n. tryon st. dorton st. - charlotte, nc · dorton st. n. tryon st. greensboro st. raleigh st. e....

1
CATS PARK-N-RIDE DECK 34.00' 22.50' RALEIGH ST. RALEIGH ST. RALEIGH ST. E. CRAIGHEAD RD. PHILEMON AVE. E. SUGAR CREEK RD. GREENSBORO ST. DORTON ST. N. TRYON ST. GREENSBORO ST. RALEIGH ST. E. SUGAR CREEK ROAD BRIDGE BRIDGE WALL, PINCH POINT BRIDGE COLUMNS HOLD EXISTING CENTERLINE HOLD EXISTING CENTERLINE HOLD EXISTING CENTERLINE HOLD EXISTING RIGHT CURB LINE PROPERTY LINE HOLD EXISTING RIGHT CURB LINE HOLD EXISTING CENTERLINE PER APPROVED REZONING HOLD EXISTING RIGHT CURB LINE EXTENTS OF NEW PUBLIC STREET BY DEVELOPER PER REZONING 2017-121, FUTURE CONNECTION TO DORTON ST. ALIGNMENT TO BE DETERMINED BY FUTURE DEVELOPMENT ALIGNMENT TO BE DETERMINED BY FUTURE DEVELOPMENT DORTON ST. HOLD EXISTING RIGHT CURB LINE SCALE: 1"=80' 0 40' 80' 160' 40' PN_1017244 CROSS CHARLOTTE TRAIL | PROPOSED ALIGNMENT CRAIGHEAD TO WELLINGFORD 12' TWO-WAY CYCLE TRACK 8' SIDEWALK 8' PLANT STRIP & 1' / 5' BUFFER 2'-6" CURB & GUTTER INTERIM CONDITION AT DORTON STREET CONNECTION PREFERRED SECTION (77' R.O.W.) 2.0' 12.0' 5.0' 8.0' 8.0' 8.0' 8.0' 2.5' 2.5' 1.0' 10.0' 10.0' RIGHT LEFT

Upload: others

Post on 09-Jun-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: N. TRYON ST. DORTON ST. - Charlotte, NC · dorton st. n. tryon st. greensboro st. raleigh st. e. sugar creek road bridge bridge wall, pinch point bridge columns hold existing centerline

CATS

PARK-N-RIDE

DECK

34.00'

22.50'

R

A

LE

IG

H

S

T.

R

A

LE

IG

H

S

T.

R

A

L

E

I

G

H

S

T

.

E

.

C

R

A

I

G

H

E

A

D

R

D

.

P

H

I

L

E

M

O

N

A

V

E

.

E

.

S

U

G

A

R

C

R

E

E

K

R

D

.

G

R

E

E

N

S

B

O

R

O

S

T

.

DO

RT

ON

S

T.

N. T

RY

ON

ST

.

G

R

E

E

N

S

B

O

R

O

S

T

.

R

A

L

E

IG

H

S

T

.

E. SUGAR CREEK ROAD BRIDGE

BRIDGE WALL,

PINCH POINT

BRIDGE COLUMNS

HOLD EXISTING

CENTERLINE

HOLD EXISTING

CENTERLINE

HOLD EXISTING

CENTERLINE

HOLD EXISTING

RIGHT CURB LINE

PROPERTY LINE

HOLD EXISTING

RIGHT CURB LINE

HOLD EXISTING

CENTERLINE PER

APPROVED REZONING

HOLD EXISTING

RIGHT CURB LINE

EXTENTS OF NEW PUBLIC

STREET BY DEVELOPER PER

REZONING 2017-121, FUTURE

CONNECTION TO DORTON ST.

ALIGNMENT TO BE

DETERMINED BY FUTURE

DEVELOPMENT

ALIGNMENT TO BE

DETERMINED BY

FUTURE DEVELOPMENT

DO

RT

ON

S

T.

HOLD EXISTING

RIGHT CURB LINE

SCALE: 1"=80'

0 40' 80' 160'40'

PN_1017244

CROSS CHARLOTTE TRAIL | PROPOSED ALIGNMENT

CRAIGHEAD TO WELLINGFORD

12' TWO-WAY CYCLE TRACK

8' SIDEWALK

8' PLANT STRIP & 1' / 5' BUFFER

2'-6" CURB & GUTTER

INTERIM CONDITION AT DORTON STREET CONNECTION

PREFERRED SECTION (77' R.O.W.)

2.0'

12.0'

5.0'

8.0'

8.0'

8.0'

8.0'

2.5'

2.5'

1.0'

10.0'

10.0'

RIGHT

LEFT