
Responsibilities of the Grantor
16
1. One half of the cost of Project Management/ Independent
Consultant (PMC/ IC).
2. Tie-up with Bank to provide on-line payment facility to the operators
3. Identify rules for data validation and confirm that entire volume of
existing data has been migrated accurately
4. Provide office space to the 17 professionals for 1 year (within the
premises of LTFRB offices at each of the 17 locations)
5. Retain the right to charge User Fees from the Operators/
Franchises directly
![Page 18: n Undersecretary for Legal Affairs - PPP Center€¦ · - Reduction in physical appearance Updated To-Be Process 9 1.1.1 1.1.2 Pre-Evaluation of Application Filing Assessment of Fees](https://reader036.vdocuments.us/reader036/viewer/2022070900/5f3701beb2a2bd04fb7d7293/html5/thumbnails/18.jpg)
Land Transport
Franchising and Regulatory Board
(LTFRB)
Concessionaire
Develop IT
Infrastructure for
the LTFRB based
on contract terms
Operators
Provide furnished
space for
development of
kiosks
Bureau of Treasury
and Revenue/ Project Bank
Account
Transfer revenue
and user charges
collected
Payment of ABPs based on pre-
specified Key Performance
Indicators (KPIs)
Operate, Maintain IT
infrastructure for
the LTFRB for a
period of 10 years
Financing
Institutions Provides project finance to
the Concessionaire
Hand over IT
infrastructure to
the LTFRB after the
period has elapsed
Transfer legal
ownership of IT
Infrastructure to
LTFRB
Proposed Transaction Structure
17
![Page 19: n Undersecretary for Legal Affairs - PPP Center€¦ · - Reduction in physical appearance Updated To-Be Process 9 1.1.1 1.1.2 Pre-Evaluation of Application Filing Assessment of Fees](https://reader036.vdocuments.us/reader036/viewer/2022070900/5f3701beb2a2bd04fb7d7293/html5/thumbnails/19.jpg)
Project Background
Project Objectives
Proposed PPP Structure
Bidding Process & Pre Qualification Criteria
Agenda
18
![Page 20: n Undersecretary for Legal Affairs - PPP Center€¦ · - Reduction in physical appearance Updated To-Be Process 9 1.1.1 1.1.2 Pre-Evaluation of Application Filing Assessment of Fees](https://reader036.vdocuments.us/reader036/viewer/2022070900/5f3701beb2a2bd04fb7d7293/html5/thumbnails/20.jpg)
Instructions to Bidders (ITB) including Draft Concession Agreements and Minimum Performance Standards and Specifications to be shared with Pre-Qualified Bidders
Evaluation of Pre-Qualification applications and announcement of Pre-Qualified Bidders for the 2nd stage
Issuance of Instructions to Prospective Bidders (ITPB) for Pre-Qualification of Prospective Bidders
Two- stage public bidding process in accordance with Philippine RA No. 7718 (“ BOT Law”) and its Revised IRR (2012) (“Revised IRR”)
Bidding Process
19
![Page 21: n Undersecretary for Legal Affairs - PPP Center€¦ · - Reduction in physical appearance Updated To-Be Process 9 1.1.1 1.1.2 Pre-Evaluation of Application Filing Assessment of Fees](https://reader036.vdocuments.us/reader036/viewer/2022070900/5f3701beb2a2bd04fb7d7293/html5/thumbnails/21.jpg)
Notice of Award to be issued to the Winning Bidder
Announcement of Winning Bidder as per the provisions of the ITB documents
Financial Proposal Evaluation of Prospective Bidders whose Technical Proposal has passed the evaluation criteria
Evaluation of Technical Proposals
Submission of Bid Proposals, including technical and financial proposals, by the Pre-Qualified Bidders
Bidding Process
20
![Page 22: n Undersecretary for Legal Affairs - PPP Center€¦ · - Reduction in physical appearance Updated To-Be Process 9 1.1.1 1.1.2 Pre-Evaluation of Application Filing Assessment of Fees](https://reader036.vdocuments.us/reader036/viewer/2022070900/5f3701beb2a2bd04fb7d7293/html5/thumbnails/22.jpg)
• The Prospective Bidder must be either:
a partnership or corporation registered with the Philippine
Securities and Exchange Commission (SEC) or appropriate
government agency in the foreign country in case of foreign entity
a Consortium whose members must be partnerships or
corporations registered with the SEC or the appropriate
government agency in the foreign country in case of a foreign
entity
• If an Affiliate of a Prospective Bidder or Consortium Member is
proposed to meet either the Technical Qualification Requirements or
Financial Capability Requirements, such proposed entity must
remain an Affiliate of such Prospective Bidder or Consortium
Member during the lock-up period
Qualification Criteria – Legal Requirements
21
![Page 23: n Undersecretary for Legal Affairs - PPP Center€¦ · - Reduction in physical appearance Updated To-Be Process 9 1.1.1 1.1.2 Pre-Evaluation of Application Filing Assessment of Fees](https://reader036.vdocuments.us/reader036/viewer/2022070900/5f3701beb2a2bd04fb7d7293/html5/thumbnails/23.jpg)
• The Prospective Bidder should be in the Information
Technology/ IT consulting / IT Integration/ IT Solutions/ Managed
Services business for at least five (5) years as of 31
December 2014
• The Prospective Bidder or a related entity, as described below,
should be a CMM level 3 (or higher) or a CMMi level 3 (or
higher) organization.
The related entity that fulfils this requirement may be:
Qualification Criteria – Technical Requirements
22
If the Prospective Bidder is a
partnership or corporation
i. The Prospective Bidder itself; or
ii. An Affiliate of the Prospective Bidder
(but not a Contractor)
If the Prospective Bidder is a
Consortium
i. The Lead Member; or
ii. An Affiliate of the Lead Member
![Page 24: n Undersecretary for Legal Affairs - PPP Center€¦ · - Reduction in physical appearance Updated To-Be Process 9 1.1.1 1.1.2 Pre-Evaluation of Application Filing Assessment of Fees](https://reader036.vdocuments.us/reader036/viewer/2022070900/5f3701beb2a2bd04fb7d7293/html5/thumbnails/24.jpg)
Qualification Criteria – Technical Requirements
23
System Integration Experience:
The Prospective Bidder must demonstrate that it has experience with
System Integration projects in the past.
It should provide at least two client references for
implementation of integrated projects
The projects should have
the following aspects
• Software development
• System maintenance and technical helpdesk
support
The two SI projects listed
should have all the following
components
• Database Setup
• Web based Application Software
• Workflow Management System
• Document Management System
• Web portal
• Electronic Forms
![Page 25: n Undersecretary for Legal Affairs - PPP Center€¦ · - Reduction in physical appearance Updated To-Be Process 9 1.1.1 1.1.2 Pre-Evaluation of Application Filing Assessment of Fees](https://reader036.vdocuments.us/reader036/viewer/2022070900/5f3701beb2a2bd04fb7d7293/html5/thumbnails/25.jpg)
Qualification Criteria – Technical Requirements
24
System Integration Experience:
The Prospective Bidder or a related entity should have
successfully completed the software development for
each of these two projects
Provided technical and helpdesk support for at least five
years for both these projects
The completion date of software system development
should be within the last ten (10) years from the
Qualification Documents Submission Date.
The minimum revenue receipt for each of these two projects
should be at least PhP 150 Million each project
![Page 26: n Undersecretary for Legal Affairs - PPP Center€¦ · - Reduction in physical appearance Updated To-Be Process 9 1.1.1 1.1.2 Pre-Evaluation of Application Filing Assessment of Fees](https://reader036.vdocuments.us/reader036/viewer/2022070900/5f3701beb2a2bd04fb7d7293/html5/thumbnails/26.jpg)
Hardware Products Installation Experience:
The Prospective Bidder should have completed at least two (2)
projects where the Prospective Bidder has delivered and
operationalized hardware products covering servers and
networking equipment
The revenue received on account of installation of servers and
networking equipment from each of these two projects should
be at least PhP 50 Million
The revenue received amount should not include revenue from
desktops, or other similar client-site equipment provided in the
project.
The date of completion of each of these projects should be within
the last seven (7) years from the Qualification Documents
Submission Date.
Qualification Criteria – Technical Requirements
25
![Page 27: n Undersecretary for Legal Affairs - PPP Center€¦ · - Reduction in physical appearance Updated To-Be Process 9 1.1.1 1.1.2 Pre-Evaluation of Application Filing Assessment of Fees](https://reader036.vdocuments.us/reader036/viewer/2022070900/5f3701beb2a2bd04fb7d7293/html5/thumbnails/27.jpg)
The Prospective Bidder has to submit at least one (1) and a
maximum of two (2) CVs of personnel in each of the following
categories:
1. Program Manager
2. System Architect
3. Database Administrator
4. Network Administrator
5. System Analyst
It is clarified that one person’s CV cannot be submitted for two different
positions.
Qualification Criteria - Key Personnel
26
![Page 28: n Undersecretary for Legal Affairs - PPP Center€¦ · - Reduction in physical appearance Updated To-Be Process 9 1.1.1 1.1.2 Pre-Evaluation of Application Filing Assessment of Fees](https://reader036.vdocuments.us/reader036/viewer/2022070900/5f3701beb2a2bd04fb7d7293/html5/thumbnails/28.jpg)
• The Prospective Bidder or a related entity, as described below, must
have a Net Worth at least PhP 150 Million
The related entity that fulfils this requirement may be:
Qualification Criteria – Financial Requirements
27
If the Prospective Bidder is a
partnership or corporation
• The Prospective Bidder itself; or
• An Affiliate of the Prospective Bidder
If the Prospective Bidder is a
Consortium
• A single Consortium Member with at least
twenty percent (20%) interest in the
Consortium; or
• An Affiliate of a Consortium Member with at least
twenty percent (20%) interest in the Consortium
![Page 29: n Undersecretary for Legal Affairs - PPP Center€¦ · - Reduction in physical appearance Updated To-Be Process 9 1.1.1 1.1.2 Pre-Evaluation of Application Filing Assessment of Fees](https://reader036.vdocuments.us/reader036/viewer/2022070900/5f3701beb2a2bd04fb7d7293/html5/thumbnails/29.jpg)
Event Timeline*
Qualification Documents Submission Date Friday, October 2, 2015
Notification of the results of evaluation of the
Qualification Documents
Thursday, October 22, 2015 (or
earlier)
Issuance of Instructions to Bidders and Draft
Concession Agreement
TBD
Issuance of Final Bidding Documents January 2016
Bid Proposals Submission Date and Opening
of Technical Proposals
February 2016
Issuance of Notice of Award March 2016
*Timelines are tentative and subject to change
Bidding Process – Indicative Timeline
28
![Page 30: n Undersecretary for Legal Affairs - PPP Center€¦ · - Reduction in physical appearance Updated To-Be Process 9 1.1.1 1.1.2 Pre-Evaluation of Application Filing Assessment of Fees](https://reader036.vdocuments.us/reader036/viewer/2022070900/5f3701beb2a2bd04fb7d7293/html5/thumbnails/30.jpg)
Question & Answer
Session